CN108862071B CN201810959501.0A CN201810959501A CN108862071B CN 108862071 B CN108862071 B CN 108862071B CN 201810959501 A CN201810959501 A CN 201810959501A CN 108862071 B CN108862071 B CN 108862071B
Authority
CN
China
Prior art keywords
hoisting
hoist cable
wirerope
pulley mechanism
boom hoisting
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201810959501.0A
Other languages
Chinese (zh)
Other versions
CN108862071A (en
Inventor
赵旭
丁海明
晏桂珍
杨照东
李大鹏
马淋淋
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shandong Nuclear Power Equipment Manufacturing Co Ltd
Original Assignee
Shandong Nuclear Power Equipment Manufacturing Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shandong Nuclear Power Equipment Manufacturing Co Ltd filed Critical Shandong Nuclear Power Equipment Manufacturing Co Ltd
Priority to CN201810959501.0A priority Critical patent/CN108862071B/en
Publication of CN108862071A publication Critical patent/CN108862071A/en
Application granted granted Critical
Publication of CN108862071B publication Critical patent/CN108862071B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66DCAPSTANS; WINCHES; TACKLES, e.g. PULLEY BLOCKS; HOISTS
    • B66D1/00Rope, cable, or chain winding mechanisms; Capstans
    • B66D1/02Driving gear
    • B66D1/14Power transmissions between power sources and drums or barrels
    • B66D1/20Chain, belt, or friction drives, e.g. incorporating sheaves of fixed or variable ratio
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66CCRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
    • B66C1/00Load-engaging elements or devices attached to lifting or lowering gear of cranes or adapted for connection therewith for transmitting lifting forces to articles or groups of articles
    • B66C1/10Load-engaging elements or devices attached to lifting or lowering gear of cranes or adapted for connection therewith for transmitting lifting forces to articles or groups of articles by mechanical means
    • B66C1/12Slings comprising chains, wires, ropes, or bands; Nets
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66DCAPSTANS; WINCHES; TACKLES, e.g. PULLEY BLOCKS; HOISTS
    • B66D2700/00Capstans, winches or hoists
    • B66D2700/02Hoists or accessories for hoists
    • B66D2700/026Pulleys, sheaves, pulley blocks or their mounting

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Load-Engaging Elements For Cranes (AREA)
  • Jib Cranes (AREA)

Abstract

The present invention relates to a kind of metal containment hoist cable method for dismounting, comprising: step 1: in cylinder ring periphery mounting bracket.Step 2: boom hoisting being installed on bracket, the solderless wrapped connection hoisting wirerope on cylinder ring upper installation pulley mechanism suitable for reading, the pulley mechanism, described hoisting wirerope one end is connect with boom hoisting, and the other end connects around the end to be removed of pulley mechanism and hoist cable.Step 3: starting boom hoisting tenses hoisting wirerope, closes boom hoisting.Step 4: removing the attachment device of hoist cable and cylinder ring inner wall lifting lifting lug.Step 5: being again started up boom hoisting, lengthen hoisting wirerope, and rope end to be removed is placed into free state.Step 6: the end of hoist cable free state and hoisting wirerope being separated, changes boom hoisting and pulley mechanism position, removes the hoist cable at remaining suspension centre.Step 7: packing up boom hoisting, hoisting wirerope and pulley mechanism, striking.Method of the invention is at low cost, highly-safe.

Description

A kind of metal containment hoist cable method for dismounting
Technical field
The present invention relates to metal containment mounting technique fields, and in particular to a kind of metal containment hoist cable method for dismounting.
Background technique
Metal containment is one of the key equipment of AP/CAP series passive PWR nuclear power station passive cooling system.Steel The features such as containment vessel is the Free Station vertical vessel with lower head in elliposoidal, big with internal diameter, and whole height is high.It builds 5 modular segments are divided into during making, are followed successively by bottom (head), one ring of cylinder, two ring of cylinder, cylinder tricyclic, closedtop from the bottom to top Head.
Be illustrated by taking two ring of metal containment cylinder as an example: two ring of metal containment cylinder is that interior diameter is 43m, is highly 15.64m, the upper and lower opening thin-walled cylinder that wall thickness is 52mm.Two ring of cylinder is put more energy into totally by 4 layers of (48 pieces) cylinder board, 1 inside The groups such as rib, several piece accessory plate are welded.Two ring of cylinder is self-possessed 966 tons.
When five big ring segment hoisting Design of metal containment, using more liftings with hoist cable (comprising top connector, wirerope The parts such as (diameter 100mm or so), rod segment containing adjustable thread) lower end is connected directly to major ring segment lifting lifting lug.It hangs because of every Rope gross weight is at 3 tons or so, and hoist cable lower end is connected to major ring segment lifting lifting lug, and there are certain difficulty;Major ring segment lifting is completed Afterwards, there is also certain difficulty for the dismounting of hoist cable.
The prior art removes lifting hoist cable according to truck crane or tower crane, will be present because sling height is inadequate or arm is opened up not Foot leads to not the problem of removing hoist cable.It is connected in addition, being removed using the direct haulage cable end of crane with chamber wall lifting lug The hoist cable connect is unsatisfactory in " crane safety operating instruction " requirement of " ten do not hang " its " the askew extension that skews is not hung ", and there are safety Hidden danger.
Summary of the invention
The purpose of the present invention is to overcome above-mentioned the deficiencies in the prior art, solving, large diameter thin wall open containers are suitable for reading to be added Admittedly with wirerope and the lifting installation of wirerope and removing problem, when operation, the safety regulation for operations of lifting appliance is met, Avoid security risk.
To achieve the above object, the present invention adopts the following technical solutions:
A kind of metal containment hoist cable method for dismounting, comprising the following steps:
Step 1: in cylinder ring periphery mounting bracket.
Step 2: boom hoisting being removably installed on bracket, in cylinder ring dismountable installation turbine suitable for reading Structure, solderless wrapped connection hoisting wirerope on the pulley mechanism, described hoisting wirerope one end are connect with boom hoisting, and the other end is around sliding The end to be removed for taking turns mechanism and hoist cable connects, hoisting wirerope rope section and pulley mechanism between the pulley mechanism, hoist cable, Hoisting wirerope rope section between device for hoisting is in same perpendicular.
Step 3: starting boom hoisting tenses hoisting wirerope, closes boom hoisting.
Step 4: removing the attachment device of hoist cable and cylinder ring inner wall lifting lifting lug.
Step 5: being again started up boom hoisting, lengthen hoisting wirerope, and rope end to be removed is placed into free shape State.
Step 6: the end of hoist cable free state and hoisting wirerope are separated, lower boom hoisting and pulley mechanism are dismantled, Change boom hoisting and pulley mechanism position, the hoist cable at remaining suspension centre is removed using the method for step 1- step 5.
Step 7: packing up boom hoisting, hoisting wirerope and pulley mechanism, striking.
Further, the boom hoisting uses hoist engine.
Further, the bracket is set up on the ground or is welded in cylinder ring outer peripheral sidewall.
Further, the upper surface of the bracket is close to cylinder ring position of upper.
Further, the hoisting wirerope is fixedly connected by hanging belt and shackle with rope end to be removed.
Further, the bearing capacity of the hoisting wirerope is 2 tons -3 tons.
Beneficial effects of the present invention:
1. the present invention uses pulley structure, hoisting wirerope and hoist engine, the equipment used is simple, wants to the ability of equipment Ask lower, it is at low cost.
2. the present invention reduces the end of hoist cable by the lengthen method of wirerope of hoist engine, " crane safety is avoided Operating instruction " in " ten do not hang " its " askew skew extension do not hang " the phenomenon that, ensure that the safety of construction.
3. hoist engine and pulley of the invention all for convenience of mobile equipment, are removed the hoist cable of many places suspension centre on cylinder ring Position is reachable.Avoid truck crane or the problem of tower crane can not reach removal position.
Detailed description of the invention
The accompanying drawings constituting a part of this application is used to provide further understanding of the present application, and the application's shows Meaning property embodiment and its explanation do not constitute the restriction to the application for explaining the application.
Fig. 1 is operation principle schematic diagram of the present invention;
Wherein, 1. bottom (head), 2. cylinder rings, 3. lifting lifting lugs, 4. hoist cables, 5. brackets, 6. hoist engines, 7. pulley mechanisms, 8. hoisting wirerope.
Specific embodiment
It is noted that following detailed description is all illustrative, it is intended to provide further instruction to the application.Unless another It indicates, all technical and scientific terms used herein has usual with the application person of an ordinary skill in the technical field The identical meanings of understanding.
It should be noted that term used herein above is merely to describe specific embodiment, and be not intended to restricted root According to the illustrative embodiments of the application.As used herein, unless the context clearly indicates otherwise, otherwise singular Also it is intended to include plural form, additionally, it should be understood that, when in the present specification using term "comprising" and/or " packet Include " when, indicate existing characteristics, step, operation, device, component and/or their combination.
In order to facilitate narration, if there is "upper", "lower", " left side " " right side " printed words in the present invention, only expression and attached drawing itself Upper and lower, left and right direction it is consistent, not to structure rise restriction effect, it is only for convenient for description the present invention and simplification retouch It states, rather than the equipment of indication or suggestion meaning or element must have a particular orientation, and be constructed and operated in a specific orientation, Therefore it is not considered as limiting the invention.
As background technique is introduced, the prior art removes metal containment hoist cable according to truck crane or tower crane, will There are problems that because sling height is inadequate or arm exhibition deficiency leads to not remove hoist cable, in addition, using the direct traction steel wire of crane The hoist cable being connected with chamber wall lifting lug is removed in rope end, and being unsatisfactory in " crane safety operating instruction " " ten do not hang ", it is " askew Skew hang do not hang " requirement, there are security risks, are torn open in view of the above-mentioned problems, present applicant proposes a kind of metal containments with hoist cable Except method.
In a kind of exemplary embodiment of the application, as shown in Figure 1, need to 1 upper shell ring of bottom (head) 2 place suitable for reading with The hoist cable 4 that lifting lifting lug 3 connects is removed, a kind of metal containment hoist cable method for dismounting, comprising the following steps:
Step 1: the mounting bracket 5 in cylinder ring periphery.
For a lower height of cylinder ring, bracket is installed on ground, the bracket can be used welding for steel structure and be made, For higher-height cylinder ring, bracket is welded in the outside circumference of cylinder ring, can be in the outer of cylinder ring when practice of construction Multiple locating pieces are welded on circumference side, support plate is set up on locating piece, and locating piece and support plate constitute bracket, use completion Afterwards, then striking.The rack upper surface minimizes following hoisting wireropes at cylinder ring position of upper Length saves material, reduces cost, in presently filed embodiment, using the side of the welding support in cylinder ring circumferential lateral surface Method.
Step 2: boom hoisting being installed on bracket, the boom hoisting uses hoist engine 6, and hoist engine is common lifting Device, cost is relatively low, and hoist engine is detachably arranged on bracket by bolt, passes through bolt on cylinder ring end face suitable for reading It is dismountable that pulley mechanism 7, solderless wrapped connection hoisting wirerope 8, described hoisting wirerope one end and elevator on the pulley mechanism are installed Machine connection, the other end are attached around the end to be removed of pulley mechanism and hoist cable by hanging belt and shackle, hoist engine and cunning The hoisting wirerope rope section for taking turns hoisting wirerope rope section and pulley mechanism and rope end to be removed between mechanism is erected same In straight plane, askew the phenomenon that skewing extension is avoided, the hoisting wirerope bearing capacity is 2 tons -3 tons, is met strong when lifting by crane Degree requires.
Step 3: starting hoist engine tenses hoisting wirerope to suitable state, is then shut off hoist engine, makes to lift by crane steel wire Rope keeps tension.
Step 4: removing the attachment devices such as shackle between hoist cable and cylinder ring inner wall lifting lifting lug, when dismounting, can be used Chain block is assisted.
Step 5: being again started up hoist engine, lengthen hoisting wirerope, and rope end to be removed is placed under the effect of gravity To free state.
Step 6: removing the hanging belt between hoist cable and hoisting wirerope and shackle, by the end of hoist cable free state and rise It hangs wirerope to separate, traveling hoisting machine and pulley mechanism change hoist engine and pulley mechanism position, using step 1- step 5 Method removes the hoist cable at remaining suspension centre.
Step 7: after the hoist cable of all suspension centres is removed, packing up hoist engine, hoisting wirerope and pulley mechanism, remove branch Frame.
Using method for dismounting of the invention, hoisting wirerope rope section and pulley mechanism between hoist engine and pulley mechanism with The hoisting wirerope rope section of rope end to be removed is dropped in same perpendicular by the lengthen method of wirerope of hoist engine The end of low hoist cable, guarantees the phenomenon that avoiding in " crane safety operating instruction " " ten do not hang " its " askew skew extension do not hang " The safety of construction.
Hoist engine and pulley mechanism are moved easily, and are met the dismounting requirement of each suspension centre hoist cable on cylinder ring, are avoided The problem of truck crane or tower crane can not reach removal position.And hoist engine is existing conventional lifting appliance, pulley mechanism It also is conventional structure, it is at low cost.
Above-mentioned, although the foregoing specific embodiments of the present invention is described with reference to the accompanying drawings, not protects model to the present invention The limitation enclosed, those skilled in the art should understand that, based on the technical solutions of the present invention, those skilled in the art are not Need to make the creative labor the various modifications or changes that can be made still within protection scope of the present invention.

Claims (6)

1. a kind of metal containment hoist cable method for dismounting, which comprises the following steps:
Step 1: in cylinder ring periphery mounting bracket;
Step 2: boom hoisting being removably installed on bracket, in cylinder ring dismountable installation pulley mechanism suitable for reading, institute Solderless wrapped connection hoisting wirerope on pulley mechanism is stated, described hoisting wirerope one end is connect with boom hoisting, and the other end bypasses turbine The connection of the end to be removed of structure and hoist cable, hoisting wirerope rope section and pulley mechanism, lifting between the pulley mechanism, hoist cable Hoisting wirerope rope section between setting is in same perpendicular;
Step 3: starting boom hoisting tenses hoisting wirerope, closes boom hoisting;
Step 4: removing the attachment device of hoist cable and cylinder ring inner wall lifting lifting lug;
Step 5: being again started up boom hoisting, lengthen hoisting wirerope, and rope end to be removed is placed into free state;
Step 6: the end of hoist cable free state and hoisting wirerope being separated, lower boom hoisting and pulley mechanism is dismantled, changes Boom hoisting and pulley mechanism position remove the hoist cable at remaining suspension centre using the method for step 1- step 5;
Step 7: packing up boom hoisting, hoisting wirerope and pulley mechanism, striking.
2. a kind of metal containment hoist cable method for dismounting as described in claim 1, which is characterized in that the boom hoisting uses Hoist engine.
3. a kind of metal containment hoist cable method for dismounting as described in claim 1, which is characterized in that the bracket rides upon ground On face or it is welded in cylinder ring outer peripheral sidewall.
4. a kind of metal containment hoist cable method for dismounting as claimed in claim 3, which is characterized in that the upper surface of the bracket Close to cylinder ring position of upper.
5. a kind of metal containment hoist cable method for dismounting as described in claim 1, which is characterized in that the hoisting wirerope is logical Hanging belt and shackle is crossed to be fixedly connected with rope end to be removed.
6. a kind of metal containment hoist cable method for dismounting as described in claim 1, which is characterized in that the hoisting wirerope Bearing capacity is 2 tons -3 tons.
CN201810959501.0A 2018-08-22 2018-08-22 A kind of metal containment hoist cable method for dismounting Active CN108862071B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810959501.0A CN108862071B (en) 2018-08-22 2018-08-22 A kind of metal containment hoist cable method for dismounting

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810959501.0A CN108862071B (en) 2018-08-22 2018-08-22 A kind of metal containment hoist cable method for dismounting

Publications (2)

Publication Number Publication Date
CN108862071A CN108862071A (en) 2018-11-23
CN108862071B true CN108862071B (en) 2019-11-19

Family

ID=64321538

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810959501.0A Active CN108862071B (en) 2018-08-22 2018-08-22 A kind of metal containment hoist cable method for dismounting

Country Status (1)

Country Link
CN (1) CN108862071B (en)

Family Cites Families (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101967886B (en) * 2010-11-16 2013-06-05 中国核工业第五建设有限公司 Assembly and installation methods of steel containment vessel of nuclear power station
CN102855947B (en) * 2012-09-21 2015-03-11 国核工程有限公司 Temporary roof cover of nuclear island safety shell
CN203846786U (en) * 2014-04-11 2014-09-24 沈阳工业安装工程股份有限公司 Nuclear power containment upper end socket and lower end socket assembly jig frame structure
CN106081870B (en) * 2016-08-12 2017-09-22 河北省电力建设第一工程公司 A kind of nuclear power station steel dome balances hanging method
CN106744311B (en) * 2016-12-22 2018-09-18 中国核工业二四建设有限公司 A kind of nuclear power plant containment shell steel lining module hanging method
CN106395605B (en) * 2016-12-22 2018-09-18 中国核工业二四建设有限公司 A kind of nuclear power plant steel lining module Lift-on/Lift-off System

Also Published As

Publication number Publication date
CN108862071A (en) 2018-11-23

Similar Documents

Publication Publication Date Title
CN104444762B (en) Wind power foundation ring overturning device and method for overturning foundation ring by using same
CN103754800A (en) Crane type multi-directional horizontal-movement multifunctional hydraulic lifting construction method
CN107887044B (en) A kind of reactor lower part in-pile component underwater centralising device at a distance
CN203461680U (en) Self-balancing hanger for nuclear power plant steel containment module
CN108862071B (en) A kind of metal containment hoist cable method for dismounting
CN103072899A (en) Hoisting technology for ultra-large type cylinder block
CN104495648A (en) Crane arm loading and unloading method and crane arm
CN106829725A (en) A kind of construction site with exempt from dismantle cage
CN110409803A (en) Dismantle the hanging method of hydraulic mould lifting device center drum circle
CN106013795B (en) The method for dismounting of thermal power station's chimney hydraulic mould lifting device
CN207048281U (en) A kind of ore deposit Jiao groove feed hopper liner installation system
CN215101491U (en) Nitrogen making machine convenient to overhaul
CN205527632U (en) Vertical well lid door opening device
CN109019293A (en) A kind of metal containment hoist cable or the attaching/detaching apparatus and application method for reinforcing wirerope
CN210944508U (en) Bearing assembly lifting appliance
CN204938717U (en) V-type diesel complete machine hoisting tool
CN209841384U (en) Load test device for chain hoist
CN102642018B (en) Steel ladle cover
CN207943765U (en) A kind of reversal hanger of list skirt engine
JPH09315760A (en) Balance of weight pulled type
CN204150990U (en) A kind of anti-fracture Electric Chain Blocks
CN210855091U (en) Simple movable heavy object vertical lifting equipment
CN108840251A (en) Upending frame is used in a kind of carrying of mechanical equipment
CN221116696U (en) Hoisting equipment for assembling excavator
CN212799288U (en) Novel ton bucket hoist and mount device

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
PE01 Entry into force of the registration of the contract for pledge of patent right
PE01 Entry into force of the registration of the contract for pledge of patent right

Denomination of invention: A method of removing slings for steel containment

Effective date of registration: 20220725

Granted publication date: 20191119

Pledgee: Agricultural Bank of China Limited Haiyang sub branch

Pledgor: SHANDONG NUCLEAR POWER EQUIPMENT MANUFACTURING Co.,Ltd.

Registration number: Y2022980011031