CN108862040B - Determine the method and device of craning weight of same - Google Patents

Determine the method and device of craning weight of same Download PDF

Info

Publication number
CN108862040B
CN108862040B CN201810798718.8A CN201810798718A CN108862040B CN 108862040 B CN108862040 B CN 108862040B CN 201810798718 A CN201810798718 A CN 201810798718A CN 108862040 B CN108862040 B CN 108862040B
Authority
CN
China
Prior art keywords
value
hoist
current
initial
predetermined number
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201810798718.8A
Other languages
Chinese (zh)
Other versions
CN108862040A (en
Inventor
郭启训
龙世文
杨凯
袁海
谢明中
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hunan Intellectual Technology Co Ltd Of Zhong Lianchong Section
Original Assignee
Hunan Intellectual Technology Co Ltd Of Zhong Lianchong Section
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hunan Intellectual Technology Co Ltd Of Zhong Lianchong Section filed Critical Hunan Intellectual Technology Co Ltd Of Zhong Lianchong Section
Priority to CN201810798718.8A priority Critical patent/CN108862040B/en
Publication of CN108862040A publication Critical patent/CN108862040A/en
Application granted granted Critical
Publication of CN108862040B publication Critical patent/CN108862040B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66CCRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
    • B66C15/00Safety gear
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66CCRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
    • B66C13/00Other constructional features or details
    • B66C13/16Applications of indicating, registering, or weighing devices

Abstract

The present invention relates to heavy industry control fields, more particularly to the method and device for determining craning weight of same.This method comprises: the initial hoist value of the multiple initial calculations of acquisition time sequentially;According to current time closest to predetermined number initial hoist value, determine the current working status of the crane;And according to the current working status, determine the current hoist value of the crane.This method and device can accurately determine the current hoist of crane, and eliminate the hopping phenomenon of hoist when crane band carries flexible, so that the security control for crane provides reliable basis.

Description

Determine the method and device of craning weight of same
Technical field
The present invention relates to heavy industry control fields, more particularly to the method and device for determining craning weight of same.
Background technique
Crane needs to prevent from leading to it because of specific run condition in its operational process as a kind of heavy industry mechanical equipment Component is impaired, thus needs to carry out security control.When in the prior art, usually realizing that crane is run using limiter of moment Security control.Crane torque limiter is a kind of real-time hoisting moment safety detection device, can be with by limiter of moment It checks the parameters such as brachium, angle, amplitude, hoist, the torque percentage when crane operation, while torque limitation can also be inquired The logging and overload recording of device.It is mostly important one of parameter that hoist, which is shown, in the numerous parameters of limiter of moment.Its His multiple functions are all to realize under the premise of hoist is correctly shown, such as cut off crane when overload recording inquiry and overload To dangerous direction operation.Thus hoist is key parameter that crane transports full security control, it is accurate determine craning weight of same for The security control of crane has very important significance.
In the prior art, the hoist precision determined by crane torque limiter can reach country under general operating condition Standard, but show that hoist value is unstable, is easy to happen jump in some special operations.For example, when crane band carries flexible Wirerope, cantilever crane, the frictional force between pulley can be caused to generate change dramatically, the frictional force of generation can not be calculated, be eventually led to Hoist display variation is big, and precision display is not achieved and requires.
Existing crane generally avoids causing oil cylinder to deform and crane band being forbidden to carry scaling operation.Only certain processes It is flexible that specially designed telescopic oil cylinder allows band to carry, and is equipped with band and carries flexible rated load weight table, when band loading capacity is greater than band Band is forbidden to carry when carrying flexible rated load weight flexible.These specially designed permissions are allowed for flexible crane is carried Accurately show current hoist, cutting band carries flexible when not allowing band to carry flexible, avoids causing the safe things such as telescopic oil cylinder fracture Therefore occur.
Summary of the invention
The purpose of the embodiment of the present invention is that providing a kind of method and device of determining craning weight of same, this method and device energy Enough accurate current hoists for determining crane, and the hopping phenomenon of hoist is eliminated, so that the security control for crane provides Reliable basis.
To achieve the goals above, the embodiment of the present invention provides a kind of method of determining craning weight of same, this method comprises: The initial hoist value of the multiple initial calculations of acquisition time sequentially;According to current time closest to predetermined number it is initial Hoist value determines the current working status of the crane;And according to the current working status, determine the crane Current hoist value.
Wherein, the basis and current time closest to predetermined number initial hoist value, determine the crane Current working status comprises determining that the change degree of the initial hoist value of the predetermined number, the change degree indicate the lifting The hoist variation degree of machine;The current working status of the crane is determined according to the change degree.
Wherein, the change degree of the initial hoist value of the determination predetermined number comprises determining that and the predetermined number The initial associated a reference value of hoist value;And relative to the base in the initial hoist value of the determining predetermined number each The change degree of quasi- value.It is described according to the change degree determine the crane the current working status comprise determining that it is described In the initial hoist value of predetermined number, first number of predetermined value is greater than relative to the change degree of a reference value;And according to First number determines the current working status.
Wherein, the change degree in the initial hoist value of the determination predetermined number each relative to a reference value It include: that variation of each relative to a reference value in the initial hoist value of the predetermined number is determined according to following equation one Degree:
Equation one:
Wherein, diIt is i-th of initial hoist value in the initial hoist value of the predetermined number relative to a reference value Change degree, MiFor described i-th initial hoist value, M is a reference value.
Wherein, a reference value is preferably the intermediate value of the initial hoist value of the predetermined number, average value or described predetermined Positioned at the average value of one of middle or both when the initial baseline value of number is arranged by the time sequencing.
Wherein, described to determine that the current working status includes: that the current time is recorded according to described first number Until, first number is greater than first number of predetermined number and first number is the predetermined number below second Number;The current of the crane is determined according to first number and the associated state subordinating degree function of second number Smoothness;When the current smoothness is greater than predetermined smoothness, determine that the current working status is steady state;And work as When the current smoothness is the predetermined smoothness or less, determine that the current working status is to hook up state or off the hook shape State, wherein when determining the current working status is steady state, first number and second number are cleared.
Wherein, the state subordinating degree function is as shown in following equation two:
Equation two:
Wherein, n is first number, and m is second number, and P is the smoothness.
Wherein, according to the current working status, the current hoist value for determining the crane may include: if it is determined that The current working status is steady state, determining and current time closest to the first predetermined number the initial hoist value Average value;It, will be described and if current initial hoist value is within predictive error relative to the error of the average value Average value is determined as the current hoist value.
According to another aspect of the present invention, a kind of device of determining craning weight of same is also provided, which includes: acquisition mould Block, the initial hoist value for the multiple initial calculations of acquisition time sequentially;Determining module is used for: according to current time Closest to predetermined number initial hoist value, determine the current working status of the crane;And according to the current work Make state, determines the current hoist value of the crane.
Wherein, according to current time closest to predetermined number initial hoist value, determine the current of the crane Working condition comprises determining that the change degree of the initial hoist value of the predetermined number, the change degree indicate the crane Hoist variation degree;The current working status of the crane is determined according to the change degree.
Wherein, the change degree of the initial hoist value of the determination predetermined number comprises determining that and the predetermined number The initial associated a reference value of hoist value;Determine that each is relative to a reference value in the initial hoist value of the predetermined number Change degree;It is described to determine that the current working status of the crane comprises determining that described make a reservation for according to the change degree In the initial hoist value of number, first number of predetermined value is greater than relative to the change degree of a reference value;And according to described First number determines the current working status.
Wherein, the determination of change degree can be realized by the equation one.
Wherein, a reference value is intermediate value, average value or the predetermined number of the initial hoist value of the predetermined number Initial baseline value by the time sequencing arrange when positioned at one of middle or both average value.
Wherein, described to determine that the current working status includes: record according to first number and described second number Until the current time, first number is greater than first number of predetermined number and first number is described predetermined Number second number below;Institute is determined according to first number and the associated state subordinating degree function of second number State the current smoothness of crane;When the current smoothness is greater than predetermined smoothness, determine that the current working status is Steady state;And when the current smoothness is the predetermined smoothness or less, determine that the current working status is Hook-shaped state or off the hook state, wherein when determining the current working status is steady state, first number and described the Two times number is cleared.
Wherein, the state subordinating degree function can be realized by the equation two.
Wherein, according to the current working status, determine that the current hoist value of the crane includes: if it is determined that described Current working status is steady state, determining and current time closest to the first predetermined number the initial hoist value it is flat Mean value;It, will be described average and if current initial hoist value is within predictive error relative to the error of the average value Value is determined as the current hoist value.
On the other hand, the present invention provides a kind of machine readable storage medium, and finger is stored on the machine readable storage medium It enables, which is used for so that the method that machine executes determining craning weight of same described herein.
Through the above technical solutions, the nearest initial hoist value according to acquisition has determined the current working status restarted, And Fuzzy Processing, with the hoist value that determination is final, the hoist thus shown are carried out to initial hoist value according to current working status Value can be avoided jump, so that the security control for crane provides reliable basis.
The other feature and advantage of the embodiment of the present invention will the following detailed description will be given in the detailed implementation section.
Detailed description of the invention
Attached drawing is to further understand for providing to the embodiment of the present invention, and constitute part of specification, under The specific embodiment in face is used to explain the present invention embodiment together, but does not constitute the limitation to the embodiment of the present invention.Attached In figure:
Fig. 1 is the flow chart of the method for determining craning weight of same according to an embodiment of the invention;
Fig. 2 is the flow chart of the method for determining craning weight of same according to another embodiment of the present invention;
Fig. 3 is to determine crane work at present in the method for determining craning weight of same according to another embodiment of the present invention The flow chart of state;
Fig. 4 is the structural block diagram of the device of determining craning weight of same according to an embodiment of the invention;And
Fig. 5 is one kind that change degree is determined in the method and device of determining craning weight of same according to an embodiment of the invention Example.
Description of symbols
10: obtaining module 20: determining module
Specific embodiment
It is described in detail below in conjunction with specific embodiment of the attached drawing to the embodiment of the present invention.It should be understood that this Locate described specific embodiment and be merely to illustrate and explain the present invention embodiment, is not intended to restrict the invention embodiment.
Fig. 1 is the flow chart of the method for determining craning weight of same according to an embodiment of the invention.This method includes following Step:
Step S110, the initial hoist value of the multiple initial calculations of acquisition time sequentially.Initial hoist value is i.e. using existing The hoist value for thering is technology to obtain.For example, the input torques such as length of boom, angle, pressure sensor real-time parameter can be limited Thus initial hoist value is calculated using the input as BP neural network in device.Initial hoist value can also utilize the prior art In other methods determine.
Step S120, according to current time closest to predetermined number initial hoist value, determine the crane Current working status.In the crane course of work, each moment can be successively obtained with time sequencing and certain time interval Initial hoist value.In the current working status for determining crane, according to apart from current time nearest predetermined number just Beginning hoist value, being capable of accurate judgement current working status.For crane, working condition generally comprises steady state, rises Hook-shaped state, off the hook state.Steady state, that is, crane hooks up before rear, off the hook normal movement or flexible state in the sky.
Step S130 determines the current hoist value of the crane according to the current working status.
Under steady state, theoretically the hoist of crane should be remained unchanged, but hoist may be due to various Factor and jump, especially for can carry out with the crane for carrying Telescopic, cantilever crane, wirerope etc. when band carries flexible Frictional force change dramatically occurs, cause hoist jump serious.In this case, if by hoist value determining in the prior art It will be unfavorable for the security control of crane as craning weight of same.The hoist value that thus present invention determines the prior art is as just Beginning hoist value, and determine based on this current working status of crane, and further determine that according to current working status final Current hoist value.Fuzzy processing is carried out to the hoist obtained in the crane course of work as a result, is jumped so as to eliminate hoist Become, to obtain accurate current hoist value.
Fig. 2 is the flow chart of the method for determining craning weight of same according to another embodiment of the present invention.As shown in Fig. 2, root Determine that current working status may include following steps according to the initial hoist value of the predetermined number:
Step S202 determines that the change degree of the initial hoist value of the predetermined number, the change degree indicate the lifting The hoist variation degree of machine.
Step S203 determines the current working status of the crane according to the change degree.
Fig. 3 is the flow chart of the process for determining crane current working status middle according to one preferred embodiment of the present invention.Such as Shown in Fig. 3, determine that the process of current working status can preferably include following steps:
Step S301, the determining initial associated a reference value of hoist value with predetermined number.A reference value can be and predetermined Several initial associated arbitrary values of hoist value, such as any one value that can be chosen in the predetermined sensitive initial value are made On the basis of be worth.
In the present invention, a reference value is preferably intermediate value, average value or the institute of the initial hoist value of the predetermined number State the average value when initial baseline value of predetermined number is arranged by the time sequencing positioned at one of middle or both.Example Such as, the initial hoist value of predetermined number can choose 9 values nearest from current time, as shown in figure 5, can successively be labeled as M1、M2……M9, at this point, M can be chosen5On the basis of be worth.If choosing 8 values nearest from current time (can be denoted as M according to production1、 M2……M8) initial value as predetermined number, a reference value can be M3And M4Average value.In addition, a reference value can also be pre- Determine the average value or intermediate value of a reference value of number.Those skilled in the art can select Else Rule to determine a reference value, such as When predetermined number is 9, M can be2And M8Average value.
Step S302 determines variation of each relative to a reference value in the initial hoist value of the predetermined number Degree.
It can determine that each is relative to the benchmark in the initial hoist value of the predetermined number according to following equation one The change degree of value:
Equation one:
Wherein, diIt is i-th of initial hoist value in the initial hoist value of the predetermined number relative to a reference value Change degree, MiFor described i-th initial hoist value, M is a reference value.
Step S303 determines in the initial hoist value of the predetermined number that the change degree relative to a reference value is greater than First number of predetermined value.For example, the predetermined value can be 0.5, when change degree is greater than 0.5, it is believed that the hoist of crane It changes greatly.The statistics available number conduct in the initial hoist value of predetermined number, relative to the change degree of a reference value greater than 0.5 First number, and the current working status is determined according to described first number.
Determine that the process of current working status can preferably comprise according to first number:
Step S304, judges whether first number that current time determines is greater than predetermined number.
Step S305 makes n that 1, n be added to indicate first number until current time when first number is greater than predetermined number Greater than first number of predetermined number.
Step S306 makes m that 1, m be added to indicate until current time when first number is less than or equal to predetermined number, the One number is the predetermined number second number below.
It is illustrated below.Until near current time, the ti that t1, t2 is calculated as to the sampling instant of initial hoist value ..., Ti indicates current time, and t1 indicates the first moment sampled to initial hoist value, with 9 values nearest apart from current time As the initial hoist value of the predetermined number, predetermined number value is 7.Assuming that current time was the 17th moment (i.e. i=17), It is delayed until the 9th moment, the current working status at current time can be determined according to 9 initial hoist values.Assuming that when from the 9th Until quarter plays current time, in the initial hoist value of 9 of each moment number of the change degree greater than 0.5 be followed successively by 5,4,6,8, 9,7,6,8,9.Then after the preceding moment executes step S304-S306, m=5, n=4.That is, making a reservation for a until current time In several initial hoist values, the number relative to the change degree of a reference value greater than 0.5 have 4 times be more than 7, have 5 times without super Cross 7.
The value of the predetermined number will affect the delay that can accurately determine current hoist, and those skilled in the art are in reality When applying the present invention, the value of predetermined number can be determined as the case may be.
Step S307, according to being determined with first number and the associated state subordinating degree function of second number The current smoothness of crane.Current smoothness indicates that current crane is intended to the degree of steady state, it may for instance be considered that When current smoothness is greater than 0.5, current working status is steady state.
In a preferred embodiment, the state subordinating degree function is as shown in following equation two:
Equation two:
Wherein, n is first number, and m is second number, and P is the smoothness.
After determining current smoothness, current working status further can be determined according to current smoothness.Specifically may include as Lower step:
Step S308, judges whether current smoothness is greater than predetermined smoothness.
Step S309 can determine that current working status is steady state if current smoothness is greater than predetermined smoothness.
Step S310, if current smoothness is less than or equal to predetermined smoothness, it is believed that current working status is to hook up Or off the hook state.
Step S311 resets m, n when determining current working status is steady state.
When the current working status of crane is determined, final current hoist can be determined according to current working status.Ginseng Fig. 2 is examined, determines that current hoist may include following steps according to current working status:
Step S204 judges whether current working status is steady state.
Step S205, if current working status is steady state, can further determine that and current time closest to the The average value of the initial hoist value of one predetermined number.
Step S206, judge current initial hoist value relative to the average value error whether in predictive error range It is interior.
Step S207, if current initial hoist value relative to the average value error in predictive error, can will The average value is determined as current hoist.When determining current working status is steady state, the actual working state of crane It may be to remain steady state, it is also possible to start to be turned from steady state to the state that hooks up or off the hook state at current time It changes.Therefore, if current initial hoist value relative to the error of the average value is within predictive error, it is believed that crane It is still run to current time with steady state.And if current initial hoist relative to the error of the average value has been more than pre- When determining error, it is believed that current working status is converted to the state of hooking up or off the hook state by steady state before.For example, the One predetermined number can be 20, and predictive error can be 8%, if the initial hoist value at current time is relative to from current time The error of the average value of the initial hoist value of nearest 20 is 9%, then it is believed that actual current working status is by before Steady state is converted to the state of hooking up or off the hook state.
In step S208, if current working status is not steady state, it is believed that current working status is to hook up State or off the hook state.
In step S209, if current working status be hook up state or off the hook state, can will current time just Beginning hoist value is determined as current hoist value.Hook up or off the hook state under, it is normal that variation, which occurs, in craning weight of same, therefore can Current initial hoist value is determined as current hoist value.Current initial hoist value can also be further processed to make For current hoist value.For example, if can use most when current initial hoist value is excessive with respect to the variation of the initial hoist value of last moment The average value at nearly two moment is as current hoist value.
Fig. 4 is the structural block diagram of the device of determining craning weight of same according to an embodiment of the invention.The device includes: to obtain Modulus block 10, the initial hoist value for the multiple initial calculations of acquisition time sequentially;Determining module 20, is used for: according to Current time closest to predetermined number initial hoist value, determine the current working status of the crane;And according to institute Current working status is stated, determines the current hoist value of the crane.
Wherein, according to current time closest to predetermined number initial hoist value, determine the current of the crane Working condition comprises determining that the change degree of the initial hoist value of the predetermined number, the change degree indicate the crane Hoist variation degree;The current working status of the crane is determined according to the change degree.
Wherein, the change degree of the initial hoist value of the determination predetermined number comprises determining that and the predetermined number The initial associated a reference value of hoist value;Determine that each is relative to a reference value in the initial hoist value of the predetermined number Change degree;It is described to determine that the current working status of the crane comprises determining that described make a reservation for according to the change degree In the initial hoist value of number, first number of predetermined value is greater than relative to the change degree of a reference value;And according to described First number determines the current working status.
Wherein, the determination of change degree can be realized by the equation one.
Wherein, a reference value is intermediate value, average value or the predetermined number of the initial hoist value of the predetermined number Initial baseline value by the time sequencing arrange when positioned at one of middle or both average value.
Wherein, described to determine that the current working status includes: record according to first number and described second number Until the current time, first number is greater than first number of predetermined number and first number is described predetermined Number second number below;Institute is determined according to first number and the associated state subordinating degree function of second number State the current smoothness of crane;When the current smoothness is greater than predetermined smoothness, determine that the current working status is Steady state;And when the current smoothness is the predetermined smoothness or less, determine that the current working status is Hook-shaped state or off the hook state, wherein when determining the current working status is steady state, first number and described the Two times number is cleared.
Wherein, the state subordinating degree function can be realized by the equation two.
Wherein, according to the current working status, determine that the current hoist value of the crane includes: if it is determined that described Current working status is steady state, determining and current time closest to the first predetermined number the initial hoist value it is flat Mean value;It, will be described average and if current initial hoist value is within predictive error relative to the error of the average value Value is determined as the current hoist value.
The details mentioned in the description of the above-mentioned method to determination craning weight of same of the invention is equally applicable to described true Act the device for determining heavy-duty machine hoist.
The optional embodiment of the embodiment of the present invention is described in detail in conjunction with attached drawing above, still, the embodiment of the present invention is simultaneously The detail being not limited in above embodiment can be to of the invention real in the range of the technology design of the embodiment of the present invention The technical solution for applying example carries out a variety of simple variants, these simple variants belong to the protection scope of the embodiment of the present invention.
It is further to note that specific technical features described in the above specific embodiments, in not lance In the case where shield, it can be combined in any appropriate way.In order to avoid unnecessary repetition, the embodiment of the present invention pair No further explanation will be given for various combinations of possible ways.
It will be appreciated by those skilled in the art that realizing that all or part of the steps in above-described embodiment device is can to pass through Program is completed to instruct relevant hardware, which is stored in a storage medium, including some instructions are used so that single Piece machine, chip or processor (processor) execute all or part of the steps of each embodiment described device of the application.And it is preceding The storage medium stated includes: USB flash disk, mobile hard disk, read-only memory (ROM, Read-Only Memory), random access memory The various media that can store program code such as (RAM, Random Access Memory), magnetic or disk.
In addition, any combination can also be carried out between a variety of different embodiments of the embodiment of the present invention, as long as it is not The thought of the embodiment of the present invention is violated, equally should be considered as disclosure of that of the embodiment of the present invention.

Claims (17)

1. a kind of method of determining craning weight of same, which is characterized in that this method comprises:
The initial hoist value of the multiple initial calculations of acquisition time sequentially;
According to current time closest to predetermined number initial hoist value, determine the current working status of the crane; And
According to the current working status, the current hoist value of the crane is determined.
2. the method according to claim 1, wherein the basis and current time closest to predetermined number Initial hoist value, determines that the current working status of the crane includes:
Determine that the change degree of the initial hoist value of the predetermined number, the change degree indicate the hoist variation journey of the crane Degree;
The current working status of the crane is determined according to the change degree.
3. according to the method described in claim 2, it is characterized in that, the change of the initial hoist value of the determination predetermined number Change degree includes:
The determining initial associated a reference value of hoist value with the predetermined number;And
Determine change degree of each relative to a reference value in the initial hoist value of the predetermined number,
The current working status that the crane is determined according to the change degree includes:
It determines in the initial hoist value of the predetermined number, the change degree relative to a reference value is greater than first of predetermined value Number;And
The current working status is determined according to described first number.
4. according to the method described in claim 3, it is characterized in that, every in the initial hoist value of the determination predetermined number One includes: relative to the change degree of a reference value
Change degree of each relative to a reference value in the initial hoist value of the predetermined number is determined according to the following formula:
Wherein, diFor variation of i-th of initial hoist value relative to a reference value in the initial hoist value of the predetermined number Degree, MiFor described i-th initial hoist value, M is a reference value.
5. the method according to claim 3 or 4, which is characterized in that a reference value is initially hanging for the predetermined number Positioned at the one of middle when the initial hoist value of the intermediate values of weight values, average value or the predetermined number is arranged by the time sequencing The average value of person or both.
6. the method according to claim 3 or 4, which is characterized in that described determining described current according to described first number Working condition includes:
Until the current time is recorded, first number is greater than first number of predetermined number and first number is Predetermined number second number below;
The current of the crane is determined according to first number and the associated state subordinating degree function of second number Smoothness;
When the current smoothness is greater than predetermined smoothness, determine that the current working status is steady state;And
When the current smoothness is the predetermined smoothness or less, determine that the current working status is to hook up state or fall Hook-shaped state,
Wherein, when determining the current working status is steady state, first number and second number are cleared.
7. according to the method described in claim 6, it is characterized in that, the state subordinating degree function are as follows:
Wherein, n is first number, and m is second number, and P is the smoothness.
8. the method according to claim 1, wherein determining the crane according to the current working status Current hoist value include:
If it is determined that the current working status is steady state, determining and current time closest to the first predetermined number institute State the average value of initial hoist value;And
If current initial hoist value is to determine the average value within predictive error relative to the error of the average value For the current hoist value.
9. a kind of device of determining craning weight of same, which is characterized in that the device includes:
Obtain module, the initial hoist value for the multiple initial calculations of acquisition time sequentially;
Determining module is used for:
According to current time closest to predetermined number initial hoist value, determine the current working status of the crane; And
According to the current working status, the current hoist value of the crane is determined.
10. device according to claim 9, which is characterized in that according to current time closest to predetermined number just Beginning hoist value determines that the current working status of the crane includes:
Determine that the change degree of the initial hoist value of the predetermined number, the change degree indicate the hoist variation journey of the crane Degree;
The current working status of the crane is determined according to the change degree.
11. device according to claim 10, which is characterized in that the initial hoist value of the determination predetermined number Change degree includes:
The determining initial associated a reference value of hoist value with the predetermined number;
Determine change degree of each relative to a reference value in the initial hoist value of the predetermined number;
The current working status that the crane is determined according to the change degree includes:
It determines in the initial hoist value of the predetermined number, the change degree relative to a reference value is greater than first of predetermined value Number;And
The current working status is determined according to described first number.
12. device according to claim 11, which is characterized in that in the initial hoist value of the determination predetermined number Each includes: relative to the change degree of a reference value
Change degree of each relative to a reference value in the initial hoist value of the predetermined number is determined according to the following formula:
Wherein, diFor variation of i-th of initial hoist value relative to a reference value in the initial hoist value of the predetermined number Degree, MiFor described i-th initial hoist value, M is a reference value.
13. device according to claim 11 or 12, which is characterized in that a reference value is the initial of the predetermined number Positioned at middle when the initial hoist value of the intermediate value of hoist value, average value or the predetermined number is arranged by the time sequencing The average value of one or both.
14. device according to claim 11 or 12, which is characterized in that described to work as according to described first several determinations Preceding working condition includes:
Until the current time is recorded, first number is greater than first number of predetermined number and first number is Predetermined number second number below;
The current of the crane is determined according to first number and the associated state subordinating degree function of second number Smoothness;
When the current smoothness is greater than predetermined smoothness, determine that the current working status is steady state;And
When the current smoothness is the predetermined smoothness or less, determine that the current working status is to hook up state or fall Hook-shaped state,
Wherein, when determining the current working status is steady state, first number and second number are cleared.
15. device according to claim 14, which is characterized in that the state subordinating degree function are as follows:
Wherein, n is first number, and m is second number, and P is the smoothness.
16. device according to claim 9, which is characterized in that according to the current working status, determine the crane Current hoist value include:
If it is determined that the current working status is steady state, determining and current time closest to the first predetermined number institute State the average value of initial hoist value;And
If current initial hoist value is to determine the average value within predictive error relative to the error of the average value For the current hoist value.
17. a kind of machine readable storage medium, it is stored with instruction on the machine readable storage medium, which is used for so that machine The method that perform claim requires any one of 1-8.
CN201810798718.8A 2018-07-19 2018-07-19 Determine the method and device of craning weight of same Active CN108862040B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810798718.8A CN108862040B (en) 2018-07-19 2018-07-19 Determine the method and device of craning weight of same

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810798718.8A CN108862040B (en) 2018-07-19 2018-07-19 Determine the method and device of craning weight of same

Publications (2)

Publication Number Publication Date
CN108862040A CN108862040A (en) 2018-11-23
CN108862040B true CN108862040B (en) 2019-11-01

Family

ID=64303420

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810798718.8A Active CN108862040B (en) 2018-07-19 2018-07-19 Determine the method and device of craning weight of same

Country Status (1)

Country Link
CN (1) CN108862040B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111348556A (en) * 2020-02-06 2020-06-30 深圳市测力佳控制技术有限公司 Crane load weight detection method and device, computer equipment and storage medium

Family Cites Families (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101348216B (en) * 2008-09-05 2010-06-02 湖南三一起重机械有限公司 Crane security protection system and crane thereof
FI122872B (en) * 2011-01-28 2012-08-15 Ponsse Oyj Method of control weighing included in a weighing system and program product and arrangement of control weighing included in a weighing system and material handling machine
JP6147062B2 (en) * 2013-04-02 2017-06-14 株式会社タダノ Work condition check device for work equipment
CN104150359B (en) * 2014-07-08 2016-06-08 湖南中联重科智能技术有限公司 Hoisting capacity measuring method, equipment, system and engineering machinery

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111348556A (en) * 2020-02-06 2020-06-30 深圳市测力佳控制技术有限公司 Crane load weight detection method and device, computer equipment and storage medium
CN111348556B (en) * 2020-02-06 2021-11-26 深圳市测力佳控制技术有限公司 Crane load weight detection method and device, computer equipment and storage medium

Also Published As

Publication number Publication date
CN108862040A (en) 2018-11-23

Similar Documents

Publication Publication Date Title
WO2016055025A2 (en) Crane operation range compensation method and apparatus
CN108862040B (en) Determine the method and device of craning weight of same
CN110498341A (en) Lifting equipment safety control method and its system
JP4320931B2 (en) Crane overload prevention method and overload prevention device
CN103787197A (en) Control system for super lifting working condition of crane and crane
CN104822618A (en) Hoist life calculating device
CN109292652A (en) Crane support supporting force monitors system and method
CN106927369A (en) Lorry-mounted crane and its job safety guard method, device and system
US10919739B2 (en) Overload preventing device
CN103939507B (en) A kind of method and apparatus that the stopping power of brake is detected
CN201372433Y (en) Piling machine frequency conversion driving system
CN105217477B (en) Crane hoisting multiplying power automatic recognition control method and control system
CN108706481A (en) Suspension hook Hovering control method, apparatus and frequency converter
KR20230128371A (en) Crane super lifting radius control method, system and crane
JP2018034958A (en) Measurement method of lifting load of crane
CN109573838A (en) Monitor the method and apparatus and derrick crane of tower crane lifting state
WO2023071207A1 (en) Dual-winch disordered rope identification method and apparatus, hoisting machinery, electronic device, computer-readable storage medium, and computer product
CN102390781B (en) Lateral load protection device and method for crane
CN202245775U (en) Portal crane control system
CN115043338B (en) Safety control method and system of hoisting equipment
RU2448037C1 (en) Hoisting or construction machine load limiter (versions)
CN111908338B (en) Multi-machine lifting horizontal monitoring method and device and multi-machine lifting system
CN114132853B (en) Safety control method and system for hoisting equipment
JP2000159477A (en) Operation recorder for mobile crane
CN208054750U (en) A kind of crane torque limiter

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant