CN108845860A CN201810387462.1A CN201810387462A CN108845860A CN 108845860 A CN108845860 A CN 108845860A CN 201810387462 A CN201810387462 A CN 201810387462A CN 108845860 A CN108845860 A CN 108845860A
Authority
CN
China
Prior art keywords
quota
dilatation
value
virtual machine
period
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201810387462.1A
Other languages
Chinese (zh)
Other versions
CN108845860B (en
Inventor
林青云
顾晓洁
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Beijing QIYI Century Science and Technology Co Ltd
Original Assignee
Beijing QIYI Century Science and Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Beijing QIYI Century Science and Technology Co Ltd filed Critical Beijing QIYI Century Science and Technology Co Ltd
Priority to CN201810387462.1A priority Critical patent/CN108845860B/en
Publication of CN108845860A publication Critical patent/CN108845860A/en
Application granted granted Critical
Publication of CN108845860B publication Critical patent/CN108845860B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F9/00Arrangements for program control, e.g. control units
    • G06F9/06Arrangements for program control, e.g. control units using stored programs, i.e. using an internal store of processing equipment to receive or retain programs
    • G06F9/44Arrangements for executing specific programs
    • G06F9/455Emulation; Interpretation; Software simulation, e.g. virtualisation or emulation of application or operating system execution engines
    • G06F9/45533Hypervisors; Virtual machine monitors
    • G06F9/45558Hypervisor-specific management and integration aspects
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F9/00Arrangements for program control, e.g. control units
    • G06F9/06Arrangements for program control, e.g. control units using stored programs, i.e. using an internal store of processing equipment to receive or retain programs
    • G06F9/46Multiprogramming arrangements
    • G06F9/50Allocation of resources, e.g. of the central processing unit [CPU]
    • G06F9/5005Allocation of resources, e.g. of the central processing unit [CPU] to service a request
    • G06F9/5011Allocation of resources, e.g. of the central processing unit [CPU] to service a request the resources being hardware resources other than CPUs, Servers and Terminals
    • G06F9/5016Allocation of resources, e.g. of the central processing unit [CPU] to service a request the resources being hardware resources other than CPUs, Servers and Terminals the resource being the memory
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F9/00Arrangements for program control, e.g. control units
    • G06F9/06Arrangements for program control, e.g. control units using stored programs, i.e. using an internal store of processing equipment to receive or retain programs
    • G06F9/46Multiprogramming arrangements
    • G06F9/50Allocation of resources, e.g. of the central processing unit [CPU]
    • G06F9/5005Allocation of resources, e.g. of the central processing unit [CPU] to service a request
    • G06F9/5027Allocation of resources, e.g. of the central processing unit [CPU] to service a request the resource being a machine, e.g. CPUs, Servers, Terminals
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F9/00Arrangements for program control, e.g. control units
    • G06F9/06Arrangements for program control, e.g. control units using stored programs, i.e. using an internal store of processing equipment to receive or retain programs
    • G06F9/44Arrangements for executing specific programs
    • G06F9/455Emulation; Interpretation; Software simulation, e.g. virtualisation or emulation of application or operating system execution engines
    • G06F9/45533Hypervisors; Virtual machine monitors
    • G06F9/45558Hypervisor-specific management and integration aspects
    • G06F2009/45583Memory management, e.g. access or allocation
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F2209/00Indexing scheme relating to G06F9/00
    • G06F2209/50Indexing scheme relating to G06F9/50
    • G06F2209/504Resource capping
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02DCLIMATE CHANGE MITIGATION TECHNOLOGIES IN INFORMATION AND COMMUNICATION TECHNOLOGIES [ICT], I.E. INFORMATION AND COMMUNICATION TECHNOLOGIES AIMING AT THE REDUCTION OF THEIR OWN ENERGY USE
    • Y02D10/00Energy efficient computing, e.g. low power processors, power management or thermal management

Landscapes

  • Engineering & Computer Science (AREA)
  • Software Systems (AREA)
  • Theoretical Computer Science (AREA)
  • Physics & Mathematics (AREA)
  • General Engineering & Computer Science (AREA)
  • General Physics & Mathematics (AREA)
  • Debugging And Monitoring (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The embodiment of the invention provides a kind of quota management method, device and electronic equipments, are applied to field of cloud computer technology, the method includes:For every kind of resource in virtual machine, the remaining usable levels and current dilatation threshold value of the resource are obtained, when remaining usable levels are less than current dilatation threshold value, dilatation are carried out to the resource, increased quota value is dilatation quota value;It obtains user and user is calculated to the increase in demand value of the resource, value added, remaining usable levels and current dilatation threshold value, calculate dilatation threshold value next time according to demand according to multiple actual use values to the actual use value of the resource in multiple preset time periods;When remaining usable levels in dilatation quota value are less than dilatation quota threshold value next time, according to dilatation quota value, the number of average growth rate and preset time period, the increased quota value of the institute of dilatation next time is determined.The quota value of resource can be arranged in the present invention according to business demand.

Description

A kind of quota management method, device and electronic equipment
Technical field
The present invention relates to field of cloud computer technology, more particularly to a kind of quota management method, device and electronic equipment.
Background technique
In cloud computing technology, enterprise can provide dynamic by internet, easily extend and the resource of virtualization, such as empty Quasi-ization service platform and the related service of elastic calculation platform etc..Usual administrator can be arranged in virtualization services Quota (quota), such as the quota etc. of department quota and different department's configuration respective numbers, quota is one to resource Kind management and distribution, for example, a certain number of memories and disk etc. can be distributed.When user applies for that related service finds quota When surplus deficiency, need to propose capacity expansion application to administrator, administrator increases quota according to existing resource.
However, inventor has found in the implementation of the present invention, at least there are the following problems for the prior art:Administrator increases The quota value added is the numerical value being rule of thumb arranged, and the quota value being arranged is determining, with user practical business need The degree of conformity asked is lower.
Summary of the invention
The embodiment of the present invention is designed to provide a kind of quota management method, device and electronic equipment, according to reality Resource quota value is set dynamically in business demand, improves the degree of conformity of quota and practical business demand.Particular technique side Case is as follows:
The embodiment of the invention provides a kind of quota management method, the method includes:
For each resource in virtual machine, the remaining usable levels and current dilatation threshold value of the resource are obtained, described When remaining usable levels are less than the current dilatation threshold value, dilatation is carried out to the resource, increased quota value is dilatation quota value;
The dilatation quota value be according to the current quota value of the resource of acquisition, the virtual machine when multiple default Between section average growth rate and preset time period number determine, the average growth rate is according to the multiple pre- of acquisition If the number of virtual machine determines in the period;
By data collector user is obtained in the multiple preset time period to the actual use value of the resource, according to Multiple actual use values calculate user to the increase in demand value of the resource, according to the increase in demand value, the remaining usable levels With the current dilatation threshold value, dilatation threshold value next time is calculated;
When remaining usable levels in the dilatation quota value are less than the dilatation quota threshold value next time, according to described Dilatation quota value, the number of the average growth rate and preset time period determine the increased quota value of the institute of dilatation next time.
Optionally, described to calculate user to the increase in demand value of the resource according to multiple actual use values, including:
If the actual use value in j-th of period is VMUj, the integer that j is 1 to n, according to formula:
User is obtained to the increase in demand value RMU of the resource,For weighting coefficient, the integer that i is 1 to n, n is default The number of period.
Optionally, it is described according to the increase in demand value, the remaining usable levels and the current dilatation threshold value, under calculating Dilatation threshold value, including:
If the increase in demand value is RMU, the residue usable levels are ARC, and the current dilatation threshold value is AQBnow, root According to formula:
Obtain dilatation threshold value A QB next timenext,For adjustment factor.
Optionally, described according to the dilatation quota value, the number of the average growth rate and preset time period, it determines The increased quota value of the institute of dilatation next time, including:
If the dilatation quota value is QPBnow, the average growth rate is CRC, and the number of preset time period is n, according to Formula:QPBnext=QPBnow(1+CRC)n, determine the increased quota value QPB of the institute of dilatation next timenext
Optionally, the number of virtual machine determines the balanced growth in the multiple preset time period according to acquisition The mode of rate, including:
If the number of the virtual machine includes:The Shen using number and virtual machine of the quota number of virtual machine, virtual machine It please number;The quota number of virtual machine is VMC in j-th of periodj, the use number of virtual machine is QT in j-th of periodj, The application number of virtual machine is ATC in j-th of periodj, the integer that j is 1 to n, n is the number of preset time period;
According to formula:Calculate the average increasing of the quota number of virtual machine Long rate CRCVMC, αi-1For the growth rate weight of i-th of period and the quota number of (i-1)-th period virtual machine;
According to formula:Calculate the average growth rate using number of virtual machine CRCQT, βi-1For the growth rate weight using number of i-th period and (i-1)-th period virtual machine;
According to formula:Calculate the balanced growth of the application number of virtual machine Rate CRCATC, γi-1For the growth rate weight of i-th of period and the application number of (i-1)-th period virtual machine;
According to formula:CRC=σ1*CRCVMC2*CRCQT3*CRCATC, determine average growth rate CRC, σ1、σ2And σ3Respectively For CRCVMC、CRCQTAnd CRCATCWeight, and σ113=1.
Optionally, if remaining usable levels of the resource within j-th of period are ARCj, the integer that j is 1 to n, n is pre- If the number of period, then remaining usable levels of the resourcebjFor ARCjWeight.
The embodiment of the present invention provides a kind of quota managing device, and described device includes:
First dilatation module, for obtaining the remaining usable levels of the resource and working as each resource in virtual machine Preceding dilatation threshold value carries out dilatation to the resource when the remaining usable levels are less than the current dilatation threshold value, increased Quota value is dilatation quota value;
The dilatation quota value be according to the current quota value of the resource of acquisition, the virtual machine when multiple default Between section average growth rate and preset time period number determine, the average growth rate is according to the multiple pre- of acquisition If the number of virtual machine determines in the period;
Threshold determination module, for obtaining user in the multiple preset time period to the resource by data collector Actual use value calculate user to the increase in demand value of the resource, according to the increase in demand according to multiple actual use values Value, the remaining usable levels and the current dilatation threshold value, calculate dilatation threshold value next time;
Second dilatation module is less than the dilatation next time for the remaining usable levels in the dilatation quota value When quota threshold value, according to the dilatation quota value, the number of the average growth rate and preset time period, determination is expanded next time Hold the increased quota value of institute.
Optionally, the threshold determination module includes:
Increase in demand value determines submodule, if the actual use value in j-th of period isj, j be 1 to n it is whole Number, according to formula:
User is obtained to the increase in demand value RMU of the resource,For weighting coefficient, the integer that i is 1 to n, n is default The number of period.
Optionally, the threshold determination module further includes:
Dilatation threshold value determines submodule, if being RMU for the increase in demand value, the residue usable levels are ARC, described Current dilatation threshold value is AQBnow, according to formula:
Obtain dilatation threshold value A QB next timenext,For adjustment factor.
Optionally, the second dilatation module is specifically used for, if the dilatation quota value is QPBnow, the balanced growth Rate is CRC, and the number of preset time period is n, according to formula:QPBnext=QPBnow(1+CRC)n, determine that dilatation next time is increased The quota value QPB addednext
Optionally, the quota managing device of the embodiment of the present invention further includes:
If the number of the virtual machine includes:The Shen using number and virtual machine of the quota number of virtual machine, virtual machine It please number;The quota number of virtual machine is VMC in j-th of periodj, the use number of virtual machine is QT in j-th of periodj, The application number of virtual machine is ATC in j-th of periodj, the integer that j is 1 to n, n is the number of preset time period;
First growth rate determining module, for according to formula:It calculates empty The average growth rate CRC of the quota number of quasi- machineVMC, αi-1For the quota of i-th of period and (i-1)-th period virtual machine Several growth rate weights;
Second growth rate determining module, for according to formula:Calculate virtual machine The average growth rate CRC using numberQT, βi-1Number is used for i-th period and (i-1)-th period virtual machine Growth rate weight;
Third growth rate determining module, for according to formula:It calculates empty The average growth rate CRC of the application number of quasi- machineATC, γi-1For the application of i-th period and (i-1)-th period virtual machine The growth rate weight of number;
Average growth rate determining module, for according to formula:CRC=σ1*CRCVMC2*CRCQT3*CRCATC, determine flat Equal growth rate CRC, σ1、σ2And σ3Respectively CRCVMC、CRCQTAnd CRCATCWeight, and σ123=1.
Optionally, if remaining usable levels of the resource within j-th of period are ARCj, the integer that j is 1 to n, n is pre- If the number of period, then remaining usable levels of the resourcebjFor ARCjWeight.
The embodiment of the invention provides a kind of electronic equipment, including:Processor, communication interface, memory and communication bus, Wherein, the processor, the communication interface, the memory complete mutual communication by the communication bus;
The memory, for storing computer program;
The processor when for executing the program stored on the memory, realizes any of the above-described quota The step of management method.
At the another aspect that the present invention is implemented, a kind of computer readable storage medium is additionally provided, it is described computer-readable Instruction is stored in storage medium, when run on a computer, so that computer executes any of the above-described quota pipe The step of reason method.
At the another aspect that the present invention is implemented, the embodiment of the invention also provides a kind of, and the computer program comprising instruction is produced Product, when run on a computer, so that the step of computer executes any of the above-described described quota management method.
Quota management method, device and electronic equipment provided in an embodiment of the present invention, for each money in virtual machine Source obtains the remaining usable levels and current dilatation threshold value of the resource, when remaining usable levels are less than current dilatation threshold value, to the money Source carries out dilatation, and increased quota value is dilatation quota value;Dilatation quota value is according to the current of the resource of acquisition Quota value, virtual machine multiple preset time periods average growth rate and preset time period number determine, average growth rate It is the number determination of virtual machine in multiple preset time periods according to acquisition;User is obtained multiple pre- by data collector If calculating increase in demand of the user to the resource according to multiple actual use values to the actual use value of the resource in the period Value, value added, remaining usable levels and current dilatation threshold value, calculate dilatation threshold value next time according to demand;In dilatation quota value Remaining usable levels be less than next time dilatation quota threshold value when, according to dilatation quota value, average growth rate and preset time period Number, determine the increased quota value of the institute of dilatation next time.The embodiment of the present invention can be directed to business demand, to each resource Quota value is adaptively arranged, and dynamic capacity-expanding is realized, and improves the degree of conformity of quota Yu practical business demand.Meanwhile The reliability and stability that ensure that business reduce artificial O&M cost.Certainly, it implements any of the products of the present invention or method It does not necessarily require achieving all the advantages described above at the same time.
Detailed description of the invention
In order to more clearly explain the embodiment of the invention or the technical proposal in the existing technology, to embodiment or will show below There is attached drawing needed in technical description to be briefly described.
Fig. 1 is the flow chart of the quota management method of the embodiment of the present invention;
Fig. 2 is the structure chart of the quota managing device of the embodiment of the present invention;
Fig. 3 is the structure chart of the electronic equipment of the embodiment of the present invention.
Specific embodiment
Following will be combined with the drawings in the embodiments of the present invention, and technical solution in the embodiment of the present invention is described.
In existing quota management method, during providing virtualization services for user, when resource used by a user When insufficient, the quota value that administrator provides a user is determining numerical value, which is not necessarily consistent with the demand of user It closes.In order to solve this problem, the embodiment of the invention provides a kind of quota management method, device and electronic equipments, according to reality Resource quota value is set dynamically in border business demand, improves the degree of conformity of quota and practical business demand.
Quota management method is provided for the embodiments of the invention first below to describe in detail.
Referring to Fig. 1, Fig. 1 is the flow chart of the quota management method of the embodiment of the present invention, is included the following steps:
S101 obtains the remaining usable levels and current dilatation threshold value of the resource for each resource in virtual machine, When remaining usable levels are less than current dilatation threshold value, dilatation is carried out to the resource, increased quota value is dilatation quota value.Dilatation Quota value is according to the current quota value of the resource of acquisition, virtual machine in the average growth rate of multiple preset time periods and pre- If what the number of period determined, average growth rate is that the number of virtual machine in multiple preset time periods according to acquisition determines 's.
In the embodiment of the present invention, enterprise can provide virtualization to user (for example, employee in enterprise) by virtual machine It services (such as desktop cloud), then, user can carry out handling official business by desktop cloud etc., virtual machine refers to the tool simulated by software Have complete hardware system function, operate in complete computer in a completely isolated environment.Enterprise provides virtual Resource in machine includes:CPU (Central Processing Unit, central processing unit), memory, disk etc..In general, enterprise The size of the resource provided for user is limited, and in user's processing business, with the increase of portfolio, the resource of user can Can be remaining insufficient, need the resource that administrator is user to carry out dilatation at this time.Since the embodiment of the present invention expands each resource The method of appearance is similar, is illustrated by taking disk as an example herein.
Specifically, an initial value is usually arranged, if resource is not in user's use process when distributing resource for user Foot carries out dilatation to the resource, after dilatation, if can also continue to carry out multiple dilatation with the increase of business demand.Separately Outside, in dilatation, a threshold value also can be set, that is, when the remaining usable levels of the resource are less than the threshold value, triggering is expanded Hold operation.In the embodiment of the present invention, the current quota value of the resource is the initial value being arranged, for example, disk is current Quota value can be 800G.Current dilatation threshold value can be the value being arranged according to current quota value, certainly, current dilatation threshold value It can also be the fixed value etc. of setting, it is not limited here.For example, current dilatation threshold value is the 1/10 of current quota value, i.e., 80G.So, when the remaining usable levels of disk are 80G, dilatation can be carried out to disk.Increased quota value is dilatation Quota value, dilatation quota value can be according to current quota value, virtual machines in the average growth rate of multiple preset time periods and pre- If the number of period, determined by default calculation formula.Average growth rate refers to the average growth rate of virtual machine number, Ke Yigen It is determined according to the number of virtual machine in multiple preset time periods.
S102 obtains user in multiple preset time periods to the actual use value of the resource, root by data collector According to multiple actual use values, user is calculated to the increase in demand value of the resource, according to demand value added, remaining usable levels and current Dilatation threshold value calculates dilatation threshold value next time.
In the embodiment of the present invention, multiple preset time periods can be the continuous period with same period, for example, can To be 3 months in a season, each preset time period is 1 month, and the number of preset time period is 3.User is monthly The actual use value of resource is usually different, user can be obtained respectively by data collector at this 3 months to disk Actual use value.It is possible to according to three actual use values, January is calculated to 2 months users to the increase in demand value of disk, And 2 months to user in March to the increase in demand value of disk, finally, calculating in first quarter, increase in demand of the user to disk Value.Can value added, remaining usable levels and current dilatation threshold value according to demand, calculate dilatation threshold value next time, next time dilatation Threshold value is threshold value when carrying out dilatation next time to disk.
S103, when the remaining usable levels in dilatation quota value are less than dilatation quota threshold value next time, according to dilatation The number of quota value, average growth rate and preset time period determines the increased quota value of the institute of dilatation next time.
Specifically, remaining usable levels are less than should after obtaining dilatation quota value to disk progress dilatation by step S101 Next time when dilatation threshold value, dilatation next time is carried out to disk.Can according to dilatation quota value, average growth rate and it is default when Between section number, pass through default calculation formula and determine the increased quota value of the institute of dilatation next time.This step calculates dilatation next time Increased quota value in step S101 calculate dilatation quota value method can be similar, unlike, dilatation quota value (i.e. first time dilatation increased quota value) is calculated based on current quota value (the quota value of initial setting up), This step (i.e. the increased quota value of second of dilatation institute) is calculated based on dilatation quota value, and so on.Also To say, when carrying out multiple dilatation, each dilatation increased quota value it is related to the quota value before dilatation.
The quota management method of the embodiment of the present invention obtains the residue of the resource for each resource in virtual machine Usable levels and current dilatation threshold value carry out dilatation to the resource when remaining usable levels are less than current dilatation threshold value, increased Quota value is dilatation quota value;Dilatation quota value is according to the current quota value of the resource of acquisition, virtual machine multiple What the average growth rate of preset time period and the number of preset time period determined, average growth rate is according to the multiple default of acquisition The number of virtual machine determines in period;User is obtained in multiple preset time periods to the resource by data collector Actual use value calculates user to the increase in demand value of the resource according to multiple actual use values, according to demand value added, surplus Remaining usable levels and current dilatation threshold value calculate dilatation threshold value next time;Remaining usable levels in dilatation quota value are less than next When secondary dilatation quota threshold value, according to dilatation quota value, the number of average growth rate and preset time period, dilatation next time is determined The increased quota value of institute.Compared with existing quota management method, the embodiment of the present invention can be directed to business demand, realize Dynamic capacity-expanding improves the degree of conformity of quota Yu practical business demand.Meanwhile ensure that the reliability and stability of business, it drops Low artificial O&M cost.
In a kind of implementation of the invention, in Fig. 1 embodiment S102, if the actual use value in j-th of period is VMUj, the integer that j is 1 to n, according to formula:
User is obtained to the increase in demand value RMU of the resource,For weighting coefficient, the integer that i is 1 to n, n is default The number of period.
In the embodiment of the present invention, the increase in demand value of two neighboring period is the actual use value of the latter period Difference between the actual use value of previous period, and for multiple preset time periods, it can be according to above-mentioned formula meter Calculate increase in demand value.For example, multiple preset time periods are 3 months in a season, then, increase in demand of the user to disk Value be January to 2 months users to the increase in demand value of disk withProduct, in addition 2 months demands to user in March to disk Value added withProduct.Wherein, weighting coefficient can be the value being arranged according to business demand, for example, the business in 2 months and March To measure bigger, the portfolio in January is smaller,Weight can compareGreatly.
If remaining usable levels of the resource within j-th of period are ARCj, the integer that j is 1 to n, n is preset time period Number, then remaining usable levels of the resourcebjFor ARCjWeight, That is, for each preset time period, the remaining usable levels of the available preset time period resource, then, the resource is more The remaining usable levels of a preset time period are the sum of the remaining usable levels of each preset time period resource.
If current dilatation threshold value is AQBnow, according to formula:
Obtain dilatation threshold value A QB next timenext,For adjustment factor.
According to above-mentioned formula as can be seen that if actual use value RMU is bigger, correspondingly, remaining usable levels ARC is smaller, AQBnextNumerical value it is higher.It for adjustment factor, can be adjusted according to actual scene, usually less than 1/100.It needs It is bright, work as AQBnowFor first time dilatation threshold value when, AQBnextFor the threshold value of second of dilatation;Work as AQBnowExpand for second When the threshold value of appearance, AQBnextFor the threshold value of third time dilatation, and so on.I.e. when carrying out multiple dilatation, dilatation next time Based on threshold value is the threshold value of a former dilatation.
In a kind of implementation of the invention, in Fig. 1 embodiment S103, according to dilatation quota value, average growth rate and pre- If the number of period, the increased quota value of the institute of dilatation next time is determined, including:
If dilatation quota value is QPBnow, the number of average growth rate CRC, preset time period are n, according to formula: QPBnext=QPBnow(1+CRC)n, determine the increased quota value QPB of the institute of dilatation next timenext
In the embodiment of the present invention, when carrying out multiple dilatation, the increased quota value of the institute of dilatation next time can be primary in the past Based on the increased quota value of dilatation institute.It is, QPBnowIt can indicate the increased quota value of preceding dilatation institute, accordingly Ground, QPBnextIndicate the increased quota value of the institute of dilatation next time.Therefore, the dilatation quota for first time dilatation, in S101 Value is equal to current quota value and (1+CRC)nProduct.In general, (1+CRC)nValue be not more than 2, that is, adjacent dilatation twice The increased quota value of institute will not be double.
In a kind of implementation of the invention, in Fig. 1 embodiment S101, if the number of virtual machine includes:Virtual machine is matched Volume number, the application number using number and virtual machine of virtual machine;The quota number of virtual machine is in j-th of period VMCj, the use number of virtual machine is QT in j-th of periodj, the application number of virtual machine is ATC in j-th of periodj, j For 1 to n integer, n is the number of preset time period;
According to formula:Calculate the average increasing of the quota number of virtual machine Long rate CRCVMC, αi-1For the growth rate weight of i-th of period and the quota number of (i-1)-th period virtual machine;
According to formula:Calculate the average growth rate using number of virtual machine CRCQT, βi-1For the growth rate weight using number of i-th period and (i-1)-th period virtual machine;
According to formula:Calculate the balanced growth of the application number of virtual machine Rate CRCATC, γi-1For the growth rate weight of i-th of period and the application number of (i-1)-th period virtual machine;
According to formula:CRC=σ1*CRCVMC2*CRCQT3*CRCATC, determine average growth rate CRC, σ1、σ2And σ3Respectively For CRCVMC、CRCQTAnd CRCATCWeight, and σ123=1.
In the embodiment of the present invention, for the quota of resource based on the number of virtual machine, the increase of virtual machine number will be direct Therefore the increase for influencing quota value can count the average growth rate of virtual machine number, which can be with Setting for quota value.Wherein, the number of virtual machine includes:Quota number, using number and application number, also, for Each preset time period, the quota number of virtual machine, using number and application number be all different, can to it is multiple default when Between section virtual machine quota number, using number and apply number average growth rate counted respectively, later, according to virtual The quota number of machine uses the average growth rate CRC of number and the average growth rate calculating virtual machine for applying for number.Above-mentioned αi-1、 βi-1And γi-1It can meet respectivelyσ1、σ2And σ3It can root It is adjusted according to the quota number of virtual machine, using the weight of number and application number, and σ123=1.
Corresponding to above method embodiment, the embodiment of the invention also provides a kind of quota managing devices, referring to fig. 2, figure 2 be the structure chart of the quota managing device of the embodiment of the present invention, including:
First dilatation module 201, for for each resource in virtual machine, obtain the resource remaining usable levels and Current dilatation threshold value carries out dilatation to the resource, increased quota value is when remaining usable levels are less than current dilatation threshold value Dilatation quota value;
Dilatation quota value is according to the current quota value of the resource of acquisition, virtual machine in the flat of multiple preset time periods What the number of equal growth rate and preset time period determined, average growth rate is virtual machine in multiple preset time periods according to acquisition Number determine;
Threshold determination module 202, for obtaining user in multiple preset time periods to the resource by data collector Actual use value calculate user to the increase in demand value of the resource according to multiple actual use values, according to demand value added, Remaining usable levels and current dilatation threshold value calculate dilatation threshold value next time;
Second dilatation module 203 is less than dilatation quota threshold next time for the remaining usable levels in dilatation quota value When value, according to dilatation quota value, the number of average growth rate and preset time period, the increased quota of the institute of dilatation next time is determined Value.
The quota managing device of the embodiment of the present invention obtains the residue of the resource for each resource in virtual machine Usable levels and current dilatation threshold value carry out dilatation to the resource when remaining usable levels are less than current dilatation threshold value, increased Quota value is dilatation quota value;Dilatation quota value is according to the current quota value of the resource of acquisition, virtual machine multiple What the average growth rate of preset time period and the number of preset time period determined, average growth rate is according to the multiple default of acquisition The number of virtual machine determines in period;User is obtained in multiple preset time periods to the resource by data collector Actual use value calculates user to the increase in demand value of the resource according to multiple actual use values, according to demand value added, surplus Remaining usable levels and current dilatation threshold value calculate dilatation threshold value next time;Remaining usable levels in dilatation quota value are less than next When secondary dilatation quota threshold value, according to dilatation quota value, the number of average growth rate and preset time period, dilatation next time is determined The increased quota value of institute.The embodiment of the present invention can be directed to business demand, realize dynamic capacity-expanding, improve quota and reality The degree of conformity of business demand.Meanwhile ensure that the reliability and stability of business, reduce artificial O&M cost.
It should be noted that the device of the embodiment of the present invention is the device using above-mentioned quota management method, then it is above-mentioned All embodiments of quota management method are suitable for the device, and can reach the same or similar beneficial effect.
In a kind of implementation of the invention, threshold determination module includes:
Increase in demand value determines submodule, if being VMU for the actual use value in j-th of periodj, j is 1 to n's Integer, according to formula:
User is obtained to the increase in demand value RMU of the resource,For weighting coefficient, the integer that i is 1 to n, n is default The number of period.
In a kind of implementation of the invention, threshold determination module further includes:
Dilatation threshold value determines submodule, if being RMU for increase in demand value, remaining usable levels are ARC, current dilatation threshold value For AQBnow, according to formula:
Obtain dilatation threshold value A QB next timenext,For adjustment factor.
In a kind of implementation of the invention, the second dilatation module is specifically used for, if dilatation quota value is QPBnow, average Growth rate is CRC, and the number of preset time period is n, according to formula:QPBnext=QPBnow(1+CRC)n, determine dilatation next time The increased quota value QPB of institutenext
In a kind of implementation of the invention, above-mentioned quota managing device further includes:
If the number of virtual machine includes:The application using number and virtual machine of the quota number, virtual machine of virtual machine Number;The quota number of virtual machine is VMC in j-th of periodj, the use number of virtual machine is QT in j-th of periodj, jth The application number of virtual machine is ATC in a periodj, the integer that j is 1 to n, n is the number of preset time period;
First growth rate determining module, for according to formula:It calculates empty The average growth rate CRC of the quota number of quasi- machineVMC, αi-1For the quota of i-th of period and (i-1)-th period virtual machine Several growth rate weights;
Second growth rate determining module, for according to formula:Calculate virtual machine The average growth rate CRC using numberQT, βi-1Number is used for i-th period and (i-1)-th period virtual machine Growth rate weight;
Third growth rate determining module, for according to formula:It calculates empty The average growth rate CRC of the application number of quasi- machineATC, γi-1For the application of i-th period and (i-1)-th period virtual machine The growth rate weight of number;
Average growth rate determining module, for according to formula:CRC=σ1*CRCVMC2*CRCQT3*CRCATC, determine flat Equal growth rate CRC, σ1、σ2And σ3Respectively CRCVMC、CRCQTAnd CRCATCWeight, and σ123=1.
In a kind of implementation of the invention, if remaining usable levels of the resource within j-th of period are ARCj, j 1 To the integer of n, n is the number of preset time period, then the remaining usable levels of the resourcebjFor ARCjWeight.
The embodiment of the invention also provides a kind of electronic equipment, are the electronic equipment of the embodiment of the present invention referring to Fig. 3, Fig. 3 Structure chart, including:Processor 301, communication interface 302, memory 303 and communication bus 304, wherein processor 301 leads to Letter interface 302, memory 303 complete mutual communication by communication bus 304;
Memory 303, for storing computer program;
Processor 301 when for executing the program stored on memory 303, realizes any quota in above-described embodiment The step of management method.
It should be noted that the communication bus 304 that above-mentioned electronic equipment is mentioned can be PCI (Peripheral Component Interconnect, Peripheral Component Interconnect standard) bus or EISA (Extended Industry Standard Architecture, expanding the industrial standard structure) bus etc..The communication bus 304 can be divided into address bus, data/address bus, Control bus etc..Only to be indicated with a thick line in Fig. 3, it is not intended that an only bus or a seed type convenient for indicating Bus.
Communication interface 302 is for the communication between above-mentioned electronic equipment and other equipment.
Memory 303 may include RAM (Random Access Memory, random access memory), also may include Nonvolatile memory (non-volatile memory), for example, at least a magnetic disk storage.Optionally, memory may be used also To be storage device that at least one is located remotely from aforementioned processor.
Above-mentioned processor 301 can be general processor, including:CPU, NP (Network Processor, at network Manage device) etc.;It can also be DSP (Digital Signal Processing, digital signal processor), ASIC (Application Specific Integrated Circuit, specific integrated circuit), FPGA (Field- Programmable Gate Array, field programmable gate array) either other programmable logic device, discrete gate or crystalline substance Body pipe logical device, discrete hardware components.
In the electronic equipment of the embodiment of the present invention, processor is by executing the program stored on memory, for virtual Each resource in machine obtains the remaining usable levels and current dilatation threshold value of the resource, is less than current expand in remaining usable levels When holding threshold value, dilatation is carried out to the resource, increased quota value is dilatation quota value;Dilatation quota value is according to acquisition The current quota value of the resource, virtual machine are determined in the average growth rate of multiple preset time periods and the number of preset time period , average growth rate is that the number of virtual machine in multiple preset time periods according to acquisition determines;It is obtained by data collector It takes family and user is calculated to this according to multiple actual use values to the actual use value of the resource in multiple preset time periods The increase in demand value of resource, value added, remaining usable levels and current dilatation threshold value, calculate dilatation threshold value next time according to demand; When remaining usable levels in dilatation quota value are less than dilatation quota threshold value next time, according to dilatation quota value, balanced growth The number of rate and preset time period determines the increased quota value of the institute of dilatation next time.The embodiment of the present invention can be needed for business It asks, realizes dynamic capacity-expanding, improve the degree of conformity of quota Yu practical business demand.Meanwhile ensure that business reliability and Stability reduces artificial O&M cost.
In another embodiment provided by the invention, a kind of computer readable storage medium is additionally provided, which can Read storage medium in be stored with instruction, when run on a computer so that computer execute it is any in above-described embodiment The step of quota management method.
When the instruction stored in the computer readable storage medium of the embodiment of the present invention is run on computers, for virtual Each resource in machine obtains the remaining usable levels and current dilatation threshold value of the resource, is less than current expand in remaining usable levels When holding threshold value, dilatation is carried out to the resource, increased quota value is dilatation quota value;Dilatation quota value is according to acquisition The current quota value of the resource, virtual machine are determined in the average growth rate of multiple preset time periods and the number of preset time period , average growth rate is that the number of virtual machine in multiple preset time periods according to acquisition determines;It is obtained by data collector It takes family and user is calculated to this according to multiple actual use values to the actual use value of the resource in multiple preset time periods The increase in demand value of resource, value added, remaining usable levels and current dilatation threshold value, calculate dilatation threshold value next time according to demand; When remaining usable levels in dilatation quota value are less than dilatation quota threshold value next time, according to dilatation quota value, balanced growth The number of rate and preset time period determines the increased quota value of the institute of dilatation next time.The embodiment of the present invention can be needed for business It asks, realizes dynamic capacity-expanding, improve the degree of conformity of quota Yu practical business demand.Meanwhile ensure that business reliability and Stability reduces artificial O&M cost.
In another embodiment provided by the invention, a kind of computer program product comprising instruction is additionally provided, when it When running on computers, so that the step of computer executes any quota management method in above-described embodiment.
As it can be seen that the computer program product of the embodiment of the present invention, when run on a computer, in virtual machine Each resource obtains the remaining usable levels and current dilatation threshold value of the resource, is less than current dilatation threshold value in remaining usable levels When, dilatation is carried out to the resource, increased quota value is dilatation quota value;Dilatation quota value is the resource according to acquisition Current quota value, virtual machine determined in the average growth rate of multiple preset time periods and the number of preset time period, it is average Growth rate is that the number of virtual machine in multiple preset time periods according to acquisition determines;User is obtained by data collector to exist User is calculated to the need of the resource according to multiple actual use values to the actual use value of the resource in multiple preset time periods Value added is sought, value added, remaining usable levels and current dilatation threshold value, calculate dilatation threshold value next time according to demand;In dilatation When remaining usable levels in quota value are less than dilatation quota threshold value next time, according to dilatation quota value, average growth rate and pre- If the number of period, the increased quota value of the institute of dilatation next time is determined.The embodiment of the present invention can be directed to business demand, real Show dynamic capacity-expanding, improves the degree of conformity of quota Yu practical business demand.Meanwhile it ensure that the reliability and stabilization of business Property, reduce artificial O&M cost.
In the above-described embodiments, can come wholly or partly by software, hardware, firmware or any combination thereof real It is existing.When implemented in software, it can entirely or partly realize in the form of a computer program product.The computer program Product includes one or more computer instructions.When loading on computers and executing the computer program instructions, all or It partly generates according to process or function described in the embodiment of the present invention.The computer can be general purpose computer, dedicated meter Calculation machine, computer network or other programmable devices.The computer instruction can store in computer readable storage medium In, or from a computer readable storage medium to the transmission of another computer readable storage medium, for example, the computer Instruction can pass through wired (such as coaxial cable, optical fiber, number from a web-site, computer, server or data center User's line (DSL)) or wireless (such as infrared, wireless, microwave etc.) mode to another web-site, computer, server or Data center is transmitted.The computer readable storage medium can be any usable medium that computer can access or It is comprising data storage devices such as one or more usable mediums integrated server, data centers.The usable medium can be with It is magnetic medium, (for example, floppy disk, hard disk, tape), optical medium (for example, DVD) or semiconductor medium (such as solid state hard disk Solid State Disk (SSD)) etc..
It should be noted that, in this document, relational terms such as first and second and the like are used merely to a reality Body or operation are distinguished with another entity or operation, are deposited without necessarily requiring or implying between these entities or operation In any actual relationship or order or sequence.Moreover, the terms "include", "comprise" or its any other variant are intended to Non-exclusive inclusion, so that the process, method, article or equipment including a series of elements is not only wanted including those Element, but also including other elements that are not explicitly listed, or further include for this process, method, article or equipment Intrinsic element.In the absence of more restrictions, the element limited by sentence "including a ...", it is not excluded that There is also other identical elements in process, method, article or equipment including the element.
Each embodiment in this specification is all made of relevant mode and describes, same and similar portion between each embodiment Dividing may refer to each other, and each embodiment focuses on the differences from other embodiments.Especially for device and For electronic equipment embodiment, since it is substantially similar to the method embodiment, so be described relatively simple, related place referring to The part of embodiment of the method illustrates.
The foregoing is merely illustrative of the preferred embodiments of the present invention, is not intended to limit the scope of the present invention.It is all Any modification, equivalent replacement, improvement and so within the spirit and principles in the present invention, are all contained in protection scope of the present invention It is interior.

Claims (13)

1. a kind of quota management method, which is characterized in that the method includes:
For each resource in virtual machine, the remaining usable levels and current dilatation threshold value of the resource are obtained, in the residue When usable levels are less than the current dilatation threshold value, dilatation is carried out to the resource, increased quota value is dilatation quota value;
The dilatation quota value is according to the current quota value of the resource of acquisition, the virtual machine in multiple preset time periods Average growth rate and preset time period number determine, the average growth rate be according to acquisition it is the multiple default when Between in section the number of virtual machine determine;
User is obtained in the multiple preset time period to the actual use value of the resource, according to multiple by data collector Actual use value calculates user to the increase in demand value of the resource, according to the increase in demand value, the remaining usable levels and institute Current dilatation threshold value is stated, dilatation threshold value next time is calculated;
When remaining usable levels in the dilatation quota value are less than the dilatation quota threshold value next time, according to the dilatation The number of quota value, the average growth rate and preset time period determines the increased quota value of the institute of dilatation next time.
2. quota management method according to claim 1, which is characterized in that it is described according to multiple actual use values, it calculates User to the increase in demand value of the resource, including:
If the actual use value in j-th of period is VMUj, the integer that j is 1 to n, according to formula:
User is obtained to the increase in demand value RMU of the resource,For weighting coefficient, the integer that i is 1 to n, n is preset time The number of section.
3. quota management method according to claim 1, which is characterized in that it is described according to the increase in demand value, it is described Remaining usable levels and the current dilatation threshold value calculate dilatation threshold value next time, including:
If the increase in demand value is RMU, the residue usable levels are ARC, and the current dilatation threshold value is AQBnow, according to public affairs Formula:
Obtain dilatation threshold value A QB next timenext,For adjustment factor.
4. quota management method according to claim 1, which is characterized in that described according to the dilatation quota value, institute The number of average growth rate and preset time period is stated, determines the increased quota value of the institute of dilatation next time, including:
If the dilatation quota value is QPBnow, the average growth rate is CRC, and the number of preset time period is n, according to public affairs Formula:QPBnext=QPBnow(1+CRC)n, determine the increased quota value QPB of the institute of dilatation next timenext
5. quota management method according to claim 1, which is characterized in that described according to the multiple default of acquisition The number of virtual machine determines the mode of the average growth rate in period, including:
If the number of the virtual machine includes:The application using number and virtual machine of the quota number, virtual machine of virtual machine Number;The quota number of virtual machine is VMC in j-th of periodj, the use number of virtual machine is QT in j-th of periodj, jth The application number of virtual machine is ATC in a periodj, the integer that j is 1 to n, n is the number of preset time period;
According to formula:Calculate the average growth rate of the quota number of virtual machine CRCVMC, αi-1For the growth rate weight of i-th of period and the quota number of (i-1)-th period virtual machine;
According to formula:Calculate the average growth rate using number of virtual machine CRCQT, βi-1For the growth rate weight using number of i-th period and (i-1)-th period virtual machine;
According to formula:Calculate the average growth rate of the application number of virtual machine CRCATC, γi-1For the growth rate weight of i-th of period and the application number of (i-1)-th period virtual machine;
According to formula:CRC=σ1*CRCVMC2*CRCQT3*CRCATC, determine average growth rate CRC, σ1、σ2And σ3Respectively CRCVMC、CRCQTAnd CRCATCWeight, and σ123=1.
6. quota management method according to claim 1, which is characterized in that if the resource is surplus within j-th of period Remaining usable levels are ARCj, the integer that j is 1 to n, n is the number of preset time period, then the remaining usable levels of the resourcebjFor ARCjWeight.
7. a kind of quota managing device, which is characterized in that described device includes:
First dilatation module, for obtaining the remaining usable levels and current expansion of the resource for each resource in virtual machine Hold threshold value, when the remaining usable levels are less than the current dilatation threshold value, dilatation, increased quota value are carried out to the resource For dilatation quota value;
The dilatation quota value is according to the current quota value of the resource of acquisition, the virtual machine in multiple preset time periods Average growth rate and preset time period number determine, the average growth rate be according to acquisition it is the multiple default when Between in section the number of virtual machine determine;
Threshold determination module, for obtaining user in the multiple preset time period to the reality of the resource by data collector Border use value calculates user to the increase in demand value of the resource according to multiple actual use values, according to the increase in demand value, The residue usable levels and the current dilatation threshold value calculate dilatation threshold value next time;
Second dilatation module is less than the dilatation quota threshold next time for the remaining usable levels in the dilatation quota value When value, according to the dilatation quota value, the number of the average growth rate and preset time period, determine that dilatation next time is increased The quota value added.
8. quota managing device according to claim 7, which is characterized in that the threshold determination module, including:
Increase in demand value determines submodule, if being VMU for the actual use value in j-th of periodj, the integer that j is 1 to n, According to formula:
User is obtained to the increase in demand value RMU of the resource,For weighting coefficient, the integer that i is 1 to n, n is preset time The number of section.
9. quota managing device according to claim 7, which is characterized in that the threshold determination module further includes:
Dilatation threshold value determines submodule, if being RMU for the increase in demand value, the residue usable levels are ARC, described current Dilatation threshold value is AQBnow, according to formula:
Obtain dilatation threshold value A QB next timenext,For adjustment factor.
10. quota managing device according to claim 7, which is characterized in that the second dilatation module is specifically used for, If the dilatation quota value is QPBnow, the average growth rate is CRC, and the number of preset time period is n, according to formula: QPBnext=QPBnow(1+CRC)n, determine the increased quota value QPB of the institute of dilatation next timenext
11. quota managing device according to claim 7, which is characterized in that described device further includes:
If the number of the virtual machine includes:The application using number and virtual machine of the quota number, virtual machine of virtual machine Number;The quota number of virtual machine is VMC in j-th of periodj, the use number of virtual machine is QT in j-th of periodj, jth The application number of virtual machine is ATC in a periodj, the integer that j is 1 to n, n is the number of preset time period;
First growth rate determining module, for according to formula:Calculate virtual machine Quota number average growth rate CRCVMC, αi-1For the quota number of i-th of period and (i-1)-th period virtual machine Growth rate weight;
Second growth rate determining module, for according to formula:Calculate making for virtual machine With the average growth rate CRC of numberQT, βi-1For the growth using number of i-th period and (i-1)-th period virtual machine Rate weight;
Third growth rate determining module, for according to formula:Calculate virtual machine Application number average growth rate CRCATC, γi-1For the application number of i-th period and (i-1)-th period virtual machine Growth rate weight;
Average growth rate determining module, for according to formula:CRC=σ1*CRCVMC2*CRCQT3*CRCATC, determine average increase Long rate CRC, σ1、σ2And σ3Respectively CRCVMC、CRCQTAnd CRCATCWeight, and σ123=1.
12. quota managing device according to claim 7, which is characterized in that if the resource is within j-th of period Remaining usable levels are ARCj, the integer that j is 1 to n, n is the number of preset time period, then the remaining usable levels of the resourcebjFor ARCjWeight.
13. a kind of electronic equipment, which is characterized in that including:Processor, communication interface, memory and communication bus, wherein institute It states processor, the communication interface, the memory and completes mutual communication by the communication bus;
The memory, for storing computer program;
The processor when for executing the program stored on the memory, realizes that claim 1-6 is any described The step of quota management method.
CN201810387462.1A 2018-04-26 2018-04-26 Method and device for managing quota and electronic equipment Active CN108845860B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810387462.1A CN108845860B (en) 2018-04-26 2018-04-26 Method and device for managing quota and electronic equipment

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810387462.1A CN108845860B (en) 2018-04-26 2018-04-26 Method and device for managing quota and electronic equipment

Publications (2)

Publication Number Publication Date
CN108845860A true CN108845860A (en) 2018-11-20
CN108845860B CN108845860B (en) 2022-06-03

Family

ID=64212339

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810387462.1A Active CN108845860B (en) 2018-04-26 2018-04-26 Method and device for managing quota and electronic equipment

Country Status (1)

Country Link
CN (1) CN108845860B (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111597253A (en) * 2020-04-03 2020-08-28 浙江工业大学 Quota-based cluster fuzzy control capacity planning method
CN113254224A (en) * 2021-07-15 2021-08-13 中电金信软件有限公司 Computing resource capacity expansion method and device, electronic equipment and readable storage medium
CN115865689A (en) * 2022-12-29 2023-03-28 天翼云科技有限公司 Network expansion method and system based on user traffic simulation analysis

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104038392A (en) * 2014-07-04 2014-09-10 云南电网公司 Method for evaluating service quality of cloud computing resources
CN105378667A (en) * 2013-12-10 2016-03-02 华为技术有限公司 Method and apparatus for scheduling virtual machine resources
CN106250207A (en) * 2016-07-27 2016-12-21 汉柏科技有限公司 A kind of virtual machine dilatation processing method and processing device
US20170031716A1 (en) * 2014-09-30 2017-02-02 International Business Machines Corporation Merging connection pools to form a logical pool of connections during a preset period of time thereby more efficiently utilizing connections in connection pools
US20170228257A1 (en) * 2014-07-31 2017-08-10 Hewlett Packard Enterprise Development Lp Dynamic adjustment of thresholds

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105378667A (en) * 2013-12-10 2016-03-02 华为技术有限公司 Method and apparatus for scheduling virtual machine resources
CN104038392A (en) * 2014-07-04 2014-09-10 云南电网公司 Method for evaluating service quality of cloud computing resources
US20170228257A1 (en) * 2014-07-31 2017-08-10 Hewlett Packard Enterprise Development Lp Dynamic adjustment of thresholds
US20170031716A1 (en) * 2014-09-30 2017-02-02 International Business Machines Corporation Merging connection pools to form a logical pool of connections during a preset period of time thereby more efficiently utilizing connections in connection pools
CN106250207A (en) * 2016-07-27 2016-12-21 汉柏科技有限公司 A kind of virtual machine dilatation processing method and processing device

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
CANTURK LSCI 等: "Runtime Demand Estimation for effective dynamic resource management", 《IEEE》 *

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111597253A (en) * 2020-04-03 2020-08-28 浙江工业大学 Quota-based cluster fuzzy control capacity planning method
CN111597253B (en) * 2020-04-03 2023-11-07 浙江工业大学 Quote-based cluster fuzzy control capacity planning method
CN113254224A (en) * 2021-07-15 2021-08-13 中电金信软件有限公司 Computing resource capacity expansion method and device, electronic equipment and readable storage medium
CN115865689A (en) * 2022-12-29 2023-03-28 天翼云科技有限公司 Network expansion method and system based on user traffic simulation analysis

Also Published As

Publication number Publication date
CN108845860B (en) 2022-06-03

Similar Documents

Publication Publication Date Title
CN107332902B (en) The user of online customer service system asks distribution method, device and computing device
CN102457571B (en) Method for uniformly distributing data in cloud storage
CN106233276B (en) The coordination admission control of network-accessible block storage device
CN103455486B (en) The method and system of placement database
US10027651B2 (en) Shaping I/O traffic by managing queue depth in fractional increments
CN108845860A (en) A kind of quota management method, device and electronic equipment
CN107784426A (en) Post distribution method, device and the equipment of a kind of employee
CN108090225A (en) Operation method, device, system and the computer readable storage medium of database instance
CN109034505A (en) Metering table demand on-line prediction method and terminal device
CN108551489A (en) A kind of application server load balancing method, system, device and storage medium
US20040088147A1 (en) Global data placement
CN110362384A (en) A kind of resource allocation methods, device, electronic equipment and storage medium
CN104954277A (en) Load balancing method, gateway server and related system
CN103631537B (en) The management method of a kind of virtual disk and device
WO2021259246A1 (en) Resource scheduling method and apparatus, electronic device, and computer-readable storage medium
CN105892955A (en) Method and equipment for managing storage system
CN108874502A (en) Method for managing resource, device and the equipment of cloud computing cluster
CN106897144A (en) A kind of resource allocation methods and device
CN110618855A (en) Task allocation method and device, electronic equipment and storage medium
WO2020042776A1 (en) Recommending method and apparatus, storage medium, and terminal device
CN109815037A (en) Slow disk detection method and storage array
CN110020025A (en) A kind of data processing method and device
CN114816241B (en) Disk allocation method and device of distributed storage cluster and distributed storage cluster
CN107026897A (en) A kind of methods, devices and systems of data processing
CN112241319A (en) Method, electronic device and computer program product for balancing load

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant