CN108843029A - A kind of circle steel column temporary support bracket and its construction method - Google Patents

A kind of circle steel column temporary support bracket and its construction method Download PDF

Info

Publication number
CN108843029A
CN108843029A CN201810669409.0A CN201810669409A CN108843029A CN 108843029 A CN108843029 A CN 108843029A CN 201810669409 A CN201810669409 A CN 201810669409A CN 108843029 A CN108843029 A CN 108843029A
Authority
CN
China
Prior art keywords
steel column
round steel
support bracket
temporary support
knightheads
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201810669409.0A
Other languages
Chinese (zh)
Inventor
徐杰
秦立标
陈亨伟
刘闪闪
张睿
韦人杰
钱洁衣
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai No 7 Construction Co Ltd
Original Assignee
Shanghai No 7 Construction Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai No 7 Construction Co Ltd filed Critical Shanghai No 7 Construction Co Ltd
Priority to CN201810669409.0A priority Critical patent/CN108843029A/en
Publication of CN108843029A publication Critical patent/CN108843029A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G21/00Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
    • E04G21/24Safety or protective measures preventing damage to building parts or finishing work during construction

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The invention discloses a kind of round steel column temporary support bracket and its construction methods, by the way that ferrule holder is arranged in the outside of round steel column, two knightheads are connected with ferrule holder and corresponding buried fixator respectively, buried fixator is installed on ground, two buried fixators are equal with the distance between round steel column, lateral support is provided to round steel column by two knightheads, improves the side bearing capacity of round steel column.And due to the round steel column can the relative movement of opposing ferrule fixator, provide lateral support simultaneously to round steel column in two knightheads, will not influence the vertical deformation of round steel column.Furthermore, one end of two knightheads is respectively equipped with spiro rod section, and the spiro rod section is threadedly coupled with the threaded sleeve of buried fixator, can be finely adjusted to the length of knighthead, to guarantee that round steel column is in a vertical state, the vertical bearing capacity of round steel column is improved.

Description

A kind of circle steel column temporary support bracket and its construction method
Technical field
The present invention relates to round steel column temporary support bracket and its construction methods, are upper and lower particularly suitable for structural system Temporary support of the hinged permanent diameter steel column in end during structure construction.
Background technique
In construction, steel column-bracing members-concrete arch shell structure system is a kind of new structural systen, in the structure In system, steel column is in the form for wherein using both ends hinged.
It needs to provide lateral support to steel column using temporary support before shaping structures.Meanwhile in anti-buckling bracing members Before (abbreviation BRB) installation, structure needs to complete most of deformation, this includes that steel column will complete pre- swaging before bracing members installation Become.Due to being temporarily supported above after bracing members are installed and could remove, this requires temporary supports cannot constrain the vertical of steel column Deformation.
Therefore, sidewise restraint can either be provided by how providing one kind, also can guarantee the round steel column of steel column energy vertical deformation Temporary support bracket and its construction method, it has also become construction circle needs the technical issues of further improvement and optimization.
Summary of the invention
The purpose of the present invention is to provide a kind of round steel column temporary support bracket and its construction method, structure is simple, property Energy is reliable, is convenient to mount and dismount, and can provide the lateral support of lateral both direction to steel column in construction, while guaranteeing steel as far as possible Column vertical deformation is unfettered.
In order to solve the above technical problems, the present invention provides the following technical solutions:
It is oblique to be sheathed on ferrule holder on circular steel column, two supports including one for a kind of circle steel column temporary support bracket Bar and two buried fixators, the circle steel column can the relative movement of opposing ferrule fixator, the buried fixator includes One is fixed on the bottom plate on ground and one is movably connected on threaded sleeve on the bottom plate, two branch by the first pin shaft One end of support brace is respectively equipped with spiro rod section, and the other end of two knightheads passes through the second pin shaft respectively and is movably connected on In the ferrule holder, the spiro rod section of the knighthead is threadedly coupled with the threaded sleeve
Preferably, in above-mentioned round steel column temporary support bracket, perpendicular where two knightheads it Between angle be 80~180 degree.
Preferably, in above-mentioned round steel column temporary support bracket, perpendicular phase where two knightheads It is mutually vertical.
Preferably, in above-mentioned round steel column temporary support bracket, the buried fixator further includes foundation bolt, One nut and a pair of first otic placode, one end of the foundation bolt are set in ground, and the other end of the foundation bolt is worn It is fixed after the bottom plate by first nut, first otic placode is vertically fixed on the bottom plate, the threaded sleeve One end screwed in for the spiro rod section of the knighthead, the other end of the threaded sleeve is offered and is passed through for first pin shaft First through hole, the first through hole of threaded sleeve described in the first pin shaft drawing-in, and the both ends peace of first pin shaft Loaded on corresponding first otic placode, first pin shaft is vertical with the threaded sleeve.
Preferably, in above-mentioned round steel column temporary support bracket, the other end of two knightheads is set respectively There is the second through-hole passed through for the second pin shaft.
Preferably, in above-mentioned round steel column temporary support bracket, the ferrule holder includes round hoop body and sets It is placed in two pair of second otic placode of the external side of circular, hoop, second through-hole of knighthead described in the second pin shaft drawing-in, and The both ends of second pin shaft are installed on corresponding second otic placode.
Preferably, in above-mentioned round steel column temporary support bracket, the circle hoop body includes two pieces of semi-circular hoop bodies, The both ends of two pieces of semi-circular hoop bodies connect bolt by hoop body and hoop body attaching nut connects, symmetrical on two pieces of semi-circular hoop bodies Equipped with a pair of second otic placode.
The invention also discloses a kind of construction methods of round steel column temporary support bracket as described above, including walk as follows Suddenly:
Step 1 carries out line setting according to the design position of round steel column and buried fixator;
Buried fixator is respectively arranged on ground by step 2, and between two buried fixators and round steel column It is equidistant;
Step 3 screws in the spiro rod section of knighthead in the threaded sleeve of buried fixator;
Step 4, the ferrule holder include two pieces of semi-circular hoop bodies, and two pieces of semi-circular hoop bodies are enclosed in the circle The outside of shape steel column;
Step 5 finely tunes the length of knighthead by the spiro rod section of rotational support brace, so that round steel column is in vertical State;
One end of two knightheads is passed through the second pin shaft respectively and is movably connected on the ferrule holder by step 6 On corresponding semi-circular hoop body;
The both ends of two pieces of semi-circular hoop bodies are connected bolt by hoop body and hoop body attaching nut connect by step 7, from And complete the installation of round steel column temporary support bracket;
Step 8, before permanent structure construction and in work progress, two knightheads provide round steel column Lateral support realizes the vertical deformation of round steel column by the opposite sliding between round steel column and ferrule holder.
Preferably, in the construction method of above-mentioned round steel column temporary support bracket, when round steel column temporary support branch After frame use, the sequence opposite with erection sequence carries out the disassembly of round steel column temporary support bracket.
Preferably, in the construction method of above-mentioned round steel column temporary support bracket, in step 2, the bottom plate is logical It crosses foundation bolt to be fixed on ground, the center of circle of the threaded sleeve and foundation bolt and round steel column draws a straight line.
By techniques disclosed above scheme it is found that compared with prior art, beneficial effects of the present invention are as follows:
Set is arranged in the outside of round steel column in circle steel column temporary support bracket provided in this embodiment and its construction method Fixator is bound round, two knightheads are connected with ferrule holder and corresponding buried fixator respectively, buried fixator installation In on ground, so that two knightheads be made to provide lateral support to round steel column, the intensity and safety of round steel column are improved Property;And due to the round steel column can the relative movement of opposing ferrule fixator, in two knightheads to circular steel Column provides lateral support simultaneously, will not influence the vertical deformation of round steel column, so that round steel column is installed in bracing members Preceding completion precompressed deformation.In addition, one end of two knightheads is respectively equipped with spiro rod section, the spiral shell of the knighthead Rod segment is threadedly coupled with the threaded sleeve of buried fixator, therefore the length of adjustable knighthead, to guarantee to justify Shape steel column is in a vertical state, improves the vertical bearing capacity of round steel column.
Detailed description of the invention
Fig. 1 is the structure front view of round one embodiment of steel column temporary support bracket of the present invention.
Fig. 2 is the structure top view of round one embodiment of steel column temporary support bracket of the present invention.
Fig. 3 is the structural schematic diagram of ferrule holder in the present invention.
Fig. 4 is the structural schematic diagram of knighthead in the present invention.
Fig. 5 is the side structure schematic view of buried fixator in the present invention.
Fig. 6 is the overlooking structure diagram of buried fixator in the present invention.
In figure:1- steel column, 2- ferrule holder, the second pin shaft of 21-, the second otic placode of 22-, the semi-circular hoop body of 23-, 24- hoop Body connects bolt, 25- hoop body attaching nut, 3- knighthead, the second through-hole of 31-, 32- brace shaft, 33- spiro rod section, 4- Bury fixator, the first pin shaft of 41-, the first otic placode of 42-, 43- screw shell, the first nut of 44-, 45- foundation bolt, 46- bottom plate.
Specific embodiment
The present invention is described in further detail below in conjunction with the drawings and specific embodiments.It below will be by cited implementation Example is in conjunction with attached drawing, the technology contents and feature that the present invention will be described in detail.Need in addition it illustrate, attached drawing is all made of very simplified Form and use non-accurate ratio, only for the purpose of facilitating and clarifying the purpose of the embodiments of the invention.For narration side Just, "upper" described below, "lower" are consistent with the upper and lower direction of attached drawing, but this can't be technical solution of the present invention Limitation.
Fig. 1 to Fig. 6 is please referred to, present embodiment discloses a kind of round steel column temporary support bracket, including one is sheathed on circle Ferrule holder 2, two knightheads 3 and two buried fixators 4 on shape steel column 1, the circle steel column 1 being capable of opposing ferrule Fixator 2 relatively moves, and the buried fixator 4 includes that a bottom plate 46 for being fixed on ground and one are living by the first pin shaft 41 The dynamic threaded sleeve 43 being connected on the bottom plate 46, one end of two knightheads 3 is respectively equipped with spiro rod section 33, described The other end of two knightheads 3 passes through the second pin shaft 21 respectively and is movably connected in the ferrule holder 2, and the support is oblique The spiro rod section 33 of bar 3 is threadedly coupled with the threaded sleeve 43, between two buried fixators 4 and round steel column 1 away from From equal.
Ferrule holder 2 is arranged in the outside of round steel column 1 in circle steel column temporary support bracket provided in this embodiment, Two knightheads 3 are connected with ferrule holder 2 and corresponding buried fixator 4 respectively, and buried fixator 4 is installed on ground On, so that 3 pairs of two knightheads round steel columns 1 be made to provide lateral support, improve the intensity and safety of round steel column 1; And due to the round steel column 1 can opposing ferrule fixator 2 relatively move, in two knightheads 3 to circular steel Column 1 provides lateral support simultaneously, will not influence round steel column 1 and carries out vertical deformation, so that round steel column 1 is in bracing members Precompressed deformation is smoothly completed before installation (not shown).In addition, one end of two knightheads 3 is respectively equipped with spiro rod section 33, The spiro rod section 33 of the knighthead 3 is threadedly coupled with the threaded sleeve 43, therefore the length of adjustable knighthead 3 Degree improves the vertical bearing capacity of round steel column 1 to guarantee that round steel column 1 is in a vertical state.
Preferably, in above-mentioned round steel column temporary support bracket, two knightheads, the 3 place perpendicular it Between angle be 80~180 degree.Angle between two knightheads, the 3 place perpendicular is preferably 80~180 degree, can To improve the stability of strutting system of 3 pairs of knighthead round steel columns 1, to improve the side bearing capacity of round steel column 1.
Preferably, in above-mentioned round steel column temporary support bracket, two knightheads, the 3 place perpendicular phase It is mutually vertical, so as to further increase the stability of strutting system of 3 pairs of two knightheads round steel columns 1.
Preferably, in above-mentioned round steel column temporary support bracket, the buried fixator 4 further includes foundation bolt 45, the first nut 44 and a pair of first otic placode 42, one end of the foundation bolt 45 are set in ground, the foundation bolt Fixed by first nut 44 after bottom plate 46 described in 45 other end drawing-in, first otic placode 42 is vertically fixed on the bottom On plate 46, one end of the threaded sleeve 43 is screwed in for the spiro rod section 33 of the knighthead 3, the threaded sleeve 43 it is another End offers the first through hole (not indicating) passed through for first pin shaft 41, threaded sleeve described in 41 drawing-in of the first pin shaft 43 first through hole, and the both ends of first pin shaft 41 are installed on corresponding first otic placode 42, first pin shaft 41 is vertical with the threaded sleeve 43.Buried fixator 4 can be pacified securely by foundation bolt 45 and the first nut 44 Loaded on ground;The first pin shaft 41 can be installed on bottom plate 46 by the way that the first otic placode 42 is arranged, to realize knighthead 3 With being flexibly connected for bottom plate 46.
Preferably, in above-mentioned round steel column temporary support bracket, the ferrule holder 2 includes round hoop body and sets It is placed in two pair of second otic placode 22 of the external side of circular, hoop, described second of knighthead 3 described in 21 drawing-in of the second pin shaft is logical Hole 31, and the both ends of second pin shaft 21 are installed on corresponding second otic placode 22, and knighthead 3 and set so may be implemented Bind round the flexible connection of fixator 2.
Preferably, in above-mentioned round steel column temporary support bracket, the other end of two knightheads 3 is set respectively There is the second through-hole 31 passed through for the second pin shaft 21, both ends are fixedly mounted after the second through-hole 31 described in 21 drawing-in of the second pin shaft In on corresponding second otic placode 22, second through-hole 31 and spiro rod section are respectively arranged at the both ends of brace shaft 32.
It is on the outside of round steel column 1 and easy to disassemble for the ease of ferrule holder 2 to be sheathed on, it is preferred that above-mentioned In round steel column temporary support bracket, it is described circle hoop body include two pieces of semi-circular hoop bodies 23, the two of two pieces of semi-circular hoop bodies 23 End connects bolt 24 by hoop body and hoop body attaching nut 25 connects, and is symmetrically arranged with described in a pair on two pieces of semi-circular hoop bodies 23 Second otic placode 22.A pair of second otic placode 22 is symmetrically arranged on two pieces of semi-circular hoop bodies 23, that is to say, that two pieces of semi-circular hoops Body 23 is completely the same, can be convenient independent assortment, improves construction efficiency.
Please continue to refer to Fig. 1 to Fig. 6, the present embodiment also discloses a kind of round steel column temporary support bracket as described above Construction method, include the following steps:
Step 1 carries out line setting according to the design position of round steel column 1 and buried fixator 4;
Buried fixator 4 is respectively arranged on ground by step 2, and between two buried fixators 4 and round steel column 1 Be equidistant;
Step 3 screws in the spiro rod section 33 of knighthead 3 in the screw shell 43 of buried fixator 4;
Step 4, the ferrule holder 2 include two pieces of semi-circular hoop bodies 23, and two pieces of semi-circular hoop bodies 23 are enclosed in institute State the outside of round steel column 1;
Step 5 finely tunes the length of knighthead 3 by the spiro rod section 33 of rotational support brace 3, so that round steel column 1 is in Vertical state;
One end of two knightheads 3 is passed through the second pin shaft 21 respectively and is movably connected on the cuff and fixed by step 6 On the semi-circular hoop body 23 of the correspondence of device 2;
The both ends of two pieces of semi-circular hoop bodies 23 are connected bolt 24 by hoop body and connected, to complete circular steel by step 7 The installation of column temporary support bracket;
Step 8, before permanent structure construction and in work progress, 3 pairs of two knightheads round steel columns 1 are mentioned The vertical shape of round steel column 1 is realized by the opposite sliding between round steel column 1 and ferrule holder 2 for lateral support Become.
The construction method of circle steel column temporary support bracket provided in this embodiment, by two knightheads of setting to energy The lateral support of lateral both direction is provided to round steel column 1 in construction, improves the side bearing capacity of round steel column 1;And by In the round steel column 1 can opposing ferrule fixator 2 relatively move, therefore, mentioned in two 3 pairs of knighthead round steel columns 1 Simultaneously for lateral support, it will not influence round steel column 1 and carry out vertical deformation, is i.e. guarantee 1 vertical deformation of steel column is unfettered.This Outside, one end of two knightheads 3 is respectively equipped with spiro rod section 33, the spiro rod section 33 of the knighthead 3 with it is described Threaded sleeve 43 is threadedly coupled, and can be adjusted to ferrule holder 2 and the length of the knighthead 3 of buried fixator 4, from And guarantee that round steel column 1 is in a vertical state, improve the vertical bearing capacity of round steel column 1.
Preferably, in the construction method of above-mentioned round steel column temporary support bracket, when round steel column temporary support branch After frame use, the sequence opposite with erection sequence carries out the disassembly of round steel column temporary support bracket.
Preferably, in the construction method of above-mentioned round steel column temporary support bracket, in step 2, the bottom plate 46 It is fixed on ground by foundation bolt 45, the center of circle of the screw shell 43 and foundation bolt 45 and round steel column 1 is linked to be one Straight line.By the way that the center of circle of the screw shell 43 and foundation bolt 45 and round steel column 1 is drawn a straight line, knighthead The support of 3 pairs of round steel columns 1 is transmitted along straight line, improves the lateral support intensity of 3 pairs of knighthead round steel columns 1, Jin Erti The safety and reliability of height construction.
Foregoing description is only the description to present pre-ferred embodiments, not to any restriction of the scope of the invention, this hair Any change, the modification that the those of ordinary skill in bright field does according to the disclosure above content, belong to the protection of claims Range.

Claims (10)

1. a kind of circle steel column temporary support bracket, which is characterized in that including one be sheathed on ferrule holder on circular steel column, Two knightheads and two buried fixators, it is described circle steel column can opposing ferrule fixator relative movement, it is described buried solid Determining device includes that a bottom plate for being fixed on ground and one are movably connected on threaded sleeve on the bottom plate, institute by the first pin shaft The one end for stating two knightheads is respectively equipped with spiro rod section, and it is living that the other end of two knightheads passes through the second pin shaft respectively Dynamic to be connected in the ferrule holder, the spiro rod section of the knighthead is threadedly coupled with the threaded sleeve, and two Buried fixator is equal with the distance between round steel column.
2. circle steel column temporary support bracket as described in claim 1, which is characterized in that perpendicular where two knightheads Angle between straight plane is 80~180 degree.
3. circle steel column temporary support bracket as described in claim 1, which is characterized in that perpendicular where two knightheads Straight plane is mutually perpendicular to.
4. circle steel column temporary support bracket as described in claim 1, which is characterized in that the buried fixator further includes ground Foot bolt, the first nut and a pair of first otic placode, one end of the foundation bolt are set in ground, the foundation bolt It is fixed after bottom plate described in other end drawing-in by first nut, first otic placode is vertically fixed on the bottom plate, described One end of threaded sleeve is screwed in for the spiro rod section of the knighthead, and the other end of the threaded sleeve is offered for described first The first through hole that pin shaft passes through, the first through hole of threaded sleeve described in the first pin shaft drawing-in, and first pin shaft Both ends be installed on corresponding first otic placode, first pin shaft is vertical with the threaded sleeve.
5. circle steel column temporary support bracket as described in claim 1, which is characterized in that two knightheads it is another End is respectively equipped with the second through-hole passed through for the second pin shaft.
6. circle steel column temporary support bracket as described in claim 1, which is characterized in that the ferrule holder includes circle Hoop body and two pair of second otic placode for being set to the external side of circular, hoop, described second of knighthead described in the second pin shaft drawing-in Through-hole, and the both ends of second pin shaft are installed on corresponding second otic placode.
7. circle steel column temporary support bracket as claimed in claim 6, which is characterized in that the circle hoop body includes two and half Round type hoop body, the both ends of two pieces of semi-circular hoop bodies connect bolt by hoop body and hoop body attaching nut connects, and two pieces semi-circular A pair of second otic placode is symmetrically arranged on hoop body.
8. a kind of construction method of the round steel column temporary support bracket as described in any one of claim 1~7, feature It is, includes the following steps:
Step 1 carries out line setting according to the design position of round steel column and buried fixator;
Buried fixator is respectively arranged on ground by step 2, and the distance between two buried fixators and round steel column It is equal;
Step 3 screws in the spiro rod section of knighthead in the threaded sleeve of buried fixator;
Step 4, the ferrule holder include two pieces of semi-circular hoop bodies, and two pieces of semi-circular hoop bodies are enclosed in the circular steel The outside of column;
Step 5 finely tunes the length of knighthead by the spiro rod section of rotational support brace, so that round steel column state in a vertical shape;
One end of two knightheads is passed through the correspondence that the second pin shaft is movably connected on the ferrule holder by step 6 respectively On semi-circular hoop body;
The both ends of two pieces of semi-circular hoop bodies are connected bolt by hoop body and hoop body attaching nut connect, thus complete by step 7 At the installation of round steel column temporary support bracket;
Step 8, before permanent structure construction and in work progress, two knightheads provide round steel column lateral Support force realizes the vertical deformation of round steel column by the opposite sliding between round steel column and ferrule holder.
9. the construction method of circle steel column temporary support bracket as claimed in claim 8, which is characterized in that when round steel column faces When supporting support use after, the sequence opposite with erection sequence carries out the disassembly of round steel column temporary support bracket.
10. the construction method of circle steel column temporary support bracket as claimed in claim 8, which is characterized in that in step 2, The bottom plate is fixed on ground by foundation bolt, and the center of circle of the threaded sleeve and foundation bolt and round steel column is linked to be one Straight line.
CN201810669409.0A 2018-06-26 2018-06-26 A kind of circle steel column temporary support bracket and its construction method Pending CN108843029A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810669409.0A CN108843029A (en) 2018-06-26 2018-06-26 A kind of circle steel column temporary support bracket and its construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810669409.0A CN108843029A (en) 2018-06-26 2018-06-26 A kind of circle steel column temporary support bracket and its construction method

Publications (1)

Publication Number Publication Date
CN108843029A true CN108843029A (en) 2018-11-20

Family

ID=64203690

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810669409.0A Pending CN108843029A (en) 2018-06-26 2018-06-26 A kind of circle steel column temporary support bracket and its construction method

Country Status (1)

Country Link
CN (1) CN108843029A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112627622A (en) * 2020-12-30 2021-04-09 中国建筑土木建设有限公司 Flagpole connecting structure
CN113605744A (en) * 2021-08-16 2021-11-05 广东宏丰建设工程有限公司 Light steel assembled archaizing building

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN203603586U (en) * 2013-11-27 2014-05-21 湖南省送变电工程公司 Equipment support regulating device
CN206289864U (en) * 2016-11-30 2017-06-30 上海二十冶建设有限公司 Colony's short column installs supporting apparatus
CN206513052U (en) * 2017-02-27 2017-09-22 北京城建十六建筑工程有限责任公司 A kind of spring layer support and hydraulic pressure spring layer climbing system
CN208734106U (en) * 2018-06-26 2019-04-12 上海建工七建集团有限公司 A kind of circle steel column temporary support bracket

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN203603586U (en) * 2013-11-27 2014-05-21 湖南省送变电工程公司 Equipment support regulating device
CN206289864U (en) * 2016-11-30 2017-06-30 上海二十冶建设有限公司 Colony's short column installs supporting apparatus
CN206513052U (en) * 2017-02-27 2017-09-22 北京城建十六建筑工程有限责任公司 A kind of spring layer support and hydraulic pressure spring layer climbing system
CN208734106U (en) * 2018-06-26 2019-04-12 上海建工七建集团有限公司 A kind of circle steel column temporary support bracket

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112627622A (en) * 2020-12-30 2021-04-09 中国建筑土木建设有限公司 Flagpole connecting structure
CN113605744A (en) * 2021-08-16 2021-11-05 广东宏丰建设工程有限公司 Light steel assembled archaizing building

Similar Documents

Publication Publication Date Title
CN108843029A (en) A kind of circle steel column temporary support bracket and its construction method
CN206593632U (en) A kind of infrared range-measurement system fixing device
CN207935554U (en) One kind being used for subway transportation antidetonation suspension and support
CN208734106U (en) A kind of circle steel column temporary support bracket
CN107762246A (en) A kind of fixing device of communication tower
CN206289864U (en) Colony's short column installs supporting apparatus
CN108869993A (en) A kind of post film and TV production special efficacy curtain wall
CN212525475U (en) Stretching device for copper pipe tee joint
CN209637265U (en) A kind of bracing means of elongate cylinder
CN110206162B (en) Assembled steel structure building connecting piece and construction method thereof
CN208268551U (en) A kind of stable type piping lane suspension and support
CN207766199U (en) A kind of photovoltaic bracket convenient for adjusting
CN209526421U (en) A kind of novel cable support device for electric power enterprise
CN206787591U (en) Building construction measurement device rack
CN108759795A (en) A kind of novel civil engineering tripod
CN206121078U (en) Basket adjusting device for basketball training
CN206233631U (en) A kind of architectural engineering support meanss
CN213098507U (en) Animal doctor is with animal inspection mount
CN109296217A (en) A kind of strenthening member and its application method of pin
CN221001956U (en) Large-span concrete beam formwork support system angle adjusting device
CN220705272U (en) Support stable structure of steel construction engineering
CN212105032U (en) Equipment maintenance sliding platform in limited space
CN218438532U (en) Frame structure and stereo garage
CN219864360U (en) Temporary supporting device for non-embedded large-scale landscape steel structural column
CN215800940U (en) Upper and lower layered structure for steel box girder

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination