CN108843024A - The construction method of the pre- tensioning binding of prefabricated small box girder framework of steel reinforcement genesis analysis muscle - Google Patents

The construction method of the pre- tensioning binding of prefabricated small box girder framework of steel reinforcement genesis analysis muscle Download PDF

Info

Publication number
CN108843024A
CN108843024A CN201810696418.9A CN201810696418A CN108843024A CN 108843024 A CN108843024 A CN 108843024A CN 201810696418 A CN201810696418 A CN 201810696418A CN 108843024 A CN108843024 A CN 108843024A
Authority
CN
China
Prior art keywords
steel
tensioning
box girder
genesis analysis
small box
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201810696418.9A
Other languages
Chinese (zh)
Other versions
CN108843024B (en
Inventor
韩峰
魏列江
陈纨年
曹国斌
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Gansu Shunda Construction Of Road And Bridge Co Ltd
Gansu Road and Bridge Construction Group Co Ltd
Original Assignee
Gansu Shunda Construction Of Road And Bridge Co Ltd
Gansu Road and Bridge Construction Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Gansu Shunda Construction Of Road And Bridge Co Ltd, Gansu Road and Bridge Construction Group Co Ltd filed Critical Gansu Shunda Construction Of Road And Bridge Co Ltd
Priority to CN201810696418.9A priority Critical patent/CN108843024B/en
Publication of CN108843024A publication Critical patent/CN108843024A/en
Application granted granted Critical
Publication of CN108843024B publication Critical patent/CN108843024B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G21/00Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
    • E04G21/12Mounting of reinforcing inserts; Prestressing
    • E04G21/122Machines for joining reinforcing bars
    • E04G21/123Wire twisting tools

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Reinforcement Elements For Buildings (AREA)
  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The present invention relates to a kind of construction methods of the pre- tensioning binding of prefabricated small box girder framework of steel reinforcement genesis analysis muscle, and this approach includes the following steps:(1) smooth location, measurement box beam bind stage;(2) box beam binds pedestal bound edge;(3) production U-shaped box beam reinforcing bar binding tire film tool;(4) production V-arrangement and the pre- tensioning cantilever beam of door shape prefabricated small box girder framework of steel reinforcement genesis analysis muscle;(5) the pre- tensioning cantilever beam suspension cable of V-arrangement prefabricated small box girder framework of steel reinforcement genesis analysis muscle is made;(6) punching;(7) the V-arrangement pre- tensioning cantilever beam of prefabricated small box girder framework of steel reinforcement genesis analysis muscle and box beam binding pedestal, U-shaped box beam reinforcing bar binding tire film tool are linked together;The door shape pre- tensioning cantilever beam of prefabricated small box girder framework of steel reinforcement genesis analysis muscle and door shape box beam reinforcing bar binding tire film tool are linked together;(8) tensioning, casting concrete in integral hoisting to precast pedestal after the completion of binding are carried out to small box girder framework of steel reinforcement genesis analysis muscle.Work efficiency is high by the present invention, save the cost, easy to operate practical.

Description

The construction method of the pre- tensioning binding of prefabricated small box girder framework of steel reinforcement genesis analysis muscle
Technical field
The present invention relates to bridge construction field more particularly to the pre- tensioning of prefabricated small box girder framework of steel reinforcement genesis analysis muscle The construction method of binding.
Background technique
In the binding construction of prefabricated small box girder framework of steel reinforcement, traditional construction way is:Prefabricated small box girder framework of steel reinforcement uses Numerical-control bending machine carries out Steel Reinforcing Bar Material and processing, carries out the methods of reinforcing bar binding and installation using mould, to guarantee framework of steel reinforcement Indeformable and protective layer thickness, usually using improving the straightening of the machining accuracy of mould, genesis analysis muscle, increase concrete mats The construction methods such as number of blocks.But there are following defects for traditional handicraft:
(1) due to the binding and installation using mould progress reinforcing bar, mould is artificial, the precision and design drawing of processing There are deviations between paper.
(2) during small box girder framework of steel reinforcement genesis analysis muscle straightening, genesis analysis muscle straightening is uneven, or it is more or Few has not straight position, in addition straightener larger workload, equipment gradually aging, the genesis analysis muscle quality produced Also it gradually glides.
(3) in small box girder framework of steel reinforcement genesis analysis muscle process of binding, since genesis analysis muscle itself has quality and tire The spacing of tool is 1m, and genesis analysis muscle has the position of downwarp very much, and reinforcing bar is not straight.
If it is guarantee genesis analysis muscle position accurately with the straight degree of reinforcing bar(Generally about using increasing personnel investment 6 work days), additional cost of labor will be increased, causes inevitable waste of human resource.
Summary of the invention
Work efficiency is high, save the cost, easy to operate practical technical problem to be solved by the invention is to provide a kind of The construction method of the pre- tensioning binding of prefabricated small box girder framework of steel reinforcement genesis analysis muscle.
To solve the above problems, the pre- tensioning binding of prefabricated small box girder framework of steel reinforcement genesis analysis muscle of the present invention is applied Work method, includes the following steps:
(1) smooth location before constructing accurately measures box beam binding stage, makes its zero deflection;
(2) the box beam binding pedestal carries out bound edge with pedestal equal leg angle;
(3) production U-shaped box beam reinforcing bar binding tire film tool is longitudinally weldingly fixed on terrace in every interval 1m by box beam binding pedestal On, it is longitudinal to be connected with lateral;
(4) production V-arrangement and the pre- tensioning cantilever beam of door shape prefabricated small box girder framework of steel reinforcement genesis analysis muscle:
I-steel I is connected into I-steel III by welding by both sides according to box girder web slope with I-steel II and forms v-component;It is described V-component is embedded at the terrace or less 100cm;
I-steel IV is connected into I-steel VI by welding by both sides according to box beam top plate width with I-steel V and forms door shape component;Institute A shape component is stated to be embedded at the terrace or less 100cm;
(5) the pre- tensioning cantilever beam suspension cable of V-arrangement prefabricated small box girder framework of steel reinforcement genesis analysis muscle is made:
Reinforcing bar I is made into U-shaped, and according to the position of the I-steel I and the I-steel II, the reinforcing bar I is embedded to described 150cm below terrace and it is horizontal away from the I-steel I and the I-steel II be 1m;Then with wirerope by the I-steel I It links together with the I-steel II and the reinforcing bar I;
(6) to the I-steel I and the I-steel II and the I-steel III according to the position of small box girder exposed steel bar and big It is small to be punched out;To the I-steel IV and the I-steel V and the I-steel VI according to the position of small box girder exposed steel bar It sets and is punched out with size;
(7) the pre- tensioning cantilever beam of V-arrangement prefabricated small box girder framework of steel reinforcement genesis analysis muscle and the box beam are bound into pedestal, institute U-shaped box beam reinforcing bar binding tire film tool is stated to link together;The door shape prefabricated small box girder framework of steel reinforcement genesis analysis muscle is opened in advance Cantilever beam is drawn to link together with door shape box beam reinforcing bar binding tire film tool;
(8) tensioning equipment carries out tensioning to small box girder framework of steel reinforcement genesis analysis muscle with matched anchorage, whole after the completion of binding to hang It is filled to casting concrete in precast pedestal.
The step (2) in the hem width of pedestal equal leg angle be 50mm, side thickness is 5mm.
The step (4) in I-steel I, I-steel II, I-steel IV, I-steel V, I-steel VI height be 400mm, width 144mm, waist thickness are 12.5mm, and leg thickness is 16.5mm.
The step (4) in I-steel III height be 280mm, width 124mm, waist thickness are 10.5mm, leg thickness is 13.7mm。
The step (5) in reinforcing bar I specification be 28 mm of Ф.
The step (5) in wirerope specification be 18 mm of Ф.
The step (8) in tensioning equipment the manual rockbolt tension meter of model ZY-10 type.
Compared with the prior art, the present invention has the following advantages:
1, the straight degree of small box girder framework of steel reinforcement genesis analysis muscle is effectively ensured.
The V-arrangement and door shape cantilever beam for having small box girder framework of steel reinforcement genesis analysis muscle tensioning due to the present invention are as tensioning stress Barrier, genesis analysis reinforcing bar stress after the completion of tensioning is effectively ensured and does not relax.Genesis analysis muscle in process of binding always In tighten, straight state.
2, reinforcing bar positioning, downwarp disadvantage rambunctious in conventional construction are avoided.
Due to oneself of the accuracy of the invention for purposefully controlling small box girder framework of steel reinforcement genesis analysis muscle position and reinforcing bar So lower amount of deflection, therefore in construction can preferably guarantee the design position and reinforcing bar of small box girder framework of steel reinforcement genesis analysis muscle Amount of deflection.
3, tensioning system is reusable.
Tensioning system in the present invention is that fashioned iron and tensioning instrument form, can be made in a project 2 pairs of tensioning V-arrangements with Door shape cantilever beam, 1 manual tensioning instrument, can the segmental operation in construction, and tensioning instrument is in different projects It is reusable.
4, it economizes on resources, save engineering cost.
Steel bar meter in the present invention uses factory normalization continuous-flow type operation, improves work efficiency, reduces the money of raw material Source waste;The binding and installation for carrying out framework of steel reinforcement after the completion of the tensioning of genesis analysis muscle in mould use truss hoisting entirety Lift reduce into mould personnel, material investment, reduce labor intensity, it is high that quality obtains effective guarantee, construction efficiency, mentions High industrialization degree.Especially after the completion of the tensioning of genesis analysis muscle, does not need additional personnel and worker is cooperated to bind operation, effectively Ground reduces cost of labor.
5, work efficiency is high, easy to operate practical by the present invention.
Detailed description of the invention
Specific embodiments of the present invention will be described in further detail with reference to the accompanying drawing.
Fig. 1 is V-arrangement tensioning cantilever beam side view of the invention.
Fig. 2 is V-arrangement tensioning cantilever beam structure figure of the invention.
Fig. 3 is door shape tensioning cantilever beam side view of the invention.
Fig. 4 is door shape tensioning cantilever beam structure figure of the invention.
Fig. 5 is V-arrangement tensioning cantilever beam and mould connection figure in the present invention.
Fig. 6 is door shape tensioning cantilever beam and mould connection figure in the present invention.
Fig. 7 is Small Precast Box beam bottom of the invention, the U-shaped binding clamping fixture of web.
Fig. 8 is prefabricated small box girder gate top plate binding clamping fixture of the invention.
In figure:1-box beam binds pedestal;2-pedestal equal leg angles;3-I-steel III;4-I-steel I;4 '-I-shapeds Steel II;5-reinforcing bars I;6-wirerope;7-I-steel IV;7 '-I-steel V;8-I-steel VI;9-tensioning equipments;10— Small box girder framework of steel reinforcement genesis analysis muscle;11-U-shaped box beam reinforcing bar binding tire films tool;12-terraces;13-door shape box beam reinforcing bars Binding tire film tool.
Specific embodiment
As shown in Fig. 1 ~ 8, the construction method of the pre- tensioning binding of prefabricated small box girder framework of steel reinforcement genesis analysis muscle, including it is following Step:
(1) smooth location before constructing accurately measures box beam binding 1 position of pedestal, makes its zero deflection.
(2) box beam binds pedestal 1 and carries out bound edge with pedestal equal leg angle 2;The hem width of pedestal equal leg angle 2 is 50mm, and side is thick For 5mm.
(3) production U-shaped box beam reinforcing bar binding tire film tool 11 is weldingly fixed on ground by the longitudinal every interval 1m of box beam binding pedestal 1 It is longitudinal to be connected with lateral on level ground 12.
(4) production V-arrangement and the pre- tensioning cantilever beam of door shape prefabricated small box girder framework of steel reinforcement genesis analysis muscle:
I-steel I 4 is connected into I-steel III 3 by welding by both sides according to box girder web slope with I-steel II 4 ' and forms v-component; V-component is embedded at 12 or less 100cm of terrace.
I-steel IV 7 is connected into I-steel VI 8 by welding by both sides according to box beam top plate width with I-steel V 7 ' and forms door Shape component;At door shape component embedment 12 or less 100cm of terrace.
I-steel I 4, I-steel II 4 ', I-steel IV 7, I-steel V 7 ', I-steel VI 8 height be 400mm, width For 144mm, waist thickness is 12.5mm, and leg thickness is 16.5mm.
The height of I-steel III 3 is 280mm, width 124mm, waist thickness are 10.5mm, leg thickness is 13.7mm.
(5) the pre- tensioning cantilever beam suspension cable of V-arrangement prefabricated small box girder framework of steel reinforcement genesis analysis muscle is made:
Reinforcing bar I 5 is made into U-shaped, and according to the position of I-steel I 4 and I-steel II 4 ', the reinforcing bar I 5 for being 28 mm of Ф by specification Be embedded to 12 or less 150cm of terrace and it is horizontal away from I-steel I 4 and I-steel II 4 ' be 1m;Then the steel wire for being 18 mm of Ф with specification Rope 6 links together I-steel I 4 and I-steel II 4 ' and reinforcing bar I 5.
To I-steel I 4 and I-steel II 4 ' and I-steel III 3 according to small box girder exposed steel bar position and size into Row punching;I-steel IV 7 and I-steel V 7 ' and I-steel VI 8 are carried out according to the position of small box girder exposed steel bar and size Punching.
(7) the V-arrangement pre- tensioning cantilever beam of prefabricated small box girder framework of steel reinforcement genesis analysis muscle and box beam are bound into pedestal 1, U-shaped case Beam steel bar colligation fetal membrane tool 11 links together;By the door shape pre- tensioning cantilever beam of prefabricated small box girder framework of steel reinforcement genesis analysis muscle with Door shape box beam reinforcing bar binding tire film tool 13 links together.
(8) tensioning equipment 9 carries out tensioning to small box girder framework of steel reinforcement genesis analysis muscle 10 with matched anchorage, and binding is completed Casting concrete in integral hoisting to precast pedestal afterwards.
Wherein:The manual rockbolt tension meter of model ZY-10 type of tensioning equipment 9.
Tensioning system in the present invention is that fashioned iron and tensioning instrument form, can be made in a project 2 pairs of tensioning V-arrangements with Door shape cantilever beam, 1 manual tensioning instrument can the segmental operation in construction.

Claims (7)

1. the construction method of the pre- tensioning binding of prefabricated small box girder framework of steel reinforcement genesis analysis muscle, includes the following steps:
(1) smooth location before constructing accurately measures box beam binding pedestal(1)Position makes its zero deflection;
(2) the box beam binds pedestal(1)With pedestal equal leg angle(2)Carry out bound edge;
(3) production U-shaped box beam reinforcing bar binding tire film tool(11), pedestal is bound by the box beam(1)Longitudinal every interval 1m is welded and fixed In terrace(12)On, it is longitudinal to be connected with lateral;
(4) production V-arrangement and the pre- tensioning cantilever beam of door shape prefabricated small box girder framework of steel reinforcement genesis analysis muscle:
By I-steel I(4)With I-steel II(4')I-steel III is connected by welding by both sides according to box girder web slope(3)Form V Shape component;The v-component is embedded to the terrace(12)At following 100cm;
By I-steel IV(7)With I-steel V(7')I-steel VI is connected by welding by both sides according to box beam top plate width(8)It is formed Door shape component;The door shape component is embedded to the terrace(12)At following 100cm;
(5) the pre- tensioning cantilever beam suspension cable of V-arrangement prefabricated small box girder framework of steel reinforcement genesis analysis muscle is made:
By reinforcing bar I(5)It is made into U-shaped, and according to the I-steel I(4)With the I-steel II(4')Position, by the reinforcing bar Ⅰ(5)It is embedded to the terrace(12)Following 150cm and level away from the I-steel I(4)With the I-steel II(4')For 1m;So After use wirerope(6)By the I-steel I(4)With the I-steel II(4')And the reinforcing bar I(5)It links together;
(6) to the I-steel I(4)With the I-steel II(4')And the I-steel III(3)According to small box girder exposed steel bar Position be punched out with size;To the I-steel IV(7)With the I-steel V(7')And the I-steel VI(8)It presses It is punched out according to the position and size of small box girder exposed steel bar;
(7) the pre- tensioning cantilever beam of V-arrangement prefabricated small box girder framework of steel reinforcement genesis analysis muscle and the box beam are bound into pedestal(1), The U-shaped box beam reinforcing bar binding tire film tool(11)It links together;By the door shape prefabricated small box girder framework of steel reinforcement genesis analysis The pre- tensioning cantilever beam of muscle and door shape box beam reinforcing bar binding tire film have(13)It links together;
(8) tensioning equipment(9)With matched anchorage to small box girder framework of steel reinforcement genesis analysis muscle(10)Tensioning is carried out, binding is completed Casting concrete in integral hoisting to precast pedestal afterwards.
2. the construction method of the pre- tensioning binding of prefabricated small box girder framework of steel reinforcement genesis analysis muscle as described in claim 1, special Sign is:The step (2) in pedestal equal leg angle(2)Hem width be 50mm, side thickness be 5mm.
3. the construction method of the pre- tensioning binding of prefabricated small box girder framework of steel reinforcement genesis analysis muscle as described in claim 1, special Sign is:The step (4) in I-steel I(4), I-steel II(4'), I-steel IV(7), I-steel V(7'), I-steel Ⅵ(8)Height be 400mm, width 144mm, waist thickness be 12.5mm, leg thickness be 16.5mm.
4. the construction method of the pre- tensioning binding of prefabricated small box girder framework of steel reinforcement genesis analysis muscle as described in claim 1, special Sign is:The step (4) in I-steel III(3)Height be 280mm, width 124mm, waist thickness are 10.5mm, leg thickness is 13.7mm。
5. the construction method of the pre- tensioning binding of prefabricated small box girder framework of steel reinforcement genesis analysis muscle as described in claim 1, special Sign is:The step (5) in reinforcing bar I(5)Specification be 28 mm of Ф.
6. the construction method of the pre- tensioning binding of prefabricated small box girder framework of steel reinforcement genesis analysis muscle as described in claim 1, special Sign is:The step (5) in wirerope(6)Specification be 18 mm of Ф.
7. the construction method of the pre- tensioning binding of prefabricated small box girder framework of steel reinforcement genesis analysis muscle as described in claim 1, special Sign is:The step (8) in tensioning equipment(9)The manual rockbolt tension meter of model ZY-10 type.
CN201810696418.9A 2018-06-29 2018-06-29 Construction method for pretensioning and binding longitudinal distribution ribs of prefabricated small box girder steel reinforcement framework Active CN108843024B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810696418.9A CN108843024B (en) 2018-06-29 2018-06-29 Construction method for pretensioning and binding longitudinal distribution ribs of prefabricated small box girder steel reinforcement framework

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810696418.9A CN108843024B (en) 2018-06-29 2018-06-29 Construction method for pretensioning and binding longitudinal distribution ribs of prefabricated small box girder steel reinforcement framework

Publications (2)

Publication Number Publication Date
CN108843024A true CN108843024A (en) 2018-11-20
CN108843024B CN108843024B (en) 2020-06-30

Family

ID=64200811

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810696418.9A Active CN108843024B (en) 2018-06-29 2018-06-29 Construction method for pretensioning and binding longitudinal distribution ribs of prefabricated small box girder steel reinforcement framework

Country Status (1)

Country Link
CN (1) CN108843024B (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111877768A (en) * 2020-07-15 2020-11-03 理工华汇(潍坊)智能机器人有限公司 Automatic steel bar binding equipment and binding method
CN113346412A (en) * 2021-04-28 2021-09-03 甘肃路桥建设集团有限公司 Highway tunnel hogging moment truss cable trench template tractor and manufacturing method thereof

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105171914A (en) * 2015-08-27 2015-12-23 江苏省交通工程集团有限公司 Precast box girder steel bar binding mould and mounting method thereof
CN105345926A (en) * 2015-09-25 2016-02-24 安徽水利开发股份有限公司 Prefabricated construction method for prestressed concrete box girder
CN105365042A (en) * 2015-09-25 2016-03-02 佛山路桥预制构件有限公司 Manufacturing method of small prefabricated box girder
CN106592426A (en) * 2017-01-17 2017-04-26 安徽省交通建设有限责任公司 Prefabricated template system for transverse pre-stress overall width reinforced concrete bridge deck and construction method
CN206306252U (en) * 2016-12-07 2017-07-07 中铁一局集团有限公司 A kind of prefabricated small box girder reinforcing bar colligation moulding bed
CN207172365U (en) * 2017-08-11 2018-04-03 湖南省第三工程有限公司 Precast T-Beam framework of steel reinforcement installation mold

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105171914A (en) * 2015-08-27 2015-12-23 江苏省交通工程集团有限公司 Precast box girder steel bar binding mould and mounting method thereof
CN105345926A (en) * 2015-09-25 2016-02-24 安徽水利开发股份有限公司 Prefabricated construction method for prestressed concrete box girder
CN105365042A (en) * 2015-09-25 2016-03-02 佛山路桥预制构件有限公司 Manufacturing method of small prefabricated box girder
CN206306252U (en) * 2016-12-07 2017-07-07 中铁一局集团有限公司 A kind of prefabricated small box girder reinforcing bar colligation moulding bed
CN106592426A (en) * 2017-01-17 2017-04-26 安徽省交通建设有限责任公司 Prefabricated template system for transverse pre-stress overall width reinforced concrete bridge deck and construction method
CN207172365U (en) * 2017-08-11 2018-04-03 湖南省第三工程有限公司 Precast T-Beam framework of steel reinforcement installation mold

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111877768A (en) * 2020-07-15 2020-11-03 理工华汇(潍坊)智能机器人有限公司 Automatic steel bar binding equipment and binding method
CN113346412A (en) * 2021-04-28 2021-09-03 甘肃路桥建设集团有限公司 Highway tunnel hogging moment truss cable trench template tractor and manufacturing method thereof
CN113346412B (en) * 2021-04-28 2022-11-08 甘肃路桥建设集团有限公司 Highway tunnel hogging moment truss cable trench template tractor and manufacturing method thereof

Also Published As

Publication number Publication date
CN108843024B (en) 2020-06-30

Similar Documents

Publication Publication Date Title
CN107119574B (en) A kind of Cantilever Construction Method of arch rib bridge girder
CN101748681B (en) Pretensioning method construction technology of 50m broken line reinforced concrete T-shaped beam
CN106522561A (en) Long-span concrete frame beam bonded prestressed post-cast strip inside stretching construction method
CN108818919A (en) Precast T-Beam reinforcing bar is bound in advance and the construction method of integral installation
KR100982974B1 (en) Method for manufacturing multi-span continuous re-prestressed preflex composite bridge
CN107299773B (en) Load bearing wall reinforcing construction method
CN104831844B (en) The unidirectional double rope inverted cone-shaped cable curtain wall construction methods of arc
CN108843024A (en) The construction method of the pre- tensioning binding of prefabricated small box girder framework of steel reinforcement genesis analysis muscle
CN113818562A (en) Construction method of assembled frame structure
CN108104505A (en) The reinforced construction method of concrete floor
CN104863296A (en) Integrally modular steel bar truss floor plate and construction method thereof
CN114770706B (en) Light T-beam prefabrication equipment and prefabrication installation construction method
CN109457872A (en) A kind of prefabricated assembled constructing device of cast in place frame column steel reinforcement cage and construction method
CN106150105A (en) A kind of stiffened column installation method
CN111074950B (en) Pre-closed advanced water stop post-cast strip for basement outer wall and construction method
CN108571173A (en) It is a kind of it is full assembly sunk type floor making and installation method
CN209384526U (en) A kind of prefabricated assembled constructing device of cast in place frame column steel reinforcement cage
CN208363460U (en) The steel reinforced concrete assembling stair of section are poured after a kind of setting
CN208197158U (en) A kind of reinforcing bar tire suspender of precast segment box beam
CN107724241B (en) Construction method for cable-stayed bridge deck auxiliary structure through counterweight construction
CN112681150B (en) Prefabricated hoisting system for box-type arch bridge and construction method
CN112523503B (en) Disassembly-free supporting system for concrete box girder inner mold and construction method
CN208267197U (en) It is prefabricated to exempt to tear flooring superimposed sheet open
KR101664165B1 (en) Construction method of prestressed steel composite girder bridge
CN208428458U (en) A kind of reinforcing bar tire fixture of precast segment box beam

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant