CN108834046A - Safe step pitch monitoring method, device and server - Google Patents

Safe step pitch monitoring method, device and server Download PDF

Info

Publication number
CN108834046A
CN108834046A CN201810554406.2A CN201810554406A CN108834046A CN 108834046 A CN108834046 A CN 108834046A CN 201810554406 A CN201810554406 A CN 201810554406A CN 108834046 A CN108834046 A CN 108834046A
Authority
CN
China
Prior art keywords
distance
positioning
step pitch
construction
safe
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201810554406.2A
Other languages
Chinese (zh)
Inventor
张森
尹山
仵军胜
刘书培
张力
张可非
张建辉
谢国兵
粟彬
许斌
张春平
李雪艳
樊慧
熊敏
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Tunnel Tang Technology Co Ltd
Original Assignee
Tunnel Tang Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Tunnel Tang Technology Co Ltd filed Critical Tunnel Tang Technology Co Ltd
Priority to CN201810554406.2A priority Critical patent/CN108834046A/en
Publication of CN108834046A publication Critical patent/CN108834046A/en
Pending legal-status Critical Current

Links

Classifications

    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04WWIRELESS COMMUNICATION NETWORKS
    • H04W4/00Services specially adapted for wireless communication networks; Facilities therefor
    • H04W4/02Services making use of location information
    • H04W4/021Services related to particular areas, e.g. point of interest [POI] services, venue services or geofences
    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21FSAFETY DEVICES, TRANSPORT, FILLING-UP, RESCUE, VENTILATION, OR DRAINING IN OR OF MINES OR TUNNELS
    • E21F17/00Methods or devices for use in mines or tunnels, not covered elsewhere
    • E21F17/18Special adaptations of signalling or alarm devices
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04WWIRELESS COMMUNICATION NETWORKS
    • H04W4/00Services specially adapted for wireless communication networks; Facilities therefor
    • H04W4/02Services making use of location information
    • H04W4/025Services making use of location information using location based information parameters
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04WWIRELESS COMMUNICATION NETWORKS
    • H04W4/00Services specially adapted for wireless communication networks; Facilities therefor
    • H04W4/30Services specially adapted for particular environments, situations or purposes

Abstract

The embodiment of the present application provides a kind of safe step pitch monitoring method, device and server, is related to constructing tunnel management domain.Method includes:Obtain the current construction location in construction tunnel;Judge whether the distance between fixation member is greater than safe step pitch in current construction location and construction tunnel;When to be, generates warning information and be sent to the user terminal.By obtaining the current construction location in work tunnel, and judge whether the distance between fixation member is greater than safe step pitch in the current construction location in construction tunnel and construction tunnel, therefore it realizes by automatically obtaining, calculating and judging, can accurately determine whether the construction of construction tunnel is greater than safe step pitch, solve the problems, such as using manually adjust the distance measure and calculate it is time-consuming and laborious, cost is too high and is also easy to mistake occur.And it is greater than safe step pitch determining, it sends a warning message to user terminal, allows users to easily know, and can manage in time.

Description

Safe step pitch monitoring method, device and server
Technical field
This application involves constructing tunnel management domains, in particular to a kind of safe step pitch monitoring method, device and clothes Business device.
Background technique
Currently, in the construction in tunnel, on the one hand in order to guarantee construction safety, the safety accidents such as landslide are prevented, and On the other hand in order to firmly grasp construction speed, the control of step pitch safe in tunnel is very important.
Summary of the invention
The application is to provide a kind of safe step pitch monitoring method, device and server.
Embodiments herein is realized in the following way:
In a first aspect, the embodiment of the present application provides a kind of safe step pitch monitoring method, the method includes:It is constructed Current construction location in tunnel;Judging the distance between the current construction location and fixation member in the construction tunnel is It is no to be greater than safe step pitch;When to be, generates warning information and be sent to the user terminal.
The technical solution provided with reference to the above first aspect, in some possible implementations, the acquisition construction tunnel Current construction location in road, including:At a set point in time, the first positioning that the safety cap that constructor wears is sent is obtained, with And the second positioning that construction equipment is sent is obtained, and by first positioning and second positioning as in construction tunnel Current construction location.
The technical solution provided with reference to the above first aspect, in some possible implementations, the setting time point Preset duration for half an hour to two hours is the time point that unit timing reaches.
The technical solution provided with reference to the above first aspect, in some possible implementations, the fixation member packet Two linings and suppression arch are included, it is described to judge whether the distance between fixation member is big in the current construction location and the construction tunnel In safe step pitch, including:It obtains the first distance between first positioning and two lining, obtain second positioning and institute Second distance between two linings is stated, the third distance between first positioning and the suppression arch is obtained and obtains described the The 4th distance between two positioning and the suppression arch;Judge whether the first distance or the second distance are greater than safe step pitch In two lining safe distances, and the suppression arch for judge whether third distance or the 4th distance are greater than in safe step pitch is safe Distance.
The technical solution provided with reference to the above first aspect, in some possible implementations, the acquisition construction tunnel After current construction location in road, the method also includes:Extremely according to first positioning and the constructor prestored Few history positioning generates the motion track of the constructor;The motion track is sent to the user terminal.
Second aspect, the embodiment of the present application provide a kind of safe step pitch monitoring device, and described device includes:Obtain mould Block, for obtaining the current construction location in construction tunnel.Judgment module, for judging that the current construction location is applied with described Whether the distance between fixation member is greater than safe step pitch in work tunnel.Sending module, for generating warning information when to be And it is sent to the user terminal.
In conjunction with the technical solution that above-mentioned second aspect provides, in some possible implementations, the acquisition module, tool The first positioning that body is sent at a set point in time, obtaining the safety cap that constructor wears, and obtain construction equipment and send Second positioning, and by it is described first positioning and it is described second positioning as the current construction location in construction tunnel.
In conjunction with the technical solution that above-mentioned second aspect provides, in some possible implementations, the judgment module packet It includes:Apart from obtaining unit, for obtaining the first distance between first positioning and two lining, obtaining second positioning First positioning of second distance, acquisition and the third distance pressed down between arch and acquisition institute between two lining State the 4th distance between the second positioning and the suppression arch.Distance Judgment unit, for judging the first distance or described Whether two distances are greater than two lining safe distances in safe step pitch, and judge whether the third distance or the 4th distance are big Safe distance is encircleed in suppression in safe step pitch.
In conjunction with the technical solution that above-mentioned second aspect provides, in some possible implementations, described device further includes: Generation module, for generating the construction according to first positioning and at least one history positioning of the constructor prestored The motion track of person, so that the sending module, is also used to the motion track being sent to the user terminal.
The third aspect, the embodiment of the present application provide a kind of server, and the server includes:Processor, memory, always Line and communication interface, the processor, the communication interface and memory are connected by the bus;The memory, is used for Store program;The processor, for executing the safe step pitch prison by calling the program of storage in the memory Prosecutor method.
Fourth aspect, the embodiment of the present application provide a kind of meter of non-volatile program code that can be performed with processor The readable storage medium of calculation machine, said program code make the processor execute the safe step pitch monitoring method.
The beneficial effect of the embodiment of the present application is:
By obtaining the current construction location in work tunnel, and judge the current construction location in construction tunnel and construction tunnel Whether the distance between fixation member is greater than safe step pitch in road, therefore realizes by automatically obtaining, calculating and judging, can It accurately determines whether the construction of construction tunnel is greater than safe step pitch, solves and measure and calculate using manually adjusting the distance Time-consuming and laborious, cost is too high and is also easy to the problem for mistake occur.And it is greater than safe step pitch determining, it is sent to user terminal Warning information is allowed users to easily know, and can be managed in time.
To enable the above objects, features, and advantages of the application to be clearer and more comprehensible, preferred embodiment is cited below particularly, and cooperate Appended attached drawing, is described in detail below.
Detailed description of the invention
Technical solution in ord to more clearly illustrate embodiments of the present application, below will be to needed in the embodiment attached Figure is briefly described, it should be understood that the following drawings illustrates only some embodiments of the application, therefore is not construed as pair The restriction of range for those of ordinary skill in the art without creative efforts, can also be according to this A little attached drawings obtain other relevant attached drawings.
Fig. 1 shows a kind of structural block diagram of server of the application first embodiment offer;
Fig. 2 shows a kind of flow charts for safe step pitch monitoring method that the application second embodiment provides;
Fig. 3 shows a kind of structural block diagram of safe step pitch monitoring device of the application 3rd embodiment offer;
Fig. 4 shows the structural frames of judgment module in a kind of safe step pitch monitoring device of the application 3rd embodiment offer Figure.
Specific embodiment
Currently, since the control to safe step pitch is very important in the construction in tunnel, along with tunnel excavation It is more and more deep, need the regular safe step pitch gone in measurement tunnel of constructor, be more than state to avoid there is safe step pitch Family's specified value.
But inventor has found by long-term practical studies, follows tunnel excavation progress is regular to go to measure by constructor There are some problems for the mode of safe step pitch in tunnel.Specifically, first, manual measurement and calculate mode there may be accidentally Difference leads to not determine whether safe step pitch is really more than national regulation value;Second, the manual type not only low efficiency used Under, it is also necessary to labor intensive and energy, cost are too high.
Defect present in the above scheme in the prior art, is that inventor is obtaining after practicing and carefully studying As a result, therefore, the solution that the discovery procedure of the above problem and hereinafter the embodiment of the present application are proposed regarding to the issue above Scheme all should be the contribution that inventor makes the application during the application.
Based on the studies above, the embodiment of the present application provides a kind of safe step pitch monitoring method, device and server.Pass through The current construction location in work tunnel is obtained, and judges fixation member in the current construction location in construction tunnel and construction tunnel The distance between whether be greater than safe step pitch, therefore realize by automatically obtaining, calculating and judging, can accurately determine and apply Whether the construction in work tunnel is greater than safe step pitch, solve using manually adjust the distance measure and calculate it is time-consuming and laborious, at There is the problem of mistake in Ben Taigao and being also easy to.And it is greater than safe step pitch determining, it sends a warning message, makes to user terminal Obtaining user can easily know, and can manage in time.
Below in conjunction with attached drawing in the embodiment of the present application, technical solutions in the embodiments of the present application carries out clear, complete Ground description, it is clear that described embodiments are only a part of embodiments of the present application, instead of all the embodiments.Usually exist The component of the embodiment of the present application described and illustrated in attached drawing can be arranged and be designed with a variety of different configurations herein.Cause This, is not intended to limit claimed the application's to the detailed description of the embodiments herein provided in the accompanying drawings below Range, but it is merely representative of the selected embodiment of the application.Based on embodiments herein, those skilled in the art are not being done Every other embodiment obtained under the premise of creative work out, shall fall in the protection scope of this application.
It should be noted that:Similar label and letter indicate similar terms in following attached drawing, therefore, once a certain Xiang Yi It is defined in a attached drawing, does not then need that it is further defined and explained in subsequent attached drawing.Term " first ", " the Two " etc. are only used for distinguishing description, are not understood to indicate or imply relative importance.
First embodiment
Referring to Fig. 1, the embodiment of the present application provides a kind of server 10, the server 10 can for network server, Database server etc..The server 10 can be respectively with the safety cap that wear of constructor being located in construction tunnel and positioned at applying Construction equipment carries out data communication in work tunnel, and server 10 obtains the positioning of constructor by the positioning chip on safety cap, And the positioning of construction equipment is obtained by the positioning chip on construction equipment.
Specifically, the server 10 may include:Memory 11, communication interface 12, bus 13 and processor 14.The place Reason device 14, communication interface 12 and memory 11 are connected by bus 13;Processor 14 be used for execute stored in memory 11 can Execution module, such as computer program.
Wherein, memory 11 may include high-speed random access memory (Random Access Memory RAM), It may further include non-labile memory (non-volatile memory), for example, at least a magnetic disk storage.By extremely A few communication interface 12 (can be wired or wireless) realizes that the server 10 is matched with the constructor in construction tunnel respectively Positioning chip on the safety cap of band and the positioning chip communication connection on construction equipment in construction tunnel, can be used mutually Networking, wide area network, local network, Metropolitan Area Network (MAN) etc..In the present embodiment, memory 11 executes safe step pitch monitoring method for storing Required program.
Bus 13 can be isa bus, pci bus or eisa bus etc..The bus can be divided into address bus, data Bus, control bus etc..Only to be indicated with a four-headed arrow convenient for indicating, in Fig. 1, it is not intended that an only bus or A type of bus.
Processor 14 may be a kind of IC chip, the processing capacity with signal.During realization, above-mentioned side Each step of method can be completed by the integrated logic circuit of the hardware in processor 14 or the instruction of software form.Above-mentioned Processor 14 can be general processor, including central processing unit (Central Processing Unit, abbreviation CPU), network Processor (Network Processor, abbreviation NP) etc.;It can also be digital signal processor (DSP), specific integrated circuit (ASIC), ready-made programmable gate array (FPGA) either other programmable logic device, discrete gate or transistor logic, Discrete hardware components.It may be implemented or execute each method, step and logic diagram of the application in the embodiment of the present invention.It is general Processor can be microprocessor or the processor is also possible to any conventional processor etc..In conjunction with institute of the embodiment of the present invention The step of method of application, can be embodied directly in hardware decoding processor and execute completion, or with the hardware in decoding processor And software module combination executes completion.Software module can be located at random access memory, and flash memory, read-only memory may be programmed read-only In the storage medium of this fields such as memory or electrically erasable programmable memory, register maturation.Processor 14 passes through total Line 13 calls the program being stored in the memory 11, executes the safe step pitch monitoring method.
Second embodiment
Referring to Fig. 2, the embodiment of the present application provides a kind of safe step pitch monitoring method, the safe step pitch monitoring method packet It includes:Step S100, step S200 and step S300.
Step S100:Obtain the current construction location in construction tunnel.
It in construction tunnel, generally requires to construct in the construction tunnel by constructor, or is applied by constructor's operation Construction equipment (such as construction trolley) is constructed in the construction tunnel, to realize the continuous excavation in tunnel.And in order to guarantee safety, Each constructor is required to wear safety cap in construction, and the life to guarantee oneself is safe.
In this present embodiment, be mounted on positioning chip on safety cap and on construction equipment, and server can also with it is every A positioning chip carries out data communication, for example, server can pass through GPRS network (General Packet Radio Service, mobile communication) with each positioning chip carry out data communication.
Specifically, having preset the time point of sampling in server, the setting time point of the sampling can be for default Duration is the time point that unit timing reaches, wherein the preset duration can be half an hour to two hours.For example, preset duration It is 1 hour, and the setting time point of server last time sampling is 8 points.With the continuation timing of server, server can be sentenced Whether the time point that disconnected timing reaches is setting of the last setting time point sampled plus this sampling after preset duration Time point, that is, whether the time point for judging that timing reaches is 9 points.
When being judged as NO, then do not execute subsequent process, and continue to execute judge timing reach time point whether be The setting time point of this sampling.
When being judged as YES, then illustrate to meet this at a set point in time, therefore server can according to predetermined control process Positioning is sent with the positioning chip on the positioning chip and construction equipment respectively on safety cap to be instructed.Correspondingly, peace Positioning chip on full cap according to positioning obtain instruction then can by GPS positioning (Global Positioning System, Global positioning system) or Beidou positioning obtain itself the first current positioning, and be located through GPRS network for first and be sent to Server;Simultaneously, the positioning chip on construction equipment, which also obtains instruction according to positioning, can also then pass through GPS positioning The positioning of (Global Positioning System, global positioning system) or Beidou obtains itself the second current positioning, and GPRS network, which is located through, by second is sent to server.
Since server is sent, positioning is instructed and the positioning chip of safety cap is based on positioning and obtains instruction for first Positioning returns to server and the second positioning is returned to server based on positioning acquisition instruction by the positioning chip of construction equipment The time-consuming of entire interaction flow is very of short duration, therefore it is also assumed that server at a set point in time, obtains constructor wears Safety cap send first positioning, and obtain construction equipment send second positioning.
The first positioning and the second positioning based on acquisition, server can be by the first positioning and the second positioning as at this Current construction location in construction tunnel, therefore server is also that of obtaining the current construction location in the construction tunnel.Wherein, One positioning and the second positioning can be longitude coordinate, latitude coordinates and the altitude coordinates at corresponding physical location, i.e., first is fixed Second coordinate points corresponding to first coordinate points corresponding to position and the second positioning can use x, y and z coordinate in a coordinate system It is indicated.
It should be noted that can be multiple constructors and Duo Tai construction equipment in construction tunnel in actual use.Therefore In fact, server can obtain multiple first positioning of multiple constructors and multiple second positioning of more construction equipments, and Place and judgement are carried out to multiple first positioning and multiple second positioning simultaneously.But due to, server for each first positioning and It is each second positioning processing and judge process be it is identical, for we can be clearly understood from convenient for those skilled in the art Case, the present embodiment are illustrated this programme by taking some first positioning of server process and some second positioning as an example, But it is not intended as the restriction to this programme.
Be also required to, according to the particularity of constructing tunnel, in the construction process, constructor and constructor manipulation apply Construction equipment is often not necessarily to regular movement.The job location of constructor and construction equipment can have stationarity or slowly become The property changed.Therefore preset duration set in the present embodiment can not have to it is too short, and if preset duration it is too short, be likely to occur due to The data of multi collect are duplicate, and the redundancy for causing server to calculate, and influence the performance of server.Therefore, optionally, The present embodiment sets half an hour to two hours for preset duration, not only can satisfy actual judgement demand, can also avoid The redundancy for causing server to calculate due to acquisition repeated data.
Step S200:Judge whether the distance between fixation member is big in the current construction location and the construction tunnel In safe step pitch.
In constructing tunnel, the country rock grade in tunnel and the relationship of safe step pitch are defined in national relevant criterion, In, safe step pitch refers respectively to the distance between the distance between face and two linings and face and suppression arch.
Specially:
Safe stride requirements of the inverted arch apart from face are:
1. I, II, III grade of country rock location inverted arch is not more than 90m apart from face;2. IV, V, VI grade of country rock location inverted arch away from It is not more than 35m from face.
Two, which serve as a contrast the safe stride requirements of (secondary lining) apart from face, is:
1. I, II grade of lining of country rock location two is not more than 200m apart from face;2. III grade of lining of country rock location two is apart from face No more than 120m;3. IV grade of lining of country rock location two is not more than 90m apart from face;4. V, VI country rock location two lining is apart from area Face is not more than 70m.
In this present embodiment, in server according to corresponding to the relevant criterion country rock grade by the construction tunnel in advance most Big distance is stored as safe step pitch.For example, two lining safe distances are 120m in the preset safe step pitch of the construction tunnel, And pressing down arch safe distance is then 90m.In addition, the construction tunnel is also stored in advance in the server to calculate convenient for subsequent distance First structure expression formula away from the nearest one end of face in two linings in road, and be also stored in advance in the suppression arch of the construction tunnel The second structure expression away from the nearest one end of face.Specifically, two lining in away from the nearest one end of face and suppression arch in away from The practical structures of the nearest one end of face be in the matched arcuation in the end face of the construction tunnel, therefore first structure can be passed through Expression formula carrys out the arc structure that the arc structure of two lining shows, and can also encircle by the second structure expression come the suppression It shows;And the first coordinate points and the second positioning that first structure expression formula, the second structure expression, the first positioning are corresponding The coordinate of the second corresponding coordinate points is indicated in the same coordinate system.
Server can calculate the first distance of the first camber line represented by the first coordinate points to first structure expression formula Range, and select the smallest value as first distance in the first distance range, that is, obtain the first positioning and two linings Between first distance.And server can also calculate the first camber line represented by the second coordinate points to first structure expression formula Second distance range, and select the smallest value as second distance in the second distance range, that is, obtain the second positioning With the second distance between two linings.And server can also calculate represented by the first coordinate points to the second structure expression The third distance range of second camber line, and select the smallest value as third distance in the third distance range, that is, it obtains Third distance between first positioning and suppression arch.And server can also calculate the second coordinate points to the second structure representation 4th distance range of the second camber line represented by formula, and select in the 4th distance range the smallest value as the 4th away from From, that is, obtain the second positioning and suppression arch between the 4th distance.
Based on two lining safe distance preset for the construction tunnel and suppression arch safe distance.Server may determine that One distance or second distance whether be greater than in safe step pitch two lining safe distances, and judge third distance or the 4th apart from whether Encircle safe distance greater than the suppression in safe step pitch.
It should be noted that the first structure expression formula can be to correspond to two current lining structures, and the second structure table Up to formula or corresponding current suppression arch structure.If with the progress of practice of construction, the current suppression arch structure and current Two lining structures can also change correspondingly, thus first structure expression formula need corresponding two lining structures change and real-time update, and second Structure expression needs the change of corresponding suppression arch structure and real-time update.
Step S300:When to be, generates warning information and be sent to the user terminal.
When server determines that first distance or second distance serve as a contrast safe distances, and judgement no more than two in safe step pitch Third distance or the 4th distance also encircle safe distance no more than the suppression in safe step pitch.Therefore server is assured that in practice Safe step pitch be meet as defined in, therefore server can terminate the execution of this process.
When server determines the two lining safe distances that first distance or second distance are greater than in safe step pitch, or judgement third Distance or the 4th distance be greater than safe step pitch in suppression encircle safe distance, i.e., judgement first distance, second distance, third distance or There is any one distance to be greater than in 4th distance.Then in actual construction, constructor or construction equipment have arrived and have exceeded explanation Defined safe step pitch is constructed, for example, the 90m of suppression arch safe distance, but collect constructor or construction equipment and encircle away from suppression Distance be 95m, it can be said that bright constructor or construction equipment go out to construct in super distance, then the construction tunnel Face also exceeds defined safe step pitch away from the distance of suppression arch certainly.Therefore server can determine safe step pitch in practice It is against regulation.Server is based on preset control program, then warning information can be generated and send the warning information To user terminal, wherein the user terminal can be the smart phone of the manager of the construction tunnel.
It is understood that arrive, in the present embodiment, by the construction location of detection constructor or construction equipment just equally come can To determine and easily determine whether actual safe step pitch exceeds regulation, therefore solves and mistake is easy to produce using manual ranging Difference, not only also bothersome laborious, also at high cost technical problem.
In the present embodiment, if user thinks to show the shifting of constructor or construction equipment whithin a period of time on the terminal device Dynamic rail mark, then user can manipulate terminal device so that terminal device in response to user manipulation and sent out to server Sending one includes that the track of period is instructed.
For server after obtaining the track that this includes the period and being instructed, server can be according to the period from depositing Storage include this first positioning and the constructor history positioning data in find out obtain time point be located at the period At least two interior positioning or server page from storage can include that second positioning and the construction are set according to the period At least two positioning for obtaining that time point is located in the period are found out in the data of standby history positioning.
Server can generate the motion track of the constructor, example according at least two positioning of the constructor Such as, at least two positioning of the constructor include that the first positioning and at least one history of the constructor prestored position, then may be used The motion track of the constructor is generated at least one history positioning of constructor according to the first positioning.Or server can also be with The motion track of the construction equipment can be generated according at least two positioning of the construction equipment, for example, the construction equipment At least two positioning include that the second positioning and at least one history of the construction equipment prestored position, then can be fixed according to second Position generates the motion track of the construction equipment at least one history positioning of construction equipment.
Therefore server can be sent by the motion track of the constructor or by the motion track of the construction equipment accordingly To user terminal, so that user terminal is shown.
3rd embodiment
Referring to Fig. 3, the embodiment of the present application provides a kind of safe step pitch monitoring device 100, the safe step pitch monitoring dress It sets 100 and is applied to server, which includes:
Module 110 is obtained, for obtaining the current construction location in construction tunnel;
Judgment module 120, for judge in the current construction location and the construction tunnel between fixation member away from From whether greater than safe step pitch;
Sending module 130, for when to be, generating warning information and being sent to the user terminal.
And further include:
Generation module 140, for being positioned according to first positioning and at least one history of the constructor prestored The motion track of the constructor is generated, so that the sending module 130, is also used to the motion track being sent to the use Family terminal.
Wherein, the acquisition module 110 is specifically used for obtaining the safety cap transmission that constructor wears at a set point in time First positioning, and obtain construction equipment send second positioning, and will it is described first positioning and it is described second position conduct Current construction location in construction tunnel.
Referring to Fig. 4, in the embodiment of the present application, judgment module 120 includes:
Apart from obtaining unit 121, for obtaining described in the first distance between first positioning and two lining, acquisition Second positioning it is described two lining between second distance, obtain it is described first positioning it is described suppression arch between third distance, with And obtain second positioning and the 4th distance pressed down between arch.
Distance Judgment unit 122, for judging whether the first distance or the second distance are greater than in safe step pitch Two lining safe distances, and judge third distance or the 4th distance whether be greater than the suppression arch in safe step pitch it is safe away from From.
It should be noted that due to it is apparent to those skilled in the art that, for the convenience and letter of description Clean, system, the specific work process of device and unit of foregoing description can be with reference to corresponding in preceding method embodiment Journey, details are not described herein.
It should be understood by those skilled in the art that, the embodiment of the present application can provide as the production of method, system or computer program Product.Therefore, in terms of the embodiment of the present application can be used complete hardware embodiment, complete software embodiment or combine software and hardware Embodiment form.Moreover, it wherein includes computer available programs generation that the embodiment of the present application, which can be used in one or more, The meter implemented in the computer-usable storage medium (including but not limited to magnetic disk storage, CD-ROM, optical memory etc.) of code The form of calculation machine program product.
In conclusion the embodiment of the present application provides a kind of safe step pitch monitoring method, device and server, method packet It includes:Obtain the current construction location in construction tunnel;Judge in current construction location and construction tunnel between fixation member away from From whether greater than safe step pitch;When to be, generates warning information and be sent to the user terminal.
By obtaining the current construction location in work tunnel, and judge the current construction location in construction tunnel and construction tunnel Whether the distance between fixation member is greater than safe step pitch in road, therefore realizes by automatically obtaining, calculating and judging, can It accurately determines whether the construction of construction tunnel is greater than safe step pitch, solves and measure and calculate using manually adjusting the distance Time-consuming and laborious, cost is too high and is also easy to the problem for mistake occur.And it is greater than safe step pitch determining, it is sent to user terminal Warning information is allowed users to easily know, and can be managed in time.
The above is only preferred embodiment of the present application, are not intended to limit this application, for those skilled in the art For member, various changes and changes are possible in this application.Within the spirit and principles of this application, it is made it is any modification, Equivalent replacement, improvement etc., should be included within the scope of protection of this application.It should be noted that:Similar label and letter are under Similar terms are indicated in the attached drawing in face, therefore, once being defined in a certain Xiang Yi attached drawing, are not then needed in subsequent attached drawing It is further defined and explained.
More than, the only specific embodiment of the application, but the protection scope of the application is not limited thereto, and it is any to be familiar with Those skilled in the art within the technical scope of the present application, can easily think of the change or the replacement, and should all cover Within the protection scope of the application.Therefore, the protection scope of the application should be subject to the protection scope in claims.

Claims (10)

1. a kind of safe step pitch monitoring method, which is characterized in that the method includes:
Obtain the current construction location in construction tunnel;
Judge whether the distance between fixation member is greater than safe step pitch in the current construction location and the construction tunnel;
When to be, generates warning information and be sent to the user terminal.
2. safe step pitch monitoring method according to claim 1, which is characterized in that current in the acquisition construction tunnel Construction location, including:
At a set point in time, the first positioning that the safety cap that constructor wears is sent is obtained, and obtains what construction equipment was sent Second positioning, and by first positioning and second positioning as the current construction location in construction tunnel.
3. safe step pitch monitoring method according to claim 2, which is characterized in that the setting time point is with half an hour It is the time point that unit timing reaches to two hours preset durations.
4. safe step pitch monitoring method according to claim 2, which is characterized in that the fixation member includes two linings and suppression Arch, it is described to judge whether the distance between fixation member is greater than safety step in the current construction location and the construction tunnel Away from, including:
It obtains the first distance between first positioning and two lining, obtain between second positioning and two lining Second distance, obtain it is described first positioning it is described suppression arch between third distance and obtain it is described second positioning with it is described The 4th distance between suppression arch;
Judge the two lining the safe distances whether first distance or the second distance are greater than in safe step pitch, and described in judgement Safe distance is encircleed in the suppression whether third distance or the 4th distance are greater than in safe step pitch.
5. safe step pitch monitoring method according to claim 4, which is characterized in that current in the acquisition construction tunnel After construction location, the method also includes:
The movement of the constructor is generated at least one history positioning of the constructor prestored according to first positioning Track;
The motion track is sent to the user terminal.
6. a kind of safe step pitch monitoring device, which is characterized in that described device includes:
Module is obtained, for obtaining the current construction location in construction tunnel;
Judgment module, for judging whether the distance between fixation member is big in the current construction location and the construction tunnel In safe step pitch;
Sending module, for when to be, generating warning information and being sent to the user terminal.
7. safe step pitch monitoring device according to claim 6, which is characterized in that the acquisition module is specifically used for Setting time point obtains the safety cap that constructor wears is sent first and positions, and the second of acquisition construction equipment transmission is fixed Position, and by first positioning and second positioning as the current construction location in construction tunnel.
8. safe step pitch monitoring device according to claim 7, which is characterized in that the fixation member includes two linings and suppression Arch, the judgment module include:
Apart from obtaining unit, determine for obtaining the first distance between first positioning and two lining, obtaining described second The third distance and acquisition between first positioning of second distance, acquisition and the suppression arch between position and two lining The 4th distance between second positioning and the suppression arch;
Distance Judgment unit, two lining peaces whether being greater than in safe step pitch for judging the first distance or the second distance Full distance, and judge whether the third distance or the 4th distance are greater than the suppression arch safe distance in safe step pitch.
9. safe step pitch monitoring device according to claim 8, which is characterized in that described device further includes:
Generation module, for being positioned described in generation according to first positioning and at least one history of the constructor prestored The motion track of constructor, so that the sending module, is also used to the motion track being sent to the user terminal.
10. a kind of server, which is characterized in that the server includes:Processor, memory, bus and communication interface, it is described Processor, the communication interface and memory are connected by the bus;
The memory, for storing program;
The processor, for executing safe step pitch monitoring method by calling the program of storage in the memory.
CN201810554406.2A 2018-05-31 2018-05-31 Safe step pitch monitoring method, device and server Pending CN108834046A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810554406.2A CN108834046A (en) 2018-05-31 2018-05-31 Safe step pitch monitoring method, device and server

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810554406.2A CN108834046A (en) 2018-05-31 2018-05-31 Safe step pitch monitoring method, device and server

Publications (1)

Publication Number Publication Date
CN108834046A true CN108834046A (en) 2018-11-16

Family

ID=64146682

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810554406.2A Pending CN108834046A (en) 2018-05-31 2018-05-31 Safe step pitch monitoring method, device and server

Country Status (1)

Country Link
CN (1) CN108834046A (en)

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201508175U (en) * 2009-03-25 2010-06-16 重庆恩菲斯软件有限公司 High-precision remote deformation monitoring and prewarning system
KR20130004646U (en) * 2012-01-19 2013-07-29 케이앤씨컨설턴트 주식회사 A safety supervision system of a blind end in a tunnel
KR20140131124A (en) * 2013-05-03 2014-11-12 주식회사 흥인이엔씨 method for measuring displacement ahead of tunnel
CN105004318A (en) * 2015-08-07 2015-10-28 山东科一力电气有限公司 System and method for automatically measuring horizontal displacement in constructed tunnel
CN204902803U (en) * 2015-08-07 2015-12-23 山东科一力电气有限公司 Horizontal displacement automatic measurement system in construction tunnel
CN106228474A (en) * 2016-09-09 2016-12-14 华中科技大学 A kind of construction safety managing and control system based on three-dimensional localization and BIM and method
CN107682807A (en) * 2017-08-30 2018-02-09 深圳市易联智道科技有限公司 Construction site workmen's BIM model real-time location methods
CN107832961A (en) * 2017-11-20 2018-03-23 中铁工程装备集团技术服务有限公司 A kind of constructing tunnel dynamic real-time monitor system

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201508175U (en) * 2009-03-25 2010-06-16 重庆恩菲斯软件有限公司 High-precision remote deformation monitoring and prewarning system
KR20130004646U (en) * 2012-01-19 2013-07-29 케이앤씨컨설턴트 주식회사 A safety supervision system of a blind end in a tunnel
KR20140131124A (en) * 2013-05-03 2014-11-12 주식회사 흥인이엔씨 method for measuring displacement ahead of tunnel
CN105004318A (en) * 2015-08-07 2015-10-28 山东科一力电气有限公司 System and method for automatically measuring horizontal displacement in constructed tunnel
CN204902803U (en) * 2015-08-07 2015-12-23 山东科一力电气有限公司 Horizontal displacement automatic measurement system in construction tunnel
CN106228474A (en) * 2016-09-09 2016-12-14 华中科技大学 A kind of construction safety managing and control system based on three-dimensional localization and BIM and method
CN107682807A (en) * 2017-08-30 2018-02-09 深圳市易联智道科技有限公司 Construction site workmen's BIM model real-time location methods
CN107832961A (en) * 2017-11-20 2018-03-23 中铁工程装备集团技术服务有限公司 A kind of constructing tunnel dynamic real-time monitor system

Similar Documents

Publication Publication Date Title
CN108777841A (en) Safe step pitch monitoring method, device and server
CN104111073A (en) Method and device for identifying inaccurate paths in map data
CN113409482A (en) Optical cable line inspection monitoring and work quantification assessment method
CN103476111A (en) Method, device and system for obtaining geographic position information
CN107368372A (en) A kind of resource exhibition method and device based on sea of clouds OS platforms
CN109410563A (en) Monitor method, apparatus, system and the server of vehicle parking
CN114758495B (en) Traffic signal lamp adjusting method and device and electronic equipment
CN111626648B (en) Survey task scheduling method and device, computer equipment and storage medium
CN109831744A (en) It is a kind of exception track recognizing method, device and storage equipment
CN108834046A (en) Safe step pitch monitoring method, device and server
CN111428197B (en) Data processing method, device and equipment
CN110197583A (en) A kind of recognition methods of road conditions, device and storage medium
CN112819228A (en) Task processing method and device, storage medium and electronic equipment
CN108225315A (en) A kind of road positioning method and device
CN109961344B (en) Automobile service site selection method and device
CN111190975A (en) River channel patrol method for calculating task track coverage rate according to GPS data
CN113961826A (en) Camera searching method and device, intelligent terminal and computer readable storage medium
CN108810036A (en) Processing method, device and the system of geographical location information
CN110864664B (en) Working condition-based settlement measurement frequency optimization method and device
CN110450821A (en) A kind of train position information real time acquiring method and device
CN112116170A (en) Method and device for automatically planning work route
CN105928503B (en) User's mobile route determines system and method
CN116714646B (en) Line test sequence generation method, device, equipment and medium
CN107346457B (en) Bus route grading method, method and device for planning travel route
CN110138987A (en) A kind of customer service cut-in method promoting high-quality user's viscosity

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20181116