CN108830500A - A kind of emergence treating method and its application - Google Patents

A kind of emergence treating method and its application Download PDF

Info

Publication number
CN108830500A
CN108830500A CN201810668439.XA CN201810668439A CN108830500A CN 108830500 A CN108830500 A CN 108830500A CN 201810668439 A CN201810668439 A CN 201810668439A CN 108830500 A CN108830500 A CN 108830500A
Authority
CN
China
Prior art keywords
emergency
monitoring center
task
emergency preplan
monitoring
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201810668439.XA
Other languages
Chinese (zh)
Inventor
徐文峰
韩云
王倩
赵明
张文静
张明坤
刘艺
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shandong Rui Yi Environmental Technology Co Ltd
Original Assignee
Shandong Rui Yi Environmental Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shandong Rui Yi Environmental Technology Co Ltd filed Critical Shandong Rui Yi Environmental Technology Co Ltd
Priority to CN201810668439.XA priority Critical patent/CN108830500A/en
Publication of CN108830500A publication Critical patent/CN108830500A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0631Resource planning, allocation, distributing or scheduling for enterprises or organisations
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0631Resource planning, allocation, distributing or scheduling for enterprises or organisations
    • G06Q10/06311Scheduling, planning or task assignment for a person or group
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0631Resource planning, allocation, distributing or scheduling for enterprises or organisations
    • G06Q10/06311Scheduling, planning or task assignment for a person or group
    • G06Q10/063114Status monitoring or status determination for a person or group

Landscapes

  • Business, Economics & Management (AREA)
  • Human Resources & Organizations (AREA)
  • Engineering & Computer Science (AREA)
  • Strategic Management (AREA)
  • Entrepreneurship & Innovation (AREA)
  • Economics (AREA)
  • Operations Research (AREA)
  • Game Theory and Decision Science (AREA)
  • Development Economics (AREA)
  • Marketing (AREA)
  • Educational Administration (AREA)
  • Quality & Reliability (AREA)
  • Tourism & Hospitality (AREA)
  • Physics & Mathematics (AREA)
  • General Business, Economics & Management (AREA)
  • General Physics & Mathematics (AREA)
  • Theoretical Computer Science (AREA)
  • Alarm Systems (AREA)

Abstract

The invention discloses a kind of emergence treating method and its applications,One of emergence treating method,Equipped with monitoring center and remote terminal,Remote terminal is set to scene,Monitoring center stores and shows the emergency preplan of peril,Monitoring center shows emergency preplan Task-decomposing area,When accident occurs,Monitoring center matches according to accident situation and selects emergency preplan,And generate emergency preplan Task-decomposing area,Emergency preplan Task-decomposing area includes each task resolution of emergency preplan,Monitoring center is communicated with remote terminal is sent to scene for each task resolution,Commander scene carries out emergency disposal,Emergence treating method of the invention,It solves emergency worker in the prior art to need often to learn for a long time,Grasp the content of handbook whole,It is bothersome laborious,And it solves when accident occurs,It cannot be quick,The problem of accurately and being efficiently completed emergency disposal.

Description

A kind of emergence treating method and its application
Technical field
The present invention relates to industrial park administrative skill fields, and in particular to a kind of emergence treating method and its application.
Background technique
In the prior art, chemical industrial park would generally be equipped with the handbook of emergency preplan, but exist ask as follows in practical applications Topic,(1)Emergency worker needs often to learn for a long time, grasps the content of handbook whole, bothersome laborious,(2)In emergency disposal mistake Cheng Zhong needs manually to select corresponding emergency preplan according to specific accident, needs to take some time, and it is pre- to there is selection emergency The problem of case mistake,(3)Emergency preplan step is various, learns even across long-time, there are still answer during emergency disposal Problem, synthtic price index are not remembered or misremembered to anxious prediction scheme step clearly(2)With(3), there are the following problems, in the event of an accident, often not Can quickly, it is accurate and be efficiently completed emergency disposal, and then be likely to result in the further expansion of accident.
In consideration of it, special propose the invention.
Summary of the invention
For the deficiencies in the prior art, the purpose of the present invention is to provide a kind of emergence treating methods, for sending out Emergency disposal when making trouble former, emergence treating method of the invention solve emergency worker in the prior art and need often for a long time The content of handbook whole is grasped in study, bothersome laborious, and is solved when accident occurs, cannot quickly, accurately and be efficiently completed The problem of emergency disposal, emergence treating method through the invention in the event of an accident can be accurately quick, accurate and efficient Emergency disposal is completed, and then prevents the further expansion of accident.
The technical proposal of the invention is realized in this way:
A kind of emergence treating method is equipped with monitoring center and remote terminal, and remote terminal is set to scene, and monitoring center is stored and shown It is shown with the emergency preplan of peril, monitoring center shows emergency preplan Task-decomposing area, when accident occurs, monitoring center root Emergency preplan is matched and selected according to accident situation, and generates emergency preplan Task-decomposing area, and emergency preplan Task-decomposing area includes Each task resolution of emergency preplan, monitoring center is communicated with remote terminal is sent to scene for each task resolution, and scene is commanded to carry out Emergency disposal.
Further, emergency preplan Task-decomposing area includes the comunication area of each task resolution, monitoring center by the comunication area with Remote terminal communication, obtains the processing progress information of each task resolution.
Further, monitoring center shows emergency group and staff's directorial area, and monitoring center passes through emergency Emergency group and staff are deleted and manage in group and the addition of staff's directorial area, and monitoring center passes through emergency group It is dispatched and is commanded in real time with staff's directorial area.
Further, the present invention also provides a kind of industrial park emergence treating method, further include, by garden and its radiation scope It is divided according to point, line, surface and domain, midpoint is the monitoring point in garden, and line is the boundary of subregion, and garden includes at least One sub-regions, face are garden, and domain is the radiation scope of garden, and point is equipped with point monitoring device, and line is equipped with line monitoring device, The boundary in face is equipped with face monitoring device, equipped with domain monitoring device in domain, by point, line, surface and domain monitoring device to garden and Its radiation scope carries out Centralized Monitoring, sends accident information to monitoring center when monitoring device monitors to occur accident, in monitoring The heart is by the Keywords matching emergency preplan in accident information, and then monitoring center selects emergency preplan and life according to accident information At emergency preplan Task-decomposing area.
Further, emergency preplan is divided according to point, line, surface and domain, when monitoring device monitors to occur accident to Monitoring center sends accident information, and monitoring center passes through the Keywords matching in accident information according to the division of monitoring device Emergency preplan.
The beneficial effects of the invention are as follows:
(1)Emergence treating method of the invention, for emergency disposal when accident to occur, when accident occurs, monitoring center according to Accident situation matches and selects emergency preplan, and generates emergency preplan Task-decomposing area, solves the prior art by the step In, artificial selection emergency preplan needs to spend the time when emergency disposal, and the problem of may select wrong emergency preplan;Emergency preplan Task-decomposing area includes each task resolution of emergency preplan, and each task resolution of monitoring center is sent to scene by remote terminal, refers to The scene of waving carries out emergency disposal, and by the step, scene is operated according to the task resolution received, when without carrying out long Between learn, and then solve in the prior art emergency worker need often for a long time learn, in another aspect, due to scene only need to press It is operated according to task resolution, and then solves the problems, such as that step is not remembered clearly or misremembered when emergency disposal in the prior art, to sum up, Emergence treating method of the invention solves when accident occurs, cannot quickly, it is accurate and the problem of be efficiently completed emergency disposal, Emergence treating method through the invention, in the event of an accident, can accurately quickly, it is accurate and be efficiently completed emergency disposal, into And prevent the further expansion of accident.
(2)Emergency preplan Task-decomposing area includes the comunication area of each task resolution, and monitoring center is by the comunication area and remotely Terminal communication, obtains the processing progress information of each task resolution, by the step, the specific reality at the monitoring center scene of can grasping Situation is applied, interim commander is convenient for, and convenient for the rewarding and punishing and accountability after accident, so that beneficial effect(1)It obtains into one Step optimization;Monitoring center shows emergency group and staff's directorial area, and monitoring center passes through emergency group and work Emergency group and staff are deleted and manage in the addition of personal management area, and monitoring center passes through emergency group and work people Member's directorial area is dispatched and is commanded in real time, by the step, interim commander is convenient for, so that beneficial effect(1)? To advanced optimizing.
(3)Industrial park emergence treating method of the invention, emergency disposal when accident occurs for chemical industrial park, passes through Point, line, surface and domain monitoring device carry out Centralized Monitoring to garden and its radiation scope, realized by the step to garden and its Radiation scope goes the monitoring at dead angle comprehensively, specifically, for example, can be found first by monitoring device when an accident occurs, if point Missing inspection occurs for monitoring device, is additionally provided with line monitoring device and is monitored to the line in garden, can monitor and accident occurs Subregion, and so on, it is realized by point, line, surface and domain level Four monitoring device and garden and its radiation scope is gone extremely comprehensively The monitoring at angle.
(4)Accident information is sent to monitoring center when monitoring device monitors to occur accident, monitoring center is believed by accident Keywords matching emergency preplan in breath, then monitoring center selects emergency preplan according to accident information and generates emergency preplan times Business resolver, specifically, for example, being then keyword according to chlorine when the accident that chlorine leaks occurs for monitoring device monitoring discovery With several emergency preplans relevant to chlorine, emergency preplan is accurately then determined according to accident information, and then solve existing skill In art, artificial selection emergency preplan needs to spend the time when emergency disposal, and the problem of may select wrong emergency preplan.
(5)Beneficial effect(3)With(4)In conjunction with beneficial effect(1)With(2), realize in chemical industrial park, when accident occurs Discovery in time, prevents missing inspection, and realizes quick, accurate in the event of an accident and be efficiently completed emergency disposal, prevents accident Further expansion, control trouble in the beneficial effect of rudiment.
(6)Emergency preplan is divided according to point, line, surface and domain, emergency preplan can be made more by the step Accurately, i.e., different emergency preplans is arranged in different accidents, and such as the emergency preplan that line emergency preplan is subregion accident, face emergency is pre- Case is the great emergency preplan of garden grade;Accident information, monitoring are sent to monitoring center when monitoring device monitors to occur accident Center is combined with according to the division of monitoring device, and by the Keywords matching emergency preplan in accident information by the step Beneficial effect(4), emergency preplan is matched according to the division of monitoring device, matched emergency preplan can be made more accurate, so that Beneficial effect(4)Further optimized.
Specific embodiment
In order to make those skilled in the art more fully understand technical solution of the present invention, below with reference to the embodiment of the present invention, Clear, complete description, based on the embodiment in the application, those of ordinary skill in the art are carried out to technical solution of the present invention The model of the application protection all should belong in other similar embodiments obtained without making creative work It encloses.
Embodiment one:
A kind of emergence treating method is equipped with monitoring center and remote terminal, and remote terminal is set to scene, and monitoring center is stored and shown It is shown with the emergency preplan of peril, monitoring center shows emergency preplan Task-decomposing area, when accident occurs, monitoring center root Emergency preplan is matched and selected according to accident situation, and generates emergency preplan Task-decomposing area, and emergency preplan Task-decomposing area includes Each task resolution of emergency preplan, monitoring center is communicated with remote terminal is sent to scene for each task resolution, and scene is commanded to carry out Emergency disposal.
Emergency preplan Task-decomposing area includes the comunication area of each task resolution, and monitoring center passes through the comunication area and remote terminal Communication, obtains the processing progress information of each boundary task.Monitoring center shows emergency group and staff's directorial area, prison Control center passes through emergency group and the addition of staff's directorial area, deletion and management emergency group and staff, monitoring It is dispatched and is commanded in real time by emergency group and staff's directorial area in center.
Embodiment two:
A kind of industrial park emergence treating method, the part being the same as example 1 repeat no more, unlike, by garden and its Radiation scope is divided according to point, line, surface and domain, and midpoint is the monitoring point in garden, and line is the boundary of subregion, garden Including at least one subregion, subregion is workshop in garden(That is danger source), face is garden, when garden only includes one When subregion, line is the boundary in face, and domain is the radiation scope of garden, and point is equipped with point monitoring device, sets wired monitoring on line Equipment, the boundary in face are equipped with face monitoring device, domain monitoring device are equipped in domain, by point, line, surface and domain monitoring device to garden Area and its radiation scope carry out Centralized Monitoring.
Accident information is sent to monitoring center when monitoring device monitors to occur accident, monitoring center passes through in accident information Keywords matching emergency preplan, then monitoring center selects emergency preplan according to accident information and generates emergency preplan task point Xie Qu, specifically, for example, when monitoring device monitoring discovery occur chlorine leakage accident, then according to chlorine be Keywords matching with Then the relevant several emergency preplans of chlorine accurately determine emergency preplan according to accident information.
The present embodiment is preferred, divides according to point, line, surface and domain to emergency preplan, and monitoring device monitors to occur Accident information is sent to monitoring center when accident, monitoring center passes through the pass in accident information according to the division of monitoring device Keyword matches emergency preplan.
In addition, it should be understood that although this specification is described in terms of embodiments, but not each embodiment is only wrapped Containing an independent technical solution, this description of the specification is merely for the sake of clarity, and those skilled in the art should It considers the specification as a whole, the technical solutions in the various embodiments may also be suitably combined, forms those skilled in the art The other embodiments being understood that.

Claims (5)

1. a kind of emergence treating method, which is characterized in that be equipped with monitoring center and remote terminal, remote terminal is set to scene, prison Control central store and the emergency preplan for showing peril, monitoring center show emergency preplan Task-decomposing area, and thing occurs Therefore when, monitoring center matches according to accident situation and selects emergency preplan, and generates emergency preplan Task-decomposing area, emergency preplan Task-decomposing area includes each task resolution of emergency preplan, and monitoring center is communicated with remote terminal is sent to each task resolution now , command scene to carry out emergency disposal.
2. a kind of emergence treating method as described in claim 1, which is characterized in that emergency preplan Task-decomposing area includes each point The comunication area of solution task, monitoring center are communicated by the comunication area with remote terminal, and the processing progress information of each task resolution is obtained.
3. a kind of emergence treating method as described in claim 1, which is characterized in that monitoring center show emergency group and Staff's directorial area, monitoring center pass through emergency group and the addition of staff's directorial area, deletion and management emergency Group and staff, monitoring center are dispatched and are commanded in real time by emergency group and staff's directorial area.
4. a kind of industrial park emergence treating method, which is characterized in that at emergency described in claim 1 ~ 3 any one Method is set, further includes, garden and its radiation scope are divided according to point, line, surface and domain, midpoint is the monitoring in garden Point, line are the boundary of subregion, and garden includes at least one subregion, and face is garden, and domain is the radiation scope of garden, are set on point There is a monitoring device, line is equipped with line monitoring device, and the boundary in face is equipped with face monitoring device, is equipped with domain monitoring device in domain, Centralized Monitoring is carried out to garden and its radiation scope by point, line, surface and domain monitoring device, monitoring device monitors that accident occurs When to monitoring center send accident information, then monitoring center is monitored by the Keywords matching emergency preplan in accident information Center selects emergency preplan according to accident information and generates emergency preplan Task-decomposing area.
5. a kind of industrial park emergence treating method as claimed in claim 4, which is characterized in that according to point, line, surface and domain pair Emergency preplan is divided, and sends accident information to monitoring center when monitoring device monitors to occur accident, monitoring center according to The division of monitoring device, and pass through the Keywords matching emergency preplan in accident information.
CN201810668439.XA 2018-06-26 2018-06-26 A kind of emergence treating method and its application Pending CN108830500A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810668439.XA CN108830500A (en) 2018-06-26 2018-06-26 A kind of emergence treating method and its application

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810668439.XA CN108830500A (en) 2018-06-26 2018-06-26 A kind of emergence treating method and its application

Publications (1)

Publication Number Publication Date
CN108830500A true CN108830500A (en) 2018-11-16

Family

ID=64138865

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810668439.XA Pending CN108830500A (en) 2018-06-26 2018-06-26 A kind of emergence treating method and its application

Country Status (1)

Country Link
CN (1) CN108830500A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110806728A (en) * 2019-09-09 2020-02-18 浙江天澈科技有限公司 Auxiliary disposal method for chemical plant emergency based on electronic plan

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101888718A (en) * 2010-04-28 2010-11-17 东南大学 Toxic or combustible gas sensor wireless detection network system and monitoring method thereof
CN103268109A (en) * 2013-05-24 2013-08-28 常州大学 Chemical industrial park risk management information system based on GIS
CN104836837A (en) * 2015-03-24 2015-08-12 南京太亚科技有限责任公司 Chemical industrial park environmental pollution prevention and emergency system
CN105404955A (en) * 2015-10-27 2016-03-16 中日友好环境保护中心 Method of determining chemical industry park environmental health risk protection distance

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101888718A (en) * 2010-04-28 2010-11-17 东南大学 Toxic or combustible gas sensor wireless detection network system and monitoring method thereof
CN103268109A (en) * 2013-05-24 2013-08-28 常州大学 Chemical industrial park risk management information system based on GIS
CN104836837A (en) * 2015-03-24 2015-08-12 南京太亚科技有限责任公司 Chemical industrial park environmental pollution prevention and emergency system
CN105404955A (en) * 2015-10-27 2016-03-16 中日友好环境保护中心 Method of determining chemical industry park environmental health risk protection distance

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110806728A (en) * 2019-09-09 2020-02-18 浙江天澈科技有限公司 Auxiliary disposal method for chemical plant emergency based on electronic plan
CN110806728B (en) * 2019-09-09 2020-11-13 浙江天澈科技有限公司 Auxiliary disposal method for chemical plant emergency based on electronic plan

Similar Documents

Publication Publication Date Title
Dingsøyr et al. Managing knowledge in global software development projects
DE10297609B4 (en) Method and system for sending location and identity-dependent information to mobile terminals
CN106777082A (en) Equipment search positioning and intelligent linkage management method
CN106779380A (en) A kind of intelligent construction safety checks evaluation system and method
CN106096911B (en) A kind of someone of based role/unmanned collaboration command and control system and its method
CN109784508A (en) A kind of power grid panorama monitoring operation management method and system based on cloud platform
CN109889791A (en) A kind of electric power construction field managing and control system and method
CN105117116B (en) The system and method for obtaining the behavioral data for executing manipulation tasks
CN103344274A (en) Power frequency electromagnetic environment intelligent monitoring and displaying system based on Zigbee
CN107872648A (en) A kind of interior decoration construction scene monitoring system based on three-dimensional modeling
CN108830500A (en) A kind of emergence treating method and its application
Vladutescu et al. Functions and forms of managerial communication
Chen et al. Effects of unreliable automation and individual differences on supervisory control of multiple ground robots
CN108052660A (en) A kind of equipment search localization method and intelligent linkage management method
Eide et al. Inter-organizational collaboration structures during emergency response: A case study.
CN115860410A (en) WeChat-based large civil engineering construction potential safety hazard management system
Kendra et al. Creativity in emergency response after the World Trade Center attack
CN110400075A (en) A kind of wisdom building site quality safety management system
CN103854230A (en) Electric power security risk management and control system and method
CN106548406A (en) A kind of drillng operation risk management and control system and method
CN205845092U (en) A kind of production management system of enterprise
JP2010239528A (en) Management system and method for provided services in communication network
CN102663959A (en) Comprehensive situation intuitive display system and implementation method thereof based on map label processing
CN207473653U (en) The evaluation system of substation's O&M performance
CN110427001A (en) A kind of event monitor method and apparatus and equipment based on production monitoring commander

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20181116