CN108828304A - A kind of micro-base station power supply management device and connection method - Google Patents

A kind of micro-base station power supply management device and connection method Download PDF

Info

Publication number
CN108828304A
CN108828304A CN201810575302.XA CN201810575302A CN108828304A CN 108828304 A CN108828304 A CN 108828304A CN 201810575302 A CN201810575302 A CN 201810575302A CN 108828304 A CN108828304 A CN 108828304A
Authority
CN
China
Prior art keywords
power supply
management device
current
interface
supply management
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201810575302.XA
Other languages
Chinese (zh)
Inventor
丁昊
潘进
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Ye Yirong
Original Assignee
Ma Shan Yang Communication Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Ma Shan Yang Communication Technology Co Ltd filed Critical Ma Shan Yang Communication Technology Co Ltd
Priority to CN201810575302.XA priority Critical patent/CN108828304A/en
Publication of CN108828304A publication Critical patent/CN108828304A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G01MEASURING; TESTING
    • G01RMEASURING ELECTRIC VARIABLES; MEASURING MAGNETIC VARIABLES
    • G01R19/00Arrangements for measuring currents or voltages or for indicating presence or sign thereof
    • G01R19/25Arrangements for measuring currents or voltages or for indicating presence or sign thereof using digital measurement techniques
    • G01R19/2506Arrangements for conditioning or analysing measured signals, e.g. for indicating peak values ; Details concerning sampling, digitizing or waveform capturing
    • G01R19/2509Details concerning sampling, digitizing or waveform capturing
    • GPHYSICS
    • G01MEASURING; TESTING
    • G01RMEASURING ELECTRIC VARIABLES; MEASURING MAGNETIC VARIABLES
    • G01R1/00Details of instruments or arrangements of the types included in groups G01R5/00 - G01R13/00 and G01R31/00
    • G01R1/02General constructional details
    • G01R1/04Housings; Supporting members; Arrangements of terminals
    • G01R1/0408Test fixtures or contact fields; Connectors or connecting adaptors; Test clips; Test sockets
    • G01R1/0416Connectors, terminals
    • GPHYSICS
    • G01MEASURING; TESTING
    • G01RMEASURING ELECTRIC VARIABLES; MEASURING MAGNETIC VARIABLES
    • G01R1/00Details of instruments or arrangements of the types included in groups G01R5/00 - G01R13/00 and G01R31/00
    • G01R1/30Structural combination of electric measuring instruments with basic electronic circuits, e.g. with amplifier
    • GPHYSICS
    • G01MEASURING; TESTING
    • G01RMEASURING ELECTRIC VARIABLES; MEASURING MAGNETIC VARIABLES
    • G01R15/00Details of measuring arrangements of the types provided for in groups G01R17/00 - G01R29/00, G01R33/00 - G01R33/26 or G01R35/00
    • G01R15/14Adaptations providing voltage or current isolation, e.g. for high-voltage or high-current networks
    • G01R15/18Adaptations providing voltage or current isolation, e.g. for high-voltage or high-current networks using inductive devices, e.g. transformers
    • GPHYSICS
    • G01MEASURING; TESTING
    • G01RMEASURING ELECTRIC VARIABLES; MEASURING MAGNETIC VARIABLES
    • G01R22/00Arrangements for measuring time integral of electric power or current, e.g. electricity meters
    • G01R22/06Arrangements for measuring time integral of electric power or current, e.g. electricity meters by electronic methods
    • G01R22/10Arrangements for measuring time integral of electric power or current, e.g. electricity meters by electronic methods using digital techniques
    • H02J13/0075
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02BCLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO BUILDINGS, e.g. HOUSING, HOUSE APPLIANCES OR RELATED END-USER APPLICATIONS
    • Y02B90/00Enabling technologies or technologies with a potential or indirect contribution to GHG emissions mitigation
    • Y02B90/20Smart grids as enabling technology in buildings sector
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04SSYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S40/00Systems for electrical power generation, transmission, distribution or end-user application management characterised by the use of communication or information technologies, or communication or information technology specific aspects supporting them
    • Y04S40/12Systems for electrical power generation, transmission, distribution or end-user application management characterised by the use of communication or information technologies, or communication or information technology specific aspects supporting them characterised by data transport means between the monitoring, controlling or managing units and monitored, controlled or operated electrical equipment
    • Y04S40/126Systems for electrical power generation, transmission, distribution or end-user application management characterised by the use of communication or information technologies, or communication or information technology specific aspects supporting them characterised by data transport means between the monitoring, controlling or managing units and monitored, controlled or operated electrical equipment using wireless data transmission

Landscapes

  • Physics & Mathematics (AREA)
  • General Physics & Mathematics (AREA)
  • Engineering & Computer Science (AREA)
  • Power Engineering (AREA)
  • Supply And Distribution Of Alternating Current (AREA)

Abstract

The present invention relates to the present invention to provide a kind of micro-base station power supply management device and connection method, which includes exchange input interface, equipment power supply interface, loop power supply output/external current sample multiplexing functions interface, AC/DC power module, voltage sample mutual inductor, voltage sample adjustment circuit, equipment control switch 1, cascade Mach-Zehnder interferometer switch 2, current sample mode selector, current transformer 1, current transformer 2, current sample adjustment circuit, sampled reference source, CPU processor, wireless communication module, radio antenna.According to the technical solution of the present invention in addition to can be other than load to each street lamp on street lamp and electricity consumption be managed, additionally it is possible to effectively be loaded to various kinds of equipment of the carry on street lamp post and power consumption management.

Description

A kind of micro-base station power supply management device and connection method
Technical field
The present invention relates to Internet of Things, road lighting field, specially a kind of micro-base station power supply management device and connection side Method.
Background technique
Since street lamp post has city density and the convenient characteristic of powering, in internet of things field and road lighting field, There is producer to start with the convenience of lamp stand power supply carry air borne sensor, camera, display screen etc. on street lamp post each Kind Internet of Things screen component, these Internet of Things screen components all take electricity from lamp stand route using the simple mode of connection, do not consider lamp stand The load capacity of power supply line, the problem of causing lamp stand power supply line overload that route is caused to burn, happen occasionally.
There is part of the manufacturer in order to guarantee that the electrical equipment of carry on street lamp post installs breaker and switch controller additional, still These devices are all to work independently, and during lamp stand loop power supply, all devices while electrifying startup cause starting current mistake Power supply line's failure problems are caused greatly.
Since street lighting belongs to social public resource, the street lighting electricity charge are by government finance according in Street lamps control cabinet Ammeter continuous data carries out unified payment, but the electricity consumption of the equipment consumption of carry can reach street lamp use on street lamp post As many as 40% of electricity, can not to these it is additional carry out effective quantitative statistics with electric consumption, lead to the tight of public social resources It wastes again.
These defects mentioned above have become technical problem urgently to be solved.
Summary of the invention
The present invention devises a kind of micro-base station power supply management device and connection method.
Present invention employs following technical solutions:
A kind of micro-base station power supply management device, the power supply management device include exchange input interface, equipment power supply interface, circuit confession Electricity output/external current sample multiplexing functions interface, radio antenna, it is characterised in that:Input interface is exchanged, equipment is used for The exchange of power supply inputs, and connects firewire, the protecting field, zero curve of exchange input respectively with tri- pins of L, E, N;Equipment power supply connects Mouthful, for being powered management to the equipment that is managed, there are tri- pins of L, E, N, respectively to managed devices offer firewire, The access of protecting field, zero curve;Loop power supply output/external current sample multiplexing functions interface, is used for built-in tandem type connection side Loop power supply output in method, and for the connection of the external current transformer in external mutual-inductor type connection method.
Further, which further includes AC/DC power module, voltage sample mutual inductor, voltage sample tune Whole circuit, equipment control switch 1, cascade Mach-Zehnder interferometer switch 2, current sample mode selector, current transformer 1, Current Mutual Inductance Device 2, current sample adjustment circuit, sampled reference source, CPU processor, wireless communication module.
Further, the equipment control switch 1 is defaulted as always-on, using control relay by CPU processor IO controls hardware realization switch control, and the normally opened contact NO and intermediate contact CO by controlling relay realize opening for power supply unit Close power supply.
Further, the cascade Mach-Zehnder interferometer switch 2 is defaulted as normally closed mode, using control relay by CPU processor IO controls hardware realization switch control, realizes opening for loop power supply output by the normally opened contact and intermediate contact that control relay Close power supply.
Further, the voltage sample adjustment circuit includes voltage transformer, phase-adjusting circuit, voltage electricity Road, over-voltage protector, amplifier amplifying circuit, driving follow circuit;The current sample adjustment circuit include current transformer, Phase-adjusting circuit, electric current turn potential circuit, over-voltage protector, operational amplification circuit, driving follow circuit.
Further, the loop power supply output/external current sample multiplexing functions interface is as external current sample function When energy, external D.C mutual-inductor S- is drawn by the S-/E pin of external current sample interface with the protecting field E for exchanging input interface Foot is connected.
Further, the loop power supply output/external current sample multiplexing functions interface has L/S+, E/S-, N tri- Pin when as loop power supply output function, provides firewire, protecting field, zero curve to next stage power supply management device respectively and connects Enter, when as external current sample function, for connecting S+, S- of external current transformer.
Further, the CPU processor, the processor is for voltage signal, the two-way electric current to power supply management device Signal carries out ADC sampling, and the power consumption and electricity consumption of the equipment that equipment power supply interface connects are calculated according to voltage and current value, simultaneously The total electricity consumption for calculating the subsequent power supply management device of this power supply management device and electrical equipment, inside CPU processor Preset threshold values judges that the electric current of the equipment of equipment power supply interface connection is lower greatly and whether electricity consumption has been more than preset threshold, if super Preset threshold is crossed, then the power supply that pin cuts off electrical equipment is controlled by IO;The processor is handled using STM32F103RC ARM Device completes the acquisition of the electric current, voltage of power supply management device and the calculating of electricity consumption.
Further, the current sample adjustment circuit, the signal for converting current transformer 1 and 2 sample Preceding adjustment guarantees that the signal waveform sampled, phase, volt value is undistorted is sampled by sampling unit, and improves two-way electric current The precision of sampling;The current sample adjustment circuit, using LM358 operational amplifier complete input current signal phase compensation, Bi-directional scaling, driving follow tertiary treatment.
Further, the current transformer 1, the current signal of the load equipment for connecting equipment power supply interface into Row isolation signals conversion, in order to carry out current sample;The current transformer 2 is used in built-in tandem type connection method The subsequent current signal for electric loading that loop power supply output interface is connected carries out isolation signals conversion, in external mutual-inductor type In connection method, for the current signal of external current transformer to be carried out isolation signals conversion, which will turn The current signal changed is for carrying out current sample;The electric current that the current transformer 1,2 is all made of TA1005-1M high precision is mutual The conversion of sensor progress current signal.
Further, the current sample mode selector, for current sample mould in built-in tandem type connection method The selection of current sample mode in the selection of formula and external mutual-inductor type connection method;The current sample mode selector has 1,2,3 totally 3 short-circuited terminals compositions, the selection of current sample mode are realized by following connection type, connection type is:1)It hands over The firewire L pin of stream input interface is connected by 2 relay of cascade Mach-Zehnder interferometer with No. 1 short-circuited terminal of selection device;2)Selection dress No. 2 short-circuited terminals are set to connect by current transformer 2 and loop power supply output/external current sample multiplexing functions interface L/S+ It connects;3)Exchange input interface protecting field E pin be connected with No. 3 short-circuited terminals of selection device, while with loop power supply output/ The E/S- connection of external current sample multiplexing functions interface;4)Exchange zero curve N pin and the loop power supply output/outer of input interface Set the N connection of current sample multiplexing functions interface.
Further, the selection of current sample mode specifically includes in the built-in tandem type connection method:1)Selection dress Set 1, No. 2 terminal of short circuit;2)The firewire L of exchange input is connected by 2 relay of cascade Mach-Zehnder interferometer with No. 1 terminal of selection device, is led to The firewire pin L connection through 2 power supply to the device output interface of overcurrent mutual inductor after 2 terminals is crossed, is filled to junior's power supply management It sets and is powered input, the power supply of junior's power supply management device passes through zero curve N and loop power supply output interface after overload Zero curve N pin is connected, and loop power supply output interface zero curve N gives junior's power supply management to fill with input zero curve N connection, formation is exchanged Set the circuit of power supply;3)Current supply circuit is carried out by current transformer 2 to be galvanically isolated conversion, then inputs to current sample tune CPU module is inputed to after whole circuit progress signal adjustment to be sampled.
Further, the selection of current sample mode specifically includes in the external mutual-inductor type connection method:1)Selection Device is shorted 2, No. 3 terminals;2)After external D.C mutual-inductor detects the high current on external cable, by external current transformer S+ be connected with the S+ pin of external current sample interface, then by current transformer 2 and selection device No. 2 terminals into Row connection, is connected by No. 3 terminals of selection device with the S- pin of external current sample interface, and adopted by external electric current Sample S- pin is connected with the S- of external D.C mutual-inductor, forms external current detection circuit;3)By current transformer 2 to electric current Measure loop carries out being galvanically isolated conversion, then inputs to after current sample adjustment circuit carries out signal adjustment and inputs to CPU mould Block is sampled.
A kind of built-in tandem type connection method of power supply management device, the connection method are used for multistage power supply management device It is attached, which is characterized in that the connection method includes:1)The exchange of supply input connection first order power supply management device is defeated Incoming interface completes the supply input of first order power supply management device;2)The equipment power supply interface of first order power supply management device connects Electrical equipment is connect, the power supply management to first order electrical equipment is completed;3)Loop power supply output/external current sample multiplexing is connect Mouth is used as loop power supply output interface, the loop power supply output interface connection second level power supply of first order power supply management device The exchange input interface of managing device is powered input to second level power supply management device;Second level power supply management device Equipment power supply interface connects second level electrical equipment, for completing the power supply management of second level electrical equipment;4)Second level power supply The exchange input interface of the loop power supply output interface connection third level power supply management device of managing device, to the third level for fulgurite Reason device is powered input;And so on, complete the power supply management of N grades of power supply management devices and electrical equipment N.
A kind of external mutual-inductor type connection method of power supply management device, which is characterized in that the connection method includes:1)The The exchange input interface of one power supply management device is articulated on service cable, is supplied by service cable to the first power supply management device Electricity;2)The equipment power supply interface of first power supply management device connects the first electrical equipment, for completing to the first electrical equipment Power supply management;3)The first Current Mutual Inductance is accessed behind power supply line's connector of the first power supply management device on service cable Device is used for the subsequent power supply load current of detection cable;4)Using loop power supply output/external current sample multiplex interface as external Current sample interface uses, and the external current sample interface of the first power supply management device connects the first current transformer, for examining Survey the size of current at the first current transformer;5)It is mutual that the exchange input interface of second power supply management device is articulated in the first electric current On service cable behind sensor, before the second current transformer;6)The equipment power supply interface of second power supply management device connects Second electrical equipment, for managing the power supply of the second electrical equipment;7)The detection of second current transformer is mounted on second for fulgurite Behind the power supply wire terminal for managing device, for detecting the load current of the subsequent electrical equipment of the second power supply management device;With this Analogize, third power supply management device to N power supply management device is respectively used to management third electrical equipment to N electrical equipment Power supply, third current transformer to N current transformer are used to detect load current thereafter.
The beneficial effects of the invention are as follows:According to the technical solution of the present invention in addition to can be to each street lamp on street lamp Load and electricity consumption are managed outer, additionally it is possible to effectively be loaded to various kinds of equipment of the carry on street lamp post and electricity consumption Management.
Detailed description of the invention
By reading the following detailed description of the preferred embodiment, various other advantages and benefits are common for this field Technical staff will become clear.The drawings are only for the purpose of illustrating a preferred embodiment, and is not considered as to the present invention Limitation.And throughout the drawings, the same reference numbers will be used to refer to the same parts.In the accompanying drawings:
Fig. 1 is the structural block diagram of power supply management device;
Fig. 2 is the schematic diagram of built-in tandem type connection;
Fig. 3 is the schematic diagram of external mutual-inductor type connection;
Fig. 4 is the electrical block diagram of power supply management device;
Fig. 5 is the structural schematic diagram of current sample mode selector;
Fig. 6 is the structural schematic diagram of built-in cascade current sampling;
Fig. 7 is the structural schematic diagram of external transformer current sampling;
Fig. 8 is the structural schematic diagram of external transformer current sampling protecting field;
Fig. 9 is the structural schematic diagram of voltage sample adjustment circuit;
Figure 10 is the structural schematic diagram of current sample adjustment circuit;
The invention will be further described with reference to the accompanying drawings and embodiments.
Specific embodiment
Present invention is further described in detail With reference to embodiment:
The present invention, which is managed the equipment of carry on lamp stand, to be completed by a wireless street lamp micro-base station power supply management device, this Invention is referred to as power supply management device for convenience, by wireless street lamp micro-base station power supply management device.
Fig. 1 is the structural block diagram of power supply management device.The power supply management device includes:Exchange input interface, equipment power supply Totally 4 parts form for interface, loop power supply output/external current sample multiplex interface, radio antenna.
The present invention is powered management to the equipment of carry on street lamp post by the completion of multiple power supply management devices, according to pipe The load total current of the electrical equipment of reason is of different sizes, and power supply management device is divided into for electrically connected method:1)Built-in tandem type Connection;2)External mutual-inductor type connection, totally 2 kinds of connection methods.
Loop power supply output/external current sample multiplex interface of the invention is a multifunctional multiplexing interface.It is born always When carrying electric current≤10A electric current, using built-in tandem type connection method, loop power supply output/external current sample multiplex interface is made For loop power supply output function, for completing the power supply management of carry equipment on street lamp post.In total load current > 10A, Using external mutual-inductor type connection method, loop power supply output/external current sample multiplex interface is as external current sample function Can, external external current sampling mutual inductor realizes the power supply management of high current electrical equipment.
Fig. 2 is the schematic diagram of built-in tandem type connection.The built-in tandem type connection is for connecting multistage power supply management device It picks up and, specifically include:
1)By the exchange input interface of supply input connection first order power supply management device, first order power supply management device is completed Supply input;
2)The electrical equipment of carry, is completed to street lamp on the equipment power supply interface connection street lamp post of first order power supply management device The electrical equipment of carry on lamp stand, such as street illumination lamp(As shown in the figure), power supply management, realize streetlamp foundation illumination Management;
3)In built-in tandem type connection method, using loop power supply output/external current sample multiplex interface as loop power supply Output interface uses, the exchange of the loop power supply output interface connection second level power supply management device of first order power supply management device Input interface is powered input to second level power supply management device.The equipment power supply interface of second level power supply management device connects The electrical equipment A for connecing carry on street lamp post, for completing the power supply management of electrical equipment A;
4)The exchange input of the loop power supply output interface connection third level power supply management device of second level power supply management device connects Mouthful, input is powered to third level power supply management device;
5)And so on, complete the power supply management of N grades of power supply management devices and electrical equipment N.
In built-in tandem type connection method of the invention, one electricity consumption of equipment power supply interface management of power supply management device is set Standby, first power supply management device completes the power supply management of street illumination lamp, and loop power supply output interface is completed to cascade below All power supply management devices and electrical equipment power supply management.
Fig. 3 is the schematic diagram of external mutual-inductor type connection.The external mutual-inductor type connection method is used for current supply circuit electric current Biggish application scenarios, specifically include:
1)The exchange input interface of power supply management device 1 is articulated on service cable, by service cable to power supply management device 1 Power supply;
2)The equipment power supply interface of power supply management device 1 connects electrical equipment, such as street illumination lamp(As shown in the figure), it is used for The power supply management of street illumination lamp is completed, realizes streetlamp foundation illumination supervision;
3)A current transformer 1 is accessed behind power supply line's connector of power supply management device 1 on service cable, for examining Survey the subsequent power supply load current of cable;
4)In external mutual-inductor type connection method, using loop power supply output/external current sample multiplex interface as external electricity It flows Sampling Interface to use, the external current sample interface of power supply management device 1 connects current transformer 1, mutual for detecting electric current Size of current at sensor 1;
5)The exchange input interface of power supply management device 2 is articulated in behind current transformer 1, the power supply of 2 front of current transformer On cable;
6)The equipment power supply interface of power supply management device 2 connects electrical equipment A, for managing the power supply of electrical equipment A;
7)The detection of current transformer 2 is mounted on behind the power supply wire terminal of power supply management device 2, for detecting power supply management device The load current of 2 subsequent electrical equipments;
8)And so on, power supply management device 3 to power supply management device N is respectively used to management electrical equipment B to electrical equipment N's Power supply, current transformer 3 to current transformer N are used to detect load current thereafter.
In above-mentioned external mutual-inductor type connection method, the electricity consumption that each managing device completes the access of equipment power supply interface is set Standby power supply, current transformer management be all electrical equipment load currents thereafter summation.
Fig. 4 is the electrical block diagram of power supply management device.The power supply management device includes exchange input interface, equipment Power supply interface, loop power supply output/external current sample multiplexing functions interface, AC/DC power module, voltage sample mutual inductor, Voltage sample adjustment circuit, equipment control switch 1, cascade Mach-Zehnder interferometer switch 2, current sample mode selector, current transformer 1, current transformer 2, current sample adjustment circuit, sampled reference source, CPU processor, wireless communication module, wireless communication day Line.Wherein:
1, input interface is exchanged, for the exchange input of equipment power supply, connects exchange input respectively with tri- pins of L, E, N Firewire, protecting field, zero curve;
2, equipment power supply interface has tri- pins of L, E, N, gives quilt respectively for being powered management to the equipment being managed The access of management equipment offer firewire, protecting field, zero curve;
3, loop power supply output/external current sample multiplexing functions interface, supplies for the circuit in built-in tandem type connection method Electricity output, and for the connection of the external current transformer in external mutual-inductor type connection method, there is L/S+, E/S-, N tri- A pin when as loop power supply output function, provides firewire, protecting field, zero curve to next stage power supply management device respectively Access, when as external current sample function, for connecting S+, S- of external current transformer;
4, AC/DC power module, for AC power source to be converted to DC power supply, in power supply management device other circuits and Module provides working power;
5, the alternating voltage of supply input is carried out isolation signals conversion, in order to carry out voltage sample by voltage sample mutual inductor;
The voltage sample mutual inductor carries out the conversion of voltage signal using the voltage isolation transformer of TV1005-1M high precision;
6, voltage sample adjustment circuit, for being adjusted before the information of voltage sampling after converting isolation signals, what guarantee was sampled Signal waveform, phase, volt value is undistorted is sampled by sampling unit, and improves the sampling precision of voltage sample;
The voltage sample adjustment circuit completes the phase compensation of input voltage signal using LM358 operational amplifier, in proportion contracts It puts, drive and follow tertiary treatment;
7, equipment control switch 1 controls the power switch of signal management equipment power supply interface by CPU IO;
The equipment control switch 1 is powered control using HF152F relay, completes no more than 5A current flow devices for fulgurite Reason;
8, cascade Mach-Zehnder interferometer switch 2 controls the output of signal management loop power supply by CPU IO in built-in tandem type connection method The power switch of interface;
The cascade Mach-Zehnder interferometer switch 2 is powered control using HF2150 relay, completes the power supply for being no more than 10A current flow devices Management;
9, current sample mode selector, for electric current in built-in tandem type connection method and external mutual-inductor type connection method The selection of sampling configuration;
10, current transformer 1, the current signal of the load equipment for connecting equipment power supply interface carry out isolation signals and turn It changes, in order to carry out current sample;
11, current transformer 2, the subsequent confession in built-in tandem type connection method, for connecting loop power supply output interface The current signal of electric loading carries out isolation signals conversion, in external mutual-inductor type connection method, for external electric current is mutual The current signal of sensor carries out isolation signals conversion, which is used to the current signal of conversion carry out current sample;
The current transformer that the current transformer 1,2 is all made of TA1005-1M high precision carries out the conversion of current signal;
12, current sample adjustment circuit, the signal for converting current transformer 1 and 2 carry out sampling preceding adjustment, and guarantee is adopted The signal waveform of sample, phase, volt value is undistorted is sampled by sampling unit, and improves the precision of two-way current sample;
The current sample adjustment circuit completes the phase compensation of input current signal using LM358 operational amplifier, in proportion contracts It puts, drive and follow tertiary treatment;
13, sampled reference source provides a sampling high-precision 1V sampled reference source to improve the sampling precision of voltage and current High-precision signal adjustment is carried out to voltage sample adjustment circuit and current sample adjustment circuit;
The sampled reference power supply completes the reference voltage of high-precision 1V using TL431;
14, CPU processor, which is used for the voltage signal to power supply management device, two-way current signal carries out ADC and adopts Sample, and the power consumption and electricity consumption of the equipment according to the calculating equipment power supply interface connection of voltage and current value, while this is calculated for fulgurite The total electricity consumption for managing device subsequent power supply management device and electrical equipment, sentences according to the threshold values of CPU processor internal preset The electric current of the equipment of disconnected equipment power supply interface connection is lower greatly and whether electricity consumption has been more than preset threshold, if being more than preset threshold, The power supply that pin cuts off electrical equipment is then controlled by IO;
The processor completes the acquisition and electricity consumption of the electric current, voltage of power supply management device using STM32F103RC arm processor The calculating of amount;
15, wireless communication module, according to the instruction of CPU processor, module is by the electric current of power supply management, electricity by wireless communication Pressure, power consumption data by wireless communication antenna transmission to administrative department;
The wireless communication module is completed to lead with other electric energy metering devices or management using SX1278 wireless data transfer module The communication of machine;
16, radio antenna, transmitting and reception for wireless signal.
Equipment control switch 1 of the invention is defaulted as always-on, real by the IO control hardware of CPU using control relay Existing switch control, normally opened contact NO and intermediate contact CO by controlling relay realize that the switch of power supply unit is powered.This hair Bright cascade Mach-Zehnder interferometer switch 2 is defaulted as normally closed mode, controls hardware realization switch control by the IO of CPU using control relay, The switch power supply of loop power supply output is realized by the normally opened contact and intermediate contact that control relay.
Fig. 5 is the structural schematic diagram of current sample mode selector.Electric current in power supply management device of the invention is adopted Sample mode selector by 1,2,3 totally 3 short-circuited terminals form, pass through following connection type realize current sample mode choosing It selects, connection type is:1)The firewire L pin for exchanging input interface passes through No. 1 terminal phase of 2 relay of cascade Mach-Zehnder interferometer and selection device Connection;2)No. 2 terminals of selection device pass through current transformer 2 and loop power supply output/external current sample multiplexing functions interface L/S+ connection;3)The protecting field E pin of exchange input interface is connected with No. 3 terminals of selection device, while and loop power supply The E/S- connection of output/external current sample multiplexing functions interface;4)Zero curve N pin and the loop power supply for exchanging input interface are defeated The N connection of out/external current sample multiplexing functions interface.
Loop power supply output/external current sample multiplexing functions interface is as two kinds of function in power supply management device of the invention It can multiplexing:1)When as loop power supply output function, there is firewire L, tri- protecting field E, zero curve N pins;2)As external electricity When flowing sampling functions, there are two pins of external mutual inductor S+, S-;Firewire L when the present invention is by loop power supply output function and Mutual inductor S+ is multiplexed on a pin when external current sample function, protecting field E when by loop power supply output function and outer Mutual inductor S- is multiplexed on a pin when setting current sample function.
Fig. 6 is the structural schematic diagram of built-in cascade current sampling.The loop power supply output of power supply management device of the invention/ Current sample mode is when external current sample multiplexing functions interface is as loop power supply output function:1)Selection device short circuit 1, No. 2 terminals;2)The firewire L of exchange input is connected by 2 relay of cascade Mach-Zehnder interferometer with No. 1 terminal of selection device, passes through 2 terminals By the firewire pin L connection of 2 power supply to the device output interface of overcurrent mutual inductor, it is powered to junior's power supply management device Input, the power supply of junior's power supply management device pass through the zero curve N pin phase of zero curve N and loop power supply output interface after overload Connection, loop power supply output interface zero curve N are returned with input zero curve N connection, formation is exchanged to what junior's power supply management device was powered Road;3)Current supply circuit is carried out by current transformer 2 to be galvanically isolated conversion, then inputs to the progress of current sample adjustment circuit CPU module is inputed to after signal adjustment to be sampled.
Fig. 7 is the structural schematic diagram of external transformer current sampling.The loop power supply of power supply management device of the invention is defeated Current sample mode is when out/external current sample multiplexing functions interface is as external current sample function:1)Selection device is short Connect 2, No. 3 terminals;2)After external D.C mutual-inductor detects the high current on external cable, by the S+ of external current transformer and The S+ pin of external current sample interface is connected, and is then connected by No. 2 terminals of current transformer 2 and selection device It connects, is connected by No. 3 terminals of selection device with the S- pin of external current sample interface, and pass through external current sample S- Pin is connected with the S- of external D.C mutual-inductor, forms external current detection circuit;3)By current transformer 2 to current detecting Circuit carries out being galvanically isolated conversion, then input to current sample adjustment circuit carry out signal adjustment after input to CPU module into Row sampling.
Fig. 8 is the structural schematic diagram of external transformer current sampling protecting field.The circuit of power supply management device of the invention When for electricity output/external current sample multiplexing functions interface as external current sample function, external D.C mutual-inductor S- passes through The S-/E pin of external current sample interface is connected with the protecting field E pin for exchanging input interface, avoids external AC mutual induction The appearance of device high-voltage pulse signal, the safety accident for avoiding result in the person and equipment occur.
Built-in tandem type connection method of the invention can control all dresses below by the cascade Mach-Zehnder interferometer switch 2 in device Set the power supply with electrical equipment, detect loop power supply output interface connection power load electric current be more than 10A electric current or When preset current threshold, cascade Mach-Zehnder interferometer switch 2 can be disconnected, interrupts the power supply to all devices and electrical equipment below.
External mutual-inductor type connection method of the invention is detecting that the load current in service cable is more than cable load When capacity or predetermined current threshold values, it is first shut off the power supply of the electrical equipment of appliance arrangement power supply interface, with protection power supply electricity The power supply safety of cable, then antenna sends load current alarm of transfiniting in other devices by wireless communication, notifies other Device cuts off the power supply of the electrical equipment of the equipment power supply interface of itself, to guarantee the power supply safety of service cable.
Cascade Mach-Zehnder interferometer switch 2 in the device of the invention is using normally closed mode is defaulted, so that device is handed in normal work Stream input interface and loop power supply output interface remain on state, when the load capacity of follow up device management surmounts When the maximum threshold or follow up device of CPU processor setting need to carry out repair and replacement, CPU processor passes through control signal Line traffic control bus loop power switch disconnects loop power supply.
Equipment control switch 1 in the device of the invention is using default always-on, so that the power load being managed is set In power supply off-state, the timer that only CPU processor receives inside wireless instructions or CPU processing refers to standby default It enables, just opens the power supply to power load equipment;Each device uses timesharing control to the unlatching power supply of power load equipment simultaneously System, avoids carrying out unlatching power supply to power load equipment simultaneously, causes current supply circuit starting current excessive and burn power supply line The problem of occur;When the power consumption of power load equipment is excessive, or the electric energy of consumption has been more than the threshold values set in CPU processor When, CPU processor controls load equipment power switch by control signal wire, disconnects the power supply to power load equipment.
Fig. 9 is the structural schematic diagram of voltage sample adjustment circuit.Voltage sample adjustment circuit of the invention by:1, voltage is mutual Sensor;2, phase-adjusting circuit;3, voltage branch circuit;4, over-voltage protector;5, operational amplification circuit;6, driving follows electricity Totally 6 parts form on road.
Figure 10 is the structural schematic diagram of current sample adjustment circuit.Current sample adjustment circuit of the invention by:1, electric current Mutual inductor;2, phase-adjusting circuit;3, electric current turns potential circuit;4, over-voltage protector;5, operational amplification circuit;6, driving with With circuit, totally 6 parts are formed.
The foregoing is only a preferred embodiment of the present invention, but scope of protection of the present invention is not limited thereto, In the technical scope disclosed by the present invention, any changes or substitutions that can be easily thought of by anyone skilled in the art, It should be covered by the protection scope of the present invention.Therefore, protection scope of the present invention should be with the protection model of the claim Subject to enclosing.

Claims (15)

1. a kind of micro-base station power supply management device, which includes exchange input interface, equipment power supply interface, circuit For electricity output/external current sample multiplexing functions interface, radio antenna, it is characterised in that:
Input interface is exchanged, for the exchange input of equipment power supply, connects the fire of exchange input respectively with tri- pins of L, E, N Line, protecting field, zero curve;
Equipment power supply interface has tri- pins of L, E, N, respectively to by pipe for being powered management to the equipment being managed It manages equipment and the access of firewire, protecting field, zero curve is provided;
Loop power supply output/external current sample multiplexing functions interface, for the loop power supply in built-in tandem type connection method Output, and for the connection of the external current transformer in external mutual-inductor type connection method.
2. power supply management device according to claim 1, it is characterised in that:
The power supply management device further includes AC/DC power module, voltage sample mutual inductor, voltage sample adjustment circuit, equipment control Make switch 1, cascade Mach-Zehnder interferometer switch 2, current sample mode selector, current transformer 1, current transformer 2, current sample tune Whole circuit, sampled reference source, CPU processor, wireless communication module.
3. power supply management device according to claim 2, it is characterised in that:The equipment control switch 1 is defaulted as normally opened Mode controls hardware realization switch control by the IO of CPU processor using control relay, by the normally opened touching for controlling relay Point NO and intermediate contact CO realizes the switch power supply of power supply unit.
4. power supply management device according to claim 2, it is characterised in that:The cascade Mach-Zehnder interferometer switch 2 is defaulted as normally closed Mode controls hardware realization switch control by the IO of CPU processor using control relay, by the normally opened touching for controlling relay Point and intermediate contact realize the switch power supply of loop power supply output.
5. power supply management device according to claim 2, it is characterised in that:
The voltage sample adjustment circuit includes voltage transformer, phase-adjusting circuit, voltage branch circuit, overvoltage protector Part, amplifier amplifying circuit, driving follow circuit;
The current sample adjustment circuit includes that current transformer, phase-adjusting circuit, electric current turn potential circuit, overvoltage protector Part, operational amplification circuit, driving follow circuit.
6. power supply management device according to claim 1 or 2, it is characterised in that:
When the loop power supply output/external current sample multiplexing functions interface is as external current sample function, external exchange Mutual inductor S- is connected by the S-/E pin of external current sample interface with the protecting field E pin for exchanging input interface.
7. power supply management device according to claim 1 or 2, it is characterised in that:
Loop power supply output/external current sample multiplexing functions the interface has tri- pins of L/S+, E/S-, N, as circuit When output function of powering, the access of firewire, protecting field, zero curve is provided to next stage power supply management device respectively, as external electricity When flowing sampling functions, for connecting S+, S- of external current transformer.
8. power supply management device according to claim 2, it is characterised in that:
The CPU processor, which is used for the voltage signal to power supply management device, two-way current signal carries out ADC and adopts Sample, and the power consumption and electricity consumption of the equipment according to the calculating equipment power supply interface connection of voltage and current value, while this is calculated for fulgurite The total electricity consumption for managing device subsequent power supply management device and electrical equipment, sentences according to the threshold values of CPU processor internal preset The electric current of the equipment of disconnected equipment power supply interface connection is lower greatly and whether electricity consumption has been more than preset threshold, if being more than preset threshold, The power supply that pin cuts off electrical equipment is then controlled by IO;
The processor completes the acquisition and electricity consumption of the electric current, voltage of power supply management device using STM32F103RC arm processor The calculating of amount.
9. power supply management device according to claim 2, it is characterised in that:
The current sample adjustment circuit, the signal for converting current transformer 1 and 2 carry out sampling preceding adjustment, guarantee quilt The signal waveform of sampling, phase, volt value is undistorted is sampled by sampling unit, and improves the precision of two-way current sample;
The current sample adjustment circuit completes the phase compensation of input current signal using LM358 operational amplifier, in proportion contracts It puts, drive and follow tertiary treatment.
10. power supply management device according to claim 2, it is characterised in that:
The current transformer 1, the current signal of the load equipment for connecting equipment power supply interface carry out isolation signals and turn It changes, in order to carry out current sample;
The current transformer 2, the subsequent confession in built-in tandem type connection method, for connecting loop power supply output interface The current signal of electric loading carries out isolation signals conversion, in external mutual-inductor type connection method, for external electric current is mutual The current signal of sensor carries out isolation signals conversion, which is used to the current signal of conversion carry out current sample;
The current transformer that the current transformer 1,2 is all made of TA1005-1M high precision carries out the conversion of current signal.
11. power supply management device according to claim 2, it is characterised in that:
The current sample mode selector, for the selection of current sample mode in built-in tandem type connection method and external The selection of current sample mode in mutual-inductor type connection method;
The current sample mode selector by 1,2,3 totally 3 short-circuited terminals form, pass through following connection type realize electric current The selection of sampling configuration, connection type are:1)The firewire L pin for exchanging input interface passes through 2 relay of cascade Mach-Zehnder interferometer and selection No. 1 short-circuited terminal of device is connected;2)No. 2 short-circuited terminals of selection device by current transformer 2 and loop power supply output/it is external The L/S+ connection of current sample multiplexing functions interface;3)Exchange No. 3 shorted ends of protecting field E pin and selection device of input interface Son is connected, while connecting with loop power supply output/external current sample multiplexing functions interface E/S-;4)Exchange input interface Zero curve N pin and loop power supply output/external current sample multiplexing functions interface N connect.
12. power supply management device according to claim 11, which is characterized in that electricity in the built-in tandem type connection method The selection of stream sampling configuration specifically includes:
1)Selection device is shorted 1, No. 2 terminal;2)The firewire L of exchange input passes through 2 relay of cascade Mach-Zehnder interferometer and selection device 1 Terminal connection, by, through the firewire pin L connection of 2 power supply to the device output interface of overcurrent mutual inductor, giving junior after 2 terminals Power supply management device is powered input, and the power supply of junior's power supply management device passes through zero curve N and loop power supply after overload The zero curve N pin of output interface is connected, loop power supply output interface zero curve N with exchange input zero curve N connection, formation to junior The circuit of power supply management device power supply;3)Current supply circuit is carried out by current transformer 2 to be galvanically isolated conversion, is then inputed to CPU module is inputed to after the progress signal adjustment of current sample adjustment circuit to be sampled.
13. power supply management device according to claim 11, which is characterized in that in the external mutual-inductor type connection method The selection of current sample mode specifically includes:
1)Selection device is shorted 2, No. 3 terminals;2)It, will be external after external D.C mutual-inductor detects the high current on external cable The S+ of current transformer is connected with the S+ pin of external current sample interface, then passes through current transformer 2 and selection device No. 2 terminals be attached, be connected by No. 3 terminals of selection device with the S- pin of external current sample interface, and lead to It crosses external current sample S- pin to connect with the S- of external D.C mutual-inductor, forms external current detection circuit;3)Pass through electric current Mutual inductor 2 carries out current detection circuit to be galvanically isolated conversion, then inputs to current sample adjustment circuit and carries out signal adjustment After input to CPU module and sampled.
14. a kind of built-in tandem type connection method of power supply management device as described in one of claim 1 to 13, the connection side Method is for multistage power supply management device to be attached, which is characterized in that the connection method includes:
1)By the exchange input interface of supply input connection first order power supply management device, first order power supply management device is completed Supply input;
2)The equipment power supply interface of first order power supply management device connects electrical equipment, completes the power supply to first order electrical equipment Management;
3)It is used using loop power supply output/external current sample multiplex interface as loop power supply output interface, first order power supply The exchange input interface of the loop power supply output interface connection second level power supply management device of managing device, to the second level for fulgurite Reason device is powered input;
The equipment power supply interface of second level power supply management device connects second level electrical equipment, for completing second level electrical equipment Power supply management;
4)The exchange input of the loop power supply output interface connection third level power supply management device of second level power supply management device connects Mouthful, input is powered to third level power supply management device;
And so on, complete the power supply management of N grades of power supply management devices and electrical equipment N.
15. a kind of external mutual-inductor type connection method of power supply management device as described in one of claim 1 to 13, feature It is, which includes:
1)The exchange input interface of first power supply management device is articulated on service cable, by service cable to first for fulgurite Manage device power supply;
2)The equipment power supply interface of first power supply management device connects the first electrical equipment, for completing to the first electrical equipment Power supply management;
3)The first current transformer is accessed behind power supply line's connector of the first power supply management device on service cable, is used for The subsequent power supply load current of detection cable;
4)It is used using loop power supply output/external current sample multiplex interface as external current sample interface, first for fulgurite The external current sample interface for managing device connects the first current transformer, big for detecting electric current at the first current transformer It is small;
5)The exchange input interface of second power supply management device is articulated in behind the first current transformer, before the second current transformer On the service cable in face;
6)The equipment power supply interface of second power supply management device connects the second electrical equipment, for managing the confession of the second electrical equipment Electricity;
7)The detection of second current transformer is mounted on behind the power supply wire terminal of the second power supply management device, is supplied for detecting second The load current of the electric subsequent electrical equipment of managing device;
And so on, third power supply management device to N power supply management device is respectively used to management third electrical equipment to N use The power supply of electric equipment, third current transformer to N current transformer are used to detect load current thereafter.
CN201810575302.XA 2018-06-06 2018-06-06 A kind of micro-base station power supply management device and connection method Pending CN108828304A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810575302.XA CN108828304A (en) 2018-06-06 2018-06-06 A kind of micro-base station power supply management device and connection method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810575302.XA CN108828304A (en) 2018-06-06 2018-06-06 A kind of micro-base station power supply management device and connection method

Publications (1)

Publication Number Publication Date
CN108828304A true CN108828304A (en) 2018-11-16

Family

ID=64144038

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810575302.XA Pending CN108828304A (en) 2018-06-06 2018-06-06 A kind of micro-base station power supply management device and connection method

Country Status (1)

Country Link
CN (1) CN108828304A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109004745A (en) * 2018-06-30 2018-12-14 江苏恒宝智能系统技术有限公司 A kind of micro-base station power supply management device and connection method

Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US6975926B2 (en) * 2002-11-08 2005-12-13 Usa Technologies, Inc. Method and apparatus for power management control of a compressor-based appliance that reduces electrical power consumption of an appliance
CN104199387A (en) * 2014-02-27 2014-12-10 中节能唯绿(北京)建筑节能科技有限公司 Multi-parameter multi-calendar terminal electrical equipment gathering control device
CN104936336A (en) * 2014-03-21 2015-09-23 杭州智尔科技有限公司 Intelligent street lamp control system and realization method
CN105242649A (en) * 2015-09-11 2016-01-13 董锐 Energy efficiency monitoring and energy-saving system for communication base station, and implementation method therefor
CN205793578U (en) * 2016-04-25 2016-12-07 武汉汇行通科技有限公司 Wireless controller for road lamp for variable power Inductive ballast
CN106972571A (en) * 2017-04-14 2017-07-21 成都微智创远科技有限公司 Mass termination intelligent charging system and its method
CN107785931A (en) * 2017-10-16 2018-03-09 电子科技大学 A kind of small-sized electric energy management is with coordinating control integrated apparatus
CN207134804U (en) * 2017-09-05 2018-03-23 北京友信宏科电子科技股份有限公司 A kind of tandem type energy storage converter device utilized based on different battery modules differentiation
CN207457370U (en) * 2017-09-22 2018-06-05 武汉微智创大科技有限公司 A kind of three-phase multiple loop radio energy harvester

Patent Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US6975926B2 (en) * 2002-11-08 2005-12-13 Usa Technologies, Inc. Method and apparatus for power management control of a compressor-based appliance that reduces electrical power consumption of an appliance
CN104199387A (en) * 2014-02-27 2014-12-10 中节能唯绿(北京)建筑节能科技有限公司 Multi-parameter multi-calendar terminal electrical equipment gathering control device
CN104936336A (en) * 2014-03-21 2015-09-23 杭州智尔科技有限公司 Intelligent street lamp control system and realization method
CN105242649A (en) * 2015-09-11 2016-01-13 董锐 Energy efficiency monitoring and energy-saving system for communication base station, and implementation method therefor
CN205793578U (en) * 2016-04-25 2016-12-07 武汉汇行通科技有限公司 Wireless controller for road lamp for variable power Inductive ballast
CN106972571A (en) * 2017-04-14 2017-07-21 成都微智创远科技有限公司 Mass termination intelligent charging system and its method
CN207134804U (en) * 2017-09-05 2018-03-23 北京友信宏科电子科技股份有限公司 A kind of tandem type energy storage converter device utilized based on different battery modules differentiation
CN207457370U (en) * 2017-09-22 2018-06-05 武汉微智创大科技有限公司 A kind of three-phase multiple loop radio energy harvester
CN107785931A (en) * 2017-10-16 2018-03-09 电子科技大学 A kind of small-sized electric energy management is with coordinating control integrated apparatus

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109004745A (en) * 2018-06-30 2018-12-14 江苏恒宝智能系统技术有限公司 A kind of micro-base station power supply management device and connection method

Similar Documents

Publication Publication Date Title
CN204335015U (en) A kind ofly support the fiery switch of the list of wireless two-way communication
CN105207237A (en) Distribution network three-phase load unbalance adjusting control system
CN103488159A (en) Distribution box type smart home terminal and comprehensive protection controller
CN104955237A (en) Intelligent switch adopting single firewire to obtain power and control method
CN209247881U (en) A kind of wireless street lamp micro-base station electric energy metering device
CN109149915A (en) Power-switching circuit, charging unit and system
CN207518328U (en) A kind of terminal device and wireless charging system
CN207523471U (en) A kind of Split type electric motor-car charging equipment
CN108828304A (en) A kind of micro-base station power supply management device and connection method
CN109061292A (en) A kind of wireless street lamp micro-base station electric energy metering device and connection method
CN109004745A (en) A kind of micro-base station power supply management device and connection method
CN205960338U (en) Power extension line that can regularly cut -off
CN115047244A (en) Intelligent switch ammeter and control method
CN107933370A (en) A kind of charging unit and a kind of charging pile
CN204243535U (en) Distribution box
CN107706975A (en) A kind of method and system of the automatic distribution power of wireless charging router
CN111463903A (en) Wisdom lamp pole switch board
CN207426991U (en) Portable metering special power box
CN207053251U (en) A kind of grid entry point supervising device of family expenses photovoltaic generating system
CN207218558U (en) A kind of power-supply system of intelligent electric meter
CN206908601U (en) Bandwidth carrier communication test system and R-T unit
CN217983231U (en) Cloud distribution intelligent circuit breaker
CN206686422U (en) A kind of street lighting monitoring system
CN201260259Y (en) Lighting single lamp monitoring and failure monitoring device
CN206378526U (en) A kind of use A/D automatic electricity-testing and phase checking device

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
TA01 Transfer of patent application right

Effective date of registration: 20191223

Address after: 361013 Room 501, No.42, Guanren Road, Siming District, Xiamen City, Fujian Province

Applicant after: Ye Yirong

Address before: 430074 Hubei Wuhan East Lake high tech Zone, Optics Valley Road, 3 Island 2 units

Applicant before: Ma Shan Yang Communication Technology Co. Ltd.

TA01 Transfer of patent application right
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20181116

WD01 Invention patent application deemed withdrawn after publication