CN108824451B - 桥隧相接段深基坑支护结构及施工方法 - Google Patents
桥隧相接段深基坑支护结构及施工方法 Download PDFInfo
- Publication number
- CN108824451B CN108824451B CN201810992099.6A CN201810992099A CN108824451B CN 108824451 B CN108824451 B CN 108824451B CN 201810992099 A CN201810992099 A CN 201810992099A CN 108824451 B CN108824451 B CN 108824451B
- Authority
- CN
- China
- Prior art keywords
- pile
- wall
- positioning
- cast
- support pile
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D17/00—Excavations; Bordering of excavations; Making embankments
- E02D17/02—Foundation pits
- E02D17/04—Bordering surfacing or stiffening the sides of foundation pits
Landscapes
- Engineering & Computer Science (AREA)
- Mining & Mineral Resources (AREA)
- Life Sciences & Earth Sciences (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Paleontology (AREA)
- Civil Engineering (AREA)
- General Engineering & Computer Science (AREA)
- Structural Engineering (AREA)
- Bulkheads Adapted To Foundation Construction (AREA)
Abstract
Description
Claims (6)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810992099.6A CN108824451B (zh) | 2018-08-29 | 2018-08-29 | 桥隧相接段深基坑支护结构及施工方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810992099.6A CN108824451B (zh) | 2018-08-29 | 2018-08-29 | 桥隧相接段深基坑支护结构及施工方法 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN108824451A CN108824451A (zh) | 2018-11-16 |
CN108824451B true CN108824451B (zh) | 2019-09-03 |
Family
ID=64150053
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201810992099.6A Expired - Fee Related CN108824451B (zh) | 2018-08-29 | 2018-08-29 | 桥隧相接段深基坑支护结构及施工方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN108824451B (zh) |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
NL9302214A (nl) * | 1993-12-20 | 1995-07-17 | Hattum & Blankevoort Bv | Schermwand. |
CN101603309A (zh) * | 2009-07-02 | 2009-12-16 | 北京建材地质工程公司 | 长螺旋搅拌止水帷幕咬合桩及其施工工艺 |
CN203684229U (zh) * | 2013-11-21 | 2014-07-02 | 昆明理工大学 | 一种连体式双排桩支护结构 |
CN205502024U (zh) * | 2016-04-01 | 2016-08-24 | 江苏建筑职业技术学院 | 一种可部分回收的拱形组合围护结构 |
CN106149733A (zh) * | 2016-08-10 | 2016-11-23 | 浙江大学城市学院 | 桥隧相接段深基坑支护结构及施工方法 |
-
2018
- 2018-08-29 CN CN201810992099.6A patent/CN108824451B/zh not_active Expired - Fee Related
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
NL9302214A (nl) * | 1993-12-20 | 1995-07-17 | Hattum & Blankevoort Bv | Schermwand. |
CN101603309A (zh) * | 2009-07-02 | 2009-12-16 | 北京建材地质工程公司 | 长螺旋搅拌止水帷幕咬合桩及其施工工艺 |
CN203684229U (zh) * | 2013-11-21 | 2014-07-02 | 昆明理工大学 | 一种连体式双排桩支护结构 |
CN205502024U (zh) * | 2016-04-01 | 2016-08-24 | 江苏建筑职业技术学院 | 一种可部分回收的拱形组合围护结构 |
CN106149733A (zh) * | 2016-08-10 | 2016-11-23 | 浙江大学城市学院 | 桥隧相接段深基坑支护结构及施工方法 |
Also Published As
Publication number | Publication date |
---|---|
CN108824451A (zh) | 2018-11-16 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN105113389B (zh) | 装配式钢‑混凝土组合结构桥墩柱构件 | |
CN107905092A (zh) | 一种预制装配式桥墩及其拼装施工方法 | |
CN102383420B (zh) | 一种掺纤维增强塑料筋的高强混凝土预制桩 | |
CN107100192A (zh) | 一种风力发电机组基础环局部加固装置及加固方法 | |
CN208151833U (zh) | 一种新型rc—砌体组合拱桥的构造 | |
CN110258593A (zh) | 用于边坡治理的抗滑桩 | |
CN108374320A (zh) | 一种新型rc—砌体组合拱桥的构造与施工方法 | |
CN202208916U (zh) | 一种高强混凝土预制桩 | |
CN202194129U (zh) | 复合预应力挡土桩 | |
CN103938871B (zh) | 一种采用钢筋混凝土环梁节点的钢管混凝土柱有粘结预应力框架梁结构的施工方法 | |
CN108035241A (zh) | 一种装配式钢-混组合桥梁及其施工工艺 | |
CN205776241U (zh) | 一种桁架式双排桩支护体系 | |
CN108824451B (zh) | 桥隧相接段深基坑支护结构及施工方法 | |
CN109083660A (zh) | 基于钢筋混凝土底梁的软岩巷(隧)道底鼓治理支护结构及方法 | |
CN103334778A (zh) | 台阶临时支撑加部分双侧壁的施工工艺 | |
CN210317328U (zh) | 一种营运期盾构隧道超浅埋覆土条件下隧道管片抗浮结构 | |
CN208650086U (zh) | 一种移动式路灯基础 | |
CN110004938A (zh) | 一种基坑侧壁结构加固支护装置 | |
CN217325391U (zh) | 一种临高铁线路深基坑咬合桩的施工工装 | |
CN206144582U (zh) | 一种巷道充填式复合支护 | |
CN109371851A (zh) | 多底模头罩支撑架造槽机 | |
CN108895203A (zh) | 一种用于横跨综合管廊的管道承托结构及其施工方法 | |
CN209385141U (zh) | 一种与过水隧洞交叉的铁路隧道防护结构 | |
CN206986915U (zh) | 一种风机平台安装基础 | |
CN110159343A (zh) | 一种台阶柱体式沿空留巷巷旁充填模板及其使用方法 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
TA01 | Transfer of patent application right |
Effective date of registration: 20190620 Address after: 067000 Unit 407, No. 4, Jiayuan South Building, Tagou Times, Shuangqiao District, Chengde City, Hebei Province Applicant after: Wu Yue Address before: 067000 Unit 407, No. 4, Jiayuan South Building, Tagou Times, Shuangqiao District, Chengde City, Hebei Province Applicant before: Wu Yue Applicant before: Tao Liang Applicant before: Deng Liping Applicant before: Song Xiaowei |
|
TA01 | Transfer of patent application right | ||
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20190903 Termination date: 20210829 |
|
CF01 | Termination of patent right due to non-payment of annual fee |