The tandem sleeve grouting detection structures and methods of vertical prefabricated components
Technical field
The present invention relates to assembled arthitecutral structure, the tandem sleeve grouting inspection of specifically a kind of vertical prefabricated components
Geodesic structure, and the tandem sleeve grouting detection method based on the structure.
Background technology
Precast reinforced concrete structure has had more practical application and more in developed countries such as America and Europe, Japan
Ripe technical research.Compared with traditional cast-in-place concrete, the craft at the precast reinforced concrete structure scene of can reducing
Labour and wet construction, construction speed is fast, small to surrounding environment influence, and the quality of prefabricated components is easy to control, and the entirety of project is applied
Working medium amount is easier to ensure.
The research that prefabricated assembled concrete is built with China with widely popularize, prefabricated concrete structure is in China
Significant progress is obtained.
The connection of prefabricated components is to influence one of the key technique of structure safety in prefabricated concrete structure.Prefabricated structure
The connection of part includes mainly the connection of the connection and concrete of reinforcing bar, and the quality of connecting portion will directly influence the peace of structure
Entirely.
In traditional cast-in-place concrete structure, the connection generally use mechanical connection, welding between reinforcing bar or binding overlap joint,
And in fabricated construction, the connection type of reinforcing bar is in addition to above-mentioned several, also sleeve grouting connection, slurry anchor overlap joint connection etc.,
And bar diameter it is larger when should not use slurry anchor overlap joint.From the force request of connecting portion and facilitates site operation this two is pointed out
It sends out, in assembled arthitecutral structure, the connection between vertical prefabricated components Reinforcement has mostly used sleeve grouting and connected at present
It connects.
The working mechanism of reinforced bar sleeve grouting jointing, is to have higher pressure resistance based on grouting material in grout sleeve
Degree, while itself also has microdilatancy characteristic, when it by grout sleeve effect of contraction when, in grouting material and grout sleeve
Larger normal stress is generated between side tube-wall, normal stress generates frictional force to reinforcing bar in its rough surface with ribbing whereby, so as to
Transmit reinforcing bar axial stress.The density of slurry directly influences the quality of connection in grout sleeve jointing.
?《Reinforced bar sleeve grouting connection application technology regulation》In, the requirement for Grouted density is answered closely knit full for grouting
Full, all grout outlets should all pulp;It is mainly connect by way of checking work progress data and examining and record to check and accept at present
Quality.It is pure to examine record by checking process, it is possible to be difficult to fully understand internal quality of connection.
There is the technology of the grouting plumpness of several detection sleeve grouting to occur in the recent period, one is based on X-ray industry CT skill
The sleeve of art is in the milk plumpness detection technique, is in the milk plumpness detection technique one is the sleeve based on pre-buried sensor method, and one
Sleeve grouting plumpness detection technique of the kind based on pre-buried steel wire hubbing, one is the sleeves based on Portable X-ray technology
Grouting plumpness detection technique, respectively there is advantage and disadvantage.
Sleeve grouting plumpness detection technique based on X-ray Industrial Computed Tomography is used for test in laboratory, can be used for examining
Survey the test specimen of process test.But it cannot really reflect live entity situation.
Sleeve grouting plumpness detection technique based on pre-buried sensor method can monitor spillage of the grouting material before solidification
Problem needs to detect if the later stage suspects node grouting quality, it is necessary to which pre-buried sensor in advance is needed to ensure random sampling observation
It will be in each grout outlet pre-buried sensor.Get off in this way, sensor complexity is high, less suitable general data, since overfall can
It can cause to judge by accident.
Sleeve grouting plumpness detection technique based on pre-buried steel wire hubbing is by special steel wire from the pulp saliva of sleeve
The flattened rebar surface position to close grout outlet side in sleeve, the gas vent that rear special steel wire in place carries rubber stopper are located at
Surface, drawn steel wire after 3 day age, judge whether corresponding sleeve grouting is full qualified by drawing load, mating endoscope
Can be put in the duck eye left after drawing judge whether it is full.The disadvantage is that cannot disturb or destroy in 3 days, at the construction field (site)
Compare and is difficult to ensure.
Sleeve grouting plumpness detection technique suitable thicknesses based on Portable X-ray technology are not more than 200mm;Sleeve list
The sleeve grouting plumpness test of the precast shear wall of row or " blossom type " arrangement.Since ray radiation is larger, away from X-ray machine X 30
It is unable to someone in rice range, so the unsuitable test for carrying out sleeve grouting plumpness at the scene.
The quality of vertical member reinforced bar sleeve grouting connection directly influences the safety of prefabricated concrete structure, with dressing
Rapid development with formula concrete structure in China, to ensure that the grouting of vertical member reinforced bar sleeve connects in prefabricated concrete structure
The quality connect, one kind is in assembled arthitecutral structure, the detection method of vertical prefabricated components reinforced bar sleeve grouting connection to be with regard to outstanding
It is important.
Invention content
The technical problem to be solved by the present invention is to:A kind of tandem sleeve grouting detection knot of vertical prefabricated components is provided
Structure and method, it is close with the slurry for solving not detecting the grouting sleeve being embedded in vertical prefabricated components concrete in the prior art
The problem of solidity.
Above-mentioned technical problem is solved, the technical solution adopted in the present invention is as follows:
A kind of tandem sleeve grouting detection structure of vertical prefabricated components is suitable for the vertical prefabricated components in upper layer and lower layer
The connecting structure of structure, wherein the stress of the understructure is indulged muscle and stretched out from its top surface, and the vertical prefabricated components in upper layer are pre-
It is embedded with grout sleeve in component, the lower port of grout sleeve is exposed from the bottom surface of the vertical prefabricated components in upper layer in the component, and institute
The stress for stating the vertical prefabricated components in upper layer is indulged in the muscle insertion component in grout sleeve;The stress of the understructure is indulged muscle and is inserted
Enter in the corresponding component of the vertical prefabricated components in the upper layer in grout sleeve, and the bottom surface of the vertical prefabricated components in the upper layer and institute
State between the top surface of understructure that there are seat pulp layer gaps, this pulp layer gap is by seat filled therewith to form a pulp layer;It is described
By injection grouting material in grout sleeve in component;
It is characterized in that:
The tandem sleeve grouting detection structure includes blind hole, connecting tube, detection grout sleeve, detection upper layer
Reinforcing bar and detection lower layer's reinforcing bar;
The blind hole is preset on the top surface of the understructure;
The upper port of the detection grout sleeve is inserted into detection top bars and detection with lower layer's reinforcing bar respectively
And lower port, and the detection is inserted into lower layer's reinforcing bar in the blind hole of the understructure, under the detection grout sleeve
Port is closed, and the lower port of the detection grout sleeve is concordant with the bottom surface of the vertical prefabricated components in the upper layer;The inspection
The grouting mouth of survey grout sleeve is connected to the thick liquid discharge mouth of grout sleeve in one of them described component by the connecting tube so that
The grouting material in the component in grout sleeve is injected to flow into the detection grout sleeve by the connecting tube.
As the preferred embodiment of the present invention:Grout sleeve is adopted in each component in the vertical prefabricated components in upper layer
With independent grouting way, i.e.,:
The vertical prefabricated components in upper layer are that grout sleeve is reserved with grout hole and slurry outlet in each described component, often
The grouting mouth of grout sleeve and thick liquid discharge mouth are respectively communicated with corresponding grout hole and slurry outlet in one component;
Grouting material in each described component in grout sleeve, the corresponding grout hole note of grout sleeve out of this component
Enter, and the corresponding slurry outlet outflow of the grouting material of spill-over grout sleeve out of this component.
As the preferred embodiment of the present invention:Grout sleeve is adopted in each component in the vertical prefabricated components in upper layer
With grouting way is connected to, i.e.,:
The vertical prefabricated components in upper layer are reserved, and there are one head end grout hole and an end slurry outlet, each components
Interior grout sleeve sequence so that grout sleeve in component described in the thick liquid discharge mouth and the latter of grout sleeve in the previous component
Grouting mouth be connected, also, the grouting mouth of grout sleeve is connected to the vertical prefabricated components in upper layer in first component
Head end grout hole, the thick liquid discharge mouth of grout sleeve is connected to the end of the vertical prefabricated components in the upper layer in the last one described component
Slurry outlet;
The grouting material is injected by the head end grout hole of the vertical prefabricated components in the upper layer so that the grouting material of injection is pressed
It is flowed through one by one in each component after grout sleeve according to above-mentioned sequence, via the end pulp of the vertical prefabricated components in the upper layer
Hole and the connecting tube flow into the detection grout sleeve.
As the preferred embodiment of the present invention:The understructure is reinforced concrete foundation;
Alternatively, the understructure is made of the vertical prefabricated components of lower layer, composite beam and laminated floor slab, lower layer's knot
The stress that the stress of structure indulges muscle, that is, vertical prefabricated components of the lower layer indulges muscle, top surface, that is, laminated floor slab of the understructure
Top surface, the blind hole of the understructure is arranged in the top surface of the laminated floor slab, and the blind hole is led to by floor blind hole and floor
Hole forms, and the floor blind hole is preset in the pre-erection of the laminated floor slab, and the floor through-hole is reserved in the overlapping building
The cast-in-place part of plate and connection coaxial with the floor blind hole.
As the preferred embodiment of the present invention:The vertical prefabricated components of the vertical prefabricated components in the upper layer and lower layer are pre-
Reinforced column or precast reinforced concrete shear wall processed.
A kind of tandem sleeve grouting detection method of vertical prefabricated components is suitable for the vertical prefabricated components in upper layer and lower layer
The construction procedure of the connecting structure of structure, the connecting structure is as follows:
Step 1: the prefabricated vertical prefabricated components in the upper layer, wherein the vertical prefabricated components in upper layer are embedded in component
Grout sleeve, the lower port of grout sleeve is exposed from the bottom surface of the vertical prefabricated components in upper layer in the component, and the upper layer is vertical
The stress of prefabricated components is indulged muscle and is inserted into the component in grout sleeve;
Step 2: at the construction field (site), completing the construction of the understructure so that the stress of the understructure indulge muscle from
Its top surface is stretched out;
Step 3: installing the vertical prefabricated components in the upper layer, the stress of the understructure is indulged into muscle and is inserted on described
In the corresponding component of the vertical prefabricated component of layer in grout sleeve, and the bottom surface of the vertical prefabricated components in the upper layer is tied with the lower layer
There are seat pulp layer gaps between the top surface of structure, also, with seat filled therewith this pulp layer gap to form a pulp layer;
Step 4: grouting material is injected grout sleeve in each component;
It is characterized in that:
The tandem sleeve grouting detection method includes:
Step S1, in the step 2, blind hole is reserved on the top surface of the understructure;
Step S2, before implementing the step 4, detection top bars and detection are inserted into detection respectively with lower layer's reinforcing bar
It is inserted into the blind hole of the understructure with lower layer's reinforcing bar with the upper port and lower port of grout sleeve, and by the detection, it will
The lower port of the detection grout sleeve is closed, and enables the lower port of the detection grout sleeve and the upper layer vertically pre-
The bottom surface of component processed is concordant;Also, it will be described in the grouting mouth of the detection grout sleeve and one of them with the connecting tube
The thick liquid discharge mouth of grout sleeve is connected together in component so that:In the step 4, inject in the component in grout sleeve
Grouting material is flowed by the connecting tube in the detection grout sleeve;
Step S3, after completing the step 4, under the detection grout sleeve, detection top bars and detection are used
Layer reinforcing bar removes together, and the vertical muscle of stress for waiting for the grouting material to reach the vertical prefabricated components in the upper layer passes through component
When interior grout sleeve indulges the design strength required by muscle is effectively connect with the stress of the understructure, it is in the milk to the detection
Sleeve is detected.
As the preferred embodiment of the present invention:Grout sleeve is adopted in each component in the vertical prefabricated components in upper layer
With independent grouting way, i.e.,:
The vertical prefabricated components in upper layer are that grout sleeve is reserved with grout hole and slurry outlet in each described component, often
The grouting mouth of grout sleeve and thick liquid discharge mouth are respectively communicated with corresponding grout hole and slurry outlet in one component;
Grouting material in each described component in grout sleeve, the corresponding grout hole note of grout sleeve out of this component
Enter, and the corresponding slurry outlet outflow of the grouting material of spill-over grout sleeve out of this component.
As the preferred embodiment of the present invention:Grout sleeve is adopted in each component in the vertical prefabricated components in upper layer
With grouting way is connected to, i.e.,:
The vertical prefabricated components in upper layer are reserved, and there are one head end grout hole and an end slurry outlet, each components
Interior grout sleeve sequence so that grout sleeve in component described in the thick liquid discharge mouth and the latter of grout sleeve in the previous component
Grouting mouth be connected, also, the grouting mouth of grout sleeve is connected to the vertical prefabricated components in upper layer in first component
Head end grout hole, the thick liquid discharge mouth of grout sleeve is connected to the end of the vertical prefabricated components in the upper layer in the last one described component
Slurry outlet;
The grouting material is injected by the head end grout hole of the vertical prefabricated components in the upper layer so that the grouting material of injection is pressed
It is flowed through one by one in each component after grout sleeve according to above-mentioned sequence, via the end pulp of the vertical prefabricated components in the upper layer
Hole and the connecting tube flow into the detection grout sleeve.
As the preferred embodiment of the present invention:The understructure is reinforced concrete foundation;
Alternatively, the understructure is made of the vertical prefabricated components of lower layer, composite beam and laminated floor slab, lower layer's knot
The stress that the stress of structure indulges muscle, that is, vertical prefabricated components of the lower layer indulges muscle, top surface, that is, laminated floor slab of the understructure
Top surface, the blind hole of the understructure is arranged in the top surface of the laminated floor slab, and the blind hole is led to by floor blind hole and floor
Hole forms, and the floor blind hole is preset in the pre-erection of the laminated floor slab, and the floor through-hole is reserved in the overlapping building
The cast-in-place part of plate and connection coaxial with the floor blind hole;
In the step 1, the vertical prefabricated components of the prefabricated lower layer, the pre-erection of the composite beam and institute are also answered
State the pre-erection of laminated floor slab, wherein the pre-erection of the laminated floor slab is preset with the floor blind hole;
In the step 2, the sequence of construction of the understructure is:First the vertical prefabricated components of the lower layer are installed
In place;Then the pre-erection of the pre-erection and the laminated floor slab of the composite beam is installed, and bind the composite beam
The reinforcing bar of the cast-in-place part of the reinforcing bar of cast-in-place part and the laminated floor slab;The mixed of the cast-in-place part for smashing the composite beam is poured again
The concrete of the cast-in-place part of solidifying soil and the laminated floor slab, and reserve the floor in the cast-in-place part of the laminated floor slab and lead to
Hole.
As the preferred embodiment of the present invention:The vertical prefabricated components of the vertical prefabricated components in the upper layer and lower layer are pre-
Reinforced column or precast reinforced concrete shear wall processed.
Compared with prior art, the invention has the advantages that:
First, the present invention includes blind hole, connecting tube, detection grout sleeve, detection top bars and inspection by setting
The tandem sleeve grouting detection structure with lower layer's reinforcing bar is surveyed, grouting can be made when grouting material injects grout sleeve in component
Material is injected by connecting tube in detection grout sleeve, realizes that detection grout sleeve and the grouting material of grout sleeve in component connect
It is logical to pour so that the compactness of grouting material can directly reflect in detection grout sleeve is in the milk in connecting tube institute communication member
The grouting material compactness actual conditions of sleeve, therefore, the present invention can be by directly detecting grouting material in detection grout sleeve
Compactness and mechanical property, the grouting material compactness and mechanical property of grout sleeve in connecting tube institute communication member are learned with this
Can, solve the slurry compactness that can not detect the grouting sleeve being embedded in vertical prefabricated components concrete in the prior art
Problem, in conjunction with, to the observation of construction site and the inspection of construction note, the present invention passes through to detection grout sleeve by regulation
Testing result can more accurately judge whether the quality of reinforced bar sleeve grouting connection reaches engineering actual demand, be carried safely for structure
For ensureing.
Second, the present invention both can be suitably used for grout sleeve use individually grouting in each component in the vertical prefabricated components in upper layer
The case where mode, and can be suitably used for the feelings of grout sleeve use connection grouting way in each component in the vertical prefabricated components in upper layer
Condition;
Also, the case where for grout sleeve in each component in the vertical prefabricated components in upper layer using connection grouting way,
Since the grouting material of injection is flowed through according to sequence in each component one by one detection filling is flowed into via connecting tube again after grout sleeve
It starches in sleeve, the compactness of grouting material will not necessarily be better than each structure in the vertical prefabricated components in upper layer in detection grout sleeve
Grout sleeve in part so that the compactness of grouting material is representative in detection grout sleeve, and it is vertically prefabricated to represent upper layer
In component in each component the grouting material compactness of grout sleeve worst state, therefore, the present invention can be by directly detecting
The compactness and mechanical property of grouting material in detection grout sleeve, learned with this be embedded in it is each in the vertical prefabricated components in upper layer
The grouting material compactness of grout sleeve and the worst state of mechanical property in component, solve can not detect in the prior art it is pre-buried
The problem of slurry compactness of grouting sleeve in vertical prefabricated components concrete, in conjunction with the observation by regulation to construction site
With the inspection of construction note, the present invention can more accurately judge that reinforced bar sleeve fills by the testing result to detection grout sleeve
Whether the quality of slurry connection reaches engineering actual demand, provides safeguard safely for structure.
Description of the drawings
The following further describes the present invention in detail with reference to the accompanying drawings and specific embodiments:
Fig. 1 is the planar junction using the vertical prefabricated components connecting structure of the tandem sleeve grouting detection structure of the present invention
Structure schematic diagram;
Fig. 2 is the section knot using the vertical prefabricated components connecting structure of the tandem sleeve grouting detection structure of the present invention
Structure schematic diagram;
Fig. 3 is the schematic diagram of grout hole and slurry outlet that the vertical prefabricated components in upper layer are reserved;
Fig. 4 is that the vertical muscle of stress of the vertical prefabricated components in upper layer and understructure is illustrated by the section that grout sleeve connects
Figure.
Specific implementation mode
As shown in Figures 1 to 4, disclosed by the invention is a kind of tandem sleeve grouting detection knot of vertical prefabricated components
Structure is suitable for the connecting structure of the vertical prefabricated components in upper layer 1 and understructure 2, wherein the stress of understructure 2 indulge muscle 211 from
Its top surface 2a stretches out, and the vertical prefabricated components in upper layer 1 are embedded with grout sleeve 3 in component, the lower port of grout sleeve 3 in the component
Expose from the bottom surface of the vertical prefabricated components in upper layer 1, and the stress of the vertical prefabricated components in upper layer 1 indulges muscle 11 and is inserted into grouting set in component
In cylinder 3;The stress of understructure 2 is indulged muscle 211 and is inserted into the vertical 1 corresponding component of prefabricated components in upper layer in grout sleeve 3, and on
Vertically there are seat pulp layer gaps, this pulp layer gap to be starched by seat between the bottom surface and the top surface 2a of understructure 2 of prefabricated components 1 for layer
Material filling is to form a pulp layer 4;By injection grouting material in grout sleeve 3 in component.
The present invention inventive concept be:
The tandem sleeve grouting detection structure of the present invention includes blind hole 23a, connecting tube 5, detection grout sleeve 6, inspection
It surveys with top bars 7 and detection lower layer's reinforcing bar 8;
Blind hole 23a is preset on the top surface 2a of understructure 2;
Upper port and the lower end of detection grout sleeve 6 are inserted into detection top bars 7 and detection with lower layer's reinforcing bar 8 respectively
Mouthful, the vertical prefabricated components of detection top bars 7 and the detection specification of lower layer's reinforcing bar 8 and insertion depth and above-mentioned upper layer 1
Stress indulge muscle 11 and the stress of understructure 2 indulge muscle 211 specification it is consistent with the insertion depth to grout sleeve in component 3,
The requirement of specification should all be met;And detection is inserted into lower layer's reinforcing bar 8 in the blind hole 23a of understructure 2, detection grout sleeve 6
Lower port be closed, detection is concordant with the bottom surface of the vertical prefabricated components in the lower port of grout sleeve 6 and upper layer 1;Detection fills
The grouting mouth of slurry sleeve 6 is connected to the thick liquid discharge mouth 3b of grout sleeve 3 in one of component by connecting tube 5 so that injects the structure
Grouting material in part in grout sleeve 3 flows into detection in grout sleeve 6 by connecting tube 5.
The invention also discloses the tandem sleeve grouting detection methods for realizing above-mentioned Parallel testing structure, are equally applicable to
The connecting structure of above-mentioned upper layer vertical prefabricated components 1 and understructure 2, the construction procedure of the connecting structure are as follows:
Step 1: the vertical prefabricated components in prefabricated upper layer 1, wherein the vertical prefabricated components in upper layer 1 are embedded with grouting set in component
Cylinder 3, the lower port of grout sleeve 3 is exposed from the bottom surface of the vertical prefabricated components in upper layer 1 in the component, and the vertical prefabricated components in upper layer
1 stress is indulged muscle 11 and is inserted into component in grout sleeve 3;
Step 2: at the construction field (site), completing the construction of understructure 2 so that the stress of understructure 2 indulges muscle 211 from its
Top surface 2a stretches out;
Step 3: after the concrete of understructure 2 reaches sufficient intensity, the vertical prefabricated components 1 in upper layer are installed, will under
The stress of layer structure 2 is indulged muscle 211 and is inserted into the vertical 1 corresponding component of prefabricated components in upper layer in grout sleeve 3, and upper layer is vertically pre-
There are seat pulp layer gaps between the bottom surface of component 1 processed and the top surface 2a of understructure 2, also, with seat filled therewith this pulp layer
Gap is to form a pulp layer 4;It wherein, when necessary can be in advance in understructure 2 in order to ensure the minimum constructive height in seat pulp layer gap
Top surface 2a places supporting block.
Step 4: grouting material is injected grout sleeve 3 in each component;
Finally, after grouting material and seat pulp layer reach the intensity of construction requirement, the branch to the vertical prefabricated components in upper layer 1 is removed
Support, the vertical prefabricated components 1 in upper layer and the connecting structure of understructure 2 complete construction.
The inventive concept of the present invention is:
The present invention tandem sleeve grouting detection method include:
Step S1, in step 2, blind hole 23a is reserved on the top surface 2a of understructure 2;
Step S2, before implementation steps four, detection top bars 7 and detection is inserted into detection with lower layer's reinforcing bar 8 respectively and are used
The upper port and lower port of grout sleeve 6, the specification and insertion depth of detection top bars 7 and detection lower layer's reinforcing bar 8
The stress that muscle 11 and understructure 2 are indulged with the stress of the vertical prefabricated components in above-mentioned upper layer 1 indulges the specification of muscle 211 and to being filled in component
The insertion depth for starching sleeve 3 is consistent, should all meet the requirement of specification;And detection lower layer's reinforcing bar 8 is inserted into the blind of understructure 2
In the 23a of hole, the lower port of detection grout sleeve 6 is closed, and enable the lower port of detection grout sleeve 6 and upper layer vertically pre-
The bottom surface of component 1 processed is concordant, moreover, need to ensure that grout sleeve 6 is relatively fixed with cavity 5 is connected to;Also, it will be examined with connecting tube 5
The grouting mouth and the thick liquid discharge mouth 3b of grout sleeve 3 in one of component of survey grout sleeve 6 are connected together so that:In step
In rapid four, injects the grouting material in the component in grout sleeve 3 and flowed into detection grout sleeve 6 by connecting tube 5;
Step S3, after completing step 4, the grouting material to be detected in grout sleeve 6 reaches certain intensity, with not
It influences in detection grout sleeve 6 in the case of grouting material, detection grout sleeve 6, detection top bars 7 and detection is used
Lower layer's reinforcing bar 8 removes together, and the stress for waiting for grouting material to reach the vertical prefabricated components in upper layer 1 indulges muscle 11 by component
When grout sleeve 3 indulges the design strength required by muscle 211 is effectively connect with the stress of understructure 2, to detection grout sleeve 6
It is detected, with by detecting grouting material compactness and mechanical property in the detection grout sleeve 6, to judge connecting tube 5
Whether the grouting material compactness and mechanical property of grout sleeve 3 can reach the requirement of related specifications in institute's communication member, to sentence
The stress for determining the vertical prefabricated components in upper layer 1 indulges muscle 11 and indulges muscle 211 by the stress of grout sleeve in component 3 and understructure 2
Whether quality of connection reaches requirement, wherein waits the time of previous designs intensity to be achieved to be generally 28 days or so, is filled to detection
The means that grouting material in slurry sleeve 6 is detected can be adapted to detect for grouting material compactness and mechanical property in the prior art
Detection method, detection top bars 7 and detection can play the booster actions such as fixed in the detection with lower layer's reinforcing bar 8.
The present invention both can be suitably used in the vertical prefabricated components 1 in upper layer in each component grout sleeve 3 using independent grouting side
The case where formula, also can be suitably used for the feelings of the use of grout sleeve 3 connection grouting way in each component in the vertical prefabricated components 1 in upper layer
Condition.
Wherein, grout sleeve 3 uses independent grouting way in each component in the vertical prefabricated components in upper layer 1, i.e.,:
The vertical prefabricated components 1 in upper layer are that grout sleeve 3 is reserved with grout hole 1a and slurry outlet 1b in each component, each
The grouting mouth 3a and thick liquid discharge mouth 3b of grout sleeve 3 are respectively communicated with corresponding grout hole 1a and slurry outlet 1b in a component;
Grouting material in each component in grout sleeve 3,3 corresponding grout hole 1a of grout sleeve is noted out of this component
Enter, and the grouting material of spill-over 3 corresponding slurry outlet 1b of grout sleeve out of this component flows out.
Wherein, grout sleeve 3 is using connection grouting way in each component in the vertical prefabricated components in upper layer 1, i.e.,:
The vertical prefabricated components 1 in upper layer are reserved, and there are one head end grout hole and an end slurry outlet, the interior grouting of each component
Sleeve 3 sorts, and is ranked up by 3 position of grout sleeve in component so that grouting set in previous component
The thick liquid discharge mouth 3b of cylinder 3 is connected with the grouting mouth 3a of grout sleeve 3 in the latter component, also, grouting set in first component
The head end grout hole of the vertical prefabricated components in the grouting mouth 3a connection upper layer of cylinder 31, the plasma discharge of grout sleeve 3 in the last one component
The end slurry outlet of the vertical prefabricated components in mouthful 3b connection upper layer 1;
Grouting material is injected by the head end grout hole of the vertical prefabricated components in upper layer 1 so that the grouting material of injection is according to above-mentioned
Sequence is flowed through one by one in each component after grout sleeve 3, via the end slurry outlet and connecting tube 5 of the vertical prefabricated components in upper layer 1
Detection is flowed into in grout sleeve 6.
The present invention is suitable for realizing that the assembled that the vertical prefabricated components in upper layer are connect with understructure is built using grout sleeve
Building structure, such as frame structure, precast concrete shear wall structure and frame shear wall structure.
The vertical prefabricated components of the vertical prefabricated components 1 in above-mentioned upper layer and lower layer 21 can be prefabricated reinforced concrete column as a result,
It may be precast reinforced concrete shear wall.
Above-mentioned understructure 2 can be reinforced concrete foundation, can also be by the vertical prefabricated components 21 of lower layer, composite beam 22
It is formed with laminated floor slab 23.
The case where being made of the vertical prefabricated components 21 of lower layer, composite beam 22 and laminated floor slab 23 for understructure 2:
The stress of the vertical prefabricated components of the stress Zong Jin211Ji lower layers of above-mentioned understructure 2 21 indulges muscle 211, understructure 2
Top surface 2a, that is, laminated floor slab 23 top surface, the blind hole 23a of understructure 2 is arranged in the top surface of laminated floor slab 23, and the blind hole
23a is made of floor blind hole and floor through-hole, and floor blind hole is preset in the pre-erection of laminated floor slab 23, and floor through-hole is reserved in
The cast-in-place part of laminated floor slab 23 and connection coaxial with floor blind hole.
In above-mentioned steps one, the vertical prefabricated components 21 of prefabricated lower layer, the pre-erection of composite beam 22 and overlapping building are also answered
The pre-erection of plate 23, wherein the pre-erection of laminated floor slab 23 is preset with floor blind hole;
In above-mentioned steps two, the sequence of construction of understructure 2 is:First the vertical prefabricated components of lower layer 21 are installed in place;
Then the pre-erection of the pre-erection and laminated floor slab 23 of installation composite beam 22, and bind the steel of the cast-in-place part of composite beam 22
The reinforcing bar of the cast-in-place part of muscle and laminated floor slab 23;The concrete and laminated floor slab 23 of the cast-in-place part for smashing composite beam 22 are poured again
Cast-in-place part concrete, and reserve floor through-hole in the cast-in-place part of laminated floor slab 23.
The present invention is not limited to above-mentioned specific implementation mode, according to the above, according to the ordinary technical knowledge of this field
And customary means, under the premise of not departing from above-mentioned basic fundamental thought of the invention, the present invention can also make other diversified forms
Equivalent modifications, replacement or change, all fall among protection scope of the present invention.Such as:Grout sleeve 3 in the component of the present invention
Can may be half grout sleeve for full grout sleeve with detection grout sleeve 6.For another example:In the vertical prefabricated components in upper layer 1
Each component in grout sleeve 3 can also be in the milk using seat slurry processes, and at this moment, inject grouting in the component of grouting material
Sleeve 3 is preferably with grout sleeve 3 in 5 communication members of connecting tube apart from farthest.