CN108797511B - A method of needing the Water Resources Allocation of water towards river channel ecology - Google Patents

A method of needing the Water Resources Allocation of water towards river channel ecology Download PDF

Info

Publication number
CN108797511B
CN108797511B CN201810628592.XA CN201810628592A CN108797511B CN 108797511 B CN108797511 B CN 108797511B CN 201810628592 A CN201810628592 A CN 201810628592A CN 108797511 B CN108797511 B CN 108797511B
Authority
CN
China
Prior art keywords
water
reservoir
biotope
ecological
ecology
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201810628592.XA
Other languages
Chinese (zh)
Other versions
CN108797511A (en
Inventor
严子奇
王浩
贾仰文
周祖昊
桑学锋
褚俊英
牛存稳
刘佳嘉
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Institute of Water Resources and Hydropower Research
Original Assignee
China Institute of Water Resources and Hydropower Research
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Institute of Water Resources and Hydropower Research filed Critical China Institute of Water Resources and Hydropower Research
Priority to CN201810628592.XA priority Critical patent/CN108797511B/en
Publication of CN108797511A publication Critical patent/CN108797511A/en
Application granted granted Critical
Publication of CN108797511B publication Critical patent/CN108797511B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02BHYDRAULIC ENGINEERING
    • E02B1/00Equipment or apparatus for, or methods of, general hydraulic engineering, e.g. protection of constructions against ice-strains
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02BHYDRAULIC ENGINEERING
    • E02B1/00Equipment or apparatus for, or methods of, general hydraulic engineering, e.g. protection of constructions against ice-strains
    • E02B1/02Hydraulic models
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02ATECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
    • Y02A20/00Water conservation; Efficient water supply; Efficient water use
    • Y02A20/40Protecting water resources
    • Y02A20/402River restoration

Abstract

The invention discloses a kind of methods of Water Resources Allocation that water is needed towards river channel ecology, it include: in water resource allocation, it is biotope by ecological water demand of rivers simplified section, it establishes between water source and biotope and contacts, and meet the constraint of water resource allocation, virtual reservoir, the water resource allocation of building ecology-oriented scheduling are being set close to the upstream of biotope, biotope water consumption rate is set as 0, and the storage capacity of virtual reservoir is set as 0;Dispatch according to the following rules in the water resource allocation of ecological dispatching process, ecology-oriented scheduling: upper pond amount of water to be discharged, section confluence carry out water and are first used for biotope water supply, let out under superfluous water into virtual reservoir;If biotope insufficient water, upstream reservoir hair water transfer instruction, carries out ecological water supplement.The present invention realizes the long series analog process of multiple target, meets the needs of different objects with water, is of great significance to development comprehensive reclamation to river basin and in planning layer wheat flour constant current domain ecological water supplement scheme.

Description

A method of needing the Water Resources Allocation of water towards river channel ecology
Technical field
The present invention relates to ecological dispatching fields, and in particular to a kind of side for the Water Resources Allocation that water is needed towards river channel ecology Method.
Background technique
Ecological dispatching is intended to rescue or restore river ecosystem in damaged condition, promotes river ecosystem self-regeneration energy Power improves and every river of implementation and the general designation of Hydraulic Projects Operation Measures, and essence is exactly to bring ecological factor into existing water Multiple target integrated dispatch is carried out in library scheduling and regional water resources allocation plan.Its usual way is to fully consider dam safety evaluation Can and river conveying characteristic, store or release in due course runoff using reservoir capacity to adjust natural water sand process, improve reservoir area and The river water environmental condition in downstream ensures river ecosystem water demand, realizes the societies such as flood control, power generation, water supply, irrigation, shipping It can economic plurality of target.
In the research of ecological dispatching, consider that the hydraulic engineering Optimal Operation Model of Ecological discharge demand usually has three Kind form:
The first is constraint control type model, i.e., Ecological discharge is added in the constraint condition of traditional Optimized model Constraint condition, this class model are occurred that earliest including minimum ecological discharge restricted model (MEF model, Minimum Ecological Flow), since its newly-increased ecological flow constraint condition is simple and fixed, modified on traditional Optimized model It is convenient, it is easy to accomplish, therefore application is wider, but its to the protecting effect of the ecosystem just increasingly by people it is especially ecological The query of scholar.The shortcomings that make up MEF model, scholar start to consider to build the methods for appropriate ecological flow of target species as constraint Vertical Optimal Operation Model (CEF model, Calculated Ecological Flow), compared with MEF, ecological flow in CEF model Amount is dynamic change, responds the use water flow demand of different biology difference Life Stages;The setting of its constraint condition guarantees The appropriate flow rate lower limit value that target species change over time when reservoir operation;CEF model major advantage be it is with strong points, it is right The protecting effect of target species is preferable, but the solution of methods for appropriate ecological flow is more complex compared with MEF, and modeling cost is higher, needs It will a large amount of ecology and hydrographic data.Model notes also the selection of target species in utilization, in the hope of protecting to the greatest extent River ecosystem.Later period develops integrated flow rate restricted model and is then referred to as IEF model (Integrated Ecological Flow), it is a complicated integrated system by river ecosystem, when there are multiple river ecologicals to manage mesh When mark, IEF model may be a kind of preferable selection.
Second is target control pattern type, i.e., Ecological discharge is added in the objective function of traditional Optimized model Target, and gradually developed model methods, this models such as RVA (Shiau and Wu, 2007), IDH and met the more mesh of reservoir The essence for marking scheduling problem is the new stage for considering the development of ecological flow Optimal Operation Model, proposes to optimizing scheduling of reservoir Higher ecological requirements.But the obtained scheduling scheme of this kind of model solution often reservoir social and economical benefits are brought it is larger It influences.
The third is ecological value object type model, by inquiring into the economic benefit of Ecological discharge, forms ecological value It is worth target;In the model, the release of ecological flow is considered a kind of economic activity, generates corresponding costs and benefits, this because Son constitutes " Cost-Electiveness " model together with other costs and benefits of reservoir operation, and reservoir target is all realized currency Change, and according to the local situation, the econometric function of definition reflection reservoir overall efficiency, by the method for working out whole cost come excellent Change the scheduling scheme of reservoir.
In conclusion the hydraulic engineering Optimal Operation Model of three of the above Ecological discharge demand all has one-sidedness, It is specific as follows:
(1) above-mentioned model is typically only capable to carry out single reservoir ecological dispatching calculating, rather than carries out in full basin level It calculates;
(2) it in terms of to the constraint of ecological flow, can only select in constraint control type and target control type first, cannot be same When take into account two kinds of about beam control methods, and be directed to and original water resource allocation rebuild, program development work Work amount is big;
(3) above-mentioned model is typically only capable to simulate a kind of target of river channel ecology flow, cannot consider basin completely Other interior social economy's supply and demand processes, Water Resources Allocation target resultant effect are unbalanced.
In view of this, being badly in need of a kind of new Water Resources Allocation scheme for needing water towards river channel ecology, can not only flow entirely Domain level carries out ecological dispatching calculating, and takes into account constraint control type and target control type feature, fully considers in basin other Social economy's supply and demand process, the balanced each target effect of Water Resources Allocation.
Summary of the invention
The technical problem to be solved by the present invention is to design a kind of new Water Resources Allocation side that water is needed towards river channel ecology Case can not only carry out ecological dispatching calculating in full basin level, and take into account constraint control type and target control type feature, fill Other social economy's supply and demand processes in basin point are considered, the problem of balanced Water Resources Allocation each target effect.
In order to solve the above-mentioned technical problem, the technical scheme adopted by the invention is that providing one kind needs water towards river channel ecology Water Resources Allocation method, comprising the following steps:
The water resource allocation E-WAS of ecology-oriented scheduling is constructed, specifically:
In water resource allocation WAS, it is biotope by the water demand for natural service simplified section in river, establishes water source and life Connection is established between state unit, and meets the constraint of water resource allocation WAS, virtual close to the setting of the upstream of biotope Reservoir, biotope water consumption rate are set as 0, and the storage capacity of virtual reservoir is set as 0;
It is scheduled in the water resource allocation E-WAS of ecological dispatching process, ecology-oriented scheduling according to following rule:
The upper pond amount of water to be discharged of virtual reservoir, section confluence, enter virtual reservoir, Lai Shuiliang is initially used for ecology Unit supplies water, and extra lets out under water;If upper pond water and section confluence are not able to satisfy biotope water supply, swim upwards Library issues instruction and carries out water transfer, and upper pond occurs water and recalls, and realizes the ecological water supplement to downstream ecology unit;
Solve using dynamic programming method and calculate to complete water resource optimal allocation.
In the above-mentioned methods, the Water Resources Allocation calculation formula of the water resource allocation E-WAS of ecology-oriented scheduling are as follows:
Virtual reservoir water equilibrium equation:
QR (r, m+1)=0
Qrin(r,m+1)+Qrin0(r,m+1)+Qrin1(r, m+1)=Qrko(r,m+1)-Qrfo(r,m+1)
Wherein, QR (r, m+1) is virtual reservoir r in m+1 period end reservoir storage, Qrin(r,m+1)、Qrin0(r,m+1)、Qrin1 (r,m+1)、Qrko(r,m+1)、Qrfo(r, m+1) is respectively virtual reservoir r in m+1 period end interval inflow amount, upstream entity water The abandoning water in library calls in water, water supply, reservoir amount of water to be discharged;
Biotope water balance equation:
QU (u, m)=QUresu(u,m)+QUwru(u,m)+QUoresu(u,m)
Wherein, QU (u, m) is biotope u in period m Eco-environmental Water Demand, QUresu(u, m) is that biotope u exists The corresponding virtual reservoir yield of period m, QUwru(u, m) is biotope u in period m regeneration water source water supply, when in this river When having water purification facilities in section, discharge tail water is as regeneration water source water supply, QUoresu(u, m) is biotope u in the period M receives outer water transfer water supply.
In the above-mentioned methods, it for the calculating of objective function, using the formula of water resource allocation WAS, but calculates single It is first then include all water demand for natural service units.
In the above-mentioned methods, the water resource allocation E-WAS verification of ecology-oriented scheduling includes water circulation and water resource Configuration verification, specifically:
Water loop module is verified using key sections runoff first, examines water further according to region social economy water supply Resource allocation scheme is lauched loop condition.
In the above-mentioned methods, the verification of key sections Runoff Simulation using the analogue value and deploys region downstream section measured value Nash efficiency factor and related coefficient (R2) evaluated;
It examines Water Resource Adjustment & Distribution scheme to be lauched loop condition according to region social economy water supply, passes through what is obtained to model Region social economy water consumption is compared with water resource bulletin in region with water statistical data, is verified.
In the above-mentioned methods, ecological water supplement scheme optimum principle is specific as follows:
Social and economic water consumption in the preferential support area of service reservoir;
For tributary make-up water measure priority are as follows: the recycled water of tributary upstream, non-water supply function reservoir, tributary regeneration downstream Water;
In the case that water quality gets a promotion in tributary, uses and carry out moisturizing in such a way that branch is mended and done, first guarantee each tributary Water demand of ecological environment, to guarantee mainstream water demand of ecological environment indirectly;
For the basin of no recycled water and reservoir resources, consider to carry out ecological water supplement from mainstream water lift or water system connection.
Compared with prior art, the present invention is based on the water resource allocations of fining, comprehensively consider ecology reason flow about The characteristics of beamforming model and ecological flow object type model, on the one hand using section ecological flow constrain reservoir water supply process, one From the aspect of river channel ecology flow targets constraint, the water resource allocation of building ecology-oriented scheduling, and by river Water demand for natural service section generally changed in a model as biotope, Ecological Control target is included in Water Resource Adjustment & Distribution system, It is contacted being established between a variety of water sources and social economy's unit, biotope, sets corresponding constraint condition, realize multiple target Long series analog process reaches the distributed allotment purpose towards river cross-section ecological flow guarantee, and in basin, level realizes people Class water and river channel ecology flow make overall plans and coordinate the ecological dispatching of calculating, meet the needs of different objects with water, to development basin It comprehensive treatment and is of great significance in planning layer wheat flour constant current domain ecological water supplement scheme.
Detailed description of the invention
Fig. 1 is traditional water resource allocation structural schematic diagram;
Fig. 2 is a kind of method flow diagram for the Water Resources Allocation that water is needed towards river channel ecology provided by the invention;
Fig. 3 is to construct Water Resources Allocation system using the water resource allocation of ecology-oriented scheduling in the embodiment of the present invention The flow chart of network;
Fig. 4 is the calibration verification result figure simulate using the present invention to Pingshan river downstream section runoff;
Fig. 5 is 1995-2015 years Shenzhen's water resource bulletin water statistical data and simulates 1995-using the present invention 2015 Pingshan social and economic water consumption amount comparison diagrams;
Fig. 6 is the hemiplegia time analogue flow rate comparison diagram under scheme 1 and scheme 2.
Specific embodiment
The present invention is based on the water resource allocation of fining (WAS), comprehensively consider ecology reason traffic constraints pattern type and On the one hand the characteristics of ecological flow object type model, constrains reservoir water supply process using section ecological flow, on the one hand considers river The constraint of road ecological flow target, the water resource allocation (E-WAS) of building ecology-oriented scheduling, and pass through the life to river State needs water section generally to be changed in a model as biotope, and Ecological Control target is included in Water Resource Adjustment & Distribution system, will be more It establishes and contacts between kind water source and social economy's unit, biotope, set corresponding constraint condition, realize multiple target water resource The long series analog (simulating the Water Resources Allocation process of decades) of configuration, reaches towards river cross-section ecological flow guarantee Distribution allotment (carrying out the allotment of each unit on space-oriented) purpose, in basin, level realizes mankind's water and river channel ecology Flow makes overall plans and coordinate the ecological dispatching of calculating, meets the needs of different objects with water, to development comprehensive reclamation to river basin and is advising The level of drawing formulates river basin ecological water complementation and is of great significance.
Refine water resource allocation (WAS) herein
Existing WAS model (water resource allocation) by water circulation faults module (Water Simulation Module), Water Resources Allocation module (Water Allocation Module) forms (Wang et al.2014;Sang et al.2017), Traditional Water Resources Allocation mold three-dimensional-structure is shown in Fig. 1.
The calculating process of WAS model is as follows: passing through the water resource change of water loop module simulated domain first, in conjunction with industry With water module analysis Region Theory water consumption and the recycled water module simulation amount of recycling, then with configuration strategy and rule into Row reasonable allocation of water resources calculates, at the same will manually take, with, consumption, drain data feedback watering cycle module and simulated in real time The regional water resources of subsequent period change, reciprocal with this, terminate until calculating, and propose final optimization pass scheme.
The function of WAS model and the relationship that intercouples: surface water and groundwater, natural water circulation may be implemented in WAS model Combined simulation is recycled with artificial water, other than statistical analysis module, each analog module is Real-time Feedback, mutual shadow in WAS model Loud relationship.Regional water loop module can produce the water such as confluence, the soil water, underground water and evaporation with the precipitation of simulated domain, earth's surface Literary process provides for region water conservancy water supply project and carrys out water;Industry theory water applying model can analyze zoning economic industry Industry water consumption process under structure;Recycled water module can simulate the reused water processing under industrial pattern and recycle process, Reclaimed water quantity is imported into related hydraulic engineering;Regional water resources allocation models carries out water resource optimization tune according to the information of front Match.Water resource circulation transformational relation and quantitative analysis under the last given region effect of human activity, are water resources management Take, use, consumption, row's total amount closure diagnosis provide quantitative support.
WAS model key calculating side includes rainwash calculating, underground water calculating, water consumption calculation, Water Resources Allocation meter Calculation and objective function and solution, are separately below illustrated various aspects.
(1) diameter stream calculation.
Often according to rainfall runoff observational data in engineering hydrology, using experiment statistics method (such as runoff coefficient method, drop Rain runoff Correlogram and push pull azobenzene compounds etc.), or pass through empirical or study on conceptual hydrological models (such as Xinanjiang model With the SCS curve model in the U.S. etc.) calculate rainwash, only citing is calculated using runoff coefficient method herein side Case.It will be observed and predicted in calculating and be distinguished into several computing units, its areal rainfall, different land use class are first found out to each computing unit Type uses different runoff coefficients, respectively observes and predicts area's runoff yield, region Surface Runoff amount R through what Area-weighted averagely acquiredb(ten thousand m3) Calculation formula are as follows:
Rb=0.1 × ∑ Ri×Si;Ri=Pi×αi
Wherein, SiFor the i-th computing unit area (km2);RiFor the i-th computing unit hourly precipitation depth of runoff (mm);PiIt is I computing unit period precipitation (mm);αiIt is dropped for the i-th computing unit related with the factors such as rainfall intensity, land use pattern Rain runoff coefficient.
(2) Water Resources Allocation calculates.
The Water Resources Allocation of Water Resources Allocation module is mainly taken based on the Water Resources Allocation principle of simulation of rule, water resource Configuration calculates and relates generally to reservoir equilibrium equation, subscriber unit equilibrium equation.
(1) reservoir water equilibrium equation.
QR (r, m+1)=QR (r, m)+Qrin(r,m+1)+Qrin0(r,m+1)+Qrin1(r,m+1)+
Qprin(r,m+1)-Qrko(r,m+1)-Qrfo(r,m+1)-Qrseep(r,m+1)-
Qret(r,m+1)-Qrko1(r,m+1)
Wherein, QR (r, m) is reservoir r in m period end reservoir storage;QR(r,m+1),Qrin(r,m+1)、Qrin0(r,m+1)、 Qrin1(r,m+1)、Qprin(r,m+1)、Qrko(r,m+1)、Qrfo(r,m+1)、Qrseep(r,m+1)、Qret(r,m+1)、Qrkol(r,m+ 1) be respectively reservoir r m+1 period end reservoir storage, interval inflow amount, upper pond abandoning water, call in water, reservoir precipitation, Water supply, reservoir amount of water to be discharged, reservoir leakage amount, reservoir evaporation amount and recall water.
It wherein, can upstream when the interval inflow of reservoir, the abandoning water of upper pond and reservoir storage are not able to satisfy water supply and need Reservoir issues water transfer instruction, can be Q to the Reservoir Regulation, water diversion volume when upper pond has remaining reservoir storagerin1(r,m+ 1).This process will embody emphasis in improved ecological water supplement model.
(2) subscriber unit water balance.
QU (u, m)=QUresu(u,m)+QUrivu(u,m)+QUshalu(u,m)+
QUdeepu(u,m)+QUwru(u,m)+QUotu(u,m)+QUoresu(u,m)
Wherein, QU (u, m) is water consumption (ten thousand m in the u subscriber unit m period3)、QUresu(u, m) is the u subscriber unit m period Reservoir yield (ten thousand m3)、QUrivu(u, m) is the period network of waterways u subscriber unit m water supply (ten thousand m3)、QUshalu(u, m) is u user Unit m period shallow seated groundwater water supply (ten thousand m3)、QUdeepu(u, m) is u subscriber unit m period deep water water supply (ten thousand m3)、QUwru (u, m) is u subscriber unit m period recycled water water supply (ten thousand m3)、QUotu(u, m) is u subscriber unit m period unconventional water (rain Water, sea water desalination, brackish water) water supply (ten thousand m3)、QUoresu(u, m) is u subscriber unit m period outer water transfer water supply library water Measure (ten thousand m3)。
(3) objective function and solution.
Regional water supply safety and water supply justice are Water Resources Allocation core objectives of concern, and WAS model uses fairness Optimal and objective function of the water supply Deficient Ratio minimum as water resource optimal allocation.
(1) fairness optimal objective.
Wherein, F (x) is equity objective;GP(xh) it is fairness function;qhFor industry user's penalty;For region The Deficient Ratio of industry user h in unit u;For the Deficient Ratio mean value of industry user h in territory element u;Myr is calculation interval Year;N is moon value in year;Mh is the number of region industry Water consumption type;Mu is territory element number.
(2) Deficient Ratio minimum target.
Wherein, Y (x) is the stress target that supplies water;SW(xh) it is the stress function that supplies water;qhFor industry user's penalty; For the Deficient Ratio of industry user h in territory element u;For the stress target stoichiometric value that supplies water each moon of region industry user h; Myr is the year of calculation interval;N is moon value in year;Mh is the number of region industry Water consumption type;Mu is territory element number.
WAS model is solved using the non-dominant genetic changec algorithm based on elitism strategy, gives each user's with each water source Water is encoded as decision variable, to decision variable and is formed set of feasible solution, by the satisfaction for judging each individual It selects the superior and eliminates the inferior, to generate set of feasible solution of new generation, and iteration completes water resource optimal allocation repeatedly.
The present invention is described in detail with specific embodiment with reference to the accompanying drawings of the specification.
Although WAS model can be for carrying out fining configuration simulation to regional water resources, working as research object is river, Configuring target is when ensureing ecological water demand of rivers process, to need to improve WAS model, the water money of building ecology-oriented scheduling Source allocation models (E-WAS) enables the requirement for meeting the scheduling of multi-water resources river ecological;As shown in Fig. 2, provided by the invention A method of needing the Water Resources Allocation of water towards river channel ecology, comprising the following steps:
Step S10, the water resource allocation of building ecology-oriented scheduling, specifically:
What it is due to traditional water resource allocation consideration is water source (reservoir, regeneration water factory etc.) and social and economic water consumption family Between water supply relationship need using the water demand for natural service section in river as life in order to make the simulation of ecological dispatching can be carried out State unit is generally changed in a model, and contacts establishing between water source and biotope, and meet the constraint of WAS model, if Determining biotope water consumption rate is 0.
In order to control different water sources in WAS model, realizes the dynamic adaptation supply of river ecological process, compare In WAS model, E-WAS model increases virtual reservoir in grid, matches with biotope, the storage capacity of virtual reservoir It is set as " 0 ";Virtual reservoir effect is the amount of water to be discharged for accepting section upper pond, section production water and outer water transfer, itself is not There is pondage capacity, in this way, all reservoir inflows to be directly fed to the Water Requirement of biotope, since Water Requirement consumes Water rate is 0, so the ecological water supply for supplying this unit can be discharged downstream river, and since virtual reservoir capacity is 0, it is more Remaining water can also be directly discharged into downstream river course.
Fig. 3 is that the water resource allocation dispatched using ecology-oriented constructs the flow chart of Water Resources Allocation grid, The embodiment constructs most basic Water Resources Allocation grid, in practical application, since river is there are due to more tributaries etc., The Water Resources Allocation grid of building will be increasingly complex.In the present embodiment, there are reservoir A, social water use sector B in water system, Tributary and mainstream, which import mouth, ecological water supplement section C (Fig. 3 a), is generally changed to ecological water supplement section first, and biotope is set C ' (Fig. 3 b) is setting virtual reservoir D (Fig. 3 c) close to the upstream of C ' later, is matching with biotope C '.Virtual reservoir D Storage capacity be set as " 0 ", effect be accept the amount of water to be discharged of section upper pond A, section produces water, work of itself not regulating and storing With, all reservoir inflows directly feed the Water Requirement of biotope C ', since Water Requirement water consumption rate is 0, so The ecological water supply for supplying this unit passes through water-break route and is discharged downstream river, and since virtual reservoir capacity is 0, it is extra Water can also be directly discharged into downstream river course.
Step S20, E-WAS model is scheduled in ecological dispatching process according to certain rule, specific as follows:
The upper pond amount of water to be discharged (Flood, abandoning water etc.) of virtual reservoir, section confluence, enter virtual reservoir, Carry out water and be initially used for biotope water supply, extra lets out under water;If upper pond water and section confluence are not able to satisfy ecology Unit supplies water, then upstream reservoir issues instruction and carries out water transfer, and upper pond occurs water and recalls, realizes to downstream ecology unit Ecological water supplement.
Step S30, solve using dynamic programming method and calculate to complete water resource optimal allocation.
E-WAS model of the invention can be on the basis of not changing WAS model internal core algorithm, by flowing to calculating The improvement of journey is aided with virtual reservoir and biotope, realizes the scheduling of section ecological flow with water resource optimal allocation and couples, It realizes that the Water Resources Allocation towards river ecological is dispatched to calculate, then the Water Resources Allocation calculation formula of E-WAS model is as follows:
(1) virtual reservoir water equilibrium equation.
QR (r, m+1)=0
Qrin(r,m+1)+Qrin0(r,m+1)+Qrin1(r, m+1)=Qrko(r,m+1)-Qrfo(r,m+1)
Wherein, QR (r, m+1) is virtual reservoir r in m+1 period end reservoir storage, Qrin(r, m+1), Qrin0(r,m+1)、Qrin1 (r,m+1)、Qrko(r,m+1)、Qrfo(r, m+1) is respectively virtual reservoir r in m+1 period end interval inflow amount, upstream entity water The abandoning water in library calls in water, water supply, reservoir amount of water to be discharged;Water supply among these refers to towards section water demand of ecological environment Water supply;When the interval inflow of the virtual reservoir and the abandoning water of upper pond are not able to satisfy corresponding biotope water requirement When, upstream water transfer instruction can be issued by entity reservoir, when there are also when remaining reservoir storage completing water supply task for upstream entity reservoir Can be to the Reservoir Regulation, water diversion volume is Qrin1(r,m+1).At this moment water is called in from the entity reservoir, so that it may be regarded as the reality The ecology filling water of body reservoir, i.e. reservoir aim at meet river channel ecology flow and under the water let out.The abandoning water Q of upper pondrin0 (r, m+1) is not that reservoir discharges water for the active of Ecological Target although also forming ecological flow.
(2) biotope water balance equation.
QU (u, m)=QUresu(u,m)+QUwru(u,m)+QUoresu(u,m)
Wherein, QU (u, m) is biotope u in period m Eco-environmental Water Demand (ten thousand m3), QUresu(u, m) is that ecology is single First u is in corresponding virtual reservoir yield (ten thousand m of period m3), QUwru(u, m) is that biotope u supplies water at period m regeneration water source Measure (ten thousand m3), when having water purification facilities in this section, discharge tail water is as regeneration water source water supply (ten thousand m3), QUoresu(u, m) is biotope u in outer water transfer water supply (ten thousand m of period m receiving3)。
Calculating for objective function still uses the formula of WAS model, but computing unit then includes all water demand for natural service Unit.
Model checking is the critical process that modeling precision and parameter rate determine, E-WAS model of the present invention is related to water and follows The two aspect verifications of ring and Water Resources Allocation, wherein first mainly use key sections runoff to verify water loop module, On this basis, Water Resource Adjustment & Distribution scheme is examined to be lauched loop condition further according to region social economy water supply.
(1) key sections Runoff Simulation Knowledge Verification Model simulates effect, using the analogue value and allotment region downstream section actual measurement The Nash efficiency factor and related coefficient (R of value2) evaluated.If model is 1961-2015 years to the Pingshan river simulation phase, In first 30 years for model rate it is regular, latter 25 years for model verify the phase;From the point of view of the check results that water is simulated, model rate is regular Interior, Nash coefficient is 0.87, model coefficient R2It is 0.8436;In the model verifying phase, Nash coefficient is 0.91, and model is related Coefficients R2Average value is 0.9138, the analog result of Pingshan river downstream section as shown in figure 4, from water circulation faults angle, this The verification result of precision is more satisfactory.
(2) social economy verifies for water consumption.Region social economy water supply be region in social economy's unit (industry, The sum of life, agricultural etc.) water supply, branch trade water supply can be calculated by the artificial water consumption module of E-WAS model.The present invention is to mould The region social economy water consumption that type obtains is compared with water resource bulletin in region with water statistical data, is verified.Such as Shown in Fig. 5,995-2015 years Shenzhen's water resource bulletin water statistical data simulate 1995-2015 Pingshans with using the present invention Social and economic water consumption amount comparison diagram, it is seen that from 1995-2015 years modeling region social economy water consumptions and use water statistical number According to relatively from the point of view of, time of the error within 10% accounts for 60%;10 years 1995-2015 years are obtained for many years by E-WAS simulation model Average social and economic water consumption amount is 3902 billion cubic meters, 374,600,000,000 m of many years average consumption of this and water resource bulletin3Poor 155 Hundred million m3, relative error 4% illustrates model to generalization of Pingshan river valley water resource system network and for the simulation of water consumption Precision is acceptable.
In the present invention, on the one hand river basin ecological scheduling needs to consider the satisfaction degree of water, on the one hand it is also contemplated that work The many factors such as journey, economy.The present invention proposes ecological water supplement scheme optimum principle thus, specific as follows:
(1) social and economic water consumption in the preferential support area of service reservoir;
(2) for tributary make-up water measure priority are as follows: the recycled water of tributary upstream, non-water supply function reservoir, tributary downstream Recycled water (needs water lift);
(3) it in the case that water quality gets a promotion in tributary, uses and carries out moisturizing in such a way that branch is mended and done, first guarantee each Water demand of ecological environment is flowed, to guarantee mainstream water demand of ecological environment indirectly;
(4) for the basin of no recycled water and reservoir resources, consider to carry out ecological benefit from mainstream water lift or water system connection Water.
E-WAS model of the invention is obtained by the improvement to water resource allocation (WAS), set constraint type and The characteristics of two kinds of ecological dispatching models of object type.Below by the result statistical parameter of comparison WAS model and E_WAS model, print Card E-WAS model needs water guarantee and the pool of social and economic water consumption to deploy river channel ecology, for this purpose, setting the following two kinds situation, Simulation, referred to as scheme 1 are carried out using Water Resources Allocation of the WAS model to research area in situation one;Second situation is using this hair Bright E-WAS model carries out model for water quantity allocation simulation, referred to as scheme 2.Wherein, global objective function is fairness objective function and lacks The average value of water rate objective function.
Hemiplegia time analog result under table 1:WAS model and E-WAS model.
Scheme Model Global objective function Social economy's degree of protection Eco-environmental Water Consumption degree of protection
Scheme 1 WAS 95% 95% 75%
Scheme 2 E-WAS 94% 92% 98%
For scheme 1, using the WAS model for not considering that river channel ecology needs water, society is only considered in configuration process Can water for economy process, by the allotment at a variety of water sources so that social economy's degree of protection reaches 95%, global objective function 95% is reached, but river channel ecology environment-guarantee degree is lower, only 75%;For scheme 2, using ecology-oriented The E-WAS Computational frame of scheduling, had not only considered social and economic water consumption demand, but also considered the ecological environment stream of Pingshan river Heavenly Stems and Earthly Branches stream as a whole Amount, final global objective function have also reached 94%, and social economy's degree of protection, which has, is slightly reduced to 92%, Eco-environmental Water Consumption Degree of protection has then reached 98%.
By taking the section of Pingshan river downstream as an example, the hemiplegia time analogue flow rate under scheme 1 and scheme 2 is illustrated in fig. 6 shown below:
Under WAS model scheme, Pingshan river downstream mainstream is in 2 months, April, May, June, July, six totally months October, ecological flow Amount target is not being met;Under E-WAS model, ecological flow is significantly improved in whole year, and all months are reachable To ecological environment water demand target.
Compared with prior art, the present invention having the advantage that
(1) based on fining water resource allocation (WAS), the water resource allocation (E- of building ecology-oriented scheduling WAS), generally changed in a model by the water demand for natural service section to river as biotope, Ecological Control target is included in Water Resource Adjustment & Distribution system is contacted establishing between a variety of water sources and social economy's unit, biotope, sets corresponding constraint item Part realizes the long series analog process of multiple target, achievees the purpose that the distributed allotment towards river cross-section ecological flow guarantee;
(2) E-WAS is an expansion to water resource allocation function, usual feelings as a simulation Computational frame Under condition, it does not change the internal calculation structure of model, is only through generalization refined to section biotope, by Virtual water source and dummy unit, bring into cross section of river as an entity in traditional water resource allocation, realize face It is deployed to the water resource of river ecological flow is comprehensive, and available the considerations of being significantly better than WAS model water demand for natural service mistake Global allotment result;
(3) the river basin ecological dispatching simulation under E-WAS frame calculates the satisfaction degree on the one hand considering water, on the one hand Taken into account many factors such as engineering, economy, reservoir divided according to function it is different classes of, in conjunction with all using water source, root Coordinate according to Heavenly Stems and Earthly Branches stream, it is preferred that the principle of upstream and downstream complementation further carries out ecological water supplement scheme;
(4) on the one hand the water resource allocation of this close copy plug-in unit avoids again the huge work of development model Amount more quickly can carry out Function Extension to kernel model, on the other hand can complete again in planning level raw to river The simulation of identification and various restoration of the ecosystem schemes that state flow wanes;
(5) for different regions, this frame can be used flexibly, especially the water supply priority between adjustment industry Dramatically different result (ecology is identical as social and economic water consumption priority in the present invention) can be obtained, this needs to depend on local right Do not have to the attention degree of industry water and river channel ecology flow guarantee in society, improves when setting ecology in E-WAS in height When priority, the degree of protection of river channel ecology water can be further promoted, and at this moment due to there is the constraint of global objective function, society Biggish wane will not occur in meeting water for economy.
The invention is not limited to above-mentioned preferred forms, and anyone should learn that is made under the inspiration of the present invention Structure change, the technical schemes that are same or similar to the present invention are fallen within the scope of protection of the present invention.

Claims (5)

1. a kind of method for the Water Resources Allocation for needing water towards river channel ecology, which comprises the following steps:
The water resource allocation E-WAS of ecology-oriented scheduling is constructed, specifically:
In water resource allocation WAS, it is biotope by the water demand for natural service simplified section in river, establishes water source and ecology list Connection is established between member, and meets the constraint of water resource allocation WAS, is setting virtual water close to the upstream of biotope Library, biotope water consumption rate are set as 0, and the storage capacity of virtual reservoir is set as 0;
It is scheduled in the water resource allocation E-WAS of ecological dispatching process, ecology-oriented scheduling according to following rule:
The upper pond amount of water to be discharged of virtual reservoir, section confluence, enter virtual reservoir, Lai Shuiliang is initially used for biotope It supplies water, extra lets out under water;If upper pond water and section confluence are not able to satisfy biotope water supply, upstream reservoir is sent out Instruction carries out water transfer out, and upper pond occurs water and recalls, and realizes the ecological water supplement to downstream ecology unit;
Solve using dynamic programming method and calculate to complete water resource optimal allocation;
The Water Resources Allocation calculation formula of the water resource allocation E-WAS of ecology-oriented scheduling are as follows:
Virtual reservoir water equilibrium equation:
QR (r, m+1)=0
Qrin(r,m+1)+Qrin0(r,m+1)+Qrin1(r, m+1)=Qrko(r,m+1)-Qrfo(r,m+1)
Wherein, QR (r, m+1) is virtual reservoir r in m+1 period end reservoir storage, Qrin(r,m+1)、Qrin0(r,m+1)、Qrin1(r,m +1)、Qrko(r,m+1)、Qrfo(r, m+1) is respectively virtual reservoir r in m+1 period end interval inflow amount, upstream entity reservoir It abandons water, call in water, water supply, reservoir amount of water to be discharged;
Biotope water balance equation:
QU (u, m)=QUresu(u,m)+QUwru(u,m)+QUoresu(u,m)
Wherein, QU (u, m) is biotope u in period m Eco-environmental Water Demand, QUresu(u, m) is biotope u in period m Corresponding virtual reservoir yield, QUwru(u, m) is biotope u in period m regeneration water source water supply, is had when in this section When water purification facilities, discharge tail water is as regeneration water source water supply, QUoresu(u, m) is that biotope u receives in period m Outer water transfer water supply.
2. the method according to claim 1, wherein the calculating for objective function, using Water Resources Allocation mould The formula of type WAS, but computing unit then includes all water demand for natural service units.
3. the method according to claim 1, wherein the school water resource allocation E-WAS of ecology-oriented scheduling It tests including water circulation and Water Resources Allocation verification, specifically:
Water loop module is verified using key sections runoff first, examines water resource further according to region social economy water supply Programs are lauched loop condition.
4. according to the method described in claim 3, it is characterized in that, the verification of key sections Runoff Simulation is using the analogue value and allotment The Nash efficiency factor and coefficient R of region downstream section measured value2It is evaluated;
It examines Water Resource Adjustment & Distribution scheme to be lauched loop condition according to region social economy water supply, passes through the region obtained to model Social and economic water consumption amount is compared with water resource bulletin in region with water statistical data, is verified.
5. the method according to claim 1, wherein ecological water supplement scheme optimum principle is specific as follows:
Social and economic water consumption in the preferential support area of service reservoir;
For tributary make-up water measure priority are as follows: the recycled water of tributary upstream, non-water supply function reservoir, tributary regeneration downstream water;
It in the case that water quality gets a promotion in tributary, uses and carries out moisturizing in such a way that branch is mended and done, first guarantee each tributary ecology Environmental Water Requirement, to guarantee mainstream water demand of ecological environment indirectly;
For the basin of no recycled water and reservoir resources, consider to carry out ecological water supplement from mainstream water lift or water system connection.
CN201810628592.XA 2018-06-19 2018-06-19 A method of needing the Water Resources Allocation of water towards river channel ecology Active CN108797511B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810628592.XA CN108797511B (en) 2018-06-19 2018-06-19 A method of needing the Water Resources Allocation of water towards river channel ecology

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810628592.XA CN108797511B (en) 2018-06-19 2018-06-19 A method of needing the Water Resources Allocation of water towards river channel ecology

Publications (2)

Publication Number Publication Date
CN108797511A CN108797511A (en) 2018-11-13
CN108797511B true CN108797511B (en) 2019-05-21

Family

ID=64083491

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810628592.XA Active CN108797511B (en) 2018-06-19 2018-06-19 A method of needing the Water Resources Allocation of water towards river channel ecology

Country Status (1)

Country Link
CN (1) CN108797511B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110852518A (en) * 2019-11-15 2020-02-28 中国水利水电科学研究院 Ecological water supplementing method for river estuary area of sediment-laden river

Families Citing this family (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109800952A (en) * 2018-12-18 2019-05-24 深圳市东深电子股份有限公司 A kind of water resource bulletin management system and management method
CN109636246B (en) * 2019-01-11 2023-06-20 中国水利水电科学研究院 Distributed surface water supply and source system
CN109767143B (en) * 2019-03-14 2023-04-18 南京大学 Water source tracking method under multi-source water supply condition
CN110688609B (en) * 2019-09-26 2021-08-31 中国水利水电科学研究院 Loess tableland shallow groundwater recharge-discharge unit dividing method
CN110689283B (en) * 2019-10-15 2022-03-08 中国水利水电科学研究院 River system and canal system staggered water supply simulation method and device based on underground water model
CN113065980B (en) * 2021-03-23 2022-07-12 水利部海河水利委员会水资源保护科学研究所 River ecological water demand oriented multi-water-source optimal configuration method
CN113256028B (en) * 2021-06-23 2021-10-01 中国水利水电科学研究院 Emergency water supply allocation method for large-range long-duration drought
CN113449935B (en) * 2021-08-31 2021-11-30 中国水利水电科学研究院 Ecological-oriented water resource optimal allocation method
CN116402410B (en) * 2023-06-08 2023-08-25 长江水利委员会长江科学院 Distributed water quantity and water quality configuration method and system

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105096004A (en) * 2015-08-18 2015-11-25 中水东北勘测设计研究有限责任公司 Real-time scheduling method for reservoir group water supply and transfer system
CN105780714A (en) * 2016-03-28 2016-07-20 武汉大学 Combined water supply water right allocation scheduling method for reservoir group
CN106087847A (en) * 2016-06-16 2016-11-09 长江勘测规划设计研究有限责任公司 Water-supply reservoir scheduling graph dynamic control method based on Runoff Forecast
CN107657329A (en) * 2017-07-04 2018-02-02 江苏鸿利智能科技有限公司 The intelligent scheduling decision-making technique taked precautions against drought based on flood control under extreme weather conditions

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105096004A (en) * 2015-08-18 2015-11-25 中水东北勘测设计研究有限责任公司 Real-time scheduling method for reservoir group water supply and transfer system
CN105780714A (en) * 2016-03-28 2016-07-20 武汉大学 Combined water supply water right allocation scheduling method for reservoir group
CN106087847A (en) * 2016-06-16 2016-11-09 长江勘测规划设计研究有限责任公司 Water-supply reservoir scheduling graph dynamic control method based on Runoff Forecast
CN107657329A (en) * 2017-07-04 2018-02-02 江苏鸿利智能科技有限公司 The intelligent scheduling decision-making technique taked precautions against drought based on flood control under extreme weather conditions

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110852518A (en) * 2019-11-15 2020-02-28 中国水利水电科学研究院 Ecological water supplementing method for river estuary area of sediment-laden river

Also Published As

Publication number Publication date
CN108797511A (en) 2018-11-13

Similar Documents

Publication Publication Date Title
CN108797511B (en) A method of needing the Water Resources Allocation of water towards river channel ecology
CN112765800B (en) Design method of distributed water resource configuration model
CN105913146B (en) Southern wet area water resource optimal allocation system
George et al. An integrated hydro-economic modelling framework to evaluate water allocation strategies I: Model development
Azari et al. Multi-objective optimization of the reservoir system operation by using the hedging policy
CN105297827A (en) Water resource allocation method taking multi-user water demand and multi-source water supply into consideration
CN104268645B (en) Industry water supplying quantity determining method with water supplying priority level taken into consideration in water resource allocation
CN114202167A (en) Multi-water-source irrigation area irrigation water consumption metering statistical method based on water circulation simulation
CN107403036A (en) Basin natural runoff computational methods based on SWAT models
Shumet et al. Assessing the impact of existing and future water demand on economic and environmental aspects (Case study from Rift Valley Lake Basin: Meki-Ziway Sub Basin), Ethiopia
Song et al. Dynamic modeling application for simulating optimal policies on water conservation in Zhangjiakou City, China
Mena et al. An analysis of unmet water demand under climate change scenarios in the Gualí River Basin, Colombia, through the implementation of Hydro-BID and WEAP hydrological modeling tools
Zeng et al. Dynamic simulation of urban water metabolism under water environmental carrying capacity restrictions
CN108269199B (en) Object-oriented small reservoir group time-space distribution type outflow calculation method
Hakami-Kermani et al. An uncertainty assessment of reservoir system performance indices under the climate change effect
Kangrang et al. Active future rule curves for multi-purpose reservoir operation on the impact of climate and land use changes
Aein et al. Integrated hydro-economic modeling for optimal design of development scheme of salinity affected irrigated agriculture in Helleh River Basin
Wang et al. A generalized reservoir module for SWAT applications in watersheds regulated by reservoirs
Safavi et al. Conjunctive use of surface and ground water using fuzzy neural network and genetic algorithm
Porhemmat et al. Evaluation of WEAP-MODFLOW model as an integrated water resources management model for sustainable development (a case study: Gharesoo at Doab-Merek, Kermanshah, Iran)
Nair et al. Methods for integrating high-resolution land, climate, and infrastructure scenarios in a hydrologic simulation model
Her et al. SWAT+ versus SWAT2012: Comparison of sub-daily urban runoff simulations
Dinh Multi-objective evolutionary algorithm, dynamic and non-dynamic emulators in the design of optimal policies for water resources management
KR20240000915A (en) Water supply and demand analysis method based on historical data by using downscaling watershed and recording medium storing program for executing the method
Stevovic et al. Sustainable water resources management of Prokletije region

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant