CN108789213A - A kind of road and bridge construction engineering machinery safety guarantee multi-point positioning device - Google Patents

A kind of road and bridge construction engineering machinery safety guarantee multi-point positioning device Download PDF

Info

Publication number
CN108789213A
CN108789213A CN201810590789.9A CN201810590789A CN108789213A CN 108789213 A CN108789213 A CN 108789213A CN 201810590789 A CN201810590789 A CN 201810590789A CN 108789213 A CN108789213 A CN 108789213A
Authority
CN
China
Prior art keywords
pedestal
stacker
engineering machinery
sides
groove
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201810590789.9A
Other languages
Chinese (zh)
Other versions
CN108789213B (en
Inventor
汤永红
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangdong Mingxin Construction Engineering Co ltd
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201810590789.9A priority Critical patent/CN108789213B/en
Publication of CN108789213A publication Critical patent/CN108789213A/en
Application granted granted Critical
Publication of CN108789213B publication Critical patent/CN108789213B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B25HAND TOOLS; PORTABLE POWER-DRIVEN TOOLS; MANIPULATORS
    • B25BTOOLS OR BENCH DEVICES NOT OTHERWISE PROVIDED FOR, FOR FASTENING, CONNECTING, DISENGAGING OR HOLDING
    • B25B11/00Work holders not covered by any preceding group in the subclass, e.g. magnetic work holders, vacuum work holders

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Refuge Islands, Traffic Blockers, Or Guard Fence (AREA)
  • Bridges Or Land Bridges (AREA)

Abstract

The invention discloses a kind of road and bridge construction engineering machinery safety guarantee multi-point positioning devices, including pedestal, the pedestal is left end opening setting, the left end of pedestal is equipped with inclined slope, the upper center of the pedestal is equipped with the groove for installing idler wheel, the both sides of the pedestal are bolted with crank, the crank stretches on the inside of pedestal and is connected with gear, the upper end of the pedestal is provided with engineering machinery stacker, the upper center of the engineering machinery stacker is equipped with holding groove, pass through the structure of embodiment 1, the positioning of road and bridge construction engineering machinery is fixed by located lateral channel steel and side plate completion, it effectively prevent road and bridge construction engineering machinery arbitrary shift position in use;Pass through the structure of embodiment 2 so that between road and bridge construction engineering machinery is located at, effectively prevent road and bridge construction engineering machinery arbitrary shift position in use.

Description

A kind of road and bridge construction engineering machinery safety guarantee multi-point positioning device
Technical field
The present invention relates to road and bridge construction field of mechanical technique, specially a kind of road and bridge construction engineering machinery safety guarantee is used more Location device.
Background technology
The region in China is wide, and contact in all parts of the country, exchange for convenience needs to build highway, iron between two places Road.It since many places are all high and steep mountains, needs to construct using big machinery, big machinery is determined due to quality weight Position difficulty is big, and the process for bridge formation of repairing the roads is easy to because machinery occurs movement and causes danger.
For this purpose, we release a kind of road and bridge construction engineering machinery safety guarantee multi-point positioning device.
Invention content
The purpose of the present invention is to provide a kind of road and bridge construction engineering machinery safety guarantee multi-point positioning devices, to solve The problems mentioned above in the background art.
To achieve the above object, the present invention provides the following technical solutions:A kind of road and bridge construction engineering machinery safety guarantee use Multi-point positioning device, including pedestal, the pedestal are left end opening setting, and the left end of pedestal is equipped with inclined slope, the pedestal Upper center is equipped with the groove for installing idler wheel, and the both sides of the pedestal are bolted with crank, and the crank stretches in pedestal Side is simultaneously connected with gear, and the upper end of the pedestal is provided with engineering machinery stacker, in the upper end of the engineering machinery stacker Portion is equipped with holding groove, and the left end of the engineering machinery stacker is arranged in opening, and its opening is equipped with inclined ramp, the work The bottom both ends of journey machinery stacker are equipped with the rack for engage connection with gear, and it is vertical that the both sides of pedestal right side upper end pass through The channel steel of setting is connected with the first upright bar, and pedestal left end both sides are connected with the second upright bar, the first upright bar described in same side Side plate, used second screw in upper end of second upright bar are fixedly connected with by the first screw with the upper side of the second upright bar It is fixedly connected with located lateral channel steel.
The both ends of the idler wheel are equipped with shaft, and stacker is equipped in the groove, and the bottom of the groove is equipped with for pacifying The upper end of spring-loaded spring mounting groove, the spring resists the lower end of stacker, and the both sides of the groove pass through third screw It is installed with stacker, the shaft is between stacker and upper stacker.
The both sides of the groove are equipped with vertical chute, and the both sides of the stacker are equipped with sliding protrusion, the sliding protrusion It is slidably connected to vertical chute.
The upper end both sides of the pedestal are equipped with sliding slot, and the lower end both sides of the engineering machinery stacker are equipped with sliding protrusion Plate, the sliding raised plate are slidably connected in sliding slot.
The first upright bar upper outside is equipped with the first locating slot, and the upper outside of second upright bar is equipped with determines with first The second contour locating slot of position slot, the left and right ends of the side plate are fixedly connected on the second locating slot and first by the first screw Locating slot, second upright bar are pinned at pedestal left end both sides, the located lateral channel steel by the connecting plate of its lower end inside Both ends the horizontal supporting plate of second upright bar upper end is fixedly connected on by the second screw, two middle side parts of the pedestal are set It is useful for placing the side edge detents of horizontal supporting plate.
The present invention also provides a kind of technical solutions:A kind of road and bridge construction engineering machinery safety guarantee multi-point positioning device, Including pedestal, the pedestal is left end opening setting, and the left end of pedestal is equipped with inclined slope, and the upper center of the pedestal, which is equipped with, to be used It is bolted with crank in the both sides of the groove of installation idler wheel, the pedestal, the crank stretches on the inside of pedestal and is connected with gear, The upper end of the pedestal is provided with engineering machinery stacker, and the upper center of the engineering machinery stacker is equipped with holding groove, institute The left end for stating engineering machinery stacker is arranged in opening, and its opening is equipped with inclined ramp, the engineering machinery stacker Bottom both ends are equipped with the rack that connection is engaged with gear, and the corner of upper end four of the pedestal is mounted on cylinder, the gas The piston rod of cylinder is connected to U-shaped posting, and the opening of the U-shaped posting is located at pedestal left end opening, the U-shaped positioning It is connected with positioning transverse slat at left and right sides of the upper end of frame.
The both ends of the idler wheel are equipped with shaft, and stacker is equipped in the groove, and the bottom of the groove is equipped with for pacifying The upper end of spring-loaded spring mounting groove, the spring resists the lower end of stacker, and the both sides of the groove pass through third screw It is installed with stacker, the shaft is between stacker and upper stacker.
The both sides of the groove are equipped with vertical chute, and the both sides of the stacker are equipped with sliding protrusion, the sliding protrusion It is slidably connected to vertical chute.
The upper end both sides of the pedestal are equipped with sliding slot, and the lower end both sides of the engineering machinery stacker are equipped with sliding protrusion Plate, the sliding raised plate are slidably connected in sliding slot.
The lower end both sides of the positioning transverse slat are equipped with sliding groove, and the both ends of the positioning transverse slat are fixed by the 4th screw It is connected to the location hole of U-shaped posting side.
Compared with prior art, the beneficial effects of the invention are as follows:It is rotated by shaking crank band moving gear, since gear is nibbled Close connection rack so that behind engineering machinery stacker shift position, be conveniently adjusted the position of road and bridge construction engineering machinery;
The lower end of engineering machinery stacker resists the upper end of idler wheel, since the both ends of idler wheel are equipped with shaft, is equipped in groove The bottom of stacker, groove is equipped with for pacifying spring-loaded spring mounting groove, and the upper end of spring resists the lower end of stacker, groove Both sides upper stacker is installed with by third screw, shaft works as engineering machinery between stacker and upper stacker When stacker movement generates vibrations down-pressure roller, damping can be played the role of by spring.
By the structure of embodiment 1, the second upright bar and the first upright bar are erected so that road and bridge construction engineering machinery is located at the Between two upright bars and the first upright bar, the left and right ends of side plate are then fixedly connected on the second locating slot and by the first screw The both ends of a positioning groove, located lateral channel steel are fixedly connected on the horizontally-supported of second upright bar upper end by the second screw Plate fixes the positioning of road and bridge construction engineering machinery by located lateral channel steel and side plate completion, effectively prevent road and bridge construction work Journey machinery arbitrary shift position in use;
By the structure of embodiment 2, cylinder controls piston rod and stretches out so that U-shaped posting rises so that road and bridge construction work Journey machinery is located in U-shaped posting, then installation positioning transverse slat so that between road and bridge construction engineering machinery is located at, effectively prevent Road and bridge construction engineering machinery arbitrary shift position in use.
Description of the drawings
Fig. 1 is the whole decomposition texture schematic diagram of the embodiment of the present invention 1;
Fig. 2 is that 1 engineering machinery stacker of the embodiment of the present invention installs decomposition texture schematic diagram;
Fig. 3 is the second upright bar structural schematic diagram of the embodiment of the present invention 1;
Fig. 4 is engineering machinery stacker structural schematic diagram of the present invention;
Fig. 5 is inside grooves schematic cross-sectional view of the present invention;
Fig. 6 is part at A in Fig. 9 of partial enlargement structural representation and embodiment 2 at A in Fig. 1 of the embodiment of the present invention 1 Enlarged structure schematic diagram;
Fig. 7 is the whole decomposition texture schematic diagram of the embodiment of the present invention 2;
Fig. 8 is that U-shaped posting installs decomposition texture schematic diagram with positioning transverse slat in the embodiment of the present invention 2.
Fig. 9 is schematic diagram of base structure in the embodiment of the present invention 2.
In figure:1 pedestal, 2 second upright bars, 201 connecting plates, 202 horizontal supporting plates, 203 second locating slots, the positioning of 3 sides Slot, 4 cranks, 5 channel steels, 6 side plates, 7 first screws, 8 first locating slots, 9 first upright bars, 10 idler wheels, 11 sliding slots, 12 springs, 13 Located lateral channel steel, 14 second screws, 15 gears, 16 inclined slopes, 17 engineering machinery stackers, 18 holding grooves, 19 inclined ramps, 20 sliding raised plates, 21 racks, 22 shafts, stacker, 24 third screws, 25 grooves, 26 spring mounting grooves, 27 are accepted on 23 Seat, 28 vertical chutes, 29 sliding protrusions, 30 the 4th screws, 31 cylinders, 32 piston rods, 33 U-shaped postings, 34 location holes, 35 Position transverse slat, 36 sliding grooves.
Specific implementation mode
Following will be combined with the drawings in the embodiments of the present invention, and technical solution in the embodiment of the present invention carries out clear, complete Site preparation describes, it is clear that described embodiments are only a part of the embodiments of the present invention, instead of all the embodiments.It is based on Embodiment in the present invention, it is obtained by those of ordinary skill in the art without making creative efforts every other Embodiment shall fall within the protection scope of the present invention.
Embodiment 1
- 6 are please referred to Fig.1, the present invention provides a kind of technical solution:A kind of road and bridge construction engineering machinery safety guarantee multiple spot Positioning device, including pedestal 1, the pedestal 1 are left end opening setting, and the left end of pedestal 1 is equipped with inclined slope 16, the pedestal 1 Upper center be equipped with groove 25 for installing idler wheel 10, the both sides of the pedestal 1 are bolted with crank 4, and the crank 4 stretches into To 1 inside of pedestal and it is connected with gear 15, the upper end of the pedestal 1 is provided with engineering machinery stacker 17, the engineering machinery The upper center of stacker 17 is equipped with holding groove 18, and the left end of the engineering machinery stacker 17 is arranged in opening, and it is open Place is equipped with inclined ramp 19, and the bottom both ends of the engineering machinery stacker 17 are equipped with the rack 21 that connection is engaged with gear 15, The both sides of 1 right side upper end of the pedestal are connected with the first upright bar 9,1 left end both sides of pedestal pin by the channel steel 5 being vertically arranged It is connected to the second upright bar 2, the first upright bar 9 described in same side is fixedly connected with the upper side of the second upright bar 2 by the first screw 7 There is a side plate 6, used second screw in the upper end of second upright bar 2 14 is fixedly connected with located lateral channel steel 13.
The both ends of the idler wheel 10 are equipped with shaft 22, and stacker 27, the bottom of the groove 25 are equipped in the groove 25 Equipped with the spring mounting groove 26 for installing spring 12, the upper end of the spring 12 resists the lower end of stacker 27, the groove 25 both sides are installed with upper stacker 23 by third screw 24, and the shaft 22 is located at stacker 27 and upper stacker 23 Between.
The both sides of the groove 25 are equipped with vertical chute 28, and the both sides of the stacker 27 are equipped with sliding protrusion 29, described Sliding protrusion 29 is slidably connected to vertical chute 28.
The upper end both sides of the pedestal 1 are equipped with sliding slot 11, and the lower end both sides of the engineering machinery stacker 17, which are equipped with, slips Raised plate 20, the sliding raised plate 20 are slidably connected in sliding slot 11.
First upright bar, 9 upper outside is equipped with the first locating slot 8, and the upper outside of second upright bar 2 is equipped with and the The second contour locating slot 203 of a positioning groove 8, the left and right ends of the side plate 6 are fixedly connected on second by the first screw 7 and determine Position slot 203 and the first locating slot 8, second upright bar 2 are pinned at 1 left end two of pedestal by the connecting plate 201 of its lower end inside Side, the both ends of the located lateral channel steel 13 are fixedly connected on the horizontal of 2 upper end of the second upright bar by the second screw 14 and prop up Fagging 202, two middle side parts of the pedestal 1 are equipped with the side edge detents 3 for placing horizontal supporting plate 202.
Specifically, in use, road and bridge construction engineering machinery is entered pedestal 1 via inclined slope 16, then via inclined ramp 19 eventually enter into the holding groove 18 of engineering machinery stacker 17, are then rotated with moving gear 15 by shaking crank 4, due to tooth 15 engagement connection rack 21 of wheel so that behind 17 shift position of engineering machinery stacker, adjust the position of road and bridge construction engineering machinery; Second upright bar 2 and the first upright bar 9 are erected so that road and bridge construction engineering machinery between the second upright bar 2 and the first upright bar 9, Then the left and right ends of side plate 6 are fixedly connected on the second locating slot 203 and the first locating slot 8 by the first screw 7, it is laterally fixed The both ends of position channel steel 13 are fixedly connected on the horizontal supporting plate 202 of 2 upper end of the second upright bar by the second screw 14, pass through cross The positioning of road and bridge construction engineering machinery is fixed to locating slot steel 13 and the completion of side plate 6, effectively prevent road and bridge construction engineering machinery Arbitrary shift position in use.
Embodiment 2
Fig. 4-9 is please referred to, the present invention provides a kind of technical solution:A kind of road and bridge construction engineering machinery safety guarantee multiple spot Positioning device, including pedestal 1, the pedestal 1 are left end opening setting, and the left end of pedestal 1 is equipped with inclined slope 16, the pedestal 1 Upper center be equipped with groove 25 for installing idler wheel 10, the both sides of the pedestal 1 are bolted with crank 4, and the crank 4 stretches into To 1 inside of pedestal and it is connected with gear 15, the upper end of the pedestal 1 is provided with engineering machinery stacker 17, the engineering machinery The upper center of stacker 17 is equipped with holding groove 18, and the left end of the engineering machinery stacker 17 is arranged in opening, and it is open Place is equipped with inclined ramp 19, and the bottom both ends of the engineering machinery stacker 17 are equipped with the rack 21 that connection is engaged with gear 15, The corner of upper end four of the pedestal 1 is mounted on cylinder 31, and the piston rod 32 of the cylinder 31 is connected to U-shaped posting 33, the opening of the U-shaped posting 33 is located at 1 left end opening of pedestal, connects at left and right sides of the upper end of the U-shaped posting 33 It is connected to positioning transverse slat 35.
The both ends of the idler wheel 10 are equipped with shaft 22, and stacker 27, the bottom of the groove 25 are equipped in the groove 25 Equipped with the spring mounting groove 26 for installing spring 12, the upper end of the spring 12 resists the lower end of stacker 27, the groove 25 both sides are installed with upper stacker 23 by third screw 24, and the shaft 22 is located at stacker 27 and upper stacker 23 Between.
The both sides of the groove 25 are equipped with vertical chute 28, and the both sides of the stacker 27 are equipped with sliding protrusion 29, described Sliding protrusion 29 is slidably connected to vertical chute 28.
The upper end both sides of the pedestal 1 are equipped with sliding slot 11, and the lower end both sides of the engineering machinery stacker 17, which are equipped with, slips Raised plate 20, the sliding raised plate 20 are slidably connected in sliding slot 11.
The lower end both sides of the positioning transverse slat 35 are equipped with sliding groove 36, and the both ends of the positioning transverse slat 35 pass through the 4th spiral shell Nail 30 is fixedly connected on the location hole 34 of 33 side of U-shaped posting.
Specifically, in use, road and bridge construction engineering machinery is entered pedestal 1 via inclined slope 16, then via inclined ramp 19 eventually enter into the holding groove 18 of engineering machinery stacker 17, are then rotated with moving gear 15 by shaking crank 4, due to tooth 15 engagement connection rack 21 of wheel so that behind 17 shift position of engineering machinery stacker, adjust the position of road and bridge construction engineering machinery; Cylinder 31 controls piston rod 32 and stretches out so that U-shaped posting 33 rises so that road and bridge construction engineering machinery is located at U-shaped posting In 33, then installation positions transverse slat 35 so that between road and bridge construction engineering machinery is located at, effectively prevent road and bridge construction engineering machinery Arbitrary shift position in use.
It although an embodiment of the present invention has been shown and described, for the ordinary skill in the art, can be with Understanding without departing from the principles and spirit of the present invention can carry out these embodiments a variety of variations, modification, replace And modification, the scope of the present invention is defined by the appended.

Claims (10)

1. a kind of road and bridge construction engineering machinery safety guarantee multi-point positioning device, including pedestal (1), the pedestal (1) is a left side End opening is arranged, and the left end of pedestal (1) is equipped with inclined slope (16), it is characterised in that:The upper center of the pedestal (1), which is equipped with, to be used In the groove (25) of installation idler wheel (10), the both sides of the pedestal (1) are bolted with crank (4), and the crank (4) stretches to pedestal (1) on the inside of and it is connected with gear (15), the upper end of the pedestal (1) is provided with engineering machinery stacker (17), the engineering machine The upper center of tool stacker (17) is equipped with holding groove (18), and the left end of the engineering machinery stacker (17) is arranged in opening, And its opening is equipped with inclined ramp (19), the bottom both ends of the engineering machinery stacker (17) are equipped with engages with gear (15) The both sides of the rack (21) of connection, pedestal (1) right side upper end are connected with the first upright bar by the channel steel (5) being vertically arranged (9), pedestal (1) the left end both sides are connected with the second upright bar (2), the first upright bar (9) and the second upright bar (2) described in same side Upper side side plate (6), used second screw in upper end of second upright bar (2) are fixedly connected with by the first screw (7) (14) it is fixedly connected with located lateral channel steel (13).
2. a kind of road and bridge construction engineering machinery safety guarantee multi-point positioning device according to claim 1, feature exist In:The both ends of the idler wheel (10) are equipped with shaft (22), and stacker (27) is equipped in the groove (25), the groove (25) Bottom is equipped with the spring mounting groove (26) for installing spring (12), and the upper end of the spring (12) resists under stacker (27) End, the both sides of the groove (25) are installed with upper stacker (23) by third screw (24), and the shaft (22) is located at Between stacker (27) and upper stacker (23).
3. a kind of road and bridge construction engineering machinery safety guarantee multi-point positioning device according to claim 2, feature exist In:The both sides of the groove (25) are equipped with vertical chute (28), and the both sides of the stacker (27) are equipped with sliding raised (29), institute It states sliding raised (29) and is slidably connected to vertical chute (28).
4. a kind of road and bridge construction engineering machinery safety guarantee multi-point positioning device according to claim 1, feature exist In:The upper end both sides of the pedestal (1) are equipped with sliding slot (11), and the lower end both sides of the engineering machinery stacker (17), which are equipped with, slips Raised plate (20), the sliding raised plate (20) are slidably connected in sliding slot (11).
5. a kind of road and bridge construction engineering machinery safety guarantee multi-point positioning device according to claim 1, feature exist In:First upright bar (9) upper outside is equipped with the first locating slot (8), and the upper outside of second upright bar (2) is equipped with and the Contour the second locating slot (203) of a positioning groove (8), the left and right ends of the side plate (6) are fixedly connected by the first screw (7) In the second locating slot (203) and the first locating slot (8), second upright bar (2) is sold by the connecting plate (201) of its lower end inside It is connected to pedestal (1) left end both sides, the both ends of the located lateral channel steel (13) are fixedly connected on described by the second screw (14) Two middle side parts of the horizontal supporting plate (202) of the second upright bar (2) upper end, the pedestal (1) are equipped with for placing horizontal supporting plate (202) side edge detents (3).
6. a kind of road and bridge construction engineering machinery safety guarantee multi-point positioning device, including pedestal (1), the pedestal (1) is a left side End opening is arranged, and the left end of pedestal (1) is equipped with inclined slope (16), it is characterised in that:The upper center of the pedestal (1), which is equipped with, to be used In the groove (25) of installation idler wheel (10), the both sides of the pedestal (1) are bolted with crank (4), and the crank (4) stretches to pedestal (1) on the inside of and it is connected with gear (15), the upper end of the pedestal (1) is provided with engineering machinery stacker (17), the engineering machine The upper center of tool stacker (17) is equipped with holding groove (18), and the left end of the engineering machinery stacker (17) is arranged in opening, And its opening is equipped with inclined ramp (19), the bottom both ends of the engineering machinery stacker (17) are equipped with engages with gear (15) The corner of upper end four of the rack (21) of connection, the pedestal (1) is mounted on cylinder (31), the piston of the cylinder (31) Bar (32) is connected to U-shaped posting (33), and the opening of the U-shaped posting (33) is located at pedestal (1) left end opening, described Positioning transverse slat (35) is connected at left and right sides of the upper end of U-shaped posting (33).
7. a kind of road and bridge construction engineering machinery safety guarantee multi-point positioning device according to claim 6, feature exist In:The both ends of the idler wheel (10) are equipped with shaft (22), and stacker (27) is equipped in the groove (25), the groove (25) Bottom is equipped with the spring mounting groove (26) for installing spring (12), and the upper end of the spring (12) resists under stacker (27) End, the both sides of the groove (25) are installed with upper stacker (23) by third screw (24), and the shaft (22) is located at Between stacker (27) and upper stacker (23).
8. a kind of road and bridge construction engineering machinery safety guarantee multi-point positioning device according to claim 7, feature exist In:The both sides of the groove (25) are equipped with vertical chute (28), and the both sides of the stacker (27) are equipped with sliding raised (29), institute It states sliding raised (29) and is slidably connected to vertical chute (28).
9. a kind of road and bridge construction engineering machinery safety guarantee multi-point positioning device according to claim 6, feature exist In:The upper end both sides of the pedestal (1) are equipped with sliding slot (11), and the lower end both sides of the engineering machinery stacker (17), which are equipped with, slips Raised plate (20), the sliding raised plate (20) are slidably connected in sliding slot (11).
10. a kind of road and bridge construction engineering machinery safety guarantee multi-point positioning device according to claim 6, feature exist In:The lower end both sides of the positioning transverse slat (35) are equipped with sliding groove (36), and the both ends of the positioning transverse slat (35) pass through the 4th Screw (30) is fixedly connected on the location hole (34) of U-shaped posting (33) side.
CN201810590789.9A 2018-06-09 2018-06-09 Multipoint positioning device for road and bridge construction engineering machinery safety guarantee Expired - Fee Related CN108789213B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810590789.9A CN108789213B (en) 2018-06-09 2018-06-09 Multipoint positioning device for road and bridge construction engineering machinery safety guarantee

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810590789.9A CN108789213B (en) 2018-06-09 2018-06-09 Multipoint positioning device for road and bridge construction engineering machinery safety guarantee

Publications (2)

Publication Number Publication Date
CN108789213A true CN108789213A (en) 2018-11-13
CN108789213B CN108789213B (en) 2019-12-13

Family

ID=64088037

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810590789.9A Expired - Fee Related CN108789213B (en) 2018-06-09 2018-06-09 Multipoint positioning device for road and bridge construction engineering machinery safety guarantee

Country Status (1)

Country Link
CN (1) CN108789213B (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109649750A (en) * 2019-01-11 2019-04-19 安徽鸿森智能装备股份有限公司 The secondary pack packaging handling device of one kind and its application method
CN111139859A (en) * 2020-01-16 2020-05-12 董传强 Outdoor auxiliary installation equipment for adjustable pump station and installation method thereof

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102286921A (en) * 2011-05-25 2011-12-21 河南省九建工程有限公司 bridge widening splicing structure and construction method thereof
CN103243656A (en) * 2013-05-17 2013-08-14 中国人民解放军国防科学技术大学 Automatic lifting type assembling highway steel bridge transporting and erecting vehicle
CN206616464U (en) * 2017-03-20 2017-11-07 王晓晶 A kind of small-sized road and bridge construction support meanss
JP2017226977A (en) * 2016-06-20 2017-12-28 日本車輌製造株式会社 Construction method for steel structure
CN108032238A (en) * 2018-01-09 2018-05-15 吴露露 A kind of steel structure bridge fender pier pile driving construction repairs fixed equipment with U-shaped steel sheet pile
CN207376485U (en) * 2017-09-06 2018-05-18 王小龙 A kind of bridge construction Bridge Erector

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102286921A (en) * 2011-05-25 2011-12-21 河南省九建工程有限公司 bridge widening splicing structure and construction method thereof
CN103243656A (en) * 2013-05-17 2013-08-14 中国人民解放军国防科学技术大学 Automatic lifting type assembling highway steel bridge transporting and erecting vehicle
JP2017226977A (en) * 2016-06-20 2017-12-28 日本車輌製造株式会社 Construction method for steel structure
CN206616464U (en) * 2017-03-20 2017-11-07 王晓晶 A kind of small-sized road and bridge construction support meanss
CN207376485U (en) * 2017-09-06 2018-05-18 王小龙 A kind of bridge construction Bridge Erector
CN108032238A (en) * 2018-01-09 2018-05-15 吴露露 A kind of steel structure bridge fender pier pile driving construction repairs fixed equipment with U-shaped steel sheet pile

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109649750A (en) * 2019-01-11 2019-04-19 安徽鸿森智能装备股份有限公司 The secondary pack packaging handling device of one kind and its application method
CN111139859A (en) * 2020-01-16 2020-05-12 董传强 Outdoor auxiliary installation equipment for adjustable pump station and installation method thereof
CN111139859B (en) * 2020-01-16 2021-08-27 董传强 Outdoor auxiliary installation equipment for adjustable pump station and installation method thereof

Also Published As

Publication number Publication date
CN108789213B (en) 2019-12-13

Similar Documents

Publication Publication Date Title
CN107059561A (en) A kind of civil engineering ramming machine
CN108789213A (en) A kind of road and bridge construction engineering machinery safety guarantee multi-point positioning device
CN211524369U (en) Enclose fender with adjustable height
CN202622259U (en) Welding tool of material baffle of paver
CN210396166U (en) Concrete vibrator
CN204725634U (en) A kind of vertical stairway die
CN208125002U (en) A kind of escalator upper detection tooling
CN116753002A (en) Adjustable coal mine side wall supporting column and supporting method thereof
CN105137313A (en) Power arrester testing device
CN212983707U (en) Road guardrail convenient to adjust
CN114813692A (en) Online fluorescence microscope inspection machine of OLED screen
CN208451024U (en) A kind of window frame installation fixing piece absorption limiting device for automatic nailing machine
CN210597042U (en) Highway bridge hydraulic pressure heel post
CN110185466B (en) Mobile tunnel concrete slotting device and implementation method thereof
CN219260347U (en) Sectional warping machine carriage device
CN220132886U (en) Soft soil foundation pre-compaction support
CN220534140U (en) Integral cantilever pre-assembly platform
CN111673437A (en) Pipe penetrating mechanism for ladder production equipment
CN109577631A (en) A kind of assembled geological exploration platform
CN201671060U (en) Sliding device for prestress tensioning jack
CN105537465B (en) Steel rib straightening machine for construction
CN216739171U (en) Road surface flatness detection device for traffic engineering
CN117342233B (en) Positioning and correcting device and positioning and correcting method for shovel plate ledge
CN211504591U (en) A testing arrangement for testing display screen shock resistance
CN215528351U (en) Adjusting device convenient for disc cabinet to be in place

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
TA01 Transfer of patent application right

Effective date of registration: 20191118

Address after: No.1-3 store (office space) on the west of Chengbei building, Yong'an Avenue, Taiping Town, Shixing County, Shaoguan City, Guangdong Province

Applicant after: Guangdong Mingxin Construction Engineering Co.,Ltd.

Address before: 056000 64 Worker Village, Mitsui village, Fuxing District, Handan, Hebei

Applicant before: Tang Yonghong

TA01 Transfer of patent application right
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20191213

CF01 Termination of patent right due to non-payment of annual fee