CN108786215A - A kind of deck sewage-treatment plant of large ship - Google Patents

A kind of deck sewage-treatment plant of large ship Download PDF

Info

Publication number
CN108786215A
CN108786215A CN201810608249.9A CN201810608249A CN108786215A CN 108786215 A CN108786215 A CN 108786215A CN 201810608249 A CN201810608249 A CN 201810608249A CN 108786215 A CN108786215 A CN 108786215A
Authority
CN
China
Prior art keywords
big
movable block
groove
plate
arc shell
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201810608249.9A
Other languages
Chinese (zh)
Other versions
CN108786215B (en
Inventor
赖彦林
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jiaxing City Xun Cheng Information Technology Co Ltds
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201810608249.9A priority Critical patent/CN108786215B/en
Publication of CN108786215A publication Critical patent/CN108786215A/en
Application granted granted Critical
Publication of CN108786215B publication Critical patent/CN108786215B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B01PHYSICAL OR CHEMICAL PROCESSES OR APPARATUS IN GENERAL
    • B01DSEPARATION
    • B01D29/00Filters with filtering elements stationary during filtration, e.g. pressure or suction filters, not covered by groups B01D24/00 - B01D27/00; Filtering elements therefor
    • B01D29/01Filters with filtering elements stationary during filtration, e.g. pressure or suction filters, not covered by groups B01D24/00 - B01D27/00; Filtering elements therefor with flat filtering elements
    • B01D29/03Filters with filtering elements stationary during filtration, e.g. pressure or suction filters, not covered by groups B01D24/00 - B01D27/00; Filtering elements therefor with flat filtering elements self-supporting
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B01PHYSICAL OR CHEMICAL PROCESSES OR APPARATUS IN GENERAL
    • B01DSEPARATION
    • B01D29/00Filters with filtering elements stationary during filtration, e.g. pressure or suction filters, not covered by groups B01D24/00 - B01D27/00; Filtering elements therefor
    • B01D29/76Handling the filter cake in the filter for purposes other than for regenerating
    • B01D29/86Retarding cake deposition on the filter during the filtration period, e.g. using stirrers
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B01PHYSICAL OR CHEMICAL PROCESSES OR APPARATUS IN GENERAL
    • B01DSEPARATION
    • B01D35/00Filtering devices having features not specifically covered by groups B01D24/00 - B01D33/00, or for applications not specifically covered by groups B01D24/00 - B01D33/00; Auxiliary devices for filtration; Filter housing constructions
    • B01D35/02Filters adapted for location in special places, e.g. pipe-lines, pumps, stop-cocks
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B63SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
    • B63JAUXILIARIES ON VESSELS
    • B63J4/00Arrangements of installations for treating ballast water, waste water, sewage, sludge, or refuse, or for preventing environmental pollution not otherwise provided for
    • B63J4/006Arrangements of installations for treating ballast water, waste water, sewage, sludge, or refuse, or for preventing environmental pollution not otherwise provided for for treating waste water or sewage

Landscapes

  • Chemical & Material Sciences (AREA)
  • Chemical Kinetics & Catalysis (AREA)
  • Engineering & Computer Science (AREA)
  • Public Health (AREA)
  • Environmental & Geological Engineering (AREA)
  • General Health & Medical Sciences (AREA)
  • Health & Medical Sciences (AREA)
  • Toxicology (AREA)
  • Combustion & Propulsion (AREA)
  • Mechanical Engineering (AREA)
  • Ocean & Marine Engineering (AREA)
  • Structures Of Non-Positive Displacement Pumps (AREA)
  • Transmission Devices (AREA)

Abstract

The present invention relates to a kind of sewage-treatment plant of large ship more particularly to a kind of deck sewage-treatment plants of large ship.The object of the present invention is to provide a kind of deck sewage-treatment plants that can be collected processing to deck sewage, be conducive to the large ship protected the marine environment.Technical solution is:A kind of deck sewage-treatment plant of large ship includes pedestal, idler wheel, universal wheel, cylinder body, drain pipe, valve, connecting tube, check valve, holder, electric rotating machine, mlultiple-groove sheave, first belt pulley etc.;It is connected with idler wheel on the left of base bottom, universal wheel is connected on the right side of base bottom, cylinder body is connected on the right side of base top, the lower part of cylinder body right side wall is connected with drain pipe.A kind of deck sewage-treatment plant of large ship provided by the present invention, simple in structure, conveniently moving can be collected processing to the sewage on deck, are conducive to the erosion for avoiding large ship deck and keep the clean hygiene on large ship deck.

Description

A kind of deck sewage-treatment plant of large ship
Technical field
The present invention relates to a kind of dirts of the deck of a kind of sewage-treatment plant of large ship more particularly to large ship Water treatment facilities.
Background technology
The deck of large ship is often subject to washing away for wave, therefore the deck of large ship can be corroded by seawater, While in order to keep the deck clean hygiene of large ship, staff to be rushed to the deck of large ship through commonly using clean water It washes, to eliminate seawater to the erosion on large ship deck and keep the clean hygiene on large ship deck, but existing work Make generated sewage after personnel rinse large ship deck, seawater is typically vented directly to by the osculum of side plate In, the water body in residing marine site is easy to cause by serious pollution, serious damage is caused to marine environment, is unfavorable for earth life The sustainable development of object life.
Therefore there is an urgent need for research and develop a kind of argosy that can be collected processing to deck sewage, be conducive to protect the marine environment The deck sewage-treatment plant of oceangoing ship.
Invention content
It is typically to pass through topside to overcome existing staff to generated sewage after the flushing of large ship deck The osculum of plate is vented directly in seawater, is easy to cause the water body in residing marine site by serious pollution, is made to marine environment The shortcomings that at serious damage, the object of the present invention is to provide one kind being collected processing to deck sewage, is conducive to protect Protect the deck sewage-treatment plant of the large ship of marine environment.
Technical solution is:A kind of deck sewage-treatment plant of large ship, includes pedestal, idler wheel, universal wheel, cylinder Body, drain pipe, valve, connecting tube, check valve, holder, electric rotating machine, mlultiple-groove sheave, the first belt pulley, first circulation skin Band, water pump, hose, big movable block, the first adjustment screw rod, second adjustment screw rod, first bearing, small connecting shaft, the first rotating wheel, Small fixed block, positioning screw, the first bevel pinion, the second bevel pinion, second bearing, long connecting shaft, tapered pole, cone rubber Set, the first arc shell, the first link block, the first contact plate, cam, the second contact plate, the second link block, the second arc shell And tension spring, idler wheel is connected on the left of base bottom, and universal wheel, the right side connection of base top are connected on the right side of base bottom There are cylinder body, the lower part of cylinder body right side wall to be connected with drain pipe, valve is installed on drain pipe, the upper right side and cylinder body of connecting tube are left The top of side wall is connected, and check valve is equipped in connecting tube, and holder is located at the rear of connecting tube, lower end and the pedestal top of holder It is connected on the left of portion, the upper end of holder is connected with electric rotating machine, and the front end of electric rotating machine output shaft is connected with mlultiple-groove sheave, First belt pulley is located at the lower left of mlultiple-groove sheave, and the first belt pulley is connect with mlultiple-groove sheave by first circulation belt, Water pump is located at the dead astern of the first belt pulley, water pump and the first belt pulley by axis connection, the bottom of water pump and base top Left side is connected, and the left end of connecting tube is connected with water pump, and the upper right side of hose is connected with water pump, the lower-left end of hose with it is big Right side at the top of movable block is connected, and big groove is provided in big movable block, and hose is connected with the big groove of big movable block, big living The right side wall of motion block is provided with the first imbibing hole, and the first imbibing hole is connected with big groove, and the bottom of big movable block is provided with the second suction Fluid apertures, the second imbibing hole are connected with big groove, and the bottom of big movable block is provided with the first little groove and the second little groove, and first is small Groove is located at the right side of the second imbibing hole, and the second little groove is located at the left side of the second imbibing hole, and the bottom thread of big movable block connects It is connected to the first adjustment screw rod and second adjustment screw rod, the first adjustment screw rod is located in the first little groove of big movable block, and first adjusts Whole screw rod is matched with the first little groove of big movable block, and second adjustment screw rod is located in the second little groove of big movable block, the Two adjustment screws are matched with the second little groove of big movable block, and big movable block is provided with L-shaped groove, and L-shaped groove is located at a left side for big groove Side, first bearing are located at the top of L-shaped groove, and first bearing is connected with big movable block, and small connecting shaft connects with first bearing interference Connect, the upper end of small connecting shaft is connected with the first rotating wheel, and small fixed block is located at the left side of first bearing, the bottom of small fixed block with It is connected at the top of big movable block, small fixed block is threaded with positioning screw, and positioning screw is in contact with small connecting shaft, little Lian The lower end of spindle is connected with the first bevel pinion, and the second bevel pinion is located at the left side of the first bevel pinion, the first bevel pinion It is meshed with the second bevel pinion, second bearing is located at the lower part of L-shaped groove, and second bearing is connected with big movable block, long connection The right part of axis is connect with second bearing interference, and the right end of long connecting shaft is connected with the second bevel pinion, the right side wall of tapered pole It is connected with the left side wall of big movable block, tapered pole is provided with the perforative long through-hole in left and right, and long connecting shaft rotary type is located at long through-hole Interior, cone rubber covers fixing sleeve in the left part of tapered pole, and the first arc shell is located at the left side of tapered pole, the first arc shell and The upper articulation of tapered pole left side wall connects, and the first link block is located in the first arc shell, the upper end of the first link block and the Downside at the top of one arc shell is connected, and the lower end of the first link block is connected with the first contact plate, and cam is located at the first contact The lower section of plate, the first contact plate are in contact with cam, and the middle part of cam is connected with the left end of long connecting shaft, the second contact plate position In the lower section of cam, the second contact plate is in contact with cam, and the bottom of the second contact plate is connected with the second link block, the second connection Block is located in the second arc shell, and the lower end of the second link block is connected with the interior bottom of the second arc shell, the second arc shell Body is located at the left side of tapered pole, and the second arc shell is connect with the lower hinge of tapered pole left side wall, and tension spring is located at the first arc Between shell and the second arc shell, the first arc shell and the second arc shell are connected with tension spring, and tension spring is located at first The left side of contact plate and the second contact plate.
Further include having filter screen, the first long connecting rod, the second long connecting rod, stirring as further preferred embodiment Plate, the first rotary shaft, 3rd bearing, cover board, the second rotating wheel, inserted link, big screw rod and tray, filter screen are located in cylinder body, mistake Strainer is slidably matched with cylinder body, and the left side at the top of filter screen is connected with the first long connecting rod, and the right side at the top of filter screen is connected with Second long connecting rod, agitating plate is between the first long connecting rod and the second long connecting rod, the lower end of the first rotary shaft and stirring Centre position at the top of plate is connected, and the first rotary shaft is connect with 3rd bearing interference, and 3rd bearing is embedded in cover board, cover board It covering on cylinder body, cover board is in contact with cylinder body, and the first long connecting rod and the second long connecting rod are connected with the bottom of cover board, the Two rotating wheels are located at the top of cover board, and in the first rotary shaft, the right part of cover board is provided with to be run through the second rotating wheel fixing sleeve up and down Jack, inserted link is located in jack, and the right side wall of cover board is threaded with big screw rod, and big screw rod is in contact with inserted link, inserted link Lower end is connected with tray, and the left side wall of tray is connected with the top of cylinder body right side wall.
As further preferred embodiment, further include have the first bevel gear wheel, the second bevel gear wheel, the second rotary shaft, The upper end of second belt pulley, L shaped plate and second circulation belt, the first rotary shaft is connected with the first bevel gear wheel, the second auger tooth Wheel is meshed positioned at the rear of the first bevel gear wheel, the second bevel gear wheel with the first bevel gear wheel, the second bevel gear wheel and second The front end of rotary shaft is connected, and the second belt pulley is located at the rear of the second bevel gear wheel, and the second belt pulley fixing sleeve is in the second rotation In shaft, L shaped plate is located at the rear of the second belt pulley, and the rear end of the second rotary shaft and the left upper end of L shaped plate are rotatablely connected, L-shaped It is connected at the top of the bottom righthand side of plate and cover board, the second belt pulley is connect with mlultiple-groove sheave by second circulation belt.
Further include having pressing plate, long bolt and fixed plate, pressing plate is located at the right side of idler wheel as further preferred embodiment Side is connected with long bolt on the right side of pressing plate, and long bolt is arranged in fixed plate, and long bolt is threadedly coupled with fixed plate, fixed plate Top be connected with the bottom of pedestal.
It is first that the present invention is mobile when needing to be collected cleaning to the sewage on large ship deck using the present invention To the place of needs, then tapered pole and cone rubber set are inserted into the osculum of large ship side plate, cone rubber Set can play the role of sealing, prevent sewage from leaking, to by tapered pole and cone rubber set by the osculum of side plate It blocks, and the first arc shell and the second arc shell are located at the outside of large ship at this time, then again to the first adjustment spiral shell Bar and second adjustment screw rod are screwed respectively, to make the first adjustment screw rod bottom and second adjustment screw rod bottom with The deck of large ship is in contact, and to which big movable block be fixed, is then rotated again to the first rotating wheel, the first rotation Runner drives the first bevel pinion to be rotated by small connecting shaft, and the first bevel pinion is to drive the second bevel pinion to carry out Rotation, the second bevel pinion are rotated by long connecting shaft band moving cam, the first contact plate of cam pair and the second contact plate into Row pushes, and the first contact plate drives the first arc shell to be moved upwards by the first link block, and the second contact plate passes through the Two link blocks drive the second arc shell to be moved downwards, and the first arc shell and the second arc shell are thus to upper and lower both sides Expansion, since the first arc shell and the second arc shell are now placed in the outside of large ship side plate, the first arc Shell and the second arc shell can be stuck in the outside of large ship side plate, to cover tightly tapered pole and cone rubber It is fixed in the osculum of side plate, then positioning screw is screwed again, and fixed small connecting shaft by positioning screw Firmly, then restart electric rotating machine to be operated, electric rotating machine drives mlultiple-groove sheave to be rotated, and mlultiple-groove sheave passes through the One endless belt drives the first belt pulley to be rotated, and the first belt pulley drives water pump to be operated by axis, and water pump passes through soft Pipe and big movable block draw the sewage on deck, and the sewage on deck is entered by the first imbibing hole and the second imbibing hole It into big groove, enters back into hose, then is entered in connecting tube by water pump, check valve can prevent the dirt in connecting tube Aqueous reflux, sewage are entered in cylinder body by connecting tube and are collected, and when the sewage in cylinder body needs discharge, can open valve, It is discharged by drain pipe.
When needing to be filtered the sewage being transported in cylinder body, cover board is sleeved on inserted link by jack first, this When filter screen, the first long connecting rod, the second long connecting rod and agitating plate enter in cylinder body, and filter screen and cylinder body match Close, filter screen is located at the lower section of connecting tube upper right side at this time, therefore by connecting tube conveying come sewage can be flowed into filter screen On, then by filter screen filtered out the pollutant of big lumpiness, it is convenient for the subsequent processing of sewage, while can be rotated to second Wheel is rotated, and the second rotating wheel drives agitating plate to be rotated by the first rotary shaft, and agitating plate is to stir sewage It mixes, so as to accelerate the filtering of sewage.
After cover plate lid is on cylinder body, then by second circulation belt sleeve on the second belt pulley and mlultiple-groove sheave, at this time Electric rotating machine can drive the first belt pulley and the second belt pulley be carried out at the same time rotation by mlultiple-groove sheave, the second belt pulley from And drive the second rotary shaft and the second bevel gear wheel to be carried out at the same time rotation, the second bevel gear wheel to the first bevel gear wheel of drive into Row rotation, the first bevel gear wheel drives agitating plate to be rotated by the first rotary shaft, so as to be conveyed to sewage During, while sewage is filtered, operation is more convenient, time saving and energy saving.
It, can be to length when needing that the present invention is fixed because further including having pressing plate, long bolt and fixed plate Screw rod is screwed, and long bolt band dynamic pressure plate is moved to the left, and pressing plate is pressed on idler wheel, to which idler wheel be fixed, It can prevent of the invention disorderly shake from tampering.
Compared with prior art, the invention has the advantages that:A kind of deck of large ship provided by the present invention Sewage-treatment plant, simple in structure, conveniently moving can be collected processing to the sewage on deck, be conducive to avoid large size The erosion of ship deck and the clean hygiene for keeping large ship deck, are conducive to protect the marine environment, easy to use, are easy to tie up Shield repair, maintenance and repair is at low cost, is easy to manufacture, manufacturing cost is low, application easy to spread.
Description of the drawings
Fig. 1 is the main view schematic diagram of the present invention.
Fig. 2 is the front sectional view structural schematic diagram of the big movable block of the present invention.
Fig. 3 is the main view schematic diagram of the agitating plate of the present invention.
Fig. 4 is the main view schematic diagram of the second circulation belt of the present invention.
Fig. 5 is the main view schematic diagram of the pressing plate of the present invention.
Wherein:1, pedestal, 2, idler wheel, 3, universal wheel, 4, cylinder body, 5, drain pipe, 6, valve, 7, connecting tube, 8, check valve, 9, holder, 10, electric rotating machine, 11, mlultiple-groove sheave, the 12, first belt pulley, 13, first circulation belt, 14, water pump, 15, soft Pipe, 16, big movable block, 17, the first adjustment screw rod, 18, second adjustment screw rod, 19, first bearing, 20, small connecting shaft, 21, the One rotating wheel, 22, small fixed block, 23, positioning screw, the 24, first bevel pinion, the 25, second bevel pinion, 26, second bearing, 27, long connecting shaft, 28, tapered pole, 29, cone rubber set, the 30, first arc shell, the 31, first link block, the 32, first contact Plate, 33, cam, the 34, second contact plate, the 35, second link block, the 36, second arc shell, 37, tension spring, 41, filter screen, 42, First long connecting rod, the 43, second long connecting rod, 44, agitating plate, the 45, first rotary shaft, 46,3rd bearing, 47, cover board, 48, Second rotating wheel, 49, inserted link, 50, big screw rod, 51, tray, the 61, first bevel gear wheel, the 62, second bevel gear wheel, 63, second Rotary shaft, the 64, second belt pulley, 65, L shaped plate, 66, second circulation belt, 71, pressing plate, 72, long bolt, 73, fixed plate, 161, big groove, the 162, first imbibing hole, the 163, second imbibing hole, the 164, first little groove, the 165, second little groove, 166, L Shape slot, 281, long through-hole, 471, jack.
Specific implementation mode
Following will be combined with the drawings in the embodiments of the present invention, and technical solution in the embodiment of the present invention carries out clear, complete Site preparation describes, it is clear that described embodiments are only a part of the embodiments of the present invention, instead of all the embodiments.It is based on Embodiment in the present invention, it is obtained by those of ordinary skill in the art without making creative efforts every other Embodiment shall fall within the protection scope of the present invention.
Embodiment 1
A kind of deck sewage-treatment plant of large ship includes as shown in Figs. 1-5 pedestal 1, idler wheel 2, universal wheel 3, cylinder body 4, drain pipe 5, valve 6, connecting tube 7, check valve 8, holder 9, electric rotating machine 10, mlultiple-groove sheave 11, the first belt Wheel 12, first circulation belt 13, water pump 14, hose 15, big movable block 16, the first adjustment screw rod 17, second adjustment screw rod 18, the One bearing 19, small connecting shaft 20, the first rotating wheel 21, small fixed block 22, positioning screw 23, the first bevel pinion 24, second are small Bevel gear 25, second bearing 26, long connecting shaft 27, tapered pole 28, cone rubber cover the connection of the 29, first arc shell 30, first Block 31, the first contact plate 32, cam 33, the second contact plate 34, the second link block 35, the second arc shell 36 and tension spring 37, bottom Seat is connected with idler wheel 2 on the left of 1 bottom, and universal wheel 3 is connected on the right side of 1 bottom of pedestal, and the right side at 1 top of pedestal is connected with cylinder The lower part of body 4,4 right side wall of cylinder body is connected with drain pipe 5, and valve 6, the upper right side and cylinder body of connecting tube 7 are equipped on drain pipe 5 The top of 4 left side walls is connected, and check valve 8 is equipped in connecting tube 7, and holder 9 is located at the rear of connecting tube 7, the lower end of holder 9 It is connected with the left side at 1 top of pedestal, the upper end of holder 9 is connected with electric rotating machine 10, and the front end of 10 output shaft of electric rotating machine connects It is connected to mlultiple-groove sheave 11, the first belt pulley 12 is located at the lower left of mlultiple-groove sheave 11, the first belt pulley 12 and multiple-grooved belt Wheel 11 is connected by first circulation belt 13, and water pump 14 is located at the dead astern of the first belt pulley 12, water pump 14 and the first belt pulley 12 are connected by axis connection, the bottom of water pump 14 with the left side at 1 top of pedestal, and the left end of connecting tube 7 is connected with water pump 14, The upper right side of hose 15 is connected with water pump 14, and the lower-left end of hose 15 is connected with the right side at 16 top of big movable block, big living Big groove 161 is provided in motion block 16, hose 15 is connected with the big groove 161 of big movable block 16, the right side wall of big movable block 16 It is provided with the first imbibing hole 162, the first imbibing hole 162 is connected with big groove 161, and the bottom of big movable block 16 is provided with the second imbibition Hole 163, the second imbibing hole 163 are connected with big groove 161, and the bottom of big movable block 16 is provided with the first little groove 164 and second Little groove 165, the first little groove 164 are located at the right side of the second imbibing hole 163, and the second little groove 165 is located at the second imbibing hole 163 Left side, the bottom thread of big movable block 16 is connected with the first adjustment screw rod 17 and second adjustment screw rod 18, the first adjustment screw rod 17 are located in the first little groove 164 of big movable block 16,164 phase of the first little groove of the first adjustment screw rod 17 and big movable block 16 Cooperation, second adjustment screw rod 18 are located in the second little groove 165 of big movable block 16, second adjustment screw rod 18 and big movable block 16 The second little groove 165 match, big movable block 16 is provided with L-shaped groove 166, and L-shaped groove 166 is located at the left side of big groove 161, first Bearing 19 is located at the top of L-shaped groove 166, and first bearing 19 is connected with big movable block 16, small connecting shaft 20 and first bearing 19 Interference connects, and the upper end of small connecting shaft 20 is connected with the first rotating wheel 21, and small fixed block 22 is located at the left side of first bearing 19, small The bottom of fixed block 22 is connected with the top of big movable block 16, and small fixed block 22 is threaded with positioning screw 23, positions spiral shell Bar 23 is in contact with small connecting shaft 20, and the lower end of small connecting shaft 20 is connected with the first bevel pinion 24, the second bevel pinion 25 In the left side of the first bevel pinion 24, the first bevel pinion 24 is meshed with the second bevel pinion 25, and second bearing 26 is located at L-shaped The lower part of slot 166, second bearing 26 are connected with big movable block 16, and right part and 26 interference of second bearing of long connecting shaft 27 connect It connects, the right end of long connecting shaft 27 is connected with the second bevel pinion 25, the left side of the right side wall of tapered pole 28 and big movable block 16 Wall is connected, and tapered pole 28 is provided with the perforative long through-hole 281 in left and right, and 27 rotary type of long connecting shaft is located in long through-hole 281, taper For 29 fixing sleeve of rubber sleeve in the left part of tapered pole 28, the first arc shell 30 is located at the left side of tapered pole 28, the first arc shell 30 connect with the upper articulation of 28 left side wall of tapered pole, and the first link block 31 is located in the first arc shell 30, the first link block 31 upper end is connected with the downside at 30 top of the first arc shell, and the lower end of the first link block 31 is connected with the first contact plate 32, cam 33 is located at the lower section of the first contact plate 32, and the first contact plate 32 is in contact with cam 33, and the middle part of cam 33 connects with long The left end of spindle 27 is connected, and the second contact plate 34 is located at the lower section of cam 33, and the second contact plate 34 is in contact with cam 33, the The bottom of two contact plates 34 is connected with the second link block 35, and the second link block 35 is located in the second arc shell 36, the second connection The lower end of block 35 is connected with the interior bottom of the second arc shell 36, and the second arc shell 36 is located at the left side of tapered pole 28, the Two arc shells 36 are connect with the lower hinge of 28 left side wall of tapered pole, and tension spring 37 is located at the first arc shell 30 and the second arc Between shell 36, the first arc shell 30 and the second arc shell 36 are connected with tension spring 37, and tension spring 37 is located at the first contact The left side of plate 32 and the second contact plate 34.
Embodiment 2
A kind of deck sewage-treatment plant of large ship includes as shown in Figs. 1-5 pedestal 1, idler wheel 2, universal wheel 3, cylinder body 4, drain pipe 5, valve 6, connecting tube 7, check valve 8, holder 9, electric rotating machine 10, mlultiple-groove sheave 11, the first belt Wheel 12, first circulation belt 13, water pump 14, hose 15, big movable block 16, the first adjustment screw rod 17, second adjustment screw rod 18, the One bearing 19, small connecting shaft 20, the first rotating wheel 21, small fixed block 22, positioning screw 23, the first bevel pinion 24, second are small Bevel gear 25, second bearing 26, long connecting shaft 27, tapered pole 28, cone rubber cover the connection of the 29, first arc shell 30, first Block 31, the first contact plate 32, cam 33, the second contact plate 34, the second link block 35, the second arc shell 36 and tension spring 37, bottom Seat is connected with idler wheel 2 on the left of 1 bottom, and universal wheel 3 is connected on the right side of 1 bottom of pedestal, and the right side at 1 top of pedestal is connected with cylinder The lower part of body 4,4 right side wall of cylinder body is connected with drain pipe 5, and valve 6, the upper right side and cylinder body of connecting tube 7 are equipped on drain pipe 5 The top of 4 left side walls is connected, and check valve 8 is equipped in connecting tube 7, and holder 9 is located at the rear of connecting tube 7, the lower end of holder 9 It is connected with the left side at 1 top of pedestal, the upper end of holder 9 is connected with electric rotating machine 10, and the front end of 10 output shaft of electric rotating machine connects It is connected to mlultiple-groove sheave 11, the first belt pulley 12 is located at the lower left of mlultiple-groove sheave 11, the first belt pulley 12 and multiple-grooved belt Wheel 11 is connected by first circulation belt 13, and water pump 14 is located at the dead astern of the first belt pulley 12, water pump 14 and the first belt pulley 12 are connected by axis connection, the bottom of water pump 14 with the left side at 1 top of pedestal, and the left end of connecting tube 7 is connected with water pump 14, The upper right side of hose 15 is connected with water pump 14, and the lower-left end of hose 15 is connected with the right side at 16 top of big movable block, big living Big groove 161 is provided in motion block 16, hose 15 is connected with the big groove 161 of big movable block 16, the right side wall of big movable block 16 It is provided with the first imbibing hole 162, the first imbibing hole 162 is connected with big groove 161, and the bottom of big movable block 16 is provided with the second imbibition Hole 163, the second imbibing hole 163 are connected with big groove 161, and the bottom of big movable block 16 is provided with the first little groove 164 and second Little groove 165, the first little groove 164 are located at the right side of the second imbibing hole 163, and the second little groove 165 is located at the second imbibing hole 163 Left side, the bottom thread of big movable block 16 is connected with the first adjustment screw rod 17 and second adjustment screw rod 18, the first adjustment screw rod 17 are located in the first little groove 164 of big movable block 16,164 phase of the first little groove of the first adjustment screw rod 17 and big movable block 16 Cooperation, second adjustment screw rod 18 are located in the second little groove 165 of big movable block 16, second adjustment screw rod 18 and big movable block 16 The second little groove 165 match, big movable block 16 is provided with L-shaped groove 166, and L-shaped groove 166 is located at the left side of big groove 161, first Bearing 19 is located at the top of L-shaped groove 166, and first bearing 19 is connected with big movable block 16, small connecting shaft 20 and first bearing 19 Interference connects, and the upper end of small connecting shaft 20 is connected with the first rotating wheel 21, and small fixed block 22 is located at the left side of first bearing 19, small The bottom of fixed block 22 is connected with the top of big movable block 16, and small fixed block 22 is threaded with positioning screw 23, positions spiral shell Bar 23 is in contact with small connecting shaft 20, and the lower end of small connecting shaft 20 is connected with the first bevel pinion 24, the second bevel pinion 25 In the left side of the first bevel pinion 24, the first bevel pinion 24 is meshed with the second bevel pinion 25, and second bearing 26 is located at L-shaped The lower part of slot 166, second bearing 26 are connected with big movable block 16, and right part and 26 interference of second bearing of long connecting shaft 27 connect It connects, the right end of long connecting shaft 27 is connected with the second bevel pinion 25, the left side of the right side wall of tapered pole 28 and big movable block 16 Wall is connected, and tapered pole 28 is provided with the perforative long through-hole 281 in left and right, and 27 rotary type of long connecting shaft is located in long through-hole 281, taper For 29 fixing sleeve of rubber sleeve in the left part of tapered pole 28, the first arc shell 30 is located at the left side of tapered pole 28, the first arc shell 30 connect with the upper articulation of 28 left side wall of tapered pole, and the first link block 31 is located in the first arc shell 30, the first link block 31 upper end is connected with the downside at 30 top of the first arc shell, and the lower end of the first link block 31 is connected with the first contact plate 32, cam 33 is located at the lower section of the first contact plate 32, and the first contact plate 32 is in contact with cam 33, and the middle part of cam 33 connects with long The left end of spindle 27 is connected, and the second contact plate 34 is located at the lower section of cam 33, and the second contact plate 34 is in contact with cam 33, the The bottom of two contact plates 34 is connected with the second link block 35, and the second link block 35 is located in the second arc shell 36, the second connection The lower end of block 35 is connected with the interior bottom of the second arc shell 36, and the second arc shell 36 is located at the left side of tapered pole 28, the Two arc shells 36 are connect with the lower hinge of 28 left side wall of tapered pole, and tension spring 37 is located at the first arc shell 30 and the second arc Between shell 36, the first arc shell 30 and the second arc shell 36 are connected with tension spring 37, and tension spring 37 is located at the first contact The left side of plate 32 and the second contact plate 34.
Further include have filter screen 41, the first long connecting rod 42, the second long connecting rod 43, agitating plate 44, the first rotary shaft 45, 3rd bearing 46, cover board 47, the second rotating wheel 48, inserted link 49, big screw rod 50 and tray 51, filter screen 41 are located in cylinder body 4, mistake Strainer 41 is slidably matched with cylinder body 4, and the left side at 41 top of filter screen is connected with the first long connecting rod 42, the right side at 41 top of filter screen Side is connected with the second long connecting rod 43, and agitating plate 44 is between the first long connecting rod 42 and the second long connecting rod 43, the first rotation The lower end of shaft 45 is connected with the centre position at 44 top of agitating plate, and the first rotary shaft 45 is connect with 46 interference of 3rd bearing, 3rd bearing 46 is embedded in cover board 47, and cover board 47 covers on cylinder body 4, and cover board 47 is in contact with cylinder body 4, the first long connecting rod 42 It is connected with the bottom of cover board 47 with the second long connecting rod 43, the second rotating wheel 48 is located at the top of cover board 47, the second rotation 48 fixing sleeves are taken turns in the first rotary shaft 45, the right part of cover board 47 is provided with perforative jack 471, inserted link 49 up and down and is located at jack In 471, the right side wall of cover board 47 is threaded with big screw rod 50, and big screw rod 50 is in contact with inserted link 49, and the lower end of inserted link 49 connects It is connected to tray 51, the left side wall of tray 51 is connected with the top of 4 right side wall of cylinder body.
Embodiment 3
A kind of deck sewage-treatment plant of large ship includes as shown in Figs. 1-5 pedestal 1, idler wheel 2, universal wheel 3, cylinder body 4, drain pipe 5, valve 6, connecting tube 7, check valve 8, holder 9, electric rotating machine 10, mlultiple-groove sheave 11, the first belt Wheel 12, first circulation belt 13, water pump 14, hose 15, big movable block 16, the first adjustment screw rod 17, second adjustment screw rod 18, the One bearing 19, small connecting shaft 20, the first rotating wheel 21, small fixed block 22, positioning screw 23, the first bevel pinion 24, second are small Bevel gear 25, second bearing 26, long connecting shaft 27, tapered pole 28, cone rubber cover the connection of the 29, first arc shell 30, first Block 31, the first contact plate 32, cam 33, the second contact plate 34, the second link block 35, the second arc shell 36 and tension spring 37, bottom Seat is connected with idler wheel 2 on the left of 1 bottom, and universal wheel 3 is connected on the right side of 1 bottom of pedestal, and the right side at 1 top of pedestal is connected with cylinder The lower part of body 4,4 right side wall of cylinder body is connected with drain pipe 5, and valve 6, the upper right side and cylinder body of connecting tube 7 are equipped on drain pipe 5 The top of 4 left side walls is connected, and check valve 8 is equipped in connecting tube 7, and holder 9 is located at the rear of connecting tube 7, the lower end of holder 9 It is connected with the left side at 1 top of pedestal, the upper end of holder 9 is connected with electric rotating machine 10, and the front end of 10 output shaft of electric rotating machine connects It is connected to mlultiple-groove sheave 11, the first belt pulley 12 is located at the lower left of mlultiple-groove sheave 11, the first belt pulley 12 and multiple-grooved belt Wheel 11 is connected by first circulation belt 13, and water pump 14 is located at the dead astern of the first belt pulley 12, water pump 14 and the first belt pulley 12 are connected by axis connection, the bottom of water pump 14 with the left side at 1 top of pedestal, and the left end of connecting tube 7 is connected with water pump 14, The upper right side of hose 15 is connected with water pump 14, and the lower-left end of hose 15 is connected with the right side at 16 top of big movable block, big living Big groove 161 is provided in motion block 16, hose 15 is connected with the big groove 161 of big movable block 16, the right side wall of big movable block 16 It is provided with the first imbibing hole 162, the first imbibing hole 162 is connected with big groove 161, and the bottom of big movable block 16 is provided with the second imbibition Hole 163, the second imbibing hole 163 are connected with big groove 161, and the bottom of big movable block 16 is provided with the first little groove 164 and second Little groove 165, the first little groove 164 are located at the right side of the second imbibing hole 163, and the second little groove 165 is located at the second imbibing hole 163 Left side, the bottom thread of big movable block 16 is connected with the first adjustment screw rod 17 and second adjustment screw rod 18, the first adjustment screw rod 17 are located in the first little groove 164 of big movable block 16,164 phase of the first little groove of the first adjustment screw rod 17 and big movable block 16 Cooperation, second adjustment screw rod 18 are located in the second little groove 165 of big movable block 16, second adjustment screw rod 18 and big movable block 16 The second little groove 165 match, big movable block 16 is provided with L-shaped groove 166, and L-shaped groove 166 is located at the left side of big groove 161, first Bearing 19 is located at the top of L-shaped groove 166, and first bearing 19 is connected with big movable block 16, small connecting shaft 20 and first bearing 19 Interference connects, and the upper end of small connecting shaft 20 is connected with the first rotating wheel 21, and small fixed block 22 is located at the left side of first bearing 19, small The bottom of fixed block 22 is connected with the top of big movable block 16, and small fixed block 22 is threaded with positioning screw 23, positions spiral shell Bar 23 is in contact with small connecting shaft 20, and the lower end of small connecting shaft 20 is connected with the first bevel pinion 24, the second bevel pinion 25 In the left side of the first bevel pinion 24, the first bevel pinion 24 is meshed with the second bevel pinion 25, and second bearing 26 is located at L-shaped The lower part of slot 166, second bearing 26 are connected with big movable block 16, and right part and 26 interference of second bearing of long connecting shaft 27 connect It connects, the right end of long connecting shaft 27 is connected with the second bevel pinion 25, the left side of the right side wall of tapered pole 28 and big movable block 16 Wall is connected, and tapered pole 28 is provided with the perforative long through-hole 281 in left and right, and 27 rotary type of long connecting shaft is located in long through-hole 281, taper For 29 fixing sleeve of rubber sleeve in the left part of tapered pole 28, the first arc shell 30 is located at the left side of tapered pole 28, the first arc shell 30 connect with the upper articulation of 28 left side wall of tapered pole, and the first link block 31 is located in the first arc shell 30, the first link block 31 upper end is connected with the downside at 30 top of the first arc shell, and the lower end of the first link block 31 is connected with the first contact plate 32, cam 33 is located at the lower section of the first contact plate 32, and the first contact plate 32 is in contact with cam 33, and the middle part of cam 33 connects with long The left end of spindle 27 is connected, and the second contact plate 34 is located at the lower section of cam 33, and the second contact plate 34 is in contact with cam 33, the The bottom of two contact plates 34 is connected with the second link block 35, and the second link block 35 is located in the second arc shell 36, the second connection The lower end of block 35 is connected with the interior bottom of the second arc shell 36, and the second arc shell 36 is located at the left side of tapered pole 28, the Two arc shells 36 are connect with the lower hinge of 28 left side wall of tapered pole, and tension spring 37 is located at the first arc shell 30 and the second arc Between shell 36, the first arc shell 30 and the second arc shell 36 are connected with tension spring 37, and tension spring 37 is located at the first contact The left side of plate 32 and the second contact plate 34.
Further include have filter screen 41, the first long connecting rod 42, the second long connecting rod 43, agitating plate 44, the first rotary shaft 45, 3rd bearing 46, cover board 47, the second rotating wheel 48, inserted link 49, big screw rod 50 and tray 51, filter screen 41 are located in cylinder body 4, mistake Strainer 41 is slidably matched with cylinder body 4, and the left side at 41 top of filter screen is connected with the first long connecting rod 42, the right side at 41 top of filter screen Side is connected with the second long connecting rod 43, and agitating plate 44 is between the first long connecting rod 42 and the second long connecting rod 43, the first rotation The lower end of shaft 45 is connected with the centre position at 44 top of agitating plate, and the first rotary shaft 45 is connect with 46 interference of 3rd bearing, 3rd bearing 46 is embedded in cover board 47, and cover board 47 covers on cylinder body 4, and cover board 47 is in contact with cylinder body 4, the first long connecting rod 42 It is connected with the bottom of cover board 47 with the second long connecting rod 43, the second rotating wheel 48 is located at the top of cover board 47, the second rotation 48 fixing sleeves are taken turns in the first rotary shaft 45, the right part of cover board 47 is provided with perforative jack 471, inserted link 49 up and down and is located at jack In 471, the right side wall of cover board 47 is threaded with big screw rod 50, and big screw rod 50 is in contact with inserted link 49, and the lower end of inserted link 49 connects It is connected to tray 51, the left side wall of tray 51 is connected with the top of 4 right side wall of cylinder body.
Further include having the first bevel gear wheel 61, the second bevel gear wheel 62, the second rotary shaft 63, the second belt pulley 64, L shaped plate 65 and second circulation belt 66, the upper end of the first rotary shaft 45 be connected with the first bevel gear wheel 61, the second bevel gear wheel 62 is located at The rear of first bevel gear wheel 61, the second bevel gear wheel 62 are meshed with the first bevel gear wheel 61, the second bevel gear wheel 62 and The front end of two rotary shafts 63 is connected, and the second belt pulley 64 is located at the rear of the second bevel gear wheel 62, and the second belt pulley 64 is fixed It is sleeved in the second rotary shaft 63, L shaped plate 65 is located at the rear of the second belt pulley 64, rear end and the L shaped plate 65 of the second rotary shaft 63 Left upper end rotation connection, the bottom righthand side of L shaped plate 65 is connected with the top of cover board 47, the second belt pulley 64 and mlultiple-groove sheave 11 are connected by second circulation belt 66.
Embodiment 4
A kind of deck sewage-treatment plant of large ship includes as shown in Figs. 1-5 pedestal 1, idler wheel 2, universal wheel 3, cylinder body 4, drain pipe 5, valve 6, connecting tube 7, check valve 8, holder 9, electric rotating machine 10, mlultiple-groove sheave 11, the first belt Wheel 12, first circulation belt 13, water pump 14, hose 15, big movable block 16, the first adjustment screw rod 17, second adjustment screw rod 18, the One bearing 19, small connecting shaft 20, the first rotating wheel 21, small fixed block 22, positioning screw 23, the first bevel pinion 24, second are small Bevel gear 25, second bearing 26, long connecting shaft 27, tapered pole 28, cone rubber cover the connection of the 29, first arc shell 30, first Block 31, the first contact plate 32, cam 33, the second contact plate 34, the second link block 35, the second arc shell 36 and tension spring 37, bottom Seat is connected with idler wheel 2 on the left of 1 bottom, and universal wheel 3 is connected on the right side of 1 bottom of pedestal, and the right side at 1 top of pedestal is connected with cylinder The lower part of body 4,4 right side wall of cylinder body is connected with drain pipe 5, and valve 6, the upper right side and cylinder body of connecting tube 7 are equipped on drain pipe 5 The top of 4 left side walls is connected, and check valve 8 is equipped in connecting tube 7, and holder 9 is located at the rear of connecting tube 7, the lower end of holder 9 It is connected with the left side at 1 top of pedestal, the upper end of holder 9 is connected with electric rotating machine 10, and the front end of 10 output shaft of electric rotating machine connects It is connected to mlultiple-groove sheave 11, the first belt pulley 12 is located at the lower left of mlultiple-groove sheave 11, the first belt pulley 12 and multiple-grooved belt Wheel 11 is connected by first circulation belt 13, and water pump 14 is located at the dead astern of the first belt pulley 12, water pump 14 and the first belt pulley 12 are connected by axis connection, the bottom of water pump 14 with the left side at 1 top of pedestal, and the left end of connecting tube 7 is connected with water pump 14, The upper right side of hose 15 is connected with water pump 14, and the lower-left end of hose 15 is connected with the right side at 16 top of big movable block, big living Big groove 161 is provided in motion block 16, hose 15 is connected with the big groove 161 of big movable block 16, the right side wall of big movable block 16 It is provided with the first imbibing hole 162, the first imbibing hole 162 is connected with big groove 161, and the bottom of big movable block 16 is provided with the second imbibition Hole 163, the second imbibing hole 163 are connected with big groove 161, and the bottom of big movable block 16 is provided with the first little groove 164 and second Little groove 165, the first little groove 164 are located at the right side of the second imbibing hole 163, and the second little groove 165 is located at the second imbibing hole 163 Left side, the bottom thread of big movable block 16 is connected with the first adjustment screw rod 17 and second adjustment screw rod 18, the first adjustment screw rod 17 are located in the first little groove 164 of big movable block 16,164 phase of the first little groove of the first adjustment screw rod 17 and big movable block 16 Cooperation, second adjustment screw rod 18 are located in the second little groove 165 of big movable block 16, second adjustment screw rod 18 and big movable block 16 The second little groove 165 match, big movable block 16 is provided with L-shaped groove 166, and L-shaped groove 166 is located at the left side of big groove 161, first Bearing 19 is located at the top of L-shaped groove 166, and first bearing 19 is connected with big movable block 16, small connecting shaft 20 and first bearing 19 Interference connects, and the upper end of small connecting shaft 20 is connected with the first rotating wheel 21, and small fixed block 22 is located at the left side of first bearing 19, small The bottom of fixed block 22 is connected with the top of big movable block 16, and small fixed block 22 is threaded with positioning screw 23, positions spiral shell Bar 23 is in contact with small connecting shaft 20, and the lower end of small connecting shaft 20 is connected with the first bevel pinion 24, the second bevel pinion 25 In the left side of the first bevel pinion 24, the first bevel pinion 24 is meshed with the second bevel pinion 25, and second bearing 26 is located at L-shaped The lower part of slot 166, second bearing 26 are connected with big movable block 16, and right part and 26 interference of second bearing of long connecting shaft 27 connect It connects, the right end of long connecting shaft 27 is connected with the second bevel pinion 25, the left side of the right side wall of tapered pole 28 and big movable block 16 Wall is connected, and tapered pole 28 is provided with the perforative long through-hole 281 in left and right, and 27 rotary type of long connecting shaft is located in long through-hole 281, taper For 29 fixing sleeve of rubber sleeve in the left part of tapered pole 28, the first arc shell 30 is located at the left side of tapered pole 28, the first arc shell 30 connect with the upper articulation of 28 left side wall of tapered pole, and the first link block 31 is located in the first arc shell 30, the first link block 31 upper end is connected with the downside at 30 top of the first arc shell, and the lower end of the first link block 31 is connected with the first contact plate 32, cam 33 is located at the lower section of the first contact plate 32, and the first contact plate 32 is in contact with cam 33, and the middle part of cam 33 connects with long The left end of spindle 27 is connected, and the second contact plate 34 is located at the lower section of cam 33, and the second contact plate 34 is in contact with cam 33, the The bottom of two contact plates 34 is connected with the second link block 35, and the second link block 35 is located in the second arc shell 36, the second connection The lower end of block 35 is connected with the interior bottom of the second arc shell 36, and the second arc shell 36 is located at the left side of tapered pole 28, the Two arc shells 36 are connect with the lower hinge of 28 left side wall of tapered pole, and tension spring 37 is located at the first arc shell 30 and the second arc Between shell 36, the first arc shell 30 and the second arc shell 36 are connected with tension spring 37, and tension spring 37 is located at the first contact The left side of plate 32 and the second contact plate 34.
Further include have filter screen 41, the first long connecting rod 42, the second long connecting rod 43, agitating plate 44, the first rotary shaft 45, 3rd bearing 46, cover board 47, the second rotating wheel 48, inserted link 49, big screw rod 50 and tray 51, filter screen 41 are located in cylinder body 4, mistake Strainer 41 is slidably matched with cylinder body 4, and the left side at 41 top of filter screen is connected with the first long connecting rod 42, the right side at 41 top of filter screen Side is connected with the second long connecting rod 43, and agitating plate 44 is between the first long connecting rod 42 and the second long connecting rod 43, the first rotation The lower end of shaft 45 is connected with the centre position at 44 top of agitating plate, and the first rotary shaft 45 is connect with 46 interference of 3rd bearing, 3rd bearing 46 is embedded in cover board 47, and cover board 47 covers on cylinder body 4, and cover board 47 is in contact with cylinder body 4, the first long connecting rod 42 It is connected with the bottom of cover board 47 with the second long connecting rod 43, the second rotating wheel 48 is located at the top of cover board 47, the second rotation 48 fixing sleeves are taken turns in the first rotary shaft 45, the right part of cover board 47 is provided with perforative jack 471, inserted link 49 up and down and is located at jack In 471, the right side wall of cover board 47 is threaded with big screw rod 50, and big screw rod 50 is in contact with inserted link 49, and the lower end of inserted link 49 connects It is connected to tray 51, the left side wall of tray 51 is connected with the top of 4 right side wall of cylinder body.
Further include having the first bevel gear wheel 61, the second bevel gear wheel 62, the second rotary shaft 63, the second belt pulley 64, L shaped plate 65 and second circulation belt 66, the upper end of the first rotary shaft 45 be connected with the first bevel gear wheel 61, the second bevel gear wheel 62 is located at The rear of first bevel gear wheel 61, the second bevel gear wheel 62 are meshed with the first bevel gear wheel 61, the second bevel gear wheel 62 and The front end of two rotary shafts 63 is connected, and the second belt pulley 64 is located at the rear of the second bevel gear wheel 62, and the second belt pulley 64 is fixed It is sleeved in the second rotary shaft 63, L shaped plate 65 is located at the rear of the second belt pulley 64, rear end and the L shaped plate 65 of the second rotary shaft 63 Left upper end rotation connection, the bottom righthand side of L shaped plate 65 is connected with the top of cover board 47, the second belt pulley 64 and mlultiple-groove sheave 11 are connected by second circulation belt 66.
Further include having pressing plate 71, long bolt 72 and fixed plate 73, pressing plate 71 is located at the right side of idler wheel 2, the right side of pressing plate 71 It is connected with long bolt 72, long bolt 72 is arranged in fixed plate 73, and long bolt 72 is threadedly coupled with fixed plate 73, fixed plate 73 Top is connected with the bottom of pedestal 1.
It is first that the present invention is mobile when needing to be collected cleaning to the sewage on large ship deck using the present invention To the place of needs, then tapered pole 28 and cone rubber set 29 are inserted into the osculum of large ship side plate, taper Rubber sleeve 29 can play the role of sealing, prevent sewage from leaking, to cover 29 by topside by tapered pole 28 and cone rubber The osculum of plate is blocked, and the first arc shell 30 and the second arc shell 36 are located at the outside of large ship at this time, then The first adjustment screw rod 17 and second adjustment screw rod 18 are screwed respectively again, to make the bottom and of the first adjustment screw rod 17 The bottom of two adjustment screws 18 is in contact with the deck of large ship, then right again to which big movable block 16 be fixed First rotating wheel 21 is rotated, and the first rotating wheel 21 drives the first bevel pinion 24 to be rotated by small connecting shaft 20, the To drive the second bevel pinion 25 to be rotated, the second bevel pinion 25 is driven convex one bevel pinion 24 by long connecting shaft 27 Wheel 33 is rotated, and cam 33 pushes the first contact plate 32 and the second contact plate 34, and the first contact plate 32 passes through first Link block 31 drives the first arc shell 30 to be moved upwards, and the second contact plate 34 drives the second arc by the second link block 35 Shape shell 36 is moved downwards, and the first arc shell 30 and the second arc shell 36 to upper and lower both sides to be unfolded, due to the One arc shell 30 and the second arc shell 36 are now placed in the outside of large ship side plate, therefore 30 He of the first arc shell Second arc shell 36 can be stuck in the outside of large ship side plate, thus tightly by tapered pole 28 and cone rubber set 29 It is fixed in the osculum of side plate, then positioning screw 23 is screwed again, and by positioning screw 23 by small connecting shaft 20 fix, and then restart electric rotating machine 10 and are operated, and electric rotating machine 10 drives mlultiple-groove sheave 11 to be rotated, multiple-grooved Belt pulley 11 drives the first belt pulley 12 to be rotated by first circulation belt 13, and the first belt pulley 12 drives water pump by axis 14 are operated, and water pump 14 draws the sewage on deck by hose 15 and big movable block 16, and the sewage on deck is logical It crosses the first imbibing hole 162 and the second imbibing hole 163 enters in big groove 161, enter back into hose 15, then pass through water pump 14 It enters in connecting tube 7, check valve 8 can prevent the sewage in connecting tube 7 from flowing backwards, and sewage enters cylinder body 4 by connecting tube 7 Interior collection can open valve 6 when the sewage in cylinder body 4 needs discharge, be discharged by drain pipe 5.
When needing to be filtered the sewage being transported in cylinder body 4, cover board 47 is sleeved on by inserted link by jack 471 first On 49, filter screen 41, the first long connecting rod 42, the second long connecting rod 43 and agitating plate 44 enter in cylinder body 4 at this time, and Filter screen 41 is matched with cylinder body 4, and filter screen 41 is located at the lower section of 7 upper right side of connecting tube at this time, therefore is conveyed by connecting tube 7 The sewage come can be flowed on filter screen 41, then be filtered out the pollutant of big lumpiness by filter screen 41, convenient for sewage Subsequent processing, while the second rotating wheel 48 can be rotated, the second rotating wheel 48 is driven by the first rotary shaft 45 and is stirred Plate 44 is rotated, and agitating plate 44 is to be stirred sewage, so as to accelerate the filtering of sewage.
It is sleeved on the second belt pulley 64 and mlultiple-groove sheave after cover board 47 covers on cylinder body 4, then by second circulation belt 66 On 11, electric rotating machine 10 can drive the first belt pulley 12 and the second belt pulley 64 to be carried out at the same time by mlultiple-groove sheave 11 at this time Rotation, the second belt pulley 64 is to drive the second rotary shaft 63 and the second bevel gear wheel 62 to be carried out at the same time rotation, the second auger tooth For wheel 62 to drive the first bevel gear wheel 61 to be rotated, the first bevel gear wheel 61 drives agitating plate 44 by the first rotary shaft 45 It is rotated, so as to be filtered during being conveyed to sewage, while to sewage, is operated more convenient fast Victory, it is time saving and energy saving.
It, can when needing that the present invention is fixed because further including having pressing plate 71, long bolt 72 and fixed plate 73 To be screwed to long bolt 72, long bolt 72 is moved to the left with dynamic pressure plate 71, and pressing plate 71 is pressed on idler wheel 2, from And fix idler wheel 2, it can prevent of the invention disorderly shake from tampering.
Finally it should be noted that:The foregoing is only a preferred embodiment of the present invention, is not intended to restrict the invention, Although the present invention is described in detail referring to the foregoing embodiments, for those skilled in the art, still may be used With technical scheme described in the above embodiments is modified or equivalent replacement of some of the technical features, All within the spirits and principles of the present invention, any modification, equivalent replacement, improvement and so on should be included in the present invention's Within protection domain.

Claims (4)

1. a kind of deck sewage-treatment plant of large ship, it is characterised in that:Include pedestal (1), idler wheel (2), universal Take turns (3), cylinder body (4), drain pipe (5), valve (6), connecting tube (7), check valve (8), holder (9), electric rotating machine (10), multiple-grooved Belt pulley (11), the first belt pulley (12), first circulation belt (13), water pump (14), hose (15), big movable block (16), It is one adjustment screw (17), second adjustment screw rod (18), first bearing (19), small connecting shaft (20), the first rotating wheel (21), small solid Determine block (22), positioning screw (23), the first bevel pinion (24), the second bevel pinion (25), second bearing (26), long connecting shaft (27), tapered pole (28), cone rubber set (29), the first arc shell (30), the first link block (31), the first contact plate (32), cam (33), the second contact plate (34), the second link block (35), the second arc shell (36) and tension spring (37), pedestal (1) it is connected with idler wheel (2) on the left of bottom, universal wheel (3), the right side at the top of pedestal (1) are connected on the right side of pedestal (1) bottom It is connected with cylinder body (4), the lower part of cylinder body (4) right side wall is connected with drain pipe (5), valve (6) is equipped on drain pipe (5), even The upper right side for taking over (7) is connected with the top of cylinder body (4) left side wall, and check valve (8), holder (9) are equipped in connecting tube (7) The lower end at the rear positioned at connecting tube (7), holder (9) is connected with the left side at the top of pedestal (1), the upper end connection of holder (9) There are electric rotating machine (10), the front end of electric rotating machine (10) output shaft to be connected with mlultiple-groove sheave (11), the first belt pulley (12) position Lower left in mlultiple-groove sheave (11), the first belt pulley (12) are connected with mlultiple-groove sheave (11) by first circulation belt (13) It connects, water pump (14) is located at the dead astern of the first belt pulley (12), and water pump (14) passes through axis connection, water pump with the first belt pulley (12) (14) bottom is connected with the left side at the top of pedestal (1), and the left end of connecting tube (7) is connected with water pump (14), hose (15) Upper right side be connected with water pump (14), the lower-left end of hose (15) is connected with the right side at the top of big movable block (16), big living It is provided with big groove (161) in motion block (16), hose (15) is connected with the big groove (161) of big movable block (16), big movable block (16) right side wall is provided with the first imbibing hole (162), and the first imbibing hole (162) is connected with big groove (161), big movable block (16) bottom is provided with the second imbibing hole (163), and the second imbibing hole (163) is connected with big groove (161), big movable block (16) Bottom be provided with the first little groove (164) and the second little groove (165), the first little groove (164) is located at the second imbibing hole (163) Right side, the second little groove (165) is located at the left side of the second imbibing hole (163), and the bottom thread of big movable block (16) is connected with It is first small recessed to be located at big movable block (16) for the first adjustment screw rod (17) and second adjustment screw rod (18), the first adjustment screw rod (17) In slot (164), the first adjustment screw rod (17) is matched with the first little groove (164) of big movable block (16), second adjustment screw rod (18) it is located in the second little groove (165) of big movable block (16), second adjustment screw rod (18) and the second of big movable block (16) Little groove (165) matches, and big movable block (16) is provided with L-shaped groove (166), and L-shaped groove (166) is located at the left side of big groove (161), First bearing (19) is located at the top of L-shaped groove (166), and first bearing (19) is connected with big movable block (16), small connecting shaft (20) it is connect with first bearing (19) interference, the upper end of small connecting shaft (20) is connected with the first rotating wheel (21), small fixed block (22) it is located at the left side of first bearing (19), is connected at the top of the bottom of small fixed block (22) and big movable block (16), it is small solid Determine block (22) and be threaded with positioning screw (23), positioning screw (23) is in contact with small connecting shaft (20), small connecting shaft (20) Lower end be connected with the first bevel pinion (24), the second bevel pinion (25) is located at the left side of the first bevel pinion (24), first Bevel pinion (24) is meshed with the second bevel pinion (25), and second bearing (26) is located at the lower part of L-shaped groove (166), the second axis It holds (26) with big movable block (16) to be connected, the right part of long connecting shaft (27) is connect with second bearing (26) interference, long connecting shaft (27) right end is connected with the second bevel pinion (25), the left side wall phase of the right side wall and big movable block (16) of tapered pole (28) Connection, tapered pole (28) are provided with the perforative long through-hole in left and right (281), and long connecting shaft (27) rotary type is located in long through-hole (281), For cone rubber set (29) fixing sleeve in the left part of tapered pole (28), the first arc shell (30) is located at the left side of tapered pole (28), First arc shell (30) is connect with the upper articulation of tapered pole (28) left side wall, and the first link block (31) is located at the first arc shell In body (30), the upper end of the first link block (31) is connected with the downside at the top of the first arc shell (30), the first link block (31) lower end is connected with the first contact plate (32), and cam (33) is located at the lower section of the first contact plate (32), the first contact plate (32) it is in contact with cam (33), the middle part of cam (33) is connected with the left end of long connecting shaft (27), the second contact plate (34) Lower section positioned at cam (33), the second contact plate (34) are in contact with cam (33), and the bottom of the second contact plate (34) is connected with Second link block (35), the second link block (35) are located in the second arc shell (36), the lower end of the second link block (35) and the The interior bottom of two arc shells (36) is connected, and the second arc shell (36) is located at the left side of tapered pole (28), the second arc shell Body (36) is connect with the lower hinge of tapered pole (28) left side wall, and tension spring (37) is located at the first arc shell (30) and the second arc Between shell (36), the first arc shell (30) and the second arc shell (36) are connected with tension spring (37), tension spring (37) position In the left side of the first contact plate (32) and the second contact plate (34).
2. a kind of deck sewage-treatment plant of large ship as described in claim 1, it is characterised in that:Further include having Strainer (41), the first long connecting rod (42), the second long connecting rod (43), agitating plate (44), the first rotary shaft (45), 3rd bearing (46), cover board (47), the second rotating wheel (48), inserted link (49), big screw rod (50) and tray (51), filter screen (41) are located at cylinder body (4) in, filter screen (41) is slidably matched with cylinder body (4), and the left side at the top of filter screen (41) is connected with the first long connecting rod (42), Right side at the top of filter screen (41) is connected with the second long connecting rod (43), and agitating plate (44) is located at the first long connecting rod (42) and the Between two long connecting rods (43), the lower end of the first rotary shaft (45) is connected with the centre position at the top of agitating plate (44), and first Rotary shaft (45) is connect with 3rd bearing (46) interference, and 3rd bearing (46) is embedded in cover board (47), and cover board (47) is covered in cylinder On body (4), cover board (47) is in contact with cylinder body (4), and the first long connecting rod (42) and the second long connecting rod (43) are and cover board (47) bottom is connected, and the second rotating wheel (48) is located at the top of cover board (47), and the second rotating wheel (48) fixing sleeve is first In rotary shaft (45), the right part of cover board (47) is provided with perforative jack (471) up and down, and inserted link (49) is located in jack (471), lid The right side wall of plate (47) is threaded with big screw rod (50), and big screw rod (50) is in contact with inserted link (49), the lower end of inserted link (49) It is connected with tray (51), the left side wall of tray (51) is connected with the top of cylinder body (4) right side wall.
3. a kind of deck sewage-treatment plant of large ship as claimed in claim 2, it is characterised in that:Further include having One bevel gear wheel (61), the second bevel gear wheel (62), the second rotary shaft (63), the second belt pulley (64), L shaped plate (65) and second The upper end of endless belt (66), the first rotary shaft (45) is connected with the first bevel gear wheel (61), and the second bevel gear wheel (62) is located at The rear of first bevel gear wheel (61), the second bevel gear wheel (62) are meshed with the first bevel gear wheel (61), the second bevel gear wheel (62) it is connected with the front end of the second rotary shaft (63), the second belt pulley (64) is located at the rear of the second bevel gear wheel (62), the For two belt pulleys (64) fixing sleeve in the second rotary shaft (63), L shaped plate (65) is located at the rear of the second belt pulley (64), the second rotation The rear end of shaft (63) is rotatablely connected with the left upper end of L shaped plate (65), the top phase of the bottom righthand side and cover board (47) of L shaped plate (65) Connection, the second belt pulley (64) are connect with mlultiple-groove sheave (11) by second circulation belt (66).
4. a kind of deck sewage-treatment plant of large ship as claimed in claim 3, it is characterised in that:Further include having pressure Plate (71), long bolt (72) and fixed plate (73), pressing plate (71) are located at the right side of idler wheel (2), and pressing plate is connected on the right side of (71) Long bolt (72), long bolt (72) are arranged in fixed plate (73), and long bolt (72) is threadedly coupled with fixed plate (73), fixed plate (73) top is connected with the bottom of pedestal (1).
CN201810608249.9A 2018-06-13 2018-06-13 Deck sewage treatment plant that large-scale boats and ships were used Active CN108786215B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810608249.9A CN108786215B (en) 2018-06-13 2018-06-13 Deck sewage treatment plant that large-scale boats and ships were used

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810608249.9A CN108786215B (en) 2018-06-13 2018-06-13 Deck sewage treatment plant that large-scale boats and ships were used

Publications (2)

Publication Number Publication Date
CN108786215A true CN108786215A (en) 2018-11-13
CN108786215B CN108786215B (en) 2020-10-13

Family

ID=64085667

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810608249.9A Active CN108786215B (en) 2018-06-13 2018-06-13 Deck sewage treatment plant that large-scale boats and ships were used

Country Status (1)

Country Link
CN (1) CN108786215B (en)

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2006001382A (en) * 2004-06-16 2006-01-05 Yamaha Motor Co Ltd Oil separator for bilge, and small vessel
CN203638050U (en) * 2013-11-29 2014-06-11 大连船舶重工集团有限公司 Ship deck drainage plugging device
CN103950403A (en) * 2014-04-28 2014-07-30 苏州创维晟自动化科技有限公司 Novel moveable sewage treatment vehicle
CN105727618A (en) * 2016-04-21 2016-07-06 藤县顺舟造船有限公司 Domestic sewage tank
CN205417997U (en) * 2016-03-17 2016-08-03 盐城海特机械科技有限公司 Boats and ships are plugging device for outlet
CN108016583A (en) * 2017-12-15 2018-05-11 浙江海洋大学 High-efficiency cleaning equipment peculiar to vessel

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2006001382A (en) * 2004-06-16 2006-01-05 Yamaha Motor Co Ltd Oil separator for bilge, and small vessel
CN203638050U (en) * 2013-11-29 2014-06-11 大连船舶重工集团有限公司 Ship deck drainage plugging device
CN103950403A (en) * 2014-04-28 2014-07-30 苏州创维晟自动化科技有限公司 Novel moveable sewage treatment vehicle
CN205417997U (en) * 2016-03-17 2016-08-03 盐城海特机械科技有限公司 Boats and ships are plugging device for outlet
CN105727618A (en) * 2016-04-21 2016-07-06 藤县顺舟造船有限公司 Domestic sewage tank
CN108016583A (en) * 2017-12-15 2018-05-11 浙江海洋大学 High-efficiency cleaning equipment peculiar to vessel

Also Published As

Publication number Publication date
CN108786215B (en) 2020-10-13

Similar Documents

Publication Publication Date Title
CN109164225B (en) Integrated water quality detection device
CN108854189A (en) A kind of deck sewage collecting processing unit for large ship
WO2023077554A1 (en) Raw material rinsing device for minced fillet processing that can clean scum
CN111054116A (en) Guide cylinder type filtering device for wastewater treatment
CN108786215A (en) A kind of deck sewage-treatment plant of large ship
CN208151003U (en) A kind of aquaculture wastewater pretreatment unit
CN208485723U (en) A kind of sewage treatment unit
CN216726181U (en) Waste liquid treatment device for papermaking
CN215031617U (en) Cleaning equipment
CN211521875U (en) Treatment facility for oily sewage
CN212864425U (en) Domestic sewage disinfection and sterilization device
CN110759501B (en) Environment-friendly equipment capable of treating sewage through wind energy
CN206126936U (en) Rotating biological disk filters integration equipment with price fixing
CN110882567B (en) A filter equipment for waste water treatment
CN219701358U (en) Integrated sewage treatment equipment
CN215627239U (en) Dosing device for aquaculture sewage treatment
CN219259772U (en) Waste liquid treatment device
CN210855414U (en) Buffer tank for sewage treatment
CN215250113U (en) South america white shrimp batch production breed tail water purification unit
CN210874354U (en) Eel processing discarded object solid-liquid separation bucket of keeping in
CN213895453U (en) Novel sewage treatment device for ecological environment treatment
CN212166715U (en) Leather waste water residue filter equipment
CN108558058A (en) Sewage-treatment plant
CN220788228U (en) Sewage treatment equipment convenient to change filter core
CN212187965U (en) A effluent treatment plant for weaving

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
TA01 Transfer of patent application right
TA01 Transfer of patent application right

Effective date of registration: 20200911

Address after: 314031 room 318, 1663 Hong Gao Road, Xiuzhou District, Jiaxing, Zhejiang.

Applicant after: Jiaxing City Xun Cheng Information Technology Co. Ltds

Address before: 300387 Tianjin city Xiqing District West Binshui Road No. 399

Applicant before: Lai Yanlin

GR01 Patent grant
GR01 Patent grant