CN108776875A - A kind of cooperative operation system based on design, construction and O&M set - Google Patents

A kind of cooperative operation system based on design, construction and O&M set Download PDF

Info

Publication number
CN108776875A
CN108776875A CN201810651291.9A CN201810651291A CN108776875A CN 108776875 A CN108776875 A CN 108776875A CN 201810651291 A CN201810651291 A CN 201810651291A CN 108776875 A CN108776875 A CN 108776875A
Authority
CN
China
Prior art keywords
design
construction
bim
project
operation system
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201810651291.9A
Other languages
Chinese (zh)
Inventor
李�杰
潘欣钰
肖炳辉
遇家滨
丁嘉卿
秦伟
盛健
陈皓
吴佳骏
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Shipbuilding NDRI Engineering Co Ltd
Original Assignee
China Shipbuilding NDRI Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Shipbuilding NDRI Engineering Co Ltd filed Critical China Shipbuilding NDRI Engineering Co Ltd
Priority to CN201810651291.9A priority Critical patent/CN108776875A/en
Publication of CN108776875A publication Critical patent/CN108776875A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0637Strategic management or analysis, e.g. setting a goal or target of an organisation; Planning actions based on goals; Analysis or evaluation of effectiveness of goals
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F30/00Computer-aided design [CAD]
    • G06F30/10Geometric CAD
    • G06F30/13Architectural design, e.g. computer-aided architectural design [CAAD] related to design of buildings, bridges, landscapes, production plants or roads
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F30/00Computer-aided design [CAD]
    • G06F30/20Design optimisation, verification or simulation
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
    • G06Q50/08Construction

Landscapes

  • Engineering & Computer Science (AREA)
  • Physics & Mathematics (AREA)
  • Business, Economics & Management (AREA)
  • Theoretical Computer Science (AREA)
  • General Physics & Mathematics (AREA)
  • Human Resources & Organizations (AREA)
  • Geometry (AREA)
  • Economics (AREA)
  • Computer Hardware Design (AREA)
  • Strategic Management (AREA)
  • Entrepreneurship & Innovation (AREA)
  • General Business, Economics & Management (AREA)
  • Tourism & Hospitality (AREA)
  • General Engineering & Computer Science (AREA)
  • Educational Administration (AREA)
  • Evolutionary Computation (AREA)
  • Marketing (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Quality & Reliability (AREA)
  • Architecture (AREA)
  • Game Theory and Decision Science (AREA)
  • General Health & Medical Sciences (AREA)
  • Health & Medical Sciences (AREA)
  • Operations Research (AREA)
  • Computational Mathematics (AREA)
  • Mathematical Analysis (AREA)
  • Mathematical Optimization (AREA)
  • Pure & Applied Mathematics (AREA)
  • Development Economics (AREA)
  • Primary Health Care (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The present invention provides a kind of cooperative operation system based on design, construction and O&M set, it is characterised in that:Including Construction Party's module, design side's module, construction party module;Wherein, Construction Party's module includes project construction basic material, project construction process material;Design side's module includes Project design BIM design informations model, design BIM flows, design BIM delivery;The construction party module includes project BIM construction informations model, construction BIM flows, the delivery of completion BIM models.

Description

A kind of cooperative operation system based on design, construction and O&M set
Technical field
The present invention relates to the management system regions of engineering project, and in particular, to one kind is based on design, construction and O&M collection The cooperative operation system of conjunction.
Background technology
From the point of view of domestic existing Engineering Project Construction platform, due to being divided according to Construction Phase, each stage pipe All there are a certain distance with foreign countries for reason system application level, are mainly reflected in three aspects, first, management system lacks and three It is integrated to tie up emulation technology;Second is that the institutionalization of management, procedure, informationization rest on stages respectively;Third, platform and other works There are gaps for the integrated level of Cheng Suoxu application systems.
Developed countries, to design leading heavy construction company, they establish technology (or research and development) work Platform provides directive function for project at two aspects of technology and management, they have advanced simulation and analysis technology, have had Whole document management system and engineering data base, the platform and good social informatization Internet resources for thering is profession to cooperate. But not yet find that a design, construction and O&M collection are integrated, have the Engineering Project Construction ability of apparent industry characteristic Promote plateform system.
Invention content
The present invention is directed to overcome defect in the prior art, a kind of new set design, construction and O&M are provided in one Management systems and management method.
The present invention provides a kind of cooperative operation system based on design, construction and O&M set, it is characterised in that:Including Construction Party's module, design side's module, construction party module;
Wherein, above-mentioned Construction Party's module includes project construction basic material, project construction process material;
Above-mentioned design side's module includes Project design BIM design informations model, design BIM flows, design BIM delivery;
Above-mentioned construction party module includes project BIM construction informations model, construction BIM flows, the delivery of completion BIM models.
Further, a kind of cooperative operation system based on design, construction and O&M set provided by the invention, also has Such feature:I.e., the design setting model of above-mentioned design BIM design information models and the construction of construction BIM construction information models are built Module system cycle is with reference to acquisition.
Further, a kind of cooperative operation system based on design, construction and O&M set provided by the invention, also has Such feature:I.e., design setting model early period of above-mentioned design BIM design information models will refer to construction BIM construction information models Construction in later period model and carry out;
The construction in later period modeling of above-mentioned construction BIM construction information models will be set in the early period of design BIM design information models Carry out on the basis of meter modeling.
Further, a kind of cooperative operation system based on design, construction and O&M set provided by the invention, also has Such feature:I.e., the data interaction between above-mentioned design BIM design informations model and construction BIM construction information models is logical It crosses in collaborative platform, is completed in the data delivery of the delivery stage.
Further, a kind of cooperative operation system based on design, construction and O&M set provided by the invention, also has Such feature:I.e., to the subscriber unit of work system, pass through its two layers of purview structure of division of labor in profession and project Classification.
Further, a kind of cooperative operation system based on design, construction and O&M set provided by the invention, also has Such feature:I.e., in profession, user is classified as design building, design structure, performance evaluation, emulation roaming, constructs and builds Build, constructing structure, builder, cost person.
Further, a kind of cooperative operation system based on design, construction and O&M set provided by the invention, also has Such feature:I.e., in project, user is classified as design group, project team, design management person, construction management person, design warp Reason, construction manager.
Further, a kind of cooperative operation system based on design, construction and O&M set provided by the invention, also has Such feature:I.e., workflow is as follows:
S1:Design phase BIM design information model early period design setting model with construction stage BIM design information model after Phase design setting model is compared;
S2:Judge otherness, and carries out the list of different information;
S3:The adjustment of BIM design information models is carried out according to different information.
The function and effect of the present invention:
For this purpose, the present invention is directed to study two aspects:First, the engineering project three dimensional design based on BIM technology+construction association With the technology and methods of work;Second is that the Cooperative Work Technology and method and the management information system in entire process of construction are integrated On a platform.Engineering project information is made effectively to be integrated and be shared by way of internet+application.This grinds Study carefully achievement, the traditional mode that change is divided with engineering project according to the construction period.It will regard engineering project as one entirety, Information data and management platform can be combined, it is complete to final model to share to resource-sharing from shared information Information Number is transmitted and is recycled.The change that it will drive from traditional file administration to knowledge management innovation, engineering project Implementation management is promoted to a new height.
Description of the drawings
The model interworking flow that Fig. 1, the present embodiment are related to;
The schematic diagram for the collaborative platform that Fig. 2, the present embodiment are related to;
The functional schematic for the collaborative platform that Fig. 3, the present embodiment are related to.
Specific implementation mode
The core of collaboration platform is design+construction BIM model interoperabilities work, which is to be with master data information bank Basis, data exchange bus is trunk inside and outside enterprise, realizes the process management in engineering project each stage.
Design based on BIM technology+construction Cooperative Work Technology and technique study to the effect that reach two it is integrated: First, the process of construction model data of design+construction based on BIM technology is integrated;Second is that by design+construction cooperative operation system With integrating for Project Management Information System.Its target is " to establish unified engineering construction project informationization back-up environment, realization is set Meter, construction team cooperate ".
Design+construction collaborative work is mainly based upon BIM technology, by design, the data integration constructed in an informationization Under back-up environment, this has selected PW as basic collaboration platform.Need four aspect contents of research:First, designing+applying The technology of work collaborative work BIM model constructions;Second is that design+construction BIM model interoperability workflows;Third, design+construction association With the BIM model datas fabric study of work;Fourth, collaboration platform is studied.
By studying this four problems, collaboration work of the design and construction vertical industry chain based on BIM technology is mainly solved Make the consistency of environment, realizes that design, construction team cooperate.Including workflow reconstruction, data organization, information sharing, Platform Requirements, project implementation organizational structure.It is described separately below:
1. the technical research of design+construction collaborative work BIM model constructions
A it is collaboration work that) consistency of two stage BIM Modeling Platforms of design and construction and platform, which have IFC format conversions, The basic demand of work.
B) design phase BIM model constructions need to consider that construction stage some processes requirement, the in-depth of construction stage model need Meet the technology requirement of design phase model.
2. design+construction collaborative work BIM model interworking flow researchs
As shown in Figure 1, the collaborative work of design+construction is in addition to it will abide by respective workflow, it is thus necessary to determine that design with Interworking flow between Collaborative Work Model of constructing, this flow are clear as Construction Phase is from design to the construction stage The responsibility of design side and construction party application BIM in transfer process.
3. design+construction collaborative work BIM model datas fabric study
A) design phase BIM data organizations research
Need consider construction stage construction technology demand, as building how construction in layer, pel name classification refinement, Basic post-cast strip processing mode etc., these construction stages factor needed to be considered, will also consider in design phase model buildings, So that designing a model can reuse in construction stage next stage
B) construction stage BIM data organizations research
Construction stage data organization needs the data for considering subcontractor and construction general contracting unit other than construction data itself Data organization
C) design+construction collaborative work BIM model interaction datas fabric study
Design and construction BIM model datas interaction be by collaborative platform achievement deliver data organization in complete, Early period, design setting model will consider the construction modeling in later stage, and the construction in later stage modeling will be carried out on the basis of model early period, examine Consider the principle that front is designed, their workflow is a cycle interaction, when with BIM technology development design+construction It cooperates, the interaction of the design and construction BIM information of project is not original complete parttion, they are crossing operations, mutually It coordinates, the design of front needs to consider laggard process.
4. design+construction collaborative work BIM plateform systems research
1) collaboration platform needs the technical conditions met
A platforms should meet the BIM technology application in two stages of design and construction simultaneously, can extend or be extended to fortune in the future The dimension stage
B platforms should be as small with the used BIM basic softwares degree of association as possible, i.e., at least supports two or more the bases BIM Software
The C platforms have certain opening, can carry out secondary development
The D platforms have the case of architectural engineering operation
The E platforms from now on can be with other management system integrations of company
The F platforms can be disposed in cloud platform from now on
In current application under management level, which has in company's external network server to model data (model G Data than it is general management data and D CAD data it is big) transmission technical solution
The H platforms have higher cost performance
2) design+construction collaboration platform system function research
A permission researchs
Design+construction collaboration platform is one to be made in many ways for Construction Party, design side, construction party, BIM technology issuer Platform, and the design based on BIM technology+construction cooperates, BIM issuers are the cores in entire platform, he is building Under if side supports, coordinate other each side's BIM technology applications, is applied by BIM technology and create value for Construction Party.The item on platform Mesh determines the permission of each side member according to project organization framework and data organizational structure, this be guarantee project in collaborative platform just The necessary condition of normally opened exhibition.We take two layers of purview structure, are divided into and " are set according to the professional and special role etc. of user Meter building ", " design structure ", " performance evaluation ", " emulation roaming ", " construction building ", " constructing structure ", " builder ", " cost The different groups of member " etc. 25.On the other hand, in single project, it is divided into " design in the Role and Responsibility of project according to personnel 6 groups such as group ", " project team ", " design management person ", " construction management person ", " Design Manager ", " construction manager ".Then lead to It crosses and is superimposed this two layers permission and completes in single project, only project participant may have access to data, and only those skilled in the art can compile Collect the targets such as expert data.And this method is realized automatically by developing priority assignation software, with tradition according to specific one It is entirely different that permission, which is arranged, in a project participant directly in collaborative platform by hand, his efficiency improves tens times, and Human error will not be caused because being arranged by hand, ensure Information Security, specified the Role and Responsibility of participant.
B boilerplates
Collaboration platform is a workbench used directly to technology and administrative staff, therefore in order to improve work Efficiency and standardization are providing main profession the boilerplate required when carrying out BIM work, when convenient for BIM modelings on platform The transmission and utilization that can be carried out the work in a unified data environment with later data.
C drawing managements
Collaborative work based on BIM technology is all to carry out emulation collaboration under three-dimensional state, and go out icon in country at present In the case of accurate not yet change, two-dimentional drawing still needs figure.Picture frame, the title block of specification drawing are wanted in collaborative platform thus Equal drawings pattern.
D floor managers
Many shared informations are needed in collaborative work, and these shared informations needs are managed by platform, floor manager It is used for the management of the information such as absolute altitude, axis net.
E family of standards library
As shown in figure 3, carrying out BIM technology application in collaborative platform, the model library of a large amount of each professions, including general-purpose library are needed And private library, and these race libraries need to classify by profession and purposes in platform, are used convenient for technical staff, collaborative platform It needs to be compatible with these race libraries, and reference management can be carried out.

Claims (8)

1. a kind of cooperative operation system based on design, construction and O&M set, it is characterised in that:Including Construction Party's module, set Meter side's module, construction party module;
Wherein, Construction Party's module includes project construction basic material, project construction process material;
Design side's module includes Project design BIM design informations model, design BIM flows, design BIM delivery;
The construction party module includes project BIM construction informations model, construction BIM flows, the delivery of completion BIM models.
2. a kind of cooperative operation system based on design, construction and O&M set as described in claim 1, it is characterised in that:
The construction modeling system cycle ginseng of the design setting model of the design BIM design information models and construction BIM construction information models According to acquisition.
3. a kind of cooperative operation system based on design, construction and O&M set as claimed in claim 2, it is characterised in that:
Design setting model early period of the design BIM design information models will refer to the construction in later period of construction BIM construction information models It models to carry out;
The construction in later period modeling of the construction BIM construction information models will be built in design early period of design BIM design information models Carry out on the basis of mould.
4. a kind of cooperative operation system based on design, construction and O&M set as claimed in claim 3, it is characterised in that:
It is described design BIM design informations model and construct BIM construction information models between data interaction be by cooperate with put down In platform, completed in the data delivery of the delivery stage.
5. a kind of cooperative operation system based on design, construction and O&M set as described in claim 1, it is characterised in that:
To the subscriber unit of work system, pass through the classification of its two layers of purview structure of division of labor in profession and project.
6. a kind of cooperative operation system based on design, construction and O&M set as claimed in claim 5, it is characterised in that:
In profession, user is classified as design building, design structure, performance evaluation, emulation roaming, construction building, construction knot Structure, builder, cost person.
7. a kind of cooperative operation system based on design, construction and O&M set as claimed in claim 5, it is characterised in that:
In project, user is classified as design group, project team, design management person, construction management person, Design Manager, construction warp Reason.
8. a kind of cooperative operation system based on design, construction and O&M set as claimed in claim 2, it is characterised in that:
Workflow is as follows:
S1:Design setting model early period of design phase BIM design information model is set with later stage of construction stage BIM design information model Meter modeling is compared;
S2:Judge otherness, and carries out the list of different information;
S3:The adjustment of BIM design information models is carried out according to different information.
CN201810651291.9A 2018-06-22 2018-06-22 A kind of cooperative operation system based on design, construction and O&M set Pending CN108776875A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810651291.9A CN108776875A (en) 2018-06-22 2018-06-22 A kind of cooperative operation system based on design, construction and O&M set

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810651291.9A CN108776875A (en) 2018-06-22 2018-06-22 A kind of cooperative operation system based on design, construction and O&M set

Publications (1)

Publication Number Publication Date
CN108776875A true CN108776875A (en) 2018-11-09

Family

ID=64025386

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810651291.9A Pending CN108776875A (en) 2018-06-22 2018-06-22 A kind of cooperative operation system based on design, construction and O&M set

Country Status (1)

Country Link
CN (1) CN108776875A (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109918875A (en) * 2019-03-15 2019-06-21 中民筑友科技投资有限公司 Right management method, device, system and the storage medium of assembled design document
CN109977496A (en) * 2019-03-09 2019-07-05 佰模伝信息科技(厦门)有限公司 Efficient information exchange and the architectural engineering artwork integrated system and method to cooperate
CN110503387A (en) * 2019-07-29 2019-11-26 兰州容大信息科技有限公司 BIM model verification method and device during railway BIM project construction
CN110532663A (en) * 2019-08-24 2019-12-03 中铁四局集团第三建设有限公司 BIM-based collaborative modeling work standardization process
CN112669005A (en) * 2020-12-25 2021-04-16 中铁大桥局集团有限公司 Intelligent cooperative management system and method suitable for engineering project life cycle
CN112784340A (en) * 2021-01-28 2021-05-11 广联达科技股份有限公司 Conversion method and conversion device for construction Building Information Modeling (BIM)

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106203784A (en) * 2016-06-29 2016-12-07 江苏三棱智慧物联发展股份有限公司 A kind of wisdom building system based on BIM and management method thereof
CN106202697A (en) * 2016-07-07 2016-12-07 北京道亨时代科技有限公司 A kind of method and system being easy to do steel tower design comparison in difference
CN106202723A (en) * 2016-07-10 2016-12-07 北京工业大学 A kind of BIM subway work method
CN106951637A (en) * 2017-03-21 2017-07-14 中国电建集团河南工程公司 Middle low-pressure boiler small pipeline Secondary Design construction method based on BIM technology
CN107330212A (en) * 2017-07-11 2017-11-07 四川电力设计咨询有限责任公司 The careful method and system in the intelligent school of power plant Design of digital
CN107402001A (en) * 2017-06-30 2017-11-28 上海建工集团股份有限公司 Construction of super highrise building deviation digitlization checking system and method based on 3D scannings
CN107943844A (en) * 2016-10-25 2018-04-20 福建省建筑设计研究院有限公司 Project data based on BIM gathers in real time, processing system

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106203784A (en) * 2016-06-29 2016-12-07 江苏三棱智慧物联发展股份有限公司 A kind of wisdom building system based on BIM and management method thereof
CN106202697A (en) * 2016-07-07 2016-12-07 北京道亨时代科技有限公司 A kind of method and system being easy to do steel tower design comparison in difference
CN106202723A (en) * 2016-07-10 2016-12-07 北京工业大学 A kind of BIM subway work method
CN107943844A (en) * 2016-10-25 2018-04-20 福建省建筑设计研究院有限公司 Project data based on BIM gathers in real time, processing system
CN106951637A (en) * 2017-03-21 2017-07-14 中国电建集团河南工程公司 Middle low-pressure boiler small pipeline Secondary Design construction method based on BIM technology
CN107402001A (en) * 2017-06-30 2017-11-28 上海建工集团股份有限公司 Construction of super highrise building deviation digitlization checking system and method based on 3D scannings
CN107330212A (en) * 2017-07-11 2017-11-07 四川电力设计咨询有限责任公司 The careful method and system in the intelligent school of power plant Design of digital

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
刘维跃 等: "基于BIM云平台的协同设计管理研究", 《价值工程》 *

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109977496A (en) * 2019-03-09 2019-07-05 佰模伝信息科技(厦门)有限公司 Efficient information exchange and the architectural engineering artwork integrated system and method to cooperate
CN109918875A (en) * 2019-03-15 2019-06-21 中民筑友科技投资有限公司 Right management method, device, system and the storage medium of assembled design document
CN110503387A (en) * 2019-07-29 2019-11-26 兰州容大信息科技有限公司 BIM model verification method and device during railway BIM project construction
CN110532663A (en) * 2019-08-24 2019-12-03 中铁四局集团第三建设有限公司 BIM-based collaborative modeling work standardization process
CN112669005A (en) * 2020-12-25 2021-04-16 中铁大桥局集团有限公司 Intelligent cooperative management system and method suitable for engineering project life cycle
CN112669005B (en) * 2020-12-25 2024-03-05 中铁大桥局集团有限公司 Intelligent collaborative management system and method applicable to engineering project whole life cycle
CN112784340A (en) * 2021-01-28 2021-05-11 广联达科技股份有限公司 Conversion method and conversion device for construction Building Information Modeling (BIM)
CN112784340B (en) * 2021-01-28 2024-05-24 广联达科技股份有限公司 Conversion method and conversion device for construction BIM model

Similar Documents

Publication Publication Date Title
CN108776875A (en) A kind of cooperative operation system based on design, construction and O&M set
Vanlande et al. IFC and building lifecycle management
Oh et al. Integrated system for BIM-based collaborative design
Godager et al. The concept of enterprise BIM: Current research practice and future trends
Ramaji et al. Product-oriented information delivery framework for multistory modular building projects
Tanyer et al. Moving beyond the fourth dimension with an IFC-based single project database
Hauschild et al. Digital processes: planning, designing, production
Mattern et al. BIM-based modeling and management of design options at early planning phases
CN108846644A (en) A kind of integrated emulation technology, collaborative work, information management and project management managing and control system
Alattas et al. Mapping private, common, and exclusive common spaces in buildings from BIM/IFC to LADM. A case study from Saudi Arabia
Matipa et al. Assessing the impact of new rules of cost planning on BIM schema pertinent to quantity surveying practice
CN111223178B (en) Three-dimensional model application method and system for nuclear power engineering modularization construction
Lee et al. Concurrent material flow analysis by P3R-driven modeling and simulation in PLM
Fernandes Advantages and disadvantages of BIM platforms on construction site
CN115033380A (en) Building engineering intelligent integrated cloud platform based on BIM technology
Feng et al. The BIM-based information integration sphere for construction projects
Lei et al. Measurement of information loss and transfer impacts of technology systems in offsite construction processes
FALTEJSEK et al. Facility management and building information modeling during operation and maintenance
Mallasi et al. Registering space requirements of construction operations using site-PECASO model
Talipova et al. Perspectives of interactions CAD and GIS systems
Gotlib et al. Cartographical presentation of BIM models
Spagnolo Information integration for asset and maintenance management
Rönneblad Product models for concrete structures
Kriphal et al. Compatibility between design and construction building information models
Guo Rethinking construction project management using the VP-based manufacturing management model

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20181109