CN108768782A - A kind of automatic test approach and device of Communication Gateway - Google Patents
A kind of automatic test approach and device of Communication Gateway Download PDFInfo
- Publication number
- CN108768782A CN108768782A CN201810580943.4A CN201810580943A CN108768782A CN 108768782 A CN108768782 A CN 108768782A CN 201810580943 A CN201810580943 A CN 201810580943A CN 108768782 A CN108768782 A CN 108768782A
- Authority
- CN
- China
- Prior art keywords
- communication gateway
- server
- unit operation
- parameter
- operation parameter
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- H—ELECTRICITY
- H04—ELECTRIC COMMUNICATION TECHNIQUE
- H04L—TRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
- H04L43/00—Arrangements for monitoring or testing data switching networks
- H04L43/50—Testing arrangements
-
- H—ELECTRICITY
- H04—ELECTRIC COMMUNICATION TECHNIQUE
- H04L—TRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
- H04L43/00—Arrangements for monitoring or testing data switching networks
- H04L43/08—Monitoring or testing based on specific metrics, e.g. QoS, energy consumption or environmental parameters
- H04L43/0805—Monitoring or testing based on specific metrics, e.g. QoS, energy consumption or environmental parameters by checking availability
- H04L43/0817—Monitoring or testing based on specific metrics, e.g. QoS, energy consumption or environmental parameters by checking availability by checking functioning
Landscapes
- Engineering & Computer Science (AREA)
- Computer Networks & Wireless Communication (AREA)
- Signal Processing (AREA)
- Environmental & Geological Engineering (AREA)
- Data Exchanges In Wide-Area Networks (AREA)
Abstract
The invention discloses a kind of automatic test approach of Communication Gateway and devices.The automatic test approach includes:Unit operation parameter is set, server is issued to by Communication Gateway, the operating parameter that server receives is compared with setting unit operation parameter, and show comparison result.The testing efficiency of Communication Gateway greatly improved in the present invention, ensures the accuracy of parsing transmission data, while reducing labor intensity, improves work efficiency.
Description
Technical field
The present invention relates to detection technique field more particularly to the automatic test approach and device of a kind of Communication Gateway.
Background technology
Communication Gateway is a kind of gateway.Usually use Communication Gateway as unit and service in air-conditioning technical field
Connector between device, effect be parsing, send unit status data to access server, parsed by access server
After storage, client software is shown, and the monitor command of client is transmitted to host computer by access server
Group.Communication Gateway parsing set state data it is whether correct, and forwarding access server monitor command to unit whether
It is correctly a very important link for verifying Communication Gateway quality, to ensure the correct transmission of control data.
The method of existing test Communication Gateway is the operating status that tester adjusts unit manually, then is supervised by comparing
Control software compare client show unit state whether with the state consistency that adjusts manually, unanimously illustrate Communication Gateway parsing and
The status data for being sent to unit is correct.Still an alternative is that unit is controlled by client, if unit is correctly held
Row then illustrates that the monitor command of Communication Gateway forwarding access server is normal.Above method needs tester to adjust manually
The state that section set state and artificial contrast's monitoring software are shown with client, test labor intensity is high and efficiency is low.
Invention content
The purpose of the present invention is to propose to a kind of automatic test approach of Communication Gateway and devices.Method proposed by the present invention and
It is low that device solves the problems, such as that tester adjusts operating states of the units labor intensity height, efficiency manually.
The automatic test approach of Communication Gateway proposed by the present invention includes:Unit operation parameter is set, Communication Gateway is passed through
It is issued to server, the operating parameter that server receives is compared with setting unit operation parameter, and show comparison knot
Fruit.
In one embodiment, the method for the present invention includes the following steps:
Step 1. is by software set unit operation parameter and is saved in memory;
The unit operation parameter of setting is issued to server by step 2. by Communication Gateway;
Step 3. server receives the unit operation parameter issued and stores into database file;
Step 4. uploads the unit operation parameter that server receives by Communication Gateway, and is carried out with setting unit operation parameter
It compares.
In step 2, setting operating states of the units ginseng is issued from trend Communication Gateway according to the sequence of setting and time interval
Number.
The invention also includes step 5, client uploads the operating parameter of unit by server and Communication Gateway, and will be upper
The operating parameter of biography is compared with setting operating parameter.
The present invention also proposes a kind of automatic testing equipment of Communication Gateway, including:
Host computer, including setup module and memory, the setup module are used to set the operating parameter of unit;Communication Gateway,
For the communication between host computer and server;
Server, for being parsed and being preserved to access information;
And client, the operating parameter for being parsed according to server test unit, and test parameter is passed through into service
Device and Communication Gateway are uploaded to host computer;
The host computer further includes comparing module, the unit operation parameter for uploading Communication Gateway and setting unit operation ginseng
Number is compared.
The beneficial effects of the invention are as follows:The testing efficiency of Communication Gateway greatly improved, ensure the standard of parsing transmission data
True property, while labor intensity is reduced, it improves work efficiency.
Description of the drawings
Fig. 1 is the schematic diagram of apparatus of the present invention.
Fig. 2 is the flow chart of the method for the present invention.
Specific implementation mode
Invention is described in detail with reference to the accompanying drawings and examples.
As shown in Figure 1, the automatic testing equipment of Communication Gateway proposed by the present invention includes:Host computer, Communication Gateway, service
Device and client.
Host computer includes setup module, memory and comparing module.Setup module is used to set the operating parameter of unit.If
The data splitting of all operating statuses of unit can be simulated by software by setting module, and is saved in memory.Upper computer software
The operating status for issuing unit automatically according to the sequence of setting and time interval simulates the communication succession of unit, sends setting
Operating states of the units data are to Communication Gateway.Upper computer software further includes that forwarding client is uploaded by server and Communication Gateway
Operation data to comparing module.
Upper computer software can be based on LabVIEW platform and ucosii platform developments.
All operating statuses of unit are set automatically by upper computer software, and are preserved in memory, solve tradition
Test tester adjusts that operating states of the units efficiency is low manually, the big problem of labor intensity.
Communication Gateway, for the communication between host computer and server.When the unit operation parameter of host computer setting issues,
Communication Gateway monitored data, parsing, caching are sent to server later, the operating states of the units of setting after server parsing
It stores in database file.
Client is read and data, and the operation shape of real-time display unit is arranged in the operation of resolution server database file
State.Meanwhile the operating status of unit can be arranged in client, and the instruction of control state parameter is sent to server, and pass through
Communication Gateway is uploaded to the comparing module in host computer, the operation of operation data and setting that comparing module uploads Communication Gateway
Data are compared, and when the two is consistent, judge that the data of Communication Gateway and resolution server parsing are correct.
As shown in Fig. 2, the automatic test approach of Communication Gateway proposed by the present invention specifically includes following steps:
Step 1. is by software set unit operation parameter and is saved in memory;
The unit operation parameter of setting is issued to server by step 2. by Communication Gateway;It can be timely according to the sequence of setting
Between interval from trend Communication Gateway issue setting operating states of the units parameter;
Step 3. server receives the unit operation parameter issued and stores into database file;
Step 4. uploads the unit operation parameter that server receives by Communication Gateway, and is carried out with setting unit operation parameter
It compares.
The method of the present invention can also include step 5, and client uploads the operation control of unit by server and Communication Gateway
Parameter processed, and the operation of the client setting unit for the operational parameter control and server storage that gateway upload client is arranged
Control parameter is compared.
Method and apparatus proposed by the present invention compare resolution server database automatically by upper computer software contrast module
The data of middle reception and the setting set state data in host computer memory, and comparison report is exported, solve traditional test
Artificial contrast's monitoring software is low with the set state efficiency that client is shown, the big problem of labor intensity.
Above-described embodiment is merely to illustrate the specific implementation mode of the present invention.It should be pointed out that for the general of this field
For logical technical staff, without departing from the inventive concept of the premise, several deformations and variation can also be made, these deformations and
Variation should all belong to the scope of protection of the present invention.
Claims (5)
1. a kind of automatic test approach of Communication Gateway, which is characterized in that including:Unit operation parameter is set, communication network is passed through
Pass is issued to server, the operating parameter that server receives is compared with setting unit operation parameter, and show comparison
As a result.
2. the method as described in claim 1, which is characterized in that include the following steps:
Step 1. is by software set unit operation parameter and is saved in memory;
The unit operation parameter of setting is issued to server by step 2. by Communication Gateway;
Step 3. server receives the unit operation parameter issued and stores into database file;
Step 4. uploads the unit operation parameter that server receives by Communication Gateway, and is carried out with setting unit operation parameter
It compares.
3. method as claimed in claim 2, which is characterized in that further include step 5, client passes through server and Communication Gateway
The operating parameter of unit is uploaded, and the operating parameter of upload is compared with setting operating parameter.
4. method as claimed in claim 2, which is characterized in that in step 2, according to the sequence of setting and time interval from trend
Communication Gateway issues setting unit operation parameter.
5. a kind of automatic testing equipment of Communication Gateway, which is characterized in that including:
Host computer, including setup module and memory, the setup module are used to set the operating parameter of unit;Communication Gateway,
For the communication between host computer and server;
Server, for being parsed and being preserved to access information;
And client, the operating parameter for being parsed according to server test unit, and test parameter is passed through into service
Device and Communication Gateway are uploaded to host computer;
The host computer further includes comparing module, the unit operation parameter for uploading Communication Gateway and setting unit operation ginseng
Number is compared.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810580943.4A CN108768782A (en) | 2018-06-07 | 2018-06-07 | A kind of automatic test approach and device of Communication Gateway |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810580943.4A CN108768782A (en) | 2018-06-07 | 2018-06-07 | A kind of automatic test approach and device of Communication Gateway |
Publications (1)
Publication Number | Publication Date |
---|---|
CN108768782A true CN108768782A (en) | 2018-11-06 |
Family
ID=64000413
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201810580943.4A Pending CN108768782A (en) | 2018-06-07 | 2018-06-07 | A kind of automatic test approach and device of Communication Gateway |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN108768782A (en) |
Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103388882A (en) * | 2013-07-19 | 2013-11-13 | 上海东大自动化工程有限公司 | Data acquisition processing system of air conditioning unit |
US20140081465A1 (en) * | 2012-09-15 | 2014-03-20 | Honeywell International Inc. | Remote access gateway configurable control system |
CN107483283A (en) * | 2017-06-28 | 2017-12-15 | 珠海格力电器股份有限公司 | Communicate method for testing reliability and device |
-
2018
- 2018-06-07 CN CN201810580943.4A patent/CN108768782A/en active Pending
Patent Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20140081465A1 (en) * | 2012-09-15 | 2014-03-20 | Honeywell International Inc. | Remote access gateway configurable control system |
CN103388882A (en) * | 2013-07-19 | 2013-11-13 | 上海东大自动化工程有限公司 | Data acquisition processing system of air conditioning unit |
CN107483283A (en) * | 2017-06-28 | 2017-12-15 | 珠海格力电器股份有限公司 | Communicate method for testing reliability and device |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
WO2016019662A1 (en) | Closed loop test system for monitoring host of intelligent substation and test method therefor | |
CN104850495A (en) | Automatic detection method and device | |
CN103916283B (en) | Server stress test system and method | |
CN108923953A (en) | A kind of virtual main station system of power remote machine debugging | |
CN109462490B (en) | Video monitoring system and fault analysis method | |
CN110991037A (en) | Intelligent substation test simulation system based on SCD | |
CN111046543A (en) | Intelligent substation test simulation method | |
CN110430215A (en) | A kind of robot communication control method | |
CN108768782A (en) | A kind of automatic test approach and device of Communication Gateway | |
CN104678292B (en) | A kind of complex programmable logic device (CPLD) test method and device | |
CN103475531A (en) | Abnormity processing method, automatic inspection console and knowledge base system | |
CN110040475B (en) | Quality monitoring system and method for current transformer test assembly line | |
CN108052455A (en) | A kind of software testing system and its test method | |
CN107105037A (en) | A kind of distributed video CDN resource management systems and method based on file verification | |
CN101414737A (en) | Control method and system for track traffic electric power data acquisition and surveillance | |
CN103544104A (en) | Testing method for power distribution terminal remote control functional software module | |
KR102283874B1 (en) | Automatic testing machine for Automatic Block System | |
CN201859341U (en) | Remote control device for probe station | |
TWI742999B (en) | Apparatus, system, method and computer-readable medium for networking device data missing analysis and supplement | |
CN109193616A (en) | A kind of substation's telecontrol information distribution acceptance method and system | |
CN104113873A (en) | Automatic test system and device for GPRS module internally arranged in power distribution terminal | |
CN103855800A (en) | Power network device state monitoring and diagnostic system | |
CN108121303A (en) | A kind of log recording method applied to manufacturing equipment statistical analysis process | |
CN112132819A (en) | Communication network management monitoring method based on artificial intelligence | |
CN105808393A (en) | Intelligent remote debugging system |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20181106 |