CN108767858A - Broken emergency processing method and system outside transmission line of electricity based on GIS platform - Google Patents

Broken emergency processing method and system outside transmission line of electricity based on GIS platform Download PDF

Info

Publication number
CN108767858A
CN108767858A CN201810718337.4A CN201810718337A CN108767858A CN 108767858 A CN108767858 A CN 108767858A CN 201810718337 A CN201810718337 A CN 201810718337A CN 108767858 A CN108767858 A CN 108767858A
Authority
CN
China
Prior art keywords
transmission line
electricity
broken
outside
processing
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201810718337.4A
Other languages
Chinese (zh)
Other versions
CN108767858B (en
Inventor
陆佳政
罗晶
方针
章国勇
何立夫
李勤朴
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Corp of China SGCC
State Grid Hunan Electric Power Co Ltd
Disaster Prevention and Mitigation Center of State Grid Hunan Electric Power Co Ltd
Original Assignee
State Grid Corp of China SGCC
State Grid Hunan Electric Power Co Ltd
Disaster Prevention and Mitigation Center of State Grid Hunan Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Corp of China SGCC, State Grid Hunan Electric Power Co Ltd, Disaster Prevention and Mitigation Center of State Grid Hunan Electric Power Co Ltd filed Critical State Grid Corp of China SGCC
Priority to CN201810718337.4A priority Critical patent/CN108767858B/en
Publication of CN108767858A publication Critical patent/CN108767858A/en
Application granted granted Critical
Publication of CN108767858B publication Critical patent/CN108767858B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J3/00Circuit arrangements for ac mains or ac distribution networks
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02GINSTALLATION OF ELECTRIC CABLES OR LINES, OR OF COMBINED OPTICAL AND ELECTRIC CABLES OR LINES
    • H02G1/00Methods or apparatus specially adapted for installing, maintaining, repairing or dismantling electric cables or lines
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J3/00Circuit arrangements for ac mains or ac distribution networks
    • H02J3/001Methods to deal with contingencies, e.g. abnormalities, faults or failures

Landscapes

  • Engineering & Computer Science (AREA)
  • Power Engineering (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)
  • Alarm Systems (AREA)

Abstract

The invention discloses emergency processing method broken outside a kind of transmission line of electricity based on GIS platform and systems, including:After entering corresponding defence state because breaking warning outside transmission line of electricity, extraction warning element information is sent to distribution platform;According to the corresponding processing prediction scheme and departmental staff's information of storage, processing prediction scheme branch is disassembled and the processing work after dismantling is distributed into qualified corresponding departmental staff in corresponding region or adjacent domain by the duty and authority of department;Receiving department personnel compare according to processing feedback information and processing prediction scheme to the processing feedback information of corresponding processing work, preferably go out the processing work of next step and distribute to corresponding departmental staff.Emergency command timeliness of the present invention is high so that the processing broken outside transmission line of electricity after life is quickly timely;It is highly practical, it is easy to operate.

Description

Broken emergency processing method and system outside transmission line of electricity based on GIS platform
Technical field
The present invention relates to power transmission network emergency processing fields, more particularly to one kind being based on GIS (Geographic Information System or Geo-Information system, GIS-Geographic Information System) platform transmission line of electricity outside it is broken Emergency processing method and system.
Background technology
As ecological environmental protection dynamics increases, fundamental construction investment scale increases and Urbanization Construction degree of progress speed, soil The vegetative coverage area on ground constantly increases and construction operation quantity increases and is distributed face expansion, in overhead power transmission line passage Tree bamboo, mountain fire, construction machinery " three is big " external hidden danger significantly rise, and thus lead to the ratio of broken tripping outside overhead transmission line not It is disconnected to increase, and most of outer broken trippings directly contribute line fault stoppage in transit.Set bamboo, mountain fire, construction machinery " three is big " external hidden danger Caused by outer broken event, it has also become seriously threaten the principal element of overhead transmission line safe and stable operation.
Currently, overhead transmission line external force damage prevention relies primarily on, manual patrol, scene object on duty and simple are anti-, and strick precaution mode is thick It puts, technological means falls behind, and puts into a large amount of manpower and materials every year, but still event takes place frequently, is impossible to guard against, producing little effect.It adopts the country Some external force damage prevention technical precaution devices, are also only limitted to several simple types such as video surveillance, infrared monitoring, sound-light alarm, can only Realize local site monitoring and the passive preventing function alarmed of event, and have a single function mostly, data transmission is unsmooth, information Lack and shares, cannot take precautions against in advance.
Invention content
The emergency processing method and system broken outside present invention aims at a kind of transmission line of electricity based on GIS platform of offer, To solve the skill that existing external force damage prevention technical precaution apparatus function is single, data transmission is unsmooth, poor information is shared, cannot take precautions against in advance Art problem.
To achieve the above object, the present invention provides emergency processing sides broken outside a kind of transmission line of electricity based on GIS platform Method includes the following steps:
S1:After entering corresponding defence state because breaking warning outside transmission line of electricity, extraction warning element information hair It send to distribution platform;Warning element information includes the region broken outside transmission line of electricity;
S2:According to the corresponding processing prediction scheme and departmental staff's information of storage, simultaneously by the dismantling of processing prediction scheme branch Processing work after dismantling is distributed into qualified correspondence in corresponding region or adjacent domain by the duty and authority of department Departmental staff;
S3:Receiving department personnel according to processing feedback information and handle the processing feedback information of corresponding processing work Prediction scheme compares, and preferably goes out the processing work of next step and distributes to corresponding departmental staff.
Further improvements in methods as the present invention:
After the completion of step S3, method further includes:
S4:The processing work and processing feedback information for storing each step, count taking and losing for this processing procedure, It is compared, is revised when this processing is optimal case optimal with the time-consuming and loss of the corresponding processing prediction scheme of storage The corresponding processing prediction scheme of choosing.
The most preferred corresponding processing prediction scheme of revision, including the most preferred corresponding processing prediction scheme of revision are whole Body or part.
In step S2, when the processing work after dismantling is distributed to corresponding departmental staff, also to departmental staff send and Show developing state information broken outside transmission line of electricity.
Because of broken warning outside transmission line of electricity, including broken alarm outside early warning and transmission line of electricity is broken outside transmission line of electricity.
Broken early warning, is realized by following steps outside transmission line of electricity:
According to broken data, construction site statistical information, live vegetation information outside the history of the geographic area from GIS platform With tree bamboo categorical data, broken district occurred frequently outside following 3~7 days transmission lines of electricity is calculated in conjunction with Weather Forecast Information and traditional solar term Domain generates broken early warning outside the transmission line of electricity of corresponding region.
Broken alarm, is realized by following steps outside transmission line of electricity:From satellite monitoring, unmanned plane monitoring and or Online Video Broken alarm outside the transmission line of electricity of acquisition is monitored, and police is broken outside the transmission line of electricity manually acquired received by handheld terminal Feelings generate broken alarm outside the transmission line of electricity of corresponding region.
Qualified corresponding departmental staff in corresponding region or adjacent domain is according to area broken outside transmission line of electricity Domain, screen corresponding region or electric power line pole tower in adjacent domain and conducting wire coordinate information, emergency personnel's information and Simultaneously overall merit obtains GPS information where disposition equipment.
The technical concept total as one is answered the present invention also provides broken outside a kind of transmission line of electricity based on GIS platform Anxious processing system, including memory, processor and storage are on a memory and the computer program that can run on a processor, The step of processor realizes any of the above-described method when executing computer program.
The invention has the advantages that:
Broken emergency processing method outside the transmission line of electricity based on GIS platform of the present invention, can be broken outside transmission line of electricity to occurring The method that command scheduling afterwards provides scientific order, emergency command timeliness are high so that the processing after life is broken outside transmission line of electricity Quickly in time;It is highly practical, it is easy to operate.Record and newer processing prediction scheme formulate outer broken prevention to transmission line of electricity operations staff There is directive significance, plays an important role to safeguarding the safety and stability of power grid and mitigating casualty loss.
Other than objects, features and advantages described above, the present invention also has other objects, features and advantages. Below with reference to accompanying drawings, the present invention is described in further detail.
Description of the drawings
The attached drawing constituted part of this application is used to provide further understanding of the present invention, schematic reality of the invention Example and its explanation are applied for explaining the present invention, is not constituted improper limitations of the present invention.In the accompanying drawings:
Fig. 1 is the flow diagram of emergency processing method broken outside the transmission line of electricity based on GIS platform of the present invention.
Specific implementation mode
The embodiment of the present invention is described in detail below in conjunction with attached drawing, but the present invention can be defined by the claims Implement with the multitude of different ways of covering.
Broken emergency processing method, includes the following steps outside the transmission line of electricity based on GIS platform of the present invention:
S1:After entering corresponding defence state because breaking warning outside transmission line of electricity, extraction warning element information hair It send to distribution platform;Warning element information includes the region broken outside transmission line of electricity;
S2:According to the corresponding processing prediction scheme and departmental staff's information of storage, simultaneously by the dismantling of processing prediction scheme branch Processing work after dismantling is distributed into qualified correspondence in corresponding region or adjacent domain by the duty and authority of department Departmental staff;
S3:Receiving department personnel according to processing feedback information and handle the processing feedback information of corresponding processing work Prediction scheme compares, and preferably goes out the processing work of next step and distributes to corresponding departmental staff.
Above-mentioned steps, the method that scientific order can be provided to the command scheduling after being broken outside transmission line of electricity occurs, emergency command Timeliness is high so that the processing broken outside transmission line of electricity after life is quickly timely;It is highly practical, it is easy to operate.It records and newer Processing prediction scheme formulates outer broken prevention to transmission line of electricity operations staff directive significance, to safeguarding the safety and stability of power grid and mitigating calamity Evil loss plays an important role.
Embodiment 1:
Broken emergency processing method, includes the following steps outside the transmission line of electricity based on GIS platform of the present invention:
S1:After entering corresponding defence state because breaking warning outside transmission line of electricity, extraction warning element information hair It send to distribution platform;Warning element information includes the region broken outside transmission line of electricity.Wherein, because of broken warning outside transmission line of electricity, including Outside transmission line of electricity alarm is broken outside broken early warning and transmission line of electricity.
A. broken early warning outside transmission line of electricity, is realized by following steps:
According to broken data, construction site statistical information, live vegetation information outside the history of the geographic area from GIS platform With tree bamboo categorical data, broken district occurred frequently outside following 3~7 days transmission lines of electricity is calculated in conjunction with Weather Forecast Information and traditional solar term Domain generates broken early warning outside the transmission line of electricity of corresponding region.
B. broken alarm outside transmission line of electricity, is realized by following steps:From satellite monitoring, unmanned plane monitoring and or regard online Alarm is broken outside the transmission line of electricity of frequency monitoring acquisition, and breaks police outside the transmission line of electricity manually acquired received by handheld terminal Feelings generate broken alarm outside the transmission line of electricity of corresponding region.
S2:According to the corresponding processing prediction scheme and departmental staff's information of storage, simultaneously by the dismantling of processing prediction scheme branch Processing work after dismantling is distributed into qualified correspondence in corresponding region or adjacent domain by the duty and authority of department Departmental staff, also to departmental staff send and show transmission line of electricity outside break developing state information.Corresponding region is neighbouring Qualified corresponding departmental staff in region is to screen corresponding region or neighbouring according to region broken outside transmission line of electricity GPS information where electric power line pole tower and conducting wire coordinate information, emergency personnel's information and disposition equipment in region is simultaneously comprehensive Evaluation is closed to obtain.
S3:Receiving department personnel according to processing feedback information and handle the processing feedback information of corresponding processing work Prediction scheme compares, and preferably goes out the processing work of next step and distributes to corresponding departmental staff.
S4:The processing work and processing feedback information for storing each step, count taking and losing for this processing procedure, It is compared, is revised when this processing is optimal case optimal with the time-consuming and loss of the corresponding processing prediction scheme of storage The corresponding processing prediction scheme of choosing.The most preferred corresponding processing prediction scheme of revision, including revision are most preferably corresponding etc. The processing prediction scheme of grade entirely or partially, that is, updates all or part of processing work.
Embodiment 2:
Broken emergency processing method, includes the following steps outside the transmission line of electricity based on GIS platform of the present invention:
(1) broken forecast outside transmission line of electricity.Break the data such as data, construction site statistics, tree bamboo type outside according to history, in conjunction with The transmission line of electricity of meteorological prognostics information, 3~7 days Element forecasts futures such as live vegetation information, solar term breaks region occurred frequently outside, Forecast (broken early warning outside transmission line of electricity) is automatically generated, to notify site disposal unit, personnel to be ready.
(2) broken data collection outside transmission line of electricity.From satellite monitoring, unmanned plane monitoring, Online Video monitoring, handheld terminal etc. Broken situation outside a variety of method acquisition transmission lines of electricity generates broken alarm outside transmission line of electricity, so that emergency preplan runs transmission line of electricity Safeguard that unit, personnel are alarmed.
(3) broken information analysis outside transmission line of electricity.The outer breakpoint information collected according to step (2), in conjunction with transmission line of electricity bar Tower, conducting wire coordinate information, emergency personnel's information, disposition equipment GPS information, intuitively obtain breaking life outside based on GIS platform Point position, with personnel, the situation of equipment.Broken analysis outside transmission line of electricity is carried out in conjunction with the processing prediction scheme of storage, is quickly formed Personnel, the outer broken method of disposal of equipment fielding mode and scene.
(4) the outer tear of transmission line of electricity sets process analysis procedure analysis procreation.According to the disposal method of step (3), existing disposal personnel utilizes Site disposal process is sent to command centre in real time and is analyzed and developed procreation by the equipment such as terminal monitoring equipment, unmanned plane, The optimal disposal options in the scene of being obtained in real time in conjunction with prediction scheme, arrange corresponding personnel's substep disposing task.
(5) broken emergency preplan revision outside transmission line of electricity.After completion (1), (2), (3), (4) step, according to transmission line of electricity Outside the case where broken emergency disposal process, the revision of emergency preplan is carried out.
Embodiment 3:
The present invention also provides broken emergent treatment system outside a kind of transmission line of electricity based on GIS platform, including memory, Processor and storage on a memory and the computer program that can run on a processor, when processor execution computer program The step of realizing any of the above-described method.
When occurring to break early warning, alarm outside transmission line of electricity, into the defence state of certain grade, system carries to be taken the present invention automatically Information needed element releases news, and has the function of human assistance publication and issues automatically, and can track and record each department Preparation;Commanding provides commander's reference information, and can be directly in transmission line of electricity according to all kinds of outer broken data being collected into Task is distributed according to prediction scheme during tear is set outside corridor, realizes the function of prediction scheme commander;System can be drilled by prediction scheme, and prediction is defeated Broken developing state outside electric line;Outside circuit after broken disposal process, broken emergency preplan model dynamic is revised outside transmission line of electricity And maintenance.
In summary, the present invention is high by emergency command timeliness so that the processing broken outside transmission line of electricity after life is quick In time, it avoids event from expanding, reduces economic loss and the expense of repair disposition.
The foregoing is only a preferred embodiment of the present invention, is not intended to restrict the invention, for the skill of this field For art personnel, the invention may be variously modified and varied.All within the spirits and principles of the present invention, any made by repair Change, equivalent replacement, improvement etc., should all be included in the protection scope of the present invention.

Claims (9)

1. broken emergency processing method outside a kind of transmission line of electricity based on GIS platform, which is characterized in that include the following steps:
S1:After entering corresponding defence state because breaking warning outside transmission line of electricity, extraction warning element information is sent to Distribution platform;The warning element information includes the region broken outside transmission line of electricity;
S2:According to the corresponding processing prediction scheme and departmental staff's information of storage, processing prediction scheme branch is disassembled and will be torn open Processing work after solution distributes to qualified corresponding portion in corresponding region or adjacent domain by the duty and authority of department Door personnel;
S3:Receiving department personnel according to the processing feedback information and handle the processing feedback information of corresponding processing work Prediction scheme compares, and preferably goes out the processing work of next step and distributes to corresponding departmental staff.
2. broken emergency processing method outside the transmission line of electricity according to claim 1 based on GIS platform, which is characterized in that After the completion of the step S3, the method further includes:
S4:The processing work and processing feedback information for storing each step, count this processing procedure take and loss, and deposit The time-consuming and loss of the corresponding processing prediction scheme of storage is compared, and when this processing is optimal case, revision is most preferred Corresponding processing prediction scheme.
3. broken emergency processing method outside the transmission line of electricity according to claim 2 based on GIS platform, which is characterized in that The most preferred corresponding processing prediction scheme of revision, including the entirety of the most preferred corresponding processing prediction scheme of revision or Person part.
4. broken emergency processing method outside the transmission line of electricity according to claim 1 based on GIS platform, which is characterized in that
In the step S2, when the processing work after dismantling is distributed to corresponding departmental staff, also sent out to the departmental staff Send and show developing state information broken outside transmission line of electricity.
5. broken emergency processing method outside the transmission line of electricity according to claim 1 based on GIS platform, which is characterized in that It is described to be warned because broken outside transmission line of electricity, including broken outside early warning and transmission line of electricity alert is broken outside transmission line of electricity.
6. broken emergency processing method outside the transmission line of electricity according to claim 5 based on GIS platform, which is characterized in that Broken early warning, is realized by following steps outside the transmission line of electricity:
According to broken data, construction site statistical information, live vegetation information and tree outside the history of the geographic area from GIS platform Bamboo categorical data calculates in conjunction with Weather Forecast Information and traditional solar term and breaks region occurred frequently outside following 3~7 days transmission lines of electricity, raw At broken early warning outside the transmission line of electricity of corresponding region.
7. broken emergency processing method outside the transmission line of electricity according to claim 5 based on GIS platform, which is characterized in that
Broken alarm, is realized by following steps outside the transmission line of electricity:From satellite monitoring, unmanned plane monitoring and or Online Video Broken alarm outside the transmission line of electricity of acquisition is monitored, and police is broken outside the transmission line of electricity manually acquired received by handheld terminal Feelings generate broken alarm outside the transmission line of electricity of corresponding region.
8. broken emergency processing method outside the transmission line of electricity according to any one of claim 1 to 7 based on GIS platform, It is characterized in that,
Qualified corresponding departmental staff in the corresponding region or adjacent domain is according to area broken outside transmission line of electricity Domain, screen corresponding region or electric power line pole tower in adjacent domain and conducting wire coordinate information, emergency personnel's information and Simultaneously overall merit obtains GPS information where disposition equipment.
9. broken emergent treatment system outside a kind of transmission line of electricity based on GIS platform, including memory, processor and it is stored in On memory and the computer program that can run on a processor, which is characterized in that the processor executes the computer journey The step of any the method for the claims 1 to 8 is realized when sequence.
CN201810718337.4A 2018-07-03 2018-07-03 GIS platform-based emergency processing method and system for transmission line external damage Active CN108767858B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810718337.4A CN108767858B (en) 2018-07-03 2018-07-03 GIS platform-based emergency processing method and system for transmission line external damage

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810718337.4A CN108767858B (en) 2018-07-03 2018-07-03 GIS platform-based emergency processing method and system for transmission line external damage

Publications (2)

Publication Number Publication Date
CN108767858A true CN108767858A (en) 2018-11-06
CN108767858B CN108767858B (en) 2022-04-22

Family

ID=63976010

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810718337.4A Active CN108767858B (en) 2018-07-03 2018-07-03 GIS platform-based emergency processing method and system for transmission line external damage

Country Status (1)

Country Link
CN (1) CN108767858B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112150773A (en) * 2020-08-14 2020-12-29 国网安徽省电力有限公司 Electric power facility external damage hidden danger supervision method and system

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105005827A (en) * 2015-07-28 2015-10-28 济南创智电气科技有限公司 Emergency response warning method based on electricity emergency
CN105069558A (en) * 2015-07-28 2015-11-18 江苏励维逊电气科技有限公司 Warning and analyzing method for power facility damage based on meteorological data
CN108092836A (en) * 2016-11-21 2018-05-29 深圳市蓝希领地科技有限公司 The monitoring method and device of a kind of server
CN108197735A (en) * 2017-12-28 2018-06-22 青岛图环视信息技术有限公司 A kind of City Emergency Linkage Control System command methods and system

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105005827A (en) * 2015-07-28 2015-10-28 济南创智电气科技有限公司 Emergency response warning method based on electricity emergency
CN105069558A (en) * 2015-07-28 2015-11-18 江苏励维逊电气科技有限公司 Warning and analyzing method for power facility damage based on meteorological data
CN108092836A (en) * 2016-11-21 2018-05-29 深圳市蓝希领地科技有限公司 The monitoring method and device of a kind of server
CN108197735A (en) * 2017-12-28 2018-06-22 青岛图环视信息技术有限公司 A kind of City Emergency Linkage Control System command methods and system

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112150773A (en) * 2020-08-14 2020-12-29 国网安徽省电力有限公司 Electric power facility external damage hidden danger supervision method and system

Also Published As

Publication number Publication date
CN108767858B (en) 2022-04-22

Similar Documents

Publication Publication Date Title
CN107092222B (en) Based on the integrated power grid regulation operational administrative system of anti-error check analysis
CN108805441A (en) power emergency command system
CN106655522B (en) A kind of main station system suitable for electric grid secondary equipment operation management
CN103970098B (en) Intelligent substation auxiliary system comprehensive monitoring platform
CN107786640A (en) A kind of city intelligent manhole cover system and management method
CN104574835B (en) A kind of power network disaster monitoring and early warning system and method based on GIS
CN207397051U (en) A kind of intelligent distribution network integrates auxiliary system
CN110652684A (en) Electric fire safety integrated management system
CN103151771A (en) Monitoring system and method for operation of power transmission network
CN104699057A (en) Intelligent control system for substation facilities
CN103383744A (en) Method and system for public network meteorological data application to power grid disaster prevention and reduction
CN108389008A (en) Power distribution network resource management system
Baranovic et al. Experiences from intelligent alarm processing and decision support tools in smart grid transmission control centers
CN201741234U (en) City fire-fighting remote monitoring management system
CN106845780A (en) A kind of generating set operating condition analysis system and its analysis method
CN109613861A (en) A kind of public safety safeguard alarm system based on smart city
CN106651071A (en) Emergency processing method used for electric power emergency
Zhou et al. Studies on big data mining techniques in wildfire prevention for power system
CN113162233A (en) Auxiliary equipment monitoring system for third-generation intelligent substation
CN108767858A (en) Broken emergency processing method and system outside transmission line of electricity based on GIS platform
CN108921755A (en) The outer broken management-control method and system of transmission line of electricity precaution by persons, equipment and techniques
CN112163765A (en) Building site integrated management system
CN205179109U (en) Shield tunnel construction numeral management platform that becomes more meticulous based on thing networking
CN117081917A (en) Intelligent gateway based on AI (advanced technology attachment) internet of things sewage treatment operation and maintenance management
CN115102161B (en) Emergency analysis and treatment method for natural disasters based on electric power

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant