CN108766303A - A kind of construction site operation progress display plate - Google Patents
A kind of construction site operation progress display plate Download PDFInfo
- Publication number
- CN108766303A CN108766303A CN201810794503.9A CN201810794503A CN108766303A CN 108766303 A CN108766303 A CN 108766303A CN 201810794503 A CN201810794503 A CN 201810794503A CN 108766303 A CN108766303 A CN 108766303A
- Authority
- CN
- China
- Prior art keywords
- fixedly connected
- slip pipe
- pedestal
- cavity
- sliding groove
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Withdrawn
Links
Classifications
-
- G—PHYSICS
- G09—EDUCATION; CRYPTOGRAPHY; DISPLAY; ADVERTISING; SEALS
- G09F—DISPLAYING; ADVERTISING; SIGNS; LABELS OR NAME-PLATES; SEALS
- G09F15/00—Boards, hoardings, pillars, or like structures for notices, placards, posters, or the like
-
- G—PHYSICS
- G09—EDUCATION; CRYPTOGRAPHY; DISPLAY; ADVERTISING; SEALS
- G09F—DISPLAYING; ADVERTISING; SIGNS; LABELS OR NAME-PLATES; SEALS
- G09F15/00—Boards, hoardings, pillars, or like structures for notices, placards, posters, or the like
- G09F15/0006—Boards, hoardings, pillars, or like structures for notices, placards, posters, or the like planar structures comprising one or more panels
Landscapes
- Physics & Mathematics (AREA)
- General Physics & Mathematics (AREA)
- Engineering & Computer Science (AREA)
- Theoretical Computer Science (AREA)
- Conveying And Assembling Of Building Elements In Situ (AREA)
Abstract
The invention discloses a kind of construction site operation progress display plates, including pedestal, the upper surface of the pedestal offers symmetrical the first sliding groove, the first sliding groove is internally provided with slip pipe, the internal sleeve of slip pipe is equipped with slide bar, the both ends of slide bar are fixedly connected with the madial wall of the first sliding groove, the outer surface of slide bar is wound with the first brute spring, first brute spring is fixedly connected close to one end of slip pipe with the outer surface of slip pipe, the one end of first brute spring far from slip pipe is fixedly connected with the madial wall of the first sliding groove, the upper surface of slip pipe is fixedly connected with support column, support column one side close to each other offers second sliding slot, the top of pedestal is equipped with support plate.Construction site operation progress display plate, the buffering that can effectively increase device horizontal direction hit effect, and damage, the buffering that can effectively increase device vertical direction hit effect, extend the service life of device caused by device when reduction collides.
Description
Technical field
The present invention relates to technical field of buildings, specially a kind of construction site operation progress display plate.
Background technology
Gantt chart, that is, construction organization carries out according to plan, it is that unit in charge of construction applies the decorative engineering that will be gone into operation
The standby basic fundamental file of working drawing is to determine the arrangement of economical rationality according to the requirement of decorative engineering project under construction.
Site operation progress display plate is capable of the construction speed of intuitive display scene, and display board can not be effective at this stage
When realizing the timely replacement to display board, while colliding, the damage of display board is caused, is unfavorable for display board at the construction field (site)
Popularization.
Invention content
(1) the technical issues of solving
In view of the deficiencies of the prior art, the present invention provides a kind of construction site operation progress display plates, solve
Site operation progress display plate is capable of the construction speed of intuitive display scene, and display board can not effectively not realized pair at this stage
The timely replacement of display board, while when colliding, causing the damage of display board, being unfavorable for the popularization of display board at the construction field (site)
The problem of.
(2) technical solution
To achieve the above object, the present invention provides the following technical solutions:A kind of construction site operation progress display
The upper surface of plate, including pedestal, the pedestal offers symmetrical the first sliding groove, and the first sliding groove is internally provided with cunning
The internal sleeve of pipe, the slip pipe is equipped with slide bar, and the both ends of the slide bar are fixedly connected with the madial wall of the first sliding groove, the cunning
The outer surface of bar is wound with the first brute spring, and first brute spring is fixed close to the outer surface of one end of slip pipe and slip pipe
Connection, the one end of first brute spring far from slip pipe are fixedly connected with the madial wall of the first sliding groove, the upper table of the slip pipe
Face is fixedly connected with support column, and support column one side close to each other offers second sliding slot, the top of the pedestal
Equipped with support plate, the inside of the support plate offers cavity, and the cavity is internally provided with adjustable spring, the cavity it is interior
Bottom wall offers third sliding slot, and the cavity is internally provided with symmetrical mobile bar, the both ends of the adjustable spring with shifting
The outer surface of lever is fixedly connected, and the bottom of the mobile bar is connected to the inside of third sliding slot, and the inner roof wall of the cavity is opened
Equipped with strip through-hole, the top of the mobile bar is through strip through-hole and extends to the outside of strip through-hole, the cavity it is interior
Side wall offers inserting hole, and the top of the pedestal is equipped with symmetrical connecting rod, and the connecting rod is far from support plate ()
One end is connected to the inside of second sliding slot, and the connecting rod through inserting hole and extends in cavity close to one end of support plate
Portion, the outer surface of the connecting rod are fixedly connected with the inner wall of inserting hole, and rubber slab is fixedly connected at the top of the mobile bar,
It is connected with display board between the rubber slab and rubber slab.
Preferably, the bottom of the pedestal is fixedly connected with clump weight, and the horizontal length value of clump weight and the water of pedestal
Flat length value is equal.
Preferably, the bottom of the support plate is fixedly connected with the second brute spring, and the bottom of the second brute spring with
The upper surface of pedestal is fixedly connected.
Preferably, the inner bottom wall of the first sliding groove is fixedly connected with the first limited block, and the inner bottom wall of second sliding slot is solid
Surely it is connected with the second limited block.
Preferably, the vertical length value of the adjustable spring is less than the vertical length value of cavity, and mobile bar and support column
It is parallel.
Preferably, the vertical length value of first brute spring be less than the first sliding groove vertical length value, and slide bar with
Slip pipe is concentric.
(3) advantageous effect
The present invention provides a kind of construction site operation progress display plates, have following advantageous effect:
(1) construction site operation progress display plate, clump weight is fixedly connected with by the bottom of pedestal, can
The effective stability for increasing pedestal, is fixedly connected with the second brute spring by the bottom of support plate, can effectively make branch
Fagging has buffering effect, and the first limited block is fixedly connected with by the inner bottom wall of the first sliding groove, can effectively realize to the
The protection of one brute spring, avoids reaching its elastic limit, and the second limited block is fixedly connected with by the inner bottom wall of second sliding slot,
The inner bottom wall of support plate and second sliding slot can be effectively avoided to collide.
(2) construction site operation progress display plate by connecting rod, cavity, third sliding slot, mobile bar, is stretched
Being equipped between contracting spring and rubber slab can effectively realize the fixation to display board, by the first sliding groove, slide bar,
Being equipped between slip pipe and the first brute spring, the buffering that can effectively increase device horizontal direction hit effect, drop
Low collision damage caused by device, by being equipped between second sliding slot and the second brute spring, can effectively increase
The buffering of feeder apparatus vertical direction hits effect, extends the service life of device.
Description of the drawings
Fig. 1 is structure of the invention sectional view;
Fig. 2 is structural schematic diagram at A in Fig. 1 of the present invention;
Fig. 3 is structural schematic diagram at B in Fig. 1 of the present invention.
In figure:1 pedestal, 2 clump weights, 3 the first sliding grooves, 4 slip pipes, 5 support columns, 6 connecting rods, 7 second sliding slots, 8 support plates,
9 second limited blocks, 10 rubber slabs, 11 display boards, 12 cavitys, 13 mobile bars, 14 adjustable springs, 15 third sliding slots, 16 the last the second
Power spring, 17 slide bars, 18 first brute springs, 19 first limited blocks.
Specific implementation mode
Following will be combined with the drawings in the embodiments of the present invention, and technical solution in the embodiment of the present invention carries out clear, complete
Site preparation describes, it is clear that described embodiments are only a part of the embodiments of the present invention, instead of all the embodiments.It is based on
Embodiment in the present invention, it is obtained by those of ordinary skill in the art without making creative efforts every other
Embodiment shall fall within the protection scope of the present invention.
- 3 are please referred to Fig.1, the present invention provides a kind of technical solution:A kind of construction site operation progress display plate,
Including pedestal 1, the bottom of pedestal 1 is fixedly connected with clump weight 2, and the horizontal length of the horizontal length value and pedestal 1 of clump weight 2
It is worth equal, can effectively increases the stability of pedestal 1, the upper surface of pedestal 1 offers symmetrical the first sliding groove 3, and first
Sliding slot 3 is internally provided with slip pipe 4, and the internal sleeve of slip pipe 4 is equipped with slide bar 17, and the vertical length value of the first brute spring 18 is less than the
The vertical length value of one sliding slot 3 can effectively avoid the first brute spring 18 from being generated with the first sliding groove 3 and do to wipe, and slide bar 17
It is concentric with slip pipe 4, the frictional force between slide bar 17 and slip pipe 4 can be effectively reduced, the both ends of slide bar 17 are slided with first
The madial wall of slot 3 is fixedly connected, and the outer surface of slide bar 17 is wound with the first brute spring 18, and the first brute spring 18 is close to slip pipe
4 one end is fixedly connected with the outer surface of slip pipe 4, the inside of the first brute spring 18 one end and the first sliding groove 3 far from slip pipe 4
Wall is fixedly connected, and the upper surface of slip pipe 4 is fixedly connected with support column 5, and the one side close to each other of support column 5 offers second
The top of sliding slot 7, pedestal 1 is equipped with support plate 8, and the bottom of support plate 8 is fixedly connected with the second brute spring 16, and the second strength
The bottom of spring 16 is fixedly connected with the upper surface of pedestal 1, and support plate 8 can effectively be made to have buffering effect, is improved to dress
The inside of the protection set, support plate 8 offers cavity 12, and cavity 12 is internally provided with adjustable spring 14, the inner bottom wall of cavity 12
Offer third sliding slot 15, cavity 12 is internally provided with symmetrical mobile bar 13, and the both ends of adjustable spring 14 are and mobile bar
13 outer surface is fixedly connected, and the bottom of mobile bar 13 is connected to the inside of third sliding slot 15, and the inner roof wall of cavity 12 offers
The top of strip through-hole, mobile bar 13 runs through strip through-hole and extends to the outside of strip through-hole, and the madial wall of cavity 12 is opened
Equipped with inserting hole, the top of pedestal 1 is equipped with symmetrical connecting rod 6, and the inner bottom wall of the first sliding groove 3 is fixedly connected with the first limit
Block 19 can effectively realize the protection to the first brute spring 18, avoid reaching its elastic limit, and second sliding slot 7 is interior
Bottom wall is fixedly connected with the second limited block 9, can effectively avoid the inner bottom wall of connecting rod 6 and second sliding slot 7 from generating collision, even
The one end of extension bar 6 far from support plate 8 is connected to the inside of second sliding slot 7, and connecting rod 6 is close to one end of support plate 8 through interspersed
Hole and the inside for extending to cavity 12, the outer surface of connecting rod 6 are fixedly connected with the inner wall of inserting hole, and the top of mobile bar 13 is solid
Surely it is connected with rubber slab 10, display board 11 is connected between rubber slab 10 and rubber slab 10.
Operation principle:Using the retractility of adjustable spring 14, in cavity 12, mobile bar 13, rubber slab 10, third sliding slot 15
Under being equipped between adjustable spring 14, fixation of the rubber slab 10 to display board 11 is realized, in the first sliding groove 3, slide bar
17, under being equipped between slip pipe 4 and support column 5, using the elasticity of the first brute spring 18, increase device horizontal direction
Buffering hits effect, under being equipped between second sliding slot 7 and connecting rod 6, using the elasticity of the second brute spring 16, increases
The buffering of device vertical direction hits effect, extends the service life of device.
In conclusion construction site operation progress display plate, counterweight is fixedly connected with by the bottom of pedestal 1
Block 2 can effectively increase the stability of pedestal 1, and the second brute spring 16, energy are fixedly connected with by the bottom of support plate 8
It is enough effectively to make support plate 8 that there is buffering effect, the first limited block 19, energy are fixedly connected with by the inner bottom wall of the first sliding groove 3
Enough effective protections realized to the first brute spring 18, avoid reaching its elastic limit, solid by the inner bottom wall of second sliding slot 7
Surely it is connected with the second limited block 9, can effectively avoid connecting rod 6 and the inner bottom wall of second sliding slot 7 from colliding, pass through connection
Being equipped between bar 6, cavity 12, third sliding slot 15, mobile bar 13, adjustable spring 14 and rubber slab 10, can be effective
It realizes the fixation to display board 11, is set by the cooperation between the first sliding groove 3, slide bar 17, slip pipe 4 and the first brute spring 18
It sets, the buffering that can effectively increase device horizontal direction hits effect, and the damage caused by device, passes through when reduction collides
Being equipped between second sliding slot 7 and the second brute spring 16, the buffering that can effectively increase device vertical direction hit effect
Fruit extends the service life of device.
It should be noted that herein, relational terms such as first and second and the like are used merely to a reality
Body or operation are distinguished with another entity or operation, are deposited without necessarily requiring or implying between these entities or operation
In any actual relationship or order or sequence.
It although an embodiment of the present invention has been shown and described, for the ordinary skill in the art, can be with
Understanding without departing from the principles and spirit of the present invention can carry out these embodiments a variety of variations, modification, replace
And modification, the scope of the present invention is defined by the appended.
Claims (6)
1. a kind of construction site operation progress display plate, including pedestal (1), it is characterised in that:The pedestal (1) it is upper
Surface offers symmetrical the first sliding groove (3), and the first sliding groove (3) is internally provided with slip pipe (4), the slip pipe (4)
Internal sleeve is equipped with slide bar (17), and the both ends of the slide bar (17) are fixedly connected with the madial wall of the first sliding groove (3), the slide bar
(17) outer surface is wound with the first brute spring (18), and first brute spring (18) is close to one end of slip pipe (4) and cunning
The outer surface of pipe (4) is fixedly connected, and the one end of first brute spring (18) far from slip pipe (4) is interior with the first sliding groove (3)
Side wall is fixedly connected, and the upper surface of the slip pipe (4) is fixedly connected with support column (5), the support column (5) it is close to each other one
Side offers second sliding slot (7), and the top of the pedestal (1) is equipped with support plate (8), and the inside of the support plate (8) is opened
Equipped with cavity (12), the cavity (12) is internally provided with adjustable spring (14), and the inner bottom wall of the cavity (12) offers
Three sliding slots (15), the cavity (12) are internally provided with symmetrical mobile bar (13), and the both ends of the adjustable spring (14) are equal
It is fixedly connected with the outer surface of mobile bar (13), the bottom of the mobile bar (13) is connected to the inside of third sliding slot (15), institute
The inner roof wall for stating cavity (12) offers strip through-hole, and the top of the mobile bar (13) through strip through-hole and extends to bar shaped
The madial wall of the outside of through-hole, the cavity (12) offers inserting hole, and the top of the pedestal (1) is equipped with symmetrical company
Extension bar (6), the one end of the connecting rod (6) far from support plate (8) are connected to the inside of second sliding slot (7), the connecting rod (6)
Through inserting hole and extend to the inside of cavity (12) close to one end of support plate (8), the outer surface of the connecting rod (6) with wear
The inner wall of jack is fixedly connected, and is fixedly connected with rubber slab (10) at the top of the mobile bar (13), the rubber slab (10) with
Display board (11) is connected between rubber slab (10).
2. a kind of construction according to claim 1 site operation progress display plate, it is characterised in that:The pedestal
(1) bottom is fixedly connected with clump weight (2), and the horizontal length value phase of the horizontal length value of clump weight (2) and pedestal (1)
Deng.
3. a kind of construction according to claim 1 site operation progress display plate, it is characterised in that:The support
The bottom of plate (8) is fixedly connected with the second brute spring (16), and the upper table of the bottom of the second brute spring (16) and pedestal (1)
Face is fixedly connected.
4. a kind of construction according to claim 1 site operation progress display plate, it is characterised in that:Described first
The inner bottom wall of sliding slot (3) is fixedly connected with the first limited block (19), and the inner bottom wall of second sliding slot (7) is fixedly connected with the second limit
Position block (9).
5. a kind of construction according to claim 1 site operation progress display plate, it is characterised in that:It is described flexible
The vertical length value of spring (14) is less than the vertical length value of cavity (12), and mobile bar (13) is parallel with support column (5).
6. a kind of construction according to claim 1 site operation progress display plate, it is characterised in that:Described first
The vertical length value of brute spring (18) is less than the vertical length value of the first sliding groove (3), and slide bar (17) and slip pipe (4) are coaxial
The heart.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810794503.9A CN108766303A (en) | 2018-07-19 | 2018-07-19 | A kind of construction site operation progress display plate |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810794503.9A CN108766303A (en) | 2018-07-19 | 2018-07-19 | A kind of construction site operation progress display plate |
Publications (1)
Publication Number | Publication Date |
---|---|
CN108766303A true CN108766303A (en) | 2018-11-06 |
Family
ID=63970386
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201810794503.9A Withdrawn CN108766303A (en) | 2018-07-19 | 2018-07-19 | A kind of construction site operation progress display plate |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN108766303A (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN113593317A (en) * | 2021-07-26 | 2021-11-02 | 陈徽 | Teaching display equipment that teaching plane drawing software used |
-
2018
- 2018-07-19 CN CN201810794503.9A patent/CN108766303A/en not_active Withdrawn
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN113593317A (en) * | 2021-07-26 | 2021-11-02 | 陈徽 | Teaching display equipment that teaching plane drawing software used |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN108937251B (en) | Desk convenient to clean | |
CN108766303A (en) | A kind of construction site operation progress display plate | |
CN207260546U (en) | A kind of scaffold easy to use | |
CN209654799U (en) | A kind of flange connector of metal tube | |
CN107591752A (en) | A kind of ladder-type bridge frame | |
CN208622391U (en) | A kind of construction site operation progress display plate | |
CN209533692U (en) | A kind of vibration device of block machine | |
CN105333278A (en) | Multifunctional support of television displayer | |
CN206755275U (en) | A kind of integrated kitchen range easy to remove | |
CN110429515A (en) | A kind of cable laying multiple pulley bracket | |
CN206911992U (en) | A kind of bending machine with elevating function | |
CN207553286U (en) | A kind of novel earthquake-proof steel construction | |
CN207452842U (en) | A kind of hydraulic engineering diversion channel | |
CN204626913U (en) | Device for paving bricks | |
CN210888110U (en) | Masonry leveling device | |
CN207588852U (en) | It is a kind of that there is the communication interphone of shatter-resistant | |
CN211117355U (en) | Elastic anti-seismic support convenient for height adjustment | |
CN211597514U (en) | Assembled shock attenuation mixes earth floor | |
CN110185889A (en) | A kind of handheld portable jack support base | |
CN208169423U (en) | A kind of Architectural Equipment vibration damping apparatus for placing | |
CN203620154U (en) | Horizontal-bar parallel-bar body-building device | |
CN206454246U (en) | Community endowment recreation scoreboard | |
CN208083262U (en) | It is a kind of that there is the automatic reinforcing bar bullodozer for bending function | |
CN204456845U (en) | The model sheetinstallat structure of shear wall for building or beam column | |
CN212387608U (en) | Tower crane attachment frame operation platform |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
WW01 | Invention patent application withdrawn after publication |
Application publication date: 20181106 |
|
WW01 | Invention patent application withdrawn after publication |