CN108764724A - A kind of Scientific And Technological Management System - Google Patents

A kind of Scientific And Technological Management System Download PDF

Info

Publication number
CN108764724A
CN108764724A CN201810527670.7A CN201810527670A CN108764724A CN 108764724 A CN108764724 A CN 108764724A CN 201810527670 A CN201810527670 A CN 201810527670A CN 108764724 A CN108764724 A CN 108764724A
Authority
CN
China
Prior art keywords
management
module
enterprise
financial
layer
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201810527670.7A
Other languages
Chinese (zh)
Inventor
鲍艳
左春波
郭凤臣
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jilin Teachers Institute of Engineering and Technology
Original Assignee
Jilin Teachers Institute of Engineering and Technology
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jilin Teachers Institute of Engineering and Technology filed Critical Jilin Teachers Institute of Engineering and Technology
Priority to CN201810527670.7A priority Critical patent/CN108764724A/en
Publication of CN108764724A publication Critical patent/CN108764724A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0631Resource planning, allocation, distributing or scheduling for enterprises or organisations

Landscapes

  • Business, Economics & Management (AREA)
  • Human Resources & Organizations (AREA)
  • Engineering & Computer Science (AREA)
  • Strategic Management (AREA)
  • Entrepreneurship & Innovation (AREA)
  • Economics (AREA)
  • Operations Research (AREA)
  • Game Theory and Decision Science (AREA)
  • Development Economics (AREA)
  • Marketing (AREA)
  • Educational Administration (AREA)
  • Quality & Reliability (AREA)
  • Tourism & Hospitality (AREA)
  • Physics & Mathematics (AREA)
  • General Business, Economics & Management (AREA)
  • General Physics & Mathematics (AREA)
  • Theoretical Computer Science (AREA)
  • Financial Or Insurance-Related Operations Such As Payment And Settlement (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The invention discloses a kind of Scientific And Technological Management Systems, including enterprise's layer-management subsystem and project layer-management subsystem, enterprise's layer-management subsystem and project layer-management subsystem carry out mutual information feedback by information flow, enterprise's layer-management subsystem includes financial management module, quality control module, safety control module, contract management module, rate control module, human resource management module and other management modules, the target of project layer-management subsystem will obey the general objective of enterprise management system, the effect of subsystems is not placed side by side, wherein there are one subsystems to realizing that general objective holds the central place, it plays a leading role.Business administration is regarded as a system, the method that network analysis can be taken, every specialized management of comprehensive study enterprise, the interior condition and external environment of production and operating activities, quantitative analysis and qualitative analysis are organically combined, it chooses the best alternatives, it increases economic efficiency, promotes production development.

Description

A kind of Scientific And Technological Management System
Technical field
The present invention relates to a kind of management system, specifically a kind of Scientific And Technological Management Systems.
Background technology
Management system is to reach organizational goal, for management object, by knitting energy and inner link with cura specialis The complete organization and administration system that various management organizations, management system, management process, management method are constituted.In enterprise, this A total system can be divided into planning management, the subsystems such as production technology, labor and personnel, financial cost and service for life.Between them, Not only it had any different, but also was related.The target of subsystem will obey the general objective of enterprise management system.The effect of subsystems is not It places side by side, holds the central place, play a leading role to realization general objective wherein there are one subsystems.Business administration, which is regarded as one, is System, it will be able to the method for taking network analysis, every specialized management of comprehensive study enterprise, the inside item of production and operating activities Part and external environment, quantitative analysis and qualitative analysis organically combine, and choose the best alternatives, increase economic efficiency, and promote Production development.
Enterprise management system is the burden that company managers can be helped to improve working efficiency, rather than increase them. Not complicated flow scheme design, not complicated form design etc..Business management software is paying attention to the comprehensive of system function, The controllability of flow, the advance of technology will more focus on the ease for use of system.
Enterprise management system is most of function (including decision, plan, tissue, the neck for referring to embody business administration Lead, monitor, analyze etc.), it is capable of providing real-time, related, accurate, complete data, provide decision-making foundation for manager one Kind software.It is divided with module, business management software can be divided into financial management, workshop management, purchase, sales and stock management (ERP), Assets Reorganization Taking Reason, cost management, equipment management, quality management, distribution resource planning management, human resource management (HR), supply chain management (SCM), the kinds such as customer relation management (CRM).
As its name suggests, enterprise management system is set of system, but it is not merely a system, even more management theory and pipe The materialization of reason experience, logically, is the landing of administration behaviour, because the process that business management software is designed and developed, exactly grinds Study carefully in this industry state-of-the-art management mode and flow be even more demonstrates effective management rule by most enterprises, These managerial experiences intension in the thought of management software, flow, report content, statistical analysis project, management level, information Decision suffers.So most effective business management software is the business management software of business advice consultant's form, only general official communication It askes and this service is provided.
Invention content
The purpose of the present invention is to provide a kind of Scientific And Technological Management Systems, to solve the problems mentioned in the above background technology.
To achieve the above object, the present invention provides the following technical solutions:
A kind of Scientific And Technological Management System, including enterprise's layer-management subsystem and project layer-management subsystem, the enterprises level pipe It manages subsystem and project layer-management subsystem and mutual information feedback is carried out by information flow, wrapped in enterprise's layer-management subsystem Include financial management module, quality control module, safety control module, contract management module, rate control module, human resources pipe Module and other management modules are managed, the project layer-management subsystem also includes financial management module, quality control module, safety Control module, contract management module, rate control module, human resource management module and other management modules.
As a further solution of the present invention:The financial management module includes accounting and financial management, accounting core Calculation includes Ledger Module, accounts receivable module, account payable module, cash management module, fixed assets accounting module, fixed assets core Calculate module, multi-currency module, wage accounting module and cost module;The function of Ledger Module is the input of processing bookkeeping voucher, steps on Note, output journal account, general detailed account and account as recorded in a ledger, works out main accounting statement;Accounts receivable module refers to that enterprise is receivable The normal clients debt account generated since commodity are bought on dredit;Account payable module includes managing bill, supplier management, check pipe Reason, aging the accounts etc.;Cash management module is mainly the control flowed out to cash inflow and petty cash and cash in banks It calculates;Fixed assets accounting module completes the accounting changed to the increase and decrease of fixed assets and depreciation is proposed and distributed in relation to fund meter Work;The various functions of the entire financial system of enterprise are indicated and are settled accounts with various currency systems by multi-currency module, and customer order, Stock control and purchasing management etc. could be used that multi-currency is traded management;Wage accounting module is automatic progress enterprise staff Wage clearing, distribution, calculate and the meter of every related funds carries;Cost module will be according to product structure, work centre, work The information such as sequence, buying carry out the calculating of the various costs of product, to carry out cost analysis and planning;Financial management includes finance Plan, financial analysis and financial decision;The financial plan of next period, budget etc. are made in financial plan according to financial analysis early period;Wealth Business analysis;Carry out Corporate Performance assessment, account analysis etc.;The centre point of financial decision is to make the decision in relation to fund, packet Include fund procurement, dispensing and capital management.
As further scheme of the invention:The quality control module is including being buying and entry log control respectively System, production process quality control, finished product and storage quality control and delivery quality control.
As further scheme of the invention:The contract management module is built upon on Information Technology Foundation, is utilized The advanced management thought of modern enterprise provides comprehensive, the systematization that decision, plan, control and business performance are assessed for enterprise Contract management platform;Contract management system is based primarily upon Collaborative Product Commerce management, customer demand, manufacturing activities, buying The cooperation catenary system of a close-coupled is regarded in management, funds on account management, operation flow as, using whole course integration modeling technique, Enterprises information management is divided into the support subsystem of several mutual work compounds, it is effective to all links on cooperation chain Ground is managed, and the rate control module is to carry out follow-up in time and feedback to the progress of whole system, and make corresponding Scheduling ensures the operation of whole system smooth sequential.
As further scheme of the invention:The human resource management module include human resource planing, recruitment with Configuration, training and exploitation, performance management, salary and social benefits management and Employee Relationship Management, human resource planing includes institutional framework Setting and adjustment, the formulation of people initiative, Human Resource Management Institution and expense budget;Recruitment includes recruitment needs with configuration Analysis, recruitment prepare, recruitment implements and exit interview;Training includes establishing training system, formulating training planning, training with exploitation Management and training evaluation;Salary and social benefits management includes payroll administration, insurance for welfare management;Performance management includes performance management The design of system, the method for the effective operation and performance appraisal of Performance Management System;Labor relation management, including labour contract pipe Reason, collective agreement negotiation and fulfil, labour dispute resolving system, employee link up and occupation health safety management.
Compared with prior art, the beneficial effects of the invention are as follows:The target of project layer-management subsystem will obey enterprise's pipe The effect of the general objective of reason system, subsystems is not placed side by side, wherein there are one subsystems to realizing the general objective heart placed in the middle Status plays a leading role.Business administration is regarded as a system, it will be able to the method for taking network analysis, comprehensive study enterprise Every specialized management, the interior condition and external environment of production and operating activities, quantitative analysis and qualitative analysis are organically tied Altogether, it chooses the best alternatives, increases economic efficiency, promote production development.
Description of the drawings
Fig. 1 is a kind of structural schematic diagram of Scientific And Technological Management System.
Specific implementation mode
The technical solution of this patent is described in more detail With reference to embodiment.
Referring to Fig. 1, a kind of Scientific And Technological Management System, including enterprise's layer-management subsystem and project layer-management subsystem, institute It states enterprise's layer-management subsystem and project layer-management subsystem and mutual information feedback, enterprise's layer-management is carried out by information flow Subsystem include financial management module, quality control module, safety control module, contract management module, rate control module, Human resource management module and other management modules, the financial management module includes accounting and financial management, accounting core Calculation includes Ledger Module, accounts receivable module, account payable module, cash management module, fixed assets accounting module, fixed assets core Calculate module, multi-currency module, wage accounting module and cost module;The function of Ledger Module is the input of processing bookkeeping voucher, steps on Note, output journal account, general detailed account and account as recorded in a ledger, works out main accounting statement;Accounts receivable module refers to that enterprise is receivable The normal clients debt account generated since commodity are bought on dredit;Account payable module includes managing bill, supplier management, check pipe Reason, aging the accounts etc.;Cash management module is mainly the control flowed out to cash inflow and petty cash and cash in banks It calculates;Fixed assets accounting module completes the accounting changed to the increase and decrease of fixed assets and depreciation is proposed and distributed in relation to fund meter Work;The various functions of the entire financial system of enterprise are indicated and are settled accounts with various currency systems by multi-currency module, and customer order, Stock control and purchasing management etc. could be used that multi-currency is traded management;Wage accounting module is automatic progress enterprise staff Wage clearing, distribution, calculate and the meter of every related funds carries;Cost module will be according to product structure, work centre, work The information such as sequence, buying carry out the calculating of the various costs of product, to carry out cost analysis and planning;Financial management includes finance Plan, financial analysis and financial decision;The financial plan of next period, budget etc. are made in financial plan according to financial analysis early period;Wealth Business analysis:Carry out Corporate Performance assessment, account analysis etc.;The centre point of financial decision is to make the decision in relation to fund, packet Include fund procurement, dispensing and capital management.
The quality control module include respectively be buying with entry log control, production process quality control, finished product and Storage quality controls and delivery quality control;The contract management module is built upon on Information Technology Foundation, is looked forward to using the modern times The advanced management thought of industry provides comprehensive, systematization the contract that decision, plan, control and business performance are assessed for enterprise Management platform;Contract management system is based primarily upon Collaborative Product Commerce management, customer demand, manufacturing activities, purchasing management, account The cooperation catenary system of a close-coupled is regarded in money management, operation flow as, will be in enterprise using whole course integration modeling technique Portion's information management is divided into the support subsystem of several mutual work compounds, and pipe is effectively performed to all links on cooperation chain Reason, the rate control module are to carry out follow-up in time and feedback to the progress of whole system, and make corresponding scheduling, are ensured The operation of whole system smooth sequential, the human resource management module include human resource planing, recruitment and configuration, training with Exploitation, performance management, salary and social benefits management and Employee Relationship Management, human resource planing include setting and the tune of institutional framework Whole, people initiative formulation, Human Resource Management Institution and expense budget;Recruitment includes recruitment needs analysis, recruitment with configuration Prepare, recruitment implements and exit interview;Training includes establishing training system, formulating training planning, Training Management and training with exploitation Instruct recruitment evaluation;Salary and social benefits management includes payroll administration, insurance for welfare management;Performance management includes setting for Performance Management System The method of the effective operation and performance appraisal of meter, Performance Management System;Labor relation management, including labor contract management, collective The negotiation of contract and fulfil, labour dispute resolving system, employee links up and occupation health safety management, project layer-management System also includes financial management module, quality control module, safety control module, contract management module, rate control module, people Human resource management module and other management modules.
The better embodiment of this patent is explained in detail above, but this patent is not limited to above-mentioned embodiment party Formula, one skilled in the relevant art within the scope of knowledge, can also be under the premise of not departing from this patent objective It makes a variety of changes.

Claims (5)

1. a kind of Scientific And Technological Management System, including enterprise's layer-management subsystem and project layer-management subsystem, it is characterised in that:It is described Enterprise's layer-management subsystem and project layer-management subsystem carry out mutual information feedback, enterprise's layer-management by information flow System includes financial management module, quality control module, safety control module, contract management module, rate control module, people Human resource management module and other management modules, the project layer-management subsystem also include financial management module, quality control Module, safety control module, contract management module, rate control module, human resource management module and other management modules.
2. a kind of Scientific And Technological Management System according to claim 1, it is characterised in that:The financial management module includes accounting It calculates and financial management, accounting includes Ledger Module, accounts receivable module, account payable module, cash management module, fixed assets Module, fixed assets accounting module, multi-currency module, wage accounting module and cost module are calculated in production;The function of Ledger Module It is the input of processing bookkeeping voucher, registration, output journal account, general detailed account and account as recorded in a ledger work out main accounting statement;It is receivable Account module refers to the receivable normal clients debt account generated since commodity are bought on dredit of enterprise;Account payable module includes invoice pipe Reason, supplier management, check management, aging the accounts etc.;Cash management module be mainly the control that cash inflow is flowed out and The accounting of petty cash and cash in banks;Fixed assets accounting module is completed related to the increase and decrease variation and depreciation of fixed assets The calculation work that fund meter is carried and distributed;The various functions of the entire financial system of enterprise are carried out table by multi-currency module with various currency systems Show and settle accounts, and customer order, stock control and purchasing management etc. could be used that multi-currency is traded management;Wage accounting mould Block is that the meter of the automatic wage clearing for carrying out enterprise staff, distribution, accounting and every related funds carries;Cost module is by foundation The information such as product structure, work centre, process, buying carry out product various costs calculating, so as to carry out cost analysis and Planning;Financial management includes financial plan, financial analysis and financial decision;Financial plan makes the next period according to financial analysis early period Financial plan, budget etc.;Financial analysis:Carry out Corporate Performance assessment, account analysis etc.;The centre point of financial decision is to make Go out the decision in relation to fund, including fund procurement, dispensing and capital management.
3. a kind of Scientific And Technological Management System according to claim 1, it is characterised in that:The quality control module includes difference It is buying and entry log control, production process quality control, finished product and storage quality control and delivery quality control.
4. a kind of Scientific And Technological Management System according to claim 1, it is characterised in that:The contract management module is built upon On Information Technology Foundation, using the advanced management thought of modern enterprise, decision, plan, control and business performance are provided for enterprise Comprehensive, systematization the contract management platform of assessment;Contract management system is based primarily upon Collaborative Product Commerce management, client Demand, manufacturing activities, purchasing management, funds on account management, operation flow regard the cooperation catenary system of a close-coupled as, using complete Enterprises information management is divided into the support subsystem of several mutual work compounds by journey integrated modelling technology, to cooperation All links on chain are effectively performed management, the rate control module be to the progress of whole system carry out follow-up in time with Feedback, and corresponding scheduling is made, ensure the operation of whole system smooth sequential.
5. a kind of Scientific And Technological Management System according to claim 1, it is characterised in that:The human resource management module includes Human resource planing, recruitment and configuration, training and exploitation, performance management, salary and social benefits management and Employee Relationship Management, manpower money Source planning includes setting and adjustment, the formulation of people initiative, Human Resource Management Institution and the expense budget of institutional framework;Recruitment With configuration include recruitment needs analysis, recruitment prepares, recruitment implements and exit interview;Training includes establishing training system with exploitation Degree formulates training planning, Training Management and training evaluation;Salary and social benefits management includes payroll administration, insurance for welfare management; Performance management includes the design of Performance Management System, the method for the effective operation and performance appraisal of Performance Management System;Labour is closed System management, including labor contract management, collective agreement negotiation and fulfil, labour dispute resolving system, employee link up and occupation Safety and sanitation management.
CN201810527670.7A 2018-05-29 2018-05-29 A kind of Scientific And Technological Management System Pending CN108764724A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810527670.7A CN108764724A (en) 2018-05-29 2018-05-29 A kind of Scientific And Technological Management System

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810527670.7A CN108764724A (en) 2018-05-29 2018-05-29 A kind of Scientific And Technological Management System

Publications (1)

Publication Number Publication Date
CN108764724A true CN108764724A (en) 2018-11-06

Family

ID=64003307

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810527670.7A Pending CN108764724A (en) 2018-05-29 2018-05-29 A kind of Scientific And Technological Management System

Country Status (1)

Country Link
CN (1) CN108764724A (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111160792A (en) * 2019-12-31 2020-05-15 山东理工职业学院 Construction of economic management type professional comprehensive experiment system with enterprise as core
CN111340655A (en) * 2018-12-19 2020-06-26 泰康保险集团股份有限公司 Contract fusion management system and method
CN111815290A (en) * 2020-07-20 2020-10-23 云南财经大学 Territorial space planning system based on GIS
CN112016892A (en) * 2020-08-27 2020-12-01 西安热工研究院有限公司 Project management system integrated with multiple systems
CN113077231A (en) * 2021-03-31 2021-07-06 商运(江苏)科创发展有限公司 Enterprise resource coordination management system based on internet technology
CN113408789A (en) * 2021-05-26 2021-09-17 常熟市百创网络科技有限公司 Production management system for enterprises

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104573949A (en) * 2014-12-30 2015-04-29 青岛新华友建工集团股份有限公司 Intelligent construction decision support system
CN106056295A (en) * 2016-06-05 2016-10-26 镇江市亿鑫电气设备有限责任公司 Engineering management system
CN107169824A (en) * 2017-05-08 2017-09-15 内蒙古包钢钢联股份有限公司 A kind of ecommerce B2B2B plateform systems for manufacturing enterprise

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104573949A (en) * 2014-12-30 2015-04-29 青岛新华友建工集团股份有限公司 Intelligent construction decision support system
CN106056295A (en) * 2016-06-05 2016-10-26 镇江市亿鑫电气设备有限责任公司 Engineering management system
CN107169824A (en) * 2017-05-08 2017-09-15 内蒙古包钢钢联股份有限公司 A kind of ecommerce B2B2B plateform systems for manufacturing enterprise

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111340655A (en) * 2018-12-19 2020-06-26 泰康保险集团股份有限公司 Contract fusion management system and method
CN111340655B (en) * 2018-12-19 2023-04-21 泰康保险集团股份有限公司 Contract fusion management system and method
CN111160792A (en) * 2019-12-31 2020-05-15 山东理工职业学院 Construction of economic management type professional comprehensive experiment system with enterprise as core
CN111815290A (en) * 2020-07-20 2020-10-23 云南财经大学 Territorial space planning system based on GIS
CN111815290B (en) * 2020-07-20 2023-08-11 云南财经大学 Territorial space planning system based on GIS
CN112016892A (en) * 2020-08-27 2020-12-01 西安热工研究院有限公司 Project management system integrated with multiple systems
CN113077231A (en) * 2021-03-31 2021-07-06 商运(江苏)科创发展有限公司 Enterprise resource coordination management system based on internet technology
CN113077231B (en) * 2021-03-31 2024-03-22 一账通(淮安)财务管理有限公司 Enterprise resource coordination management system based on Internet technology
CN113408789A (en) * 2021-05-26 2021-09-17 常熟市百创网络科技有限公司 Production management system for enterprises

Similar Documents

Publication Publication Date Title
Pererva et al. Management of relations with enterprise stakeholders based on value approach
CN108764724A (en) A kind of Scientific And Technological Management System
CN106548322A (en) Project examination system
US20020046143A1 (en) Method of and system for evaluating cash flow and elements of a business enterprise
Bruner et al. Multinational profit shifting and measures throughout economic accounts
CN103177306A (en) Workflow control system of project implementation
CN107886207A (en) A kind of business finance monitoring system and its monitoring method
English et al. Public sector management in the State of Victoria 1992–1999: genesis of the transformation
Cheung et al. Internal audit at Guangdong nuclear power joint venture Company limited
Polova Enterprise financial policy
Yang et al. Case Study of Financial Situation Based on Harvard Analysis Framework: Taking Huadong Medicine Co., Ltd. As An Example
Ishmuradova et al. Persectives of application of project budgeting in commercial organizations
Urbanek Drumet SA
Iremadze et al. ODERN TRENDS OF ACCOUNTING INFORMATION IN ERP SYSTEMS
Berhad Shaping a sustainable future
Lopes et al. Management control: lecture notes
Garasyim et al. Strategic management accounting of business processes of the service sector enterprises
Xie et al. Application of system dynamics to enterprise financial scenario planning
Odnoshevna Optimization of salary calculations and employees’ labour productivity stimulation at the enterprise
Ma et al. Policy Optimization Strategy of S&T Achievement Transformation from Stakeholder Perspective
SAGÑAY et al. COMPUTERIZED SYSTEMATIZATION OF COSTS OF CHEMICAL COMPANIES OF ECUADOR APPLYING PRINCIPLES OF SUSTAINABLE DEVELOPMENT
Герасім et al. Strategic management accounting of business processes of the service sector enterprises= Стратегічний управлінський облік бізнес-процесів підприємства сфери послуг
Mishra et al. Industrial Revival by Strategic Implementation of Total Quality Management (TQM): An Empirical Examination
Bohatkiewicz Financial Controlling in Service Enterprises–Key Tools and Indicators Facilitating Decision-Making Process with Particular Emphasis on Improving Financial Condition
Voloshyna Methods of financial regulation of the enterprise activities in the system of Ukraine’s economic development vectors

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20181106