Specific implementation mode
In order to make the object, technical scheme and advantages of the embodiment of the invention clearer, below in conjunction with the embodiment of the present invention
In attached drawing, technical scheme in the embodiment of the invention is clearly and completely described, it is clear that described embodiment is
A part of the embodiment of the present invention, instead of all the embodiments.Based on the embodiments of the present invention, those of ordinary skill in the art
The every other embodiment obtained without making creative work, shall fall within the protection scope of the present invention.
Fig. 1 is the flow diagram provided in this embodiment for netting the processing method of grade highway maintenance investment, referring to figure
1, this method includes:
101:It determines the road network for being intended to carry out maintenance investment, obtains each in road network maintenance costs over the years and the road network
The road average daily volume of traffic over the years and road conditions index;
102:According to maintenance costs over the years, the average daily volume of traffic and road conditions Index Establishment maintenance costs with the average daily volume of traffic and
The functional relation of road conditions index variation;
103:Obtain it is preset in prediction year in one's duty maintenance dollar cap value and road conditions index lower limiting value, and according to
Average daily traffic volume forecast over the years corresponds to the average daily volume of traffic of target in the prediction time;
104:It is the average daily volume of traffic of the target to find the average daily volume of traffic according to the functional relation, and meets the road conditions
Index lower limiting value and it is described maintenance dollar cap value minimum maintenance costs, according to the minimum maintenance costs to the road network into
Row maintenance investment.
It should be noted that method provided in this embodiment is executed by the equipment for being able to carry out the above method, for example, calculating
Machine.This method is used to carry out the investment needs of road network construction, determines to meet road conditions index request, spends minimum investor
Case.Maintenance costs, the average daily volume of traffic and road conditions index over the years can start the time conserved to the road surface of the road network certainly
Statistics, can also count from forward 5 years or 10 years historical datas of current year, the present embodiment does not do this specific limit
System.
A kind of processing method for netting the investment of grade highway maintenance is present embodiments provided, this method is according to maintenance over the years
Expense, the average daily volume of traffic and road conditions index pre-establish Cost Prediction Model, and are corresponded to by average daily traffic volume forecast over the years
In the average daily volume of traffic of target in prediction time, using each road conditions index of setting and maintenance dollar cap value as constraints, soon
Speed is determined to meet road conditions index request and the prime investment scheme with maintenance dollar cap value, solves current traditional curing and throw
Capital's method cannot quickly judge that meet certain fund asks with the road surface under road conditions goal condition, bridge tunel engineering maintenance fund input
Topic.
Further, on the basis of the above embodiments, the determination is intended to carry out the road network of maintenance investment, described in acquisition
Each road average daily volume of traffic over the years and road conditions index in road network maintenance costs over the years and the road network, including:
It determines the road network for being intended to carry out maintenance investment, q route is shared in the road network, the length of kth route is lk(k
=1,2 ..., q);
The average daily friendship of road network maintenance of surface expense over the years and maintenance of bridge and tunnel expense, the road network over the years is counted respectively
Correspond to road surface the first index PQI over the years, the second index BCI corresponding to bridge tunnel over the years in flux, the road network,;
Simplify the MQI of the road conditions index for characterizing the road network according to the first index PQI and the second index BCI;
Wherein, MQI=w1PQI+w2BCI, w1The weight for being PQI in MQI, w2The weight for being BCI in MQI, w1+w2=
1, and w is determined according to the ratio x of maintenance of surface expense over the years and maintenance of bridge and tunnel expense1=-0.0007x2+0.03x+0.5167。
Wherein, w1Functional relation with x is according to the ratio of maintenance of surface expense over the years and maintenance of bridge and tunnel expense, over the years
Weights of the PQI in MQI carries out what fitting of a polynomial obtained.
It should be noted that MQI is highway technology status score, in general, MQI=wPQIPQI+wBCIBCI+wSCISCI+
wTCITCI, wherein SCI be with the relevant index of roadbed, TCI be with the relevant index of equipment along road, the present embodiment in order to
It quickly determines prime investment scheme, ignores the subgrade engineering that accounting is less in road maintenance funds, equipment along road engineering, it is right
The calculating of this road conditions index of MQI is simplified.Road conditions index includes corresponding to the first index PQI on road surface and corresponding to bridge
Second index BCI of tunnel.Highway index is to obtain characterization highway bulking property by what the first index PQI and the second index BCI were calculated
The index of energy.
A kind of processing method for netting the investment of grade highway maintenance is present embodiments provided, this method is to control railway network planning
Phase annual maintenance expense and for the purpose of meeting road conditions target call, to dominate the road surface of maintenance costs, two large-engineering of bridge tunnel be to cut
Access point simplifies MQI, enabling the method provided through this embodiment quickly determines highway investment scheme.
Further, on the basis of the various embodiments described above, basis maintenance costs over the years, the average daily volume of traffic and
The functional relation that road conditions Index Establishment maintenance costs changes with the average daily volume of traffic and road conditions index, including:
Determine PQI and the average daily volume of traffic, maintenance of surface expense first function relationship fPQI(i)=f (PQIi,Ai);
Determine the second function relationship f that BCI takes with the average daily volume of traffic, maintenance of bridge and tunnelBCI(i)=f (BCIi,Ai);
Wherein, fPQI(i)For 1 year maintenance of surface expense, PQIiFor 1 year PQI mean value of all routes in road network, Ai
For 1 year average daily volume of traffic of all routes in road network, fBCI(i)For 1 year maintenance of bridge and tunnel expense, BCIiTo own in road network
1 year BCI of route.
In general, obtaining first function and second function using linear fitting by historical data.In the present embodiment, road surface
Upkeep charges refer to and implement pavement engineering routine maintenance, preventive maintenance, repair the expense needed for maintenance, specialty work.Maintenance of bridge and tunnel
Expense refers to and implements bridge tunel engineering routine maintenance, preventive maintenance, repairs the expense needed for maintenance, specialty work.
Present embodiments provide it is a kind of for net grade highway maintenance investment processing method, this method according to historical data into
Row linear fitting, is directed to road surface respectively and bridge establishes the functional relation of maintenance costs and the average daily volume of traffic, so as to according to function
Relationship accurately calculates maintenance costs.
Further, on the basis of the various embodiments described above, the acquisition is preset in one's duty foster in prediction year
Dollar cap value and road conditions index lower limiting value are protected, and corresponds to the mesh in the prediction time according to average daily traffic volume forecast over the years
The average daily volume of traffic is marked, including:
Obtain it is preset prediction year in one's duty maintenance dollar cap value, the first index PQI, the second index BCI and
The lower limiting value of the MQI of highway index, obtaining constraints is:
PQIn>=a or BCIn≥b、MQIn>=c and Fn≤d;Wherein, PQInFor the PQI, a PQI that the prediction time is 1 year
Target lower limiting value, BCInIt is the target lower limiting value of BCI, MQI for the BCI that the prediction time is 1 year, bnIt is n-th for the prediction time
The MQI in year, c are the target lower limiting value of MQI, FnFor the maintenance fund that the prediction time is 1 year, c is maintenance dollar cap value;
Determine that average annual traffic volume growth rate γ is according to the average daily volume of traffic of nearly j
According to average annual traffic volume growth rate γ, pass through formula An=At×(1+γ)n-tIt is 1 year to calculate the prediction time
The average daily volume of traffic of target;Wherein, AnFor the average daily volume of traffic of 1 year target, AtFor the equal volume of traffic of current t.
In general, when calculating average annual traffic volume growth rate γ, nearly 3 years data are selected to be calculated, the present embodiment is to this
It is not particularly limited.Constraints is:PQIn>=a or BCIn≥b、MQIn>=c and Fn≤ d, i.e. constraints are PQIn≥a、
MQIn>=c and Fn≤ d, alternatively, BCIn≥b、MQIn>=c and Fn≤d.During subsequent prediction, in other constraintss
On the basis of, only it need to choose PQIn>=a or BCInOne in >=b is used as constraint.Predict that the time is when the year before last second year is not to
Carry out certain year, the present embodiment is not particularly limited this.
A kind of processing method for netting the investment of grade highway maintenance is present embodiments provided, how this method is to determine constraint
Condition and the calculating for how carrying out the average daily volume of traffic are defined, with by the average daily volume of traffic of constraints and prediction quickly into
The determination of the follow-up prime investment scheme of row.
Further, described that the average daily volume of traffic is found according to the functional relation on the basis of the various embodiments described above
For the average daily volume of traffic of the target, and meet the minimum upkeep charges of the road conditions index lower limiting value and the maintenance dollar cap value
With, maintenance investment is carried out to the road network according to the minimum maintenance costs, including:
Enable w1PQI+w2BCI=e, when meeting e >=c, the collection of e values is combined into A={ c, c+1 ..., 100 }, and e is integer,
The variation relation figure of corresponding PQI and BCI when e is each numerical value in set A is drawn respectively;
In the variation relation figure, using PQI=a or BCI=b as target control line, determine to meet PQI >=a and
The collection of MQI >=c or BCI >=b and the target areas MQI >=c, (PQI, BCI) in the target area is combined into B=
{(PQIm, BCIm), m is the serial number of (PQI, BCI) in the target area };
For each (PQI, the BCI) and the average daily volume of traffic A of the target in set Bn, according to the first function relationship
It calculates 1 year maintenance of surface to take, and is taken according to the maintenance of bridge and tunnel of second function relationship calculating 1 year;
The maintenance of surface calculated corresponding to each group (PQI, BCI) takes the total cost taken with maintenance of bridge and tunnel, obtains by total expense
With the set C of composition, total cost Q is found out from set Cm≤ d and the corresponding (PQI of minimum maintenance costs when total cost minimumm,
BCIm), maintenance investment is carried out to the road network according to the corresponding maintenance of surface expense of the minimum maintenance costs and maintenance of bridge and tunnel expense.
A kind of processing method for netting the investment of grade highway maintenance is present embodiments provided, this method is defined according to constraint
Condition and the average daily volume of traffic carry out the process of minimum maintenance costs, are capable of determining that by linear programming and meet institute's Prescribed Properties
Minimum capital project.
Further, on the basis of the various embodiments described above, the PQIi、BCIiAnd AiIt is calculated by the following formula:
Wherein, lkFor the length of kth circuit in the road network,It is 1 year, the PQI of kth circuit,It is 1 year, the BCI of kth circuit,It is 1 year, the average daily volume of traffic of kth circuit.In the present embodiment
PQI, BCI, MQI are characteristic.
Present embodiments provide a kind of processing method for netting the investment of grade highway maintenance, the first of this method pair 1 year
Index and the second index and the computational methods of 1 year average daily volume of traffic are defined, through this embodiment in working hour energy
It is enough quickly to determine each parameter, to facilitate subsequent prediction to calculate.
Specifically, Fig. 2 shows the flows provided in this embodiment for netting the processing method of grade highway maintenance investment
Schematic diagram, referring to Fig. 2, this method includes:
1, decision road network object is determined
It determines the quasi- road network for carrying out decision, shares q route in road network, the length of each route is respectively lk(k=1,
2,…,q)
2, the history maintenance data (including static data and dynamic data) of road network are collected, and according to road surface over the years, bridge tunnel
Input ratio is established and simplifies MQI calculation formula
Road network road surface over the years, bridge tunel engineering maintenance input are counted, according to the input ratio on road surface and bridge tunel engineering, is ignored
The less subgrade engineering of accounting, equipment along road engineering in road maintenance funds simplify MQI and calculate.
MQI=w1PQI+w2BCI formulas 1
In formula:w1:Weights of the PQI in MQI;According to road surface over the years/bridge tunnel expense than determining, w1=-0.0007x2+
0.03x+0.5167, x are road surface/bridge tunnel expense ratio;w2:Weights of the BCI in MQI, w1+w2=1.
3, cost model is established based on historical data
Based on maintenance input over the years, road conditions, the volume of traffic and maintenance costs relationship are established.
1) PQI and the average daily volume of traffic, maintenance of surface expense relationship
fPQI(i)=f (PQIi,Ai) formula 2
In formula:fPQI(i)1 year maintenance of surface expense (ten thousand yuan);PQIi1 year PQI mean value of all routes in road network,
The PQI weighted averages for taking each route are calculated by formula 3;Ai--- 1 year average daily volume of traffic () of all routes in road network,
The average daily volume of traffic weighted average for taking each route is calculated by formula 4.
2) relationship of BCI and the average daily volume of traffic, maintenance of bridge and tunnel funds
fBCI(i)=f (BCIi,Ai) formula 5
In formula:fBCI(i)1 year bridge maintenance expense (ten thousand yuan);BCIi1 year BCI of all routes in road network takes each
The PQI weighted averages of route are calculated by formula 6.
4, good logical average growth rate per annum is predicted
Based on traffic data over the years, the average growth rate per annum of the nearly 3 years average daily volume of traffic of road network is calculated, it is assumed that currently year is
t。
In formula:Nearly 3 years average annual traffic volume growth rates (%) of γ;At--- the average daily volume of traffic () of t.
5, the target component critical value and limited fund condition in future plan year are set:
PQIn>=a or BCIn>=b formulas 8
MQIn>=c formulas 9
Fn≤ d formulas 10
In formula:PQInFor 1 year PQI (dimensionless);A is PQI targets lower limiting value (dimensionless);BCInIt is 1 year
BCI (dimensionless);B is BCI targets lower limiting value (dimensionless);MQInFor 1 year MQI (dimensionless);C is MQI target lower limits
It is worth (dimensionless);FnFor 1 year road surface, maintenance of bridge and tunnel fund (ten thousand yuan);D is maintenance fund (the sum of road surface, bridge tunnel fund)
Upper limit value (ten thousand yuan).
6, according to MQI desired values project period of setting
Enable w1PQI+w2BCI=e, the collection for meeting e >=c are combined into A={ c, c+1 ..., 100 }.Draw MQInUnder the conditions of=A,
The variation relation figure of PQI and BCI.MQI is drawn respectivelynEqual in set when each numerical value PQI and BCI variation relation figure,
As shown in Figure 3.
7, PQI the or BCI target lower limiting values determined according to the 5th step are looked for using PQI=a or BCI=b as target control line
The road condition area for going out while meeting 2 road conditions targets (MQI, PQI or MQI, BCI) forms the road conditions set B=met the requirements
{(PQIm, BCIm) | m is the sequence met the requirements }.As shown in Figure 4.
8, in set B, to each (PQIm, BCIm) by year n corresponding average daily traffic where the following Expression 11 prediction planning
Amount, PQI is calculated by formula 2mCorresponding maintenance of surface expense fPQI(m), BCI is calculated by formula 5nCorresponding maintenance of bridge and tunnel expense
fBCI(n)。
An=At×(1+γ)n-tFormula 11
In formula:AnFor the average daily volume of traffic () in year n where planning.
9, each (PQI in set of computations Bm, BCIm) the sum of maintenance costs under combination:
Qm=fPQI(m)+fBCI(m)Formula 12
In formula:QmFor correspondence (PQIm, BCIm) maintenance costs (ten thousand yuan) under combination condition;fPQI(m)For corresponding PQImCondition
The maintenance of surface expense (ten thousand yuan) of lower prediction;fBCI(m)For corresponding BCImUnder the conditions of the maintenance of bridge and tunnel expense (ten thousand yuan) predicted.
10, it enables the collection being made of the maintenance costs after set B measuring and calculating be combined into C, Q is found out in Cm≤ d and numerical value minimum is right
(the PQI answeredm, BCIm), as meet the road conditions combination under the conditions of road network road conditions target, fund limited target.
Wherein, road conditions index includes MQI, PQI, BCI, and numerical intervals are 0~100.Refer to project period and works as the year before last second year extremely
The time limit in certain following year.Road conditions target refers to the road conditions index that project period is certain end of year and it is expected the level reached.
Processing method provided in this embodiment for netting the investment of grade highway maintenance, to control railway network planning phase annual maintenance
Expense and for the purpose of meeting road conditions target call, to dominate the road surface of maintenance costs, two large-engineering of bridge tunnel as point of penetration, according to two
The data such as the maintenance input over the years of large-engineering, the volume of traffic, road conditions index (PQI, BCI), establish MQI simplified mathematical models, expense
Prediction model and volume of traffic model of growth, and carry out three ladders of " MQI target controls, the intervention of subitem target, fund object filtering "
Degree target is preferred, and the final road conditions horizontal combination obtained while meeting road conditions and fund target, the guiding plan phase conserves fund
Orderly input, solving current traditional curing capitalized method cannot quickly judge to meet certain fund and the road under road conditions goal condition
Face, bridge tunel engineering conserve fund input problem.
The present embodiment further illustrates the above method by taking 5 highways that certain Speedway Control Broad is administered as an example
Carry out the processing procedure and handling result of maintenance investment.The highway route coding be respectively designated as G1, G2, G3, G4 and
G5, definition are road network A by the road network that 5 highways form.5 path lengths that road network A includes be respectively 20.5km,
25.3km, 28.7km, 26.4km and 32.1km.Method includes:
(1) it determines road network object, collects historical information
The maintenance of surface expense and maintenance of bridge and tunnel expense of road network A are collected respectively, as shown in table 1.The each of road network A is collected respectively
The route volume of traffic over the years and road condition data (the first index and the second index), as shown in table 2
1 road network A of table maintenance costs data over the years
Year |
Maintenance of surface expense (ten thousand yuan) |
Maintenance of bridge and tunnel expense (ten thousand yuan) |
2013 |
6843 |
871 |
2014 |
7689 |
954 |
2015 |
8352 |
1125 |
2016 |
10230 |
1245 |
2017 |
11874 |
1359 |
2 each routes of table volume of traffic over the years and road condition data
(2) simplify MQI models
Known by conserving input over the years, the ratio between the road surfaces road network A/maintenance of bridge and tunnel expense is 8.05, substitutes into formula and calculates, w1=
0.0007 × 8.05+0.03 × 8.05+0.5167=0.8, being simplified MQI calculation formula is:
MQI=0.8PQI+0.2BCI formulas 13
(3) road conditions and maintenance costs relationship are established
Using SPSS statistical softwares, daily traffic volume A is established in recurrencei、PQIiWith maintenance of surface expense yp(i)Relationship, see formula
14, it is as shown in Figure 5 that the model of maintenance of surface expense returns to curve;Daily traffic volume A is established in recurrencei、BCIiWith bridge maintenance expense
yb(i)Relationship, see formula 15, it is as shown in Figure 6 that the model of bridge maintenance expense returns to curve.
yp(i)=0.575Ai+88.906PQIi- 11243.936 formulas 14
yb(i)=0.036Ai-59.761BCIi+ 5988.996 formulas 15
In formula:yp(i)For 1 year maintenance of surface expense (ten thousand yuan);yb(i)For 1 year bridge maintenance expense (ten thousand yuan).
(4) average growth rate per annum is calculated
It is as shown in table 3 to count to obtain nearly 3 years volume of traffic growth patterns by traffic data over the years.It is calculated nearly 3 years
Volume of traffic average growth rate per annum be 11.90%.
3 volume of traffic growth pattern of table
Year |
The average daily volume of traffic () |
Average growth rate per annum (%) |
2015 |
20099 |
6.63 |
2016 |
22387 |
11.38 |
2017 |
26349 |
17.70 |
(5) road conditions target and limited fund target are set
Using the year two thousand twenty as object of planning year, the setting object of planning is as follows:PQI2020>=93, MQI2020>=90, F2020≤
200000000 yuan.
(6) structure meets MQI2020Point in >=90 set A, set A is as shown in Figure 3
C=90 is known by road conditions target, enables the integer in MQI=90~100, calculates w1=0.8, w2When=0.2 (PQI,
BCI it) combines, establishes set A.Table 4 shows full MQI2020>=90 (PQI, BCI) combination.
Table 4 meets MQI2020>=90 (PQI, BCI) combination
(7) structure meets PQI2020≥93、MQI2020Point such as Fig. 4 cathetus PQI=93 in >=90 set B, set B
Shown in the point on the right.
C=90, a=93 are known by road conditions target, on the basis of set A, further screening meets PQI2020≥93、
MQI2020>=90 (PQI, BCI) combination, establishes set B={ (PQIm, BCIm) | m is the sequence met the requirements }.
(8) daily traffic volume under prediction sets B each (PQI, BCI) combination, maintenance of surface expense, maintenance of bridge and tunnel expense
First, the average daily volume of traffic of the year two thousand twenty is predicted
A2020=26349 × (1+11.9%)2020-2017=36919 formulas 16
Secondly, maintenance costs is predicted
The average daily volume of traffic after calculating is substituted into formula 14, formula 15, the maintenance in prediction sets B under each (PQI, BCI) combination
Expense.
With MQI=90~100 and APQI in table 42020For (PQI, BCI) combination under the conditions of >=93, road is calculated separately
Face maintenance costs, maintenance of bridge and tunnel expense such as table 5.
The lower maintenance costs prediction of 5 set B of table each (PQI, BCI) combination
(9) maintenance costs and composition set C in set of computations B under each (PQI, BCI) combination, obtains as shown in table 6
As a result.
The lower maintenance costs of 6 set B of table each (PQI, BCI) combination calculates
(10) (PQI, the BCI) combination for meeting fund target is found out in set C
It is filtered out under set C by table 6, the minimum maintenance costs of the year two thousand twenty is 19714.25 ten thousand yuan, meets fund target
“F2020≤ 20,000 ten thousand yuan " requirement.
To sum up, meeting PQI2020>=93, MQI2020>=90, F2020When≤20,000 ten thousand yuan of multiple target condition, prediction
(PQI, the BCI) of the year two thousand twenty is combined as (93,98).
Fig. 7 shows a kind of structure for netting the processing unit of grade highway maintenance investment that the embodiment of the present invention provides
Block diagram, referring to Fig. 7, the processing unit provided in this embodiment for netting the investment of grade highway maintenance, including the first acquisition module
701, module 702, the second acquisition module 703 and prediction module 704 are established, wherein
First acquisition module 701 obtains road network upkeep charges over the years for the determining road network for being intended to carry out maintenance investment
With the average daily volume of traffic and road conditions index over the years with each road in the road network;
Establish module 702, for according to maintenance costs over the years, the average daily volume of traffic and road conditions Index Establishment maintenance costs with
The functional relation of the average daily volume of traffic and the variation of road conditions index;
Second acquisition module 703, it is preset in prediction year in one's duty maintenance dollar cap value and road conditions for obtaining
Index lower limiting value, and the average daily volume of traffic of target for predicting the time is corresponded to according to average daily traffic volume forecast over the years;
Prediction module 704 is the average daily volume of traffic of the target for finding the average daily volume of traffic according to the functional relation, and
The minimum maintenance costs for meeting the road conditions index lower limiting value and the maintenance dollar cap value, according to the minimum maintenance costs
Maintenance investment is carried out to the road network.
What the processing unit provided in this embodiment for netting the investment of grade highway maintenance was provided suitable for above-described embodiment
Processing method for netting the investment of grade highway maintenance, details are not described herein.
A kind of processing unit for netting the investment of grade highway maintenance is present embodiments provided, the device is according to maintenance over the years
Expense, the average daily volume of traffic and road conditions index pre-establish Cost Prediction Model, and are corresponded to by average daily traffic volume forecast over the years
In the average daily volume of traffic of target in prediction time, using each road conditions index of setting and maintenance dollar cap value as constraints, soon
Speed is determined to meet road conditions index request and the prime investment scheme with maintenance dollar cap value, solves current traditional curing and throw
Capital's method cannot quickly judge that meet certain fund asks with the road surface under road conditions goal condition, bridge tunel engineering maintenance fund input
Topic.
Fig. 8 is the entity structure schematic diagram for showing electronic equipment provided in this embodiment.
With reference to Fig. 8, the electronic equipment includes:Processor (processor) 801, memory (memory) 802 and bus
803;
Wherein,
The processor 801, memory 802 complete mutual communication by the bus 803;
The processor 801 is used to call the program instruction in the memory 802, to execute above-mentioned each method embodiment
The method provided, such as including:It determines the road network for being intended to carry out maintenance investment, obtains road network maintenance costs over the years and institute
State the average daily volume of traffic and road conditions index that each road is over the years in road network;According to maintenance costs over the years, the average daily volume of traffic and road conditions
The functional relation that Index Establishment maintenance costs changes with the average daily volume of traffic and road conditions index;It obtains preset in the prediction time
Interior maintenance dollar cap value and road conditions index lower limiting value, and the prediction year is corresponded to according to average daily traffic volume forecast over the years
The average daily volume of traffic of target of part;It is the average daily volume of traffic of the target to find the average daily volume of traffic according to the functional relation, and is met
The minimum maintenance costs of the road conditions index lower limiting value and the maintenance dollar cap value, according to the minimum maintenance costs to institute
It states road network and carries out maintenance investment.
The present embodiment provides a kind of non-transient computer readable storage medium, the non-transient computer readable storage medium
Computer instruction is stored, the computer instruction makes the computer execute the method that above-mentioned each method embodiment is provided, example
Such as include:It determines the road network for being intended to carry out maintenance investment, obtains each road in road network maintenance costs over the years and the road network
The average daily volume of traffic and road conditions index over the years;According to maintenance costs over the years, the average daily volume of traffic and road conditions Index Establishment upkeep charges
With the functional relation with the average daily volume of traffic and the variation of road conditions index;It obtains preset on predicting year in one's duty maintenance fund
Limit value and road conditions index lower limiting value, and the target in the prediction time is corresponded to according to average daily traffic volume forecast over the years and is daily handed over
Flux;It is the average daily volume of traffic of the target to find the average daily volume of traffic according to the functional relation, and is met under the road conditions index
The minimum maintenance costs of limit value and the maintenance dollar cap value, conserves the road network according to the minimum maintenance costs
Investment.
The present embodiment discloses a kind of computer program product, and the computer program product includes being stored in non-transient calculating
Computer program on machine readable storage medium storing program for executing, the computer program include program instruction, when described program instruction is calculated
When machine executes, computer is able to carry out the method that above-mentioned each method embodiment is provided, it may for example comprise:Determination is intended to be conserved
The road network of investment obtains each road is over the years in road network maintenance costs over the years and the road network the average daily volume of traffic and road conditions
Index;Referred to the average daily volume of traffic and road conditions according to maintenance costs over the years, the average daily volume of traffic and road conditions Index Establishment maintenance costs
Mark the functional relation of variation;Obtain it is preset in prediction year in one's duty maintenance dollar cap value and road conditions index lower limiting value,
And correspond to the average daily volume of traffic of target in the prediction time according to average daily traffic volume forecast over the years;According to the functional relation
It is the average daily volume of traffic of the target to find the average daily volume of traffic, and meets the road conditions index lower limiting value and the maintenance fund upper limit
The minimum maintenance costs of value, maintenance investment is carried out according to the minimum maintenance costs to the road network.
One of ordinary skill in the art will appreciate that:Realize that all or part of step of above method embodiment can pass through
The relevant hardware of program instruction is completed, and program above-mentioned can be stored in a computer read/write memory medium, the program
When being executed, step including the steps of the foregoing method embodiments is executed;And storage medium above-mentioned includes:ROM, RAM, magnetic disc or light
The various media that can store program code such as disk.
The embodiments such as the entity structure of terminal or base station described above are only schematical, wherein the conduct
The unit that separating component illustrates may or may not be physically separated, the component shown as unit can be or
Person may not be physical unit, you can be located at a place, or may be distributed over multiple network units.It can root
According to actual need that some or all of module therein is selected to achieve the purpose of the solution of this embodiment.Ordinary skill
Personnel are not in the case where paying performing creative labour, you can to understand and implement.
Through the above description of the embodiments, those skilled in the art can be understood that each embodiment can
It is realized by the mode of software plus required general hardware platform, naturally it is also possible to pass through hardware.Based on this understanding, on
Stating technical solution, substantially the part that contributes to existing technology can be expressed in the form of software products in other words, should
Computer software product can store in a computer-readable storage medium, such as ROM/RAM, magnetic disc, CD, including several fingers
It enables and using so that a computer equipment (can be personal computer, server or the network equipment etc.) executes each implementation
Method described in certain parts of example or embodiment.
Finally it should be noted that:The above various embodiments is only to illustrate the technical solution of the embodiment of the present invention rather than right
It is limited;Although the embodiment of the present invention is described in detail with reference to foregoing embodiments, the ordinary skill of this field
Personnel should understand that:It still can be with technical scheme described in the above embodiments is modified, or to which part
Or all technical features carries out equivalent replacement;And these modifications or replacements, it does not separate the essence of the corresponding technical solution
The range of various embodiments of the present invention technical solution.