CN108763750A - 一种基于bim的管线优化方法 - Google Patents

一种基于bim的管线优化方法 Download PDF

Info

Publication number
CN108763750A
CN108763750A CN201810524690.9A CN201810524690A CN108763750A CN 108763750 A CN108763750 A CN 108763750A CN 201810524690 A CN201810524690 A CN 201810524690A CN 108763750 A CN108763750 A CN 108763750A
Authority
CN
China
Prior art keywords
pipeline
buildings model
color
clear height
different
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201810524690.9A
Other languages
English (en)
Inventor
梁梓伟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Tianyuan Guangdong Architectural Design Co Ltd
Original Assignee
Tianyuan Guangdong Architectural Design Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Tianyuan Guangdong Architectural Design Co Ltd filed Critical Tianyuan Guangdong Architectural Design Co Ltd
Priority to CN201810524690.9A priority Critical patent/CN108763750A/zh
Publication of CN108763750A publication Critical patent/CN108763750A/zh
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06TIMAGE DATA PROCESSING OR GENERATION, IN GENERAL
    • G06T17/00Three dimensional [3D] modelling, e.g. data description of 3D objects
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F30/00Computer-aided design [CAD]
    • G06F30/10Geometric CAD
    • G06F30/13Architectural design, e.g. computer-aided architectural design [CAAD] related to design of buildings, bridges, landscapes, production plants or roads
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F2113/00Details relating to the application field
    • G06F2113/14Pipes

Landscapes

  • Engineering & Computer Science (AREA)
  • Physics & Mathematics (AREA)
  • Geometry (AREA)
  • Theoretical Computer Science (AREA)
  • General Physics & Mathematics (AREA)
  • Computer Hardware Design (AREA)
  • Civil Engineering (AREA)
  • Architecture (AREA)
  • Software Systems (AREA)
  • Computer Graphics (AREA)
  • Structural Engineering (AREA)
  • Computational Mathematics (AREA)
  • Mathematical Analysis (AREA)
  • Mathematical Optimization (AREA)
  • Pure & Applied Mathematics (AREA)
  • Evolutionary Computation (AREA)
  • General Engineering & Computer Science (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)
  • Processing Or Creating Images (AREA)

Abstract

一种基于BIM的管线优化方法;包括步骤:S1:利用BIM软件构建三维的建筑模型;S2:调整建筑模型中管线的排布;S3:为不同标高区间或不同净高维度内的管线,根据相应高度所对应的颜色依次上色;S4:利用Revit软件的插件dynamo编写让梁板结构上颜色的节点,运行节点让梁的相应高度所对应的颜色依次上色;S5:将步骤S3和步骤S4中所上颜色产生交集的位置定义为建筑模型内净高紧张区域,并对该建筑模型内净高紧张区域内的管线进行优化调整。把管线净高情况以不同颜色反映出来,快速、直观地暴露净高问题;可视化的优势更有利于不同专业的配合沟通,能更全面地提前预判断施工中遇到的问题,避免二维图纸所不能表达的空间问题,提高管线施工的准确性和效率。

Description

一种基于BIM的管线优化方法
技术领域
本发明涉及建筑内管线优化的方法,特别涉及一种基于BIM的管线优化方法。
背景技术
随着我国经济快速持续发展,各类建筑规模越来越大,并且建筑功能越来越多样化,设备的种类也越来越多,连接的管线也越来越复杂,传统的二维管线综合图并不能直观表现出各专业管线与建筑主体的空间关系,容易导致各专业施工人员到现场各自施工时难以管理,容易造成管线碰撞、空间利用率不高和返工导致的建材浪费成本增加。
发明内容
为实现上述目的,本发明提出一种基于BIM的管线优化方法;包括步骤:
S1:利用BIM软件构建三维的建筑模型;
S2:调整建筑模型中管线的排布;
S3:为不同标高区间或不同净高维度内的管线,根据相应高度所对应的颜色依次上色;
S4:利用Revit软件的插件dynamo编写让梁板结构上颜色的节点,运行节点让梁的相应高度所对应的颜色依次上色;
S5:将步骤S3和步骤S4中所上颜色产生交集的位置定义为建筑模型内净高紧张区域,并对该建筑模型内净高紧张区域内的管线进行优化调整。
优选的,步骤S2中选定的是为不同标高区间内的管线进行上色时,利用Revit软件的“系统颜色方案”为处于不同标高区间的管线设定不同的颜色。
优选的,步骤S2中选定的是为不同净高维度内的管线进行上色时,利用Revit软件的插件“Dynamo”编写让管线上颜色的节点,运行节点让不同净高维度内的管线根据给定的颜色依次上色。
优选的,将步骤S5调整后的建筑模型导入可视化软件Navisworks,通过软件的漫游功能对调整后的管线模型作碰撞检测,并根据碰撞检测中所得的问题修改建筑模型。
优选的,步骤S1中,以二维图纸作为依据,利用BIM软件构建三维的建筑模型。
优选的,步骤S2中,根据机电综合管线排布的原则,调整建筑模型中管线的排布。
相对于旧的综合管线优化方法,本方法通过BIM软件把管线净高情况以不同颜色反映出来,能快速、直观地暴露净高问题。可视化的优势更加有利于不同专业的配合沟通,便于对现场的施工管理,能更全面地提前预判断施工中会遇到的问题,避免了二维图纸所不能表达的空间问题,提高了管线施工的准确性和效率。
具体实施方式
下面将对本发明实施例中的技术方案进行清楚、完整地描述,显然,所描述的实施例仅仅是本发明的一部分实施例,而不是全部的实施例。基于本发明中的实施例,本领域普通技术人员在没有作出创造性劳动前提下所获得的所有其他实施例,都属于本发明保护的范围。
一种基于BIM的管线优化方法,包括步骤:
S1:以二维图纸作为依据,利用BIM软件(本实施例中使用的均为Revit软件)构建三维的建筑模型,本实施例中的建筑模型包括建筑本身的结构、管线、机电设备等,本实施例中的管线包括但不限于风管、水管和机电管线;
S2:利用Revit软件的三维视图以及剖面视图功能,依照规范以及项目具体的管综排布原则初步调整管线,使管线在平面上合理排布;
S3:利用以下两种方法之一,为建筑模型内管线的不同高度区间依次上色,不同的高度区间所对应的颜色作统一规定(即所有管线在相同高度区间内的管线颜色相同,同一管线在不同的高度区间的颜色不同),以判断管线对建筑空间的影响情况:
方式一:利用Revit软件的“系统颜色方案”为直接为处于不同标高区间的管线设定不同的颜色;
方式二:利用Revit软件的插件“Dynamo”编写让管线上颜色的节点,运行节点让不同净高维度内的管线根据给定的颜色依次上色;
本实施例中的标高表示的是建筑物某一部位相对于基准面(一般选用海平面作为基准面)的竖向高度,是竖向定位的依据。
净高指建筑物中楼面或地面至上部楼板底面之间的最小垂直距离。 可理解为:下层地板面或楼板上表面到上层楼板下表面之间的距离,楼梯净高和层高的关系可以用公式来表示:
净高=层高-楼板厚度,即层高和楼板厚度的差叫净高。
S4:利用Revit软件编写让梁板结构上颜色的节点,运行节点让梁的相应高度所对应的颜色依次上色;本实施例中的梁板结构包括但不限于建筑的墙壁、建筑物中楼面或地面至上部楼板底面之间的各种竖梁、隔断,管线依附梁板结构而设置。
S5:将步骤S3和步骤S4中所上颜色产生交集的位置定义为建筑模型内净高紧张区域,通过该建筑模型内净高紧张区域内可以知道管线净高较低处和结构对建筑净高影响较严重的地方,通过两者的交集我们更能直观地检查出建筑空间内净高紧张区域,以便着重优化调整。
将步骤S5调整后的建筑模型导入可视化软件Navisworks,通过软件的漫游功能对调整后的管线模型作碰撞检测,并根据碰撞检测中所得的问题修改建筑模型。
相对于旧的综合管线优化方法,本方法通过BIM软件把管线净高情况以不同颜色反映出来,能快速、直观地暴露净高问题。可视化的优势更加有利于不同专业的配合沟通,便于对现场的施工管理,能更全面地提前预判断施工中会遇到的问题,避免了二维图纸所不能表达的空间问题,提高了管线施工的准确性和效率。
以上所述仅为本发明的优选实施例,并非因此限制本发明的专利范围,凡是在本发 明的发明构思下,利用本发明说明书所作的等效结构变换,或直接/间接运用在其他相关的 技术领域均包括在本发明的专利保护范围内。

Claims (6)

1.一种基于BIM的管线优化方法,其特征在于,包括步骤:
S1:利用BIM软件构建三维的建筑模型;
S2:调整建筑模型中管线的排布;
S3:为不同标高区间或不同净高维度内的管线,根据相应高度所对应的颜色依次上色;
S4:利用Revit软件的插件dynamo编写让梁板结构上颜色的节点,运行节点让梁的相应高度所对应的颜色依次上色;
S5:将步骤S3和步骤S4中所上颜色产生交集的位置定义为建筑模型内净高紧张区域,并对该建筑模型内净高紧张区域内的管线进行优化调整。
2.如权利要求1所述的管线优化方法,其特征在于,步骤S2中选定的是为不同标高区间内的管线进行上色时,利用Revit软件的“系统颜色方案”为处于不同标高区间的管线设定不同的颜色。
3.如权利要求1所述的管线优化方法,其特征在于,步骤S2中选定的是为不同净高维度内的管线进行上色时,利用Revit软件的插件“Dynamo”编写让管线上颜色的节点,运行节点让不同净高维度内的管线根据给定的颜色依次上色。
4.如权利要求1所述的管线优化方法,其特征在于:将步骤S5调整后的建筑模型导入可视化软件Navisworks,通过软件的漫游功能对调整后的管线模型作碰撞检测,并根据碰撞检测中所得的问题修改建筑模型。
5.如权利要求1所述的管线优化方法,其特征在于:步骤S1中,以二维图纸作为依据,利用BIM软件构建三维的建筑模型。
6.如权利要求1所述的管线优化方法,其特征在于:步骤S2中,根据机电综合管线排布的原则,调整建筑模型中管线的排布。
CN201810524690.9A 2018-05-28 2018-05-28 一种基于bim的管线优化方法 Pending CN108763750A (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810524690.9A CN108763750A (zh) 2018-05-28 2018-05-28 一种基于bim的管线优化方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810524690.9A CN108763750A (zh) 2018-05-28 2018-05-28 一种基于bim的管线优化方法

Publications (1)

Publication Number Publication Date
CN108763750A true CN108763750A (zh) 2018-11-06

Family

ID=64002811

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810524690.9A Pending CN108763750A (zh) 2018-05-28 2018-05-28 一种基于bim的管线优化方法

Country Status (1)

Country Link
CN (1) CN108763750A (zh)

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110765515A (zh) * 2019-09-27 2020-02-07 贵州百胜工程建设咨询有限公司 一种基于bim的管综优化方法
CN110990983A (zh) * 2019-12-05 2020-04-10 中建长远建设有限公司 一种给水管道交叉布置方法
CN111143924A (zh) * 2019-12-17 2020-05-12 万翼科技有限公司 自动管线综合方法及相关产品
CN111475877A (zh) * 2020-03-06 2020-07-31 青岛腾远设计事务所有限公司 一种基于bim技术测算空间净高的方法、装置及终端
CN112163262A (zh) * 2020-10-10 2021-01-01 中国建筑第二工程局有限公司 基于bim技术的轻钢龙骨设计方法、装置及存储介质
CN112484695A (zh) * 2020-12-03 2021-03-12 成都基准方中建筑设计有限公司 一种基于bim模型的建筑室内空间净高分析方法及装置
CN112487534A (zh) * 2020-11-30 2021-03-12 中建八局轨道交通建设有限公司 基于bim技术对建筑物进行净高分析的方法
CN112685862A (zh) * 2020-10-21 2021-04-20 升维科技有限公司 一种基于bim的管线排布优化方法
CN116050040A (zh) * 2023-03-28 2023-05-02 中国建筑第二工程局有限公司 一种基于管线排布空间特征的智能排布方法及系统

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105808835A (zh) * 2016-03-04 2016-07-27 上海宝冶集团有限公司 基于bim的机电系统管线装配方法
CN106202831A (zh) * 2016-08-10 2016-12-07 中国建筑第八工程局有限公司 一种基于bim的管线综合优化方法
US20180113959A1 (en) * 2016-10-21 2018-04-26 Autodesk, Inc. Cloud-enabled generation of construction metrics and documentation

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105808835A (zh) * 2016-03-04 2016-07-27 上海宝冶集团有限公司 基于bim的机电系统管线装配方法
CN106202831A (zh) * 2016-08-10 2016-12-07 中国建筑第八工程局有限公司 一种基于bim的管线综合优化方法
US20180113959A1 (en) * 2016-10-21 2018-04-26 Autodesk, Inc. Cloud-enabled generation of construction metrics and documentation

Non-Patent Citations (3)

* Cited by examiner, † Cited by third party
Title
刘学贤等: "BIM技术在航站楼项目中的应用――以青岛胶东国际机场T1航站楼为例", 《城市建筑》 *
杨远丰等: "三维管线综合设计实践与技术探讨", 《BIM项目实践》 *
许蓁等: "基于BIM的建筑模型构件化研究", 《城市建筑》 *

Cited By (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110765515A (zh) * 2019-09-27 2020-02-07 贵州百胜工程建设咨询有限公司 一种基于bim的管综优化方法
CN110990983A (zh) * 2019-12-05 2020-04-10 中建长远建设有限公司 一种给水管道交叉布置方法
CN111143924A (zh) * 2019-12-17 2020-05-12 万翼科技有限公司 自动管线综合方法及相关产品
CN111475877A (zh) * 2020-03-06 2020-07-31 青岛腾远设计事务所有限公司 一种基于bim技术测算空间净高的方法、装置及终端
CN112163262A (zh) * 2020-10-10 2021-01-01 中国建筑第二工程局有限公司 基于bim技术的轻钢龙骨设计方法、装置及存储介质
CN112685862A (zh) * 2020-10-21 2021-04-20 升维科技有限公司 一种基于bim的管线排布优化方法
CN112487534A (zh) * 2020-11-30 2021-03-12 中建八局轨道交通建设有限公司 基于bim技术对建筑物进行净高分析的方法
CN112484695A (zh) * 2020-12-03 2021-03-12 成都基准方中建筑设计有限公司 一种基于bim模型的建筑室内空间净高分析方法及装置
CN116050040A (zh) * 2023-03-28 2023-05-02 中国建筑第二工程局有限公司 一种基于管线排布空间特征的智能排布方法及系统
CN116050040B (zh) * 2023-03-28 2023-08-15 中国建筑第二工程局有限公司 一种基于管线排布空间特征的智能排布方法及系统

Similar Documents

Publication Publication Date Title
CN108763750A (zh) 一种基于bim的管线优化方法
US9619944B2 (en) Coordinate geometry augmented reality process for internal elements concealed behind an external element
Han et al. Formalized knowledge of construction sequencing for visual monitoring of work-in-progress via incomplete point clouds and low-LoD 4D BIMs
US20080055554A1 (en) Full Scale Plan Projection
KR102059904B1 (ko) 건물 평면도 제공장치 및 방법
CN110990983A (zh) 一种给水管道交叉布置方法
CN103778566A (zh) 基于三维可视化展示的火电厂监测方法
CN103761683B (zh) 火电厂三维虚拟可视化展示方法
WO2013161824A1 (ja) 自動cad設計システム、自動cad設計方法および記憶媒体
CN109856655A (zh) 一种基于北斗gnss和bim的施工期人员定位、监管方法
CN110516386A (zh) 一种基于手机bim施工图ar确定现场坐标位置的方法
CN108875112A (zh) 一种整体模块化住宅硬装修的方法
Waldron et al. Embodied energy and operational energy: Case studies comparing different urban layouts
CN115659564A (zh) 一种基于三维设计的输变电工程模型构建方法
Xie et al. Incorporating building information modeling (BIM) into the super high-rise industrialized housing project: A case study
CN110390725A (zh) 一种管道竣工图生成方法、装置和系统
CN109635482A (zh) 一种用于bim模型的质量自动检测系统
CN114352032B (zh) 一种精细化水电木工施工放线工艺
Dobelis et al. The capture of BIM compatible 3D building model from laser scanner data
JP2012230577A (ja) Cadシステム内のオブジェクトの干渉検出方法
Rui et al. BIM in Precast Construction: A Case Study of Highrise Residential Building
Szitar et al. Sustainable retrofitting of blocks of flats: environmental, economic and social aspects
Marriage Site: planning
de Wilde et al. Building performance simulation for the management of thermal performance risks in buildings subject to climate change
Cardoso et al. Strategic Planning of Work and the Use of 4D BIM for Multiple Floor Buildings

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20181106

RJ01 Rejection of invention patent application after publication