A kind of steel tube tower in electric transmission line supervisor Gen Kai adjusting apparatus
Technical field
The present invention relates to electrical distribution fields, and in particular to a kind of steel tube tower in electric transmission line supervisor Gen Kai adjusting apparatus.
Background technology
During iron tower of power transmission line group is vertical, since steel tower tower body main material is in have an introversion oblique angle to 45 degree of tower center direction
Degree, after the completion of main material lifting, by main material effect of weight, main material must pylon center inclination, cause horizontal material and X-braced panels
Root in place, which is opened, to become smaller, and influences to install.When actual installation, it is necessary to use corresponding measure, be adjusted, ensure just to supervisor's gradient
Position root is full of sufficient installation requirement.
During iron tower of power transmission line group is vertical, the root that main material is usually adjusted by the way that interim external cable is arranged is opened, in order to water
Flat material, the installation gap in place for intersecting material and main material are met the requirements, however this method is suitable only for that topographical position is broad, periphery
It places obstacles the tower position of object without bracing wire is influenced.When iron tower of power transmission line is located at mountain area, area crisscrossed by waterways and neighbouring power circuit, height
It when the barriers such as fast railway, highway, is limited by landform, remote external cable can not be set, then need to take special arrange
It applies solution main material root and opens adjustment problem, and then easily carry out supervisor's Slope angle adjustment, in order to horizontal material, intersect material and main material
It can smoothly connect.
Invention content
A kind of steel tube tower in electric transmission line supervisor Gen Kai adjustment dresses in order to overcome the deficiencies in the prior art, the present invention provides
It sets.
In order to solve the above-mentioned technical problem, the present invention adopts the following technical scheme that:
A kind of steel tube tower in electric transmission line is responsible for Gen Kai adjusting apparatus, including top supervisor, lower part supervisor and adjusting apparatus, it is described on
Portion is responsible for bottom and is equipped with top supervisor's flange, and being equipped with multiple tops around above-mentioned supervisor's flange is responsible for flange stiffener,
It is equipped with lower part at the top of the lower part supervisor flange and is responsible for flange, being equipped with multiple lower parts around the lower part supervisor flange is responsible for method
Blue stiffener, the adjusting apparatus include top girder steel and bottom girder steel, and thousand are equipped between the top girder steel and bottom girder steel
The side on jin top, the top girder steel is connect with top supervisor's flange stiffener, the bottom of the top girder steel other side
It is connect with the top of the jack, the side of the bottom girder steel is connect with lower part supervisor's flange stiffener, the bottom
The top of the portion girder steel other side is connect with the bottom of the jack, and the adjusting apparatus has two sets, is separately positioned on steel tower 45
Oblique root is spent to burst at the seams the both sides in direction.
Preferably, the both sides of the top girder steel are equipped with top girder steel stiffener, the both sides of the bottom girder steel are equipped with
Bottom girder steel stiffener.
Preferably, the top girder steel is fixedly connected by top power transmission otic placode with the jack.
Preferably, the bottom girder steel is fixedly connected by bottom force transmitting board with most jack.
It is fixed with top supervisor's flange stiffener preferably, the top girder steel connects bolt by top girder steel
Connection, the bottom girder steel connect bolt by bottom girder steel and are fixedly connected with lower part supervisor's flange stiffener.
Preferably, the quantity that top supervisor's flange stiffener is responsible for flange stiffener with lower part is identical, and position
It corresponds.
Preferably, the top girder steel and bottom girder steel are by two " U " shape groove profile girder steels form, and two " U " shape slots
Section steel beam is bolted by girder steel connection.
Preferably, girder steel first line of a couplet tie-plate is additionally provided at the top of the top girder steel, the both sides of the girder steel first line of a couplet tie-plate
Respectively with composition top two of girder steel " U " shape groove profile girder steels connect, the bottom of the bottom girder steel, which is additionally provided under girder steel, to be contacted
Plate, the both sides of the girder steel second line of a couplet tie-plate two with composition bottom girder steel respectively " U " shape groove profile girder steels are connect.
The beneficial effects of the invention are as follows:
The present invention realizes the adjustment opened main material root using jack, it is not necessary that interim external cable is arranged, is not limited by place, can be wide
The general supervisor Gen Kai applied to UHV transmission line steel tube tower or transmission line of electricity steel pipe tower for large cross adjusts operation, simple real
With securely and reliably, substantially increasing high-altitude installation exercise work efficiency.
Description of the drawings
Fig. 1 is the overall structure diagram of the present invention;
Fig. 2 is the structural schematic diagram of adjusting apparatus;
Fig. 3 is adjusting apparatus schematic view of the mounting position;
Fig. 4 is the vertical view of top girder steel;
Fig. 5 is the upward view of bottom girder steel.
Reference numerals list:
The tops 1- are responsible for;The lower parts 2- are responsible for;3- adjusting apparatus;Flange is responsible on the tops 4-;Flange stiffener is responsible on the tops 5-;Under 6-
Portion is responsible for flange;Flange stiffener is responsible in 7 lower parts;Girder steel at the top of 8-;The bottoms 9- girder steel;10- jack;11- jack operate
Bar;Power transmission otic placode at the top of 12-;The bottoms 13- force transmitting board;Girder steel connects bolt at the top of 14-;The bottoms 15- girder steel connects bolt;16-
Top girder steel stiffener;The bottoms 17- girder steel stiffener;18- girder steels connect bolt;19- girder steel first line of a couplet tie-plates;The 20- girder steel second lines of a couplet
Tie-plate.
Specific implementation mode
The invention will be further described with reference to the accompanying drawings and detailed description:
As shown in Figure 1 and Figure 2, a kind of steel tube tower in electric transmission line is responsible for Gen Kai adjusting apparatus, including top supervisor 1, lower part supervisor 2
With adjusting apparatus 3, top is responsible for 1 bottom and is equipped with top supervisor's flange 4, and being equipped with multiple tops around above-mentioned supervisor's flange is responsible for
Flange stiffener 5, lower part, which is responsible for the top of flange 6 and is equipped with lower part, is responsible for flange 6, lower part be responsible for around flange 6 be equipped with it is multiple under
Portion is responsible for flange stiffener 7, and top supervisor's flange stiffener 5 is identical with the quantity of lower part supervisor's flange stiffener 7, and position one
One corresponds to.Adjusting apparatus 3 includes top girder steel 8 and bottom girder steel 9, and jack is equipped between top girder steel 8 and bottom girder steel 9
10, jack 10 is equipped with jack operating lever 11, and the side of top girder steel 8 is connect with top supervisor's flange stiffener 5, top
The bottom of 8 other side of girder steel is connect with the top of jack 10, and side and the lower part supervisor's flange stiffener 7 of bottom girder steel 9 connect
It connects, the top of 9 other side of bottom girder steel is connect with the bottom of jack 10, and adjusting apparatus 3 has two sets, is separately positioned on steel tower 45
It spends oblique root to burst at the seams the both sides in direction, the installation site of adjusting apparatus 3 is as shown in figure 3, arrow direction is that the oblique root of steel tower bursts at the seams in figure
Direction.
Top girder steel 8 is fixedly connected by top power transmission otic placode 12 with jack 10 in this example.Bottom girder steel 9 passes through bottom
Force transmitting board 13 is fixedly connected with most jack 10.Top girder steel 8 connects bolt 1814 by top girder steel and is responsible for method with top
Blue stiffener 5 is fixedly connected, and bottom girder steel 9 connects bolt 1815 by bottom girder steel and is responsible for 7 fixation of flange stiffener with lower part
Connection.
The structure of top girder steel 8 and bottom girder steel 9 is as shown in Figure 4, Figure 5, and the both sides of top girder steel 8 add equipped with top girder steel
The both sides of strength plate 16, bottom girder steel 9 are equipped with bottom girder steel stiffener 17.Top girder steel 8 and bottom girder steel 9 are by two " U " shapes
Groove profile girder steel form, two " U " shape groove profile girder steels pass through girder steel connect bolt 18 connect.
The top of top girder steel 8 is additionally provided with girder steel first line of a couplet tie-plate 19, and the both sides of girder steel first line of a couplet tie-plate 19 are pushed up with composition respectively
Two of portion's girder steel 8 " U " shape groove profile girder steels connect, and the bottom of bottom girder steel 9 is additionally provided with girder steel second line of a couplet tie-plate 20, is contacted under girder steel
The both sides of plate 20 respectively with composition two of bottom girder steel 9 " U " shape groove profile girder steels connect.
The application method of above-mentioned steel tube tower in electric transmission line supervisor Gen Kai adjusting apparatus 3, includes the following steps:
(a)Before 1 lifting of top supervisor, the bottom girder steel 9 of two sets of adjusting apparatus 3 is installed on lower supervisor's flange stiffener, even
The lower flange stiffener for connecing bottom girder steel 9 is located at 45 degree of oblique roots of steel tower and bursts at the seams direction both sides;
(b)Before 1 lifting of top supervisor, the top girder steel 8 of two sets of adjusting apparatus 3 is respectively arranged in top and is responsible for flange stiffener
On 5, the upper flange stiffener of connection top girder steel 8 is similarly positioned in 45 degree of oblique roots of steel tower and bursts at the seams direction both sides;
(c)After 1 lifting of top supervisor is in place, two sets of hydraulic jacks 10 are installed between top girder steel 8 and bottom girder steel 9,
10 upper end of jack is connect with the power transmission otic placode on top girder steel 8 by axis pin, and 10 pedestal of jack is positioned on bottom girder steel 9
On the force transmitting board in portion;
(d)After two sets of adjusting apparatus 3 install, two sets of hydraulic jacks 10 of synchronization of jacking up make on the inside of supervisor's 4 plate of flange of top
It lifts slightly, generates flange gap, with the inclination of top supervisor 1, top is responsible for 1 top and bursts at the seams direction along the oblique root of steel tower
Negative direction also generates certain displacement, so that 2 supervisor's taproots of steel tower or so open size and open size slightly larger than design taproot,
Finally level supervisor, X-braced panels steel pipe can smoothly be connect with supervisor.
The technical means disclosed in the embodiments of the present invention is not limited only to the technological means disclosed in the above embodiment, further includes
By the above technical characteristic arbitrarily the formed technical solution of combination.It should be pointed out that for those skilled in the art
For, various improvements and modifications may be made without departing from the principle of the present invention, these improvements and modifications are also considered as
Protection scope of the present invention.