CN108755739A - 一种风力发电机组基础环 - Google Patents

一种风力发电机组基础环 Download PDF

Info

Publication number
CN108755739A
CN108755739A CN201810986972.0A CN201810986972A CN108755739A CN 108755739 A CN108755739 A CN 108755739A CN 201810986972 A CN201810986972 A CN 201810986972A CN 108755739 A CN108755739 A CN 108755739A
Authority
CN
China
Prior art keywords
ring
concrete
steel base
high performance
foundation ring
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201810986972.0A
Other languages
English (en)
Other versions
CN108755739B (zh
Inventor
吕伟荣
周卿祺
卢倍嵘
王功勋
袁深根
周志锦
廖继彪
姚帅
刘雪梅
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hunan University of Science and Technology
Original Assignee
Hunan University of Science and Technology
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hunan University of Science and Technology filed Critical Hunan University of Science and Technology
Priority to CN201810986972.0A priority Critical patent/CN108755739B/zh
Publication of CN108755739A publication Critical patent/CN108755739A/zh
Application granted granted Critical
Publication of CN108755739B publication Critical patent/CN108755739B/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D27/00Foundations as substructures
    • E02D27/32Foundations for special purposes
    • E02D27/42Foundations for poles, masts or chimneys
    • E02D27/425Foundations for poles, masts or chimneys specially adapted for wind motors masts

Landscapes

  • Engineering & Computer Science (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Wind Motors (AREA)

Abstract

本发明公开了一种风力发电机组基础环,包括钢制基础环,基础环内外壁均设有高性能混凝土预制条带,钢制基础环内外壁上设筒身栓钉,筒身栓钉一端焊接固定在钢制基础环上,另一端贯穿高性能混凝土预制条带并外露,与现场浇筑普通混凝土进行连接。本发明在钢制基础环内外壁上设有环形高性能混凝土预制条带,通过采用高性能混凝土先预制包裹基础环,并设置筒身栓钉后与普通混凝土进行现场整体浇筑,保证了基础环与混凝土间界面的混凝土施工质量,提高了界面间抗剪刚度和抗疲劳能力,延长了风机基础使用寿命。

Description

一种风力发电机组基础环
技术领域
本发明涉及风电领域,特别涉及一种风力发电机组基础环。
背景技术
当前,为适应低风速发电需求,长直径、大叶片的新机型不断涌现,这直接导致风致疲劳荷载的显著增加,传统的基础环式风机基础因无法满足疲劳荷载增加的需求而导致混凝土与钢制基础环间界面过早地失效而松动摇摆,严重的导致塔筒倾斜而无法正常使用,造成极大的经济损失。
传统的风机基础环,往往是通过设置上下穿环孔及穿环钢筋保证混凝土与钢制基础环间的连接,界面间抗剪性能有限,在风致疲劳荷载不大的情况下尚能应付,但随着新机型的不断出现,疲劳荷载的增加,其疲劳寿命则显著降低,基础失效事故不断涌现,为业主造成较大的经济损失,这表明传统的基础环亟需改进。
发明内容
为了解决上述技术问题,本发明提供一种结构简单、界面抗剪性能好的风力发电机组基础环。
本发明解决上述问题的技术方案是:一种风力发电机组基础环,包括钢制基础环,基础环内外壁均设有高性能混凝土预制条带,钢制基础环内外壁上设筒身栓钉,筒身栓钉一端焊接固定在钢制基础环上,另一端贯穿高性能混凝土预制条带并外露,与现场浇筑普通混凝土进行连接。
上述风力发电机组基础环,所述筒身栓钉沿钢制基础环的内外壁竖向均匀布设。
上述风力发电机组基础环,所述筒身栓钉一端焊接在基础环上,另一端露出高性能混凝土预制条带的长度为100~200mm,并与现场浇筑普通混凝土进行连接。
上述风力发电机组基础环,所述高性能混凝土预制条带宽度为100mm。
上述风力发电机组基础环,所述高性能混凝土预制条带高度与钢制基础环埋入混凝土内的高度相等。
本发明的有益效果在于:本发明在钢制基础环内外壁上均设有环形高性能混凝土预制条带,通过采用高性能混凝土先预制包裹基础环,并设置筒身栓钉与普通混凝土进行现场整体浇筑,这样可以极大地增加基础环与混凝土间界面的抗剪刚度,降低峰值应力,提高界面间抗疲劳能力,有效地增加风机疲劳寿命,延长风机使用年限。
附图说明
图1为本发明的结构示意图。
图2为本发明现场二次浇筑的示意图。
具体实施方式
下面结合附图和实施例对本发明作进一步的说明。
如图1所示,一种风力发电机组基础环,包括钢制基础环1,所述钢制基础环1内外壁设有高性能混凝土预制条带2,因为是工厂预制,不仅可有效地保证混凝土施工质量,而且可有效地增加钢制基础环1与混凝土间的抗剪性能,提高界面间抗疲劳性能,进而有效地避免了混凝土的风致疲劳损伤。
所述高性能混凝土预制条带2宽度为100mm,其高度与钢制基础环1埋入混凝土内的高度相等。
所述钢制基础环1内外壁上竖向均匀布设筒身栓钉3,筒身栓钉3一端焊接在钢制基础环1上,另一端贯穿所述高性能混凝土预制条带2并外露100~200mm,以保证与现场浇筑普通混凝土4有效连接。
所述筒身栓钉3的设置能够增加钢制基础环1与高性能混凝土预制条带2之间、高性能混凝土预制条带2与现场浇筑普通混凝土4间的界面粘结性能,提高混凝土抗剪疲劳能力,增加风机使用寿命。同时还能够增强预制的高性能混凝土与现场浇筑普通混凝土4间的连接性能,保证新旧混凝土间的共同工作,避免两种材料之间脱开。
钢制基础环1周边用高性能混凝土预制条带2预先包裹并养护好后再运输到现场,这样能充分保证高性能混凝土的施工质量,避免现场混凝土浇筑可能存在的振捣不密实及级配不达标等施工质量问题。
本发明的施工过程如下:如图2所示,首先在钢制基础环1埋入混凝土区段内外壁上根据计算分别均匀布置筒身栓钉3,筒身栓钉3长度要求贯穿高性能混凝土预制条带2后外露200mm左右,以确保与现场浇注普通混凝土间的连接质量。然后在工厂将钢制基础环1埋入混凝土区段内外壁分别用高性能混凝土预制条带2预先包裹,待养护28天后再运至现场进行二次浇注;最后在现场浇筑,后浇筑的普通混凝土通过筒身栓钉3确保与先前预制的高性能混凝土预制条带2部分进行良好连接,确保浇筑质量。

Claims (5)

1.一种风力发电机组基础环,其特征在于:包括钢制基础环,基础环内外壁均设有高性能混凝土预制条带,钢制基础环内外壁上设筒身栓钉,筒身栓钉一端焊接固定在钢制基础环上,另一端贯穿高性能混凝土预制条带并外露,与现场浇筑普通混凝土进行连接。
2.根据权利要求1所述的风力发电机组基础环,其特征在于:所述筒身栓钉沿钢制基础环的内外壁竖向均匀布设。
3.根据权利要求1所述的风力发电机组基础环,其特征在于:所述筒身栓钉一端焊接在基础环上,另一端露出高性能混凝土预制条带的长度为100~200mm,并与现场浇筑普通混凝土进行连接。
4.根据权利要求1所述的风力发电机组基础环,其特征在于:所述高性能混凝土预制条带宽度为100mm。
5.根据权利要求1所述的风力发电机组基础环,其特征在于:所述高性能混凝土预制条带高度与钢制基础环埋入混凝土内的高度相等。
CN201810986972.0A 2018-08-28 2018-08-28 一种风力发电机组基础环 Active CN108755739B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810986972.0A CN108755739B (zh) 2018-08-28 2018-08-28 一种风力发电机组基础环

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810986972.0A CN108755739B (zh) 2018-08-28 2018-08-28 一种风力发电机组基础环

Publications (2)

Publication Number Publication Date
CN108755739A true CN108755739A (zh) 2018-11-06
CN108755739B CN108755739B (zh) 2024-03-15

Family

ID=63966620

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810986972.0A Active CN108755739B (zh) 2018-08-28 2018-08-28 一种风力发电机组基础环

Country Status (1)

Country Link
CN (1) CN108755739B (zh)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2022252754A1 (zh) * 2021-06-03 2022-12-08 中国华能集团清洁能源技术研究院有限公司 一种预制装配与现浇砼组合式风机基础
CN115928893A (zh) * 2023-02-06 2023-04-07 上海核工程研究设计院股份有限公司 一种核电厂贯穿件与混凝土墙的模块化连接结构及方法

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH11256515A (ja) * 1998-03-13 1999-09-21 Mitsubishi Heavy Ind Ltd 鋼製橋脚の定着方法
CN204226126U (zh) * 2014-11-27 2015-03-25 瑞风能源(武汉)工程技术有限公司 一种变刚度锚固改善型风机基础环
CN204418206U (zh) * 2015-01-28 2015-06-24 珠海华成电力设计院有限公司 一种陆上风力发电机组基础结构
CN104895105A (zh) * 2015-04-30 2015-09-09 湖南科技大学 一种受力良好防倾覆的风力发电机组基础环
CN106223357A (zh) * 2016-09-26 2016-12-14 中国能源建设集团云南省电力设计院有限公司 一种加强锚固型风机基础环
CN206521764U (zh) * 2016-10-25 2017-09-26 大唐华银(湖南)新能源有限公司 风力发电机组基础环
CN208701735U (zh) * 2018-08-28 2019-04-05 湖南科技大学 一种风力发电机组基础环

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH11256515A (ja) * 1998-03-13 1999-09-21 Mitsubishi Heavy Ind Ltd 鋼製橋脚の定着方法
CN204226126U (zh) * 2014-11-27 2015-03-25 瑞风能源(武汉)工程技术有限公司 一种变刚度锚固改善型风机基础环
CN204418206U (zh) * 2015-01-28 2015-06-24 珠海华成电力设计院有限公司 一种陆上风力发电机组基础结构
CN104895105A (zh) * 2015-04-30 2015-09-09 湖南科技大学 一种受力良好防倾覆的风力发电机组基础环
CN106223357A (zh) * 2016-09-26 2016-12-14 中国能源建设集团云南省电力设计院有限公司 一种加强锚固型风机基础环
CN206521764U (zh) * 2016-10-25 2017-09-26 大唐华银(湖南)新能源有限公司 风力发电机组基础环
CN208701735U (zh) * 2018-08-28 2019-04-05 湖南科技大学 一种风力发电机组基础环

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2022252754A1 (zh) * 2021-06-03 2022-12-08 中国华能集团清洁能源技术研究院有限公司 一种预制装配与现浇砼组合式风机基础
CN115928893A (zh) * 2023-02-06 2023-04-07 上海核工程研究设计院股份有限公司 一种核电厂贯穿件与混凝土墙的模块化连接结构及方法
CN115928893B (zh) * 2023-02-06 2024-01-12 上海核工程研究设计院股份有限公司 一种核电厂贯穿件与混凝土墙的模块化连接结构及方法

Also Published As

Publication number Publication date
CN108755739B (zh) 2024-03-15

Similar Documents

Publication Publication Date Title
EP2985453B1 (en) Floating offshore wind power generation facility
CN208057315U (zh) 一种分片预制式风电机组预应力混凝土塔筒
CN208701735U (zh) 一种风力发电机组基础环
US10851513B1 (en) Combined offshore wind power foundation with duct piles and a bucket
CN108755739A (zh) 一种风力发电机组基础环
CN218597202U (zh) 承台基础和风电塔筒
CN207795453U (zh) 风电塔架的塔筒结构、风电塔架以及风力发电机组
CN211898510U (zh) 一种风力发电塔多向预应力预制装配式梁板基础
WO2024066906A1 (zh) 承台基础和风电塔筒
CN209703838U (zh) 钢筋连接器及预制混凝土构件间钢筋连接结构
CN109826223B (zh) 风机基础环下法兰处混凝土薄弱区加强构件
CN204491567U (zh) 预制钢管桩风力发电平台
CN111197319A (zh) 一种风力发电塔多向预应力预制装配式梁板基础
CN217325391U (zh) 一种临高铁线路深基坑咬合桩的施工工装
CN214994012U (zh) 一种用于海上风电的装配式高桩承台
CN214464684U (zh) 风机基础及风力发电机组
CN110397068B (zh) 一种多筒钢混组合基础结构及其施工方法
CN211975282U (zh) 一种基于分段预应力多腔组合壳体的混合风电塔筒
CN110397066B (zh) 一种多筒组合基础结构及其施工方法
CN210562260U (zh) 一种导管桩与筒组合式的海上风电基础
CN106836324A (zh) 一种增设斜向抗拉钢筋的风机基础加固方法
CN210827534U (zh) 一种整体式安装海上风电多桩基础结构体系
CN206829175U (zh) 一种风力发电机组基础环局部加固装置
CN110397067A (zh) 一种带支撑结构的多筒钢混组合基础结构及其施工方法
CN218622304U (zh) 一种陆上风自响应风机基础装置

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant