CN108755695A - 防止水泥搅拌桩注浆管堵塞的装置及方法 - Google Patents
防止水泥搅拌桩注浆管堵塞的装置及方法 Download PDFInfo
- Publication number
- CN108755695A CN108755695A CN201810699137.9A CN201810699137A CN108755695A CN 108755695 A CN108755695 A CN 108755695A CN 201810699137 A CN201810699137 A CN 201810699137A CN 108755695 A CN108755695 A CN 108755695A
- Authority
- CN
- China
- Prior art keywords
- grouting pipe
- mixing pile
- hinge
- shaft
- cement mixing
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D15/00—Handling building or like materials for hydraulic engineering or foundations
- E02D15/02—Handling of bulk concrete specially for foundation or hydraulic engineering purposes
- E02D15/04—Placing concrete in mould-pipes, pile tubes, bore-holes or narrow shafts
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D5/00—Bulkheads, piles, or other structural elements specially adapted to foundation engineering
- E02D5/22—Piles
- E02D5/34—Concrete or concrete-like piles cast in position ; Apparatus for making same
- E02D5/46—Concrete or concrete-like piles cast in position ; Apparatus for making same making in situ by forcing bonding agents into gravel fillings or the soil
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D2250/00—Production methods
- E02D2250/003—Injection of material
Landscapes
- Engineering & Computer Science (AREA)
- General Engineering & Computer Science (AREA)
- Structural Engineering (AREA)
- Life Sciences & Earth Sciences (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Mining & Mineral Resources (AREA)
- Paleontology (AREA)
- Civil Engineering (AREA)
- Piles And Underground Anchors (AREA)
Abstract
本发明涉及建筑施工领域,具体是一种防止水泥搅拌桩注浆管堵塞的装置;其特征是:包括合页、弹簧、转轴、限位条板和螺栓;合页分为两个半圆形,直径比注浆管的内径小2mm‑3mm;弹簧套在转轴上并与合页固定连接;转轴两端预留螺纹,可穿过注浆管预留孔洞,通过螺栓与注浆管连接,转轴距注浆管管口≤25mm;限位条板为两个半圆弧形不锈钢板,通过焊接形式固定于注浆管内壁上。本装置可根据注浆管孔径的大小,在工厂内进行批量化生产,生产成本较低;各配件损坏后易更换。同时,本装置在水泥搅拌桩喷浆搅拌作业中能够有效避免注浆管的堵塞。
Description
技术领域
本发明涉及建筑施工领域,具体是一种防止水泥搅拌桩注浆管堵塞的装置及方法。
背景技术
建筑工程基坑支护,经常采用水泥搅拌桩进行基坑围护,在水泥搅拌桩预拌及重复搅拌下沉施工过程中,为了避免土体堵塞注浆管,需同时进行注浆作业。此种作业方法,比正常的工艺要求多耗费约50%的水泥浆,且仍存在注浆管堵塞的风险。
发明内容
本发明的目的在于克服上述问题,提供一种可解决施工过程中注浆管堵塞、耗费大量水泥浆等问题的装置及其操作方法。
为了达到上述目的,本发明是这样实现的:
一种防止水泥搅拌桩注浆管堵塞的装置,包括合页、弹簧、转轴、限位条板和螺栓;合页分为两个半圆形,直径比注浆管的内径小2mm-3mm;弹簧套在转轴上并与合页固定连接;转轴两端预留螺纹,可穿过注浆管预留孔洞,通过螺栓与注浆管连接,转轴距注浆管管口≤25mm;限位条板为两个半圆弧形不锈钢板,通过焊接形式固定于注浆管内壁上。
一种防止水泥搅拌桩注浆管堵塞的方法,包括
步骤1、水泥搅拌桩预拌及搅拌下沉过程中,权利要求1所述装置的合页在弹簧的作用下,处于闭合状态,防止土体堵塞注浆管,限位条板起到限位作用以及承受土体对合页挤压力;
步骤2、水泥搅拌桩喷浆搅拌提升过程中,在水泥浆的冲击力作用下,合页打开,水泥浆与土体通过搅拌桩机充分搅拌混合成一体;
步骤3、重复以上两个步骤,直至搅拌桩成桩完成。
本装置可根据注浆管孔径的大小,在工厂内进行批量化生产,生产成本较低;各配件损坏后易更换。同时,本装置在水泥搅拌桩喷浆搅拌作业中能够有效避免注浆管的堵塞。
附图说明
图1是本装置的结构示意图。
图2是本装置与注浆管连接的结构示意图。
图3是限位条板及转轴的结构示意图。
图中:1 合页、2 弹簧、3 转轴、4 限位条板、5 螺栓、6 注浆管。
具体实施方式
以下通过具体实施例进一步说明本发明。
如图1~图3所示,一种防止水泥搅拌桩注浆管堵塞的装置,包括合页1、弹簧2、转轴3、限位条板4和螺栓5;合1页分为两个半圆形,直径比注浆管6的内径小2mm-3mm;弹簧2套在转轴3上并与合页1固定连接;转轴3两端预留螺纹,可穿过注浆管6预留孔洞,通过螺栓5与注浆管6连接,转轴3距注浆管6管口≤25mm;限位条板4为两个半圆弧形不锈钢板,通过焊接形式固定于注浆管6内壁上。
一种防止水泥搅拌桩注浆管堵塞的方法,包括
步骤1、水泥搅拌桩预拌及搅拌下沉过程中,合页1在弹簧2的作用下,处于闭合状态,防止土体堵塞注浆管6,限位条板4起到限位作用以及承受土体对合页1挤压力;
步骤2、水泥搅拌桩喷浆搅拌提升过程中,在水泥浆的冲击力作用下,合页1打开,水泥浆与土体通过搅拌桩机充分搅拌混合成一体;
步骤3、重复以上两个步骤,直至搅拌桩成桩完成。
本装置可根据注浆管孔径的大小,在工厂内进行批量化生产,生产成本较低;各配件损坏后易更换。同时,本装置在水泥搅拌桩喷浆搅拌作业中能够有效避免注浆管的堵塞。
Claims (2)
1. 一种防止水泥搅拌桩注浆管堵塞的装置,其特征是:包括合页、弹簧、转轴、限位条板和螺栓;合页分为两个半圆形,直径比注浆管的内径小2mm-3mm;弹簧套在转轴上并与合页固定连接;转轴两端预留螺纹,可穿过注浆管预留孔洞,通过螺栓与注浆管连接,转轴距注浆管管口≤25mm;限位条板为两个半圆弧形不锈钢板,通过焊接形式固定于注浆管内壁上。
2.一种防止水泥搅拌桩注浆管堵塞的方法,其特征是:包括
步骤1、水泥搅拌桩预拌及搅拌下沉过程中,权利要求1所述装置的合页在弹簧的作用下,处于闭合状态,防止土体堵塞注浆管,限位条板起到限位作用以及承受土体对合页挤压力;
步骤2、水泥搅拌桩喷浆搅拌提升过程中,在水泥浆的冲击力作用下,合页打开,水泥浆与土体通过搅拌桩机充分搅拌混合成一体;
步骤3、重复以上两个步骤,直至搅拌桩成桩完成。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810699137.9A CN108755695A (zh) | 2018-06-29 | 2018-06-29 | 防止水泥搅拌桩注浆管堵塞的装置及方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810699137.9A CN108755695A (zh) | 2018-06-29 | 2018-06-29 | 防止水泥搅拌桩注浆管堵塞的装置及方法 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN108755695A true CN108755695A (zh) | 2018-11-06 |
Family
ID=63975213
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201810699137.9A Pending CN108755695A (zh) | 2018-06-29 | 2018-06-29 | 防止水泥搅拌桩注浆管堵塞的装置及方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN108755695A (zh) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110080219A (zh) * | 2019-04-19 | 2019-08-02 | 中建八局第二建设有限公司 | 一种承插式抗浮锚杆钢护筒及其使用方法 |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101024962A (zh) * | 2007-03-22 | 2007-08-29 | 建研地基基础工程有限责任公司 | 振动沉管风压桩机 |
CN101962952A (zh) * | 2010-09-21 | 2011-02-02 | 中冶集团武汉勘察研究院有限公司 | 一种适合淤泥中振动沉管砂石桩施工的改进型活门 |
CN104912065A (zh) * | 2015-06-09 | 2015-09-16 | 四川路航建设工程有限责任公司 | 水下锚筋桩施工方法 |
CN205152949U (zh) * | 2015-10-26 | 2016-04-13 | 河南省第二建设集团有限公司 | 一种具有防堵功能的桩管 |
CN206052700U (zh) * | 2016-09-27 | 2017-03-29 | 中石化石油工程技术服务有限公司 | 一种振动沉管施工桩靴 |
-
2018
- 2018-06-29 CN CN201810699137.9A patent/CN108755695A/zh active Pending
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101024962A (zh) * | 2007-03-22 | 2007-08-29 | 建研地基基础工程有限责任公司 | 振动沉管风压桩机 |
CN101962952A (zh) * | 2010-09-21 | 2011-02-02 | 中冶集团武汉勘察研究院有限公司 | 一种适合淤泥中振动沉管砂石桩施工的改进型活门 |
CN104912065A (zh) * | 2015-06-09 | 2015-09-16 | 四川路航建设工程有限责任公司 | 水下锚筋桩施工方法 |
CN205152949U (zh) * | 2015-10-26 | 2016-04-13 | 河南省第二建设集团有限公司 | 一种具有防堵功能的桩管 |
CN206052700U (zh) * | 2016-09-27 | 2017-03-29 | 中石化石油工程技术服务有限公司 | 一种振动沉管施工桩靴 |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110080219A (zh) * | 2019-04-19 | 2019-08-02 | 中建八局第二建设有限公司 | 一种承插式抗浮锚杆钢护筒及其使用方法 |
CN110080219B (zh) * | 2019-04-19 | 2024-04-19 | 中建八局第二建设有限公司 | 一种承插式抗浮锚杆钢护筒及其使用方法 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN209350576U (zh) | 一种用于混凝土工艺的搅拌混合装置 | |
KR101844947B1 (ko) | 연속혼합 방식의 오거형 믹서 및 이를 이용한 콘크리트 구조물 보수 방법 | |
CN108755695A (zh) | 防止水泥搅拌桩注浆管堵塞的装置及方法 | |
CN115341849A (zh) | 一种水力复喷型全方位高压喷射注浆的多孔钻杆及方法 | |
CN107354939A (zh) | 一种小直径微型静压钢管桩后注浆施工方法 | |
CN212790982U (zh) | 一种丙烯酸酯乳液的反应釜 | |
CN206510206U (zh) | 一种建筑用泥沙混合搅拌设备 | |
CN110004924B (zh) | 一种具有消除土体粘结作用的双轴搅拌钻头 | |
CN207549137U (zh) | 一种混凝土搅拌机的料斗固定装置 | |
CN206986912U (zh) | 一种钢管桩基础 | |
CN210342737U (zh) | 用于建筑施工的砂浆提升装置 | |
CN206812212U (zh) | 一种建筑施工混凝土浇筑搅拌器 | |
CN205077874U (zh) | 一种控制布料机泵管混凝土洒落的控制装置 | |
CN205421263U (zh) | 一种用于解决水下混凝土浇筑堵管的装置 | |
CN204673790U (zh) | 一种水泥搅拌装置 | |
CN203834467U (zh) | 一种水泥搅拌桩机 | |
CN206703301U (zh) | 一种混凝土搅拌送料装置 | |
CN208363096U (zh) | 混凝土桩桩头保护装置 | |
CN207331665U (zh) | 一种用于强夯机的脱离装置 | |
WO2021135156A1 (zh) | 一种采用固化材料进行深层搅拌的施工设备及其施工方法 | |
CN206859231U (zh) | 一种灌注桩的注浆装置 | |
CN205501996U (zh) | 锤击式桩机搅拌旋喷装置 | |
CN216921405U (zh) | 一种水泥搅拌桩处理沿海地区软土地基用高效搅拌结构 | |
CN219316494U (zh) | 一种建筑工程用结构缝隙灌浆装置 | |
CN108468333B (zh) | 一种岩土工程用搅拌装置 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20181106 |