CN108755393A - A kind of foamed aluminium bridge pier protection guard and its manufacture craft - Google Patents
A kind of foamed aluminium bridge pier protection guard and its manufacture craft Download PDFInfo
- Publication number
- CN108755393A CN108755393A CN201810599035.XA CN201810599035A CN108755393A CN 108755393 A CN108755393 A CN 108755393A CN 201810599035 A CN201810599035 A CN 201810599035A CN 108755393 A CN108755393 A CN 108755393A
- Authority
- CN
- China
- Prior art keywords
- arc
- foamed aluminium
- flange
- steel plate
- bridge pier
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Withdrawn
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01D—CONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
- E01D19/00—Structural or constructional details of bridges
- E01D19/02—Piers; Abutments ; Protecting same against drifting ice
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01D—CONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
- E01D2101/00—Material constitution of bridges
- E01D2101/30—Metal
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01D—CONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
- E01D2101/00—Material constitution of bridges
- E01D2101/30—Metal
- E01D2101/34—Metal non-ferrous, e.g. aluminium
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Bridges Or Land Bridges (AREA)
Abstract
The invention discloses a kind of foamed aluminium bridge pier protection guard and its manufacture crafts, the foamed aluminium bridge pier protection guard includes two arc tubes, arc tube includes steel plate and foamed aluminium from outside to inside, two arc tubes are spliced into cylinder by being provided with the connecting flange of several adjustable elongated holes, steel plate upper and lower surface is drilled with location hole for installing spacer bar with upper arc flange, arc lower flanged joint, upper arc flange and arc lower flange respectively.Through making, assembles, is process.The present invention is composed using two parts arc tube, and the energy absorption characteristics that foamed aluminium material can be played when sandstone, flow friction are washed away reach protection effect, also takes into account Wear-proof, anti-landslide mud-rock flow, anticollision effect, strong applicability;The present invention is rounded, oval or special-shaped package, it can be achieved that multilayer is wrapped up, can the positive heart, eccentric package, it can be achieved that modularized production carries out local replacing, saves a large amount of human and material resources, financial resources according to field condition in later maintenance maintenance.
Description
Technical field
The present invention relates to bridge pier protection guard technical field, specifically a kind of foamed aluminium bridge pier protection guard and its making work
Skill.
Background technology
China has a vast territory, is mountain more than one, the country of more natural calamities, on the western parts such as Sichuan, Tibet, Guizhou and other places,
Annual flood, mud-rock flow take place frequently, and do great damage to the bridge facility in traffic, even destroy, form great
Security risk seriously constrains local economic development, threatens people's life and property safety.Foamed aluminium Bridge Pier body is answered
With can protect bridge to greatest extent, in the maintaining in later stage, a large amount of human and material resources, financial resources can be saved, be bridge
Safety, expanding economy provide guarantee.Traditional Bridge Pier cover is made of macromolecule chemical industry material, this protective cover
Defect is to need to make at the scene, and is fixedly mounted, is not available for local replacing, weather resistance is poor, and different aging can not
Environment is polluted in recycling.Traditional Bridge Pier cover cannot be effectively prevented mudstone drift sand, sandstone phase mutual friction, hit and bring
It destroys, and the phase mutual friction, shock of rainwater and sandstone month after month throughout the year eventually leads to bridge pier bottom and is corroded, degenerates, it is only remaining
Reinforcing bar pillar.The robustness that certainly will thus influence whether bridge pier, to which the perils such as ground is unreal, easily caves in occur.
Some bridge piers use some protective devices at present, these protective devices are broadly divided into two kinds:Outside one is bridge pier
Portion is surrounded with steel plate, intermediate cementing, but when by big impact, outer protective does not have the effect of energy-absorbing, generates big
Bridge pier can be equally damaged when deformation;Another is surrounded using steel plate outside bridge pier, centre polymeric foamed material, still
Under severe natural environmental condition, high molecular material is just quickly invalidated hardening, loses energy-absorbing function, causes shielding failure,
It cannot play the role of protecting bridge pier.
Invention content
The purpose of the present invention is to provide a kind of foamed aluminium bridge pier protection guard and its manufacture crafts, utilize the suction of foamed aluminium
Can effect, reduce sandstone, flow impact friction power and reach height protect.
To achieve the above object, the present invention provides the following technical solutions:
A kind of foamed aluminium bridge pier protection guard, including it is two arc tubes, upper arc flange, arc lower flange, connecting flange, adjustable
Elongated hole and spacer bar, the arc tube include from outside to inside steel plate and foamed aluminium, and the steel plate and foamed aluminium are arc
Structure, it is adjustable elongated that the both ends of the arc tube respectively offer several on one connecting flange of setting and the connecting flange
Hole is mutually adjacent to positioned at the connecting flange outer surface of two arc tubes of the same side and two arc tubes is spliced into entire cylinder
Body, the upper surface of the steel plate and upper arc flanged joint, lower surface and the arc lower flanged joint of the steel plate, the upper arc
It is drilled with location hole on shape flange and arc lower flange, for installing spacer bar.
As a further solution of the present invention:The steel plate and foamed aluminium are composite construction, and the arc tube includes at least
One layer of steel plate and foamed aluminium.
As a further solution of the present invention:The arc tube is round, ellipse or abnormally-structured, and the arc tube is
The positive heart or eccentric structure.
The manufacture craft of the foamed aluminium bridge pier protection guard, the specific steps are:
1)The making of steel plate:It chooses steel bushing and carries out shaping;
2)The making of foamed aluminium:Foamed aluminium blank is made in foam aluminium ingot, hot-pressing processing then is carried out to foamed aluminium blank;
3)The assembly of arc tube:Foamed aluminium is assembled in steel plate and obtains arc tube, the upper arc method of welding in the upper surface of steel plate
Orchid, then location hole is bored on upper arc flange and arc lower flange, and spacer bar is mounted in location hole, finally in arc
Respectively weld a connecting flange for carrying adjustable elongated hole in the both ends of cylinder;
4)The processing of arc tube:Polished arc tube, preservative treatment, label mark, you can manufacture.
As a further solution of the present invention:The step 1)In, shaping includes rule circle, welds arc lower flange, described
Arc lower flange welding is in the lower surface of steel plate.
As a further solution of the present invention:The step 2)In, hot-pressing processing includes heating, pressure arc, shaping deburring.
Compared with prior art, the beneficial effects of the invention are as follows:
Foamed aluminium body is light, and damping and amortization is good, and damping capacity is 5-10 times of metallic aluminium, and bending resistance specific stiffness is 1.5 times of steel, energy absorption capacity
Good, the foamed aluminium that porosity is 84% can absorb the energy of 2500KJ or more when 50% deformation occurs, external steel body with it
After cooperation, energy absorption performance is substantially improved 50% or more, i.e., the foamed aluminium that porosity is 84% can be inhaled when 50% deformation occurs
The energy for receiving 3500KJ or more, compared with other polymeric foamed materials, foamed aluminium also has nontoxicity, good weatherability, performance
Stablize, corrosion resistance, agent of low hygroscopicity, not aging, will not with temperature, humidity variation and the characteristic that changes.
Matching foamed aluminium material protective device is made according to the height of bridge pier, radius by the present invention, can sandstone,
The energy absorption characteristics that foamed aluminium material is played when flow friction is washed away reach protection effect;The present invention is answered using steel plate+foamed aluminium
Close structure, can rounded, oval or special-shaped package, it can be achieved that multilayer is wrapped up, can the positive heart, eccentric package, it can be achieved that modularization
Production;The present invention can take into account Wear-proof, anticollision both protective actions, strong applicability, flexible high-efficiency, convenient quickly.
One aspect of the present invention makes full use of the property of foamed aluminium material, and half arc-shaped device is made, and it is anti-to form foamed aluminium
Protection unit protects bridge pier, ensure that the solidity and robustness of bridge pier.On the other hand, when the bridge that needs protect is in nature item
When the more severe mountain area of part, the Al-Qaeda terrorist organization's modularized production, live Fast Installation, because it is by two parts can be achieved in the present invention
Arc tube is composed, and in the maintaining in later stage, can be carried out local replacing according to field condition, can be saved a large amount of people
Power, material resources, financial resources.
Description of the drawings
Fig. 1 is a kind of structural schematic diagram of foam bridge pier protection guard;
Fig. 2 is a kind of single layer structure vertical view of foam bridge pier protection guard;
Fig. 3 is a kind of double-layer structure vertical view of foam bridge pier protection guard;
Fig. 4 is a kind of fabrication processing figure of foam bridge pier protection guard;
In figure:The upper arc flange of 1- steel plates, 2- foamed aluminiums, 3-, 4- arc lowers flange, 5- connecting flanges, 6- is adjustable elongated hole, 7-
Spacer bar.
Specific implementation mode
Below in conjunction with the embodiment of the present invention, technical scheme in the embodiment of the invention is clearly and completely described,
Obviously, described embodiments are only a part of the embodiments of the present invention, instead of all the embodiments.Based in the present invention
Embodiment, every other embodiment obtained by those of ordinary skill in the art without making creative efforts, all
Belong to the scope of protection of the invention.
Please refer to Fig.1-3, in the embodiment of the present invention, a kind of foamed aluminium bridge pier protection guard, including two arc tubes, upper arc
Shape flange 3, arc lower flange 4, connecting flange 5, adjustable elongated hole 6 and spacer bar 7, arc tube include at least one from outside to inside
The steel plate 1 and foamed aluminium 2 of layer, steel plate 1 and foamed aluminium 2 are arcuate structure, and steel plate 1 and foamed aluminium 2 are composite construction, arc
The both ends of cylinder, which are respectively arranged on a connecting flange 5 and the connecting flange 5, offers several adjustable elongated holes 6, is located at same
5 outer surface of connecting flange of two arc tubes of side is mutually adjacent to and two arc tubes are spliced into entire cylinder, steel plate 1 it is upper
Surface is connect with upper arc flange 3, and the lower surface of steel plate 1 is connect with arc lower flange 4, upper arc flange 3 and arc lower flange 4
On be drilled with location hole, for installing spacer bar 7.
In the embodiment of the present invention, arc tube as shown in Figure 1 includes two layers of steel plate 1 and foamed aluminium 2 from outside to inside, namely
From outside to inside successively include steel plate 1, foamed aluminium 2, steel plate 1,2 four-layer structure of foamed aluminium, wherein the thickness of two-layered steel plates 1 from outside to
In be respectively 10mm and 3mm, the thickness of two layers of foam aluminium 2 is respectively 40mm and 60mm from outside to inside.Arc tube shown in Fig. 2 from
Inner steel plate 1 and foamed aluminium 2 including single layer are arrived outside, and arc tube shown in Fig. 3 includes the steel plate 1 and foamed aluminium of bilayer from outside to inside
2。
Referring to Fig. 4, the manufacture craft of the foamed aluminium bridge pier protection guard, the specific steps are:
1)The making of steel plate 1:It chooses steel bushing and carries out shaping, including advise circle, in the lower surface of steel plate 1 welding arc lower flange 4;
2)The making of foamed aluminium 2:Foamed aluminium blank is made in foam aluminium ingot, hot-pressing processing, packet then are carried out to foamed aluminium blank
Include heating, pressure arc, shaping deburring;
3)The assembly of arc tube:Foamed aluminium 2 is assembled in steel plate 1 and obtains arc tube, the upper arc of welding in the upper surface of steel plate 1
Flange 3, then location hole is bored on upper arc flange 3 and arc lower flange 4, and spacer bar 7 is mounted in location hole, finally
A connecting flange 5 for carrying adjustable elongated hole 6 is respectively welded at the both ends of arc tube;
4)The processing of arc tube:Polished arc tube, preservative treatment, label mark, you can manufacture.
Matching foamed aluminium material protective device is made according to the height of bridge pier, radius by the present invention, can sandstone,
The energy absorption characteristics that foamed aluminium material is played when flow friction is washed away reach protection effect;The present invention is answered using steel plate+foamed aluminium
Close structure, can rounded, oval or special-shaped package, it can be achieved that multilayer is wrapped up, can the positive heart, eccentric package, it can be achieved that modularization
Production;The present invention can take into account Wear-proof, anticollision both protective actions, strong applicability, flexible high-efficiency, convenient quickly.
One aspect of the present invention makes full use of the property of foamed aluminium material, and half arc-shaped device is made, and it is anti-to form foamed aluminium
Protection unit protects bridge pier, ensure that the solidity and robustness of bridge pier.On the other hand, when the bridge that needs protect is in nature item
When the more severe mountain area of part, the Al-Qaeda terrorist organization's modularized production, live Fast Installation, because it is by two parts can be achieved in the present invention
Arc tube is composed, and in the maintaining in later stage, can be carried out local replacing according to field condition, can be saved a large amount of people
Power, material resources, financial resources.
It is obvious to a person skilled in the art that invention is not limited to the details of the above exemplary embodiments, Er Qie
In the case of without departing substantially from spirit or essential attributes of the invention, the present invention can be realized in other specific forms.Therefore, no matter
From the point of view of which point, the present embodiments are to be considered as illustrative and not restrictive, and the scope of the present invention is by appended power
Profit requires rather than above description limits, it is intended that all by what is fallen within the meaning and scope of the equivalent requirements of the claims
Variation is included within the present invention.
In addition, it should be understood that although this specification is described in terms of embodiments, but not each embodiment is only wrapped
Containing an independent technical solution, this description of the specification is merely for the sake of clarity, and those skilled in the art should
It considers the specification as a whole, the technical solutions in the various embodiments may also be suitably combined, forms those skilled in the art
The other embodiment being appreciated that.
Claims (6)
1. a kind of foamed aluminium bridge pier protection guard, which is characterized in that including two arc tubes, upper arc flange(3), arc lower method
It is blue(4), connecting flange(5), adjustable elongated hole(6)And spacer bar(7), the arc tube includes steel plate from outside to inside(1)With
Foamed aluminium(2), the steel plate(1)And foamed aluminium(2)It is arcuate structure, both ends respectively one connection of setting of the arc tube
Flange(5)And the connecting flange(5)On offer several adjustable elongated holes(6), it is located at the company of two arc tubes of the same side
Acting flange(5)Outer surface is mutually adjacent to and two arc tubes are spliced into entire cylinder, the steel plate(1)Upper surface and upper arc
Shape flange(3)Connection, the steel plate(1)Lower surface and arc lower flange(4)Connection, the upper arc flange(3)With lower arc
Shape flange(4)On be drilled with location hole, for installing spacer bar(7).
2. foamed aluminium bridge pier protection guard according to claim 1, which is characterized in that the steel plate(1)And foamed aluminium(2)
For composite construction, the arc tube includes at least one layer of steel plate(1)And foamed aluminium(2).
3. foamed aluminium bridge pier protection guard according to claim 1, which is characterized in that the arc tube is round, oval
Shape is abnormally-structured, and the arc tube is the positive heart or eccentric structure.
4. a kind of manufacture craft of foamed aluminium bridge pier protection guard as described in any one of claims 1-3, which is characterized in that specific
Step is:
1)Steel plate(1)Making:It chooses steel bushing and carries out shaping;
2)Foamed aluminium(2)Making:Foamed aluminium blank is made in foam aluminium ingot, hot-pressing processing then is carried out to foamed aluminium blank;
3)The assembly of arc tube:By foamed aluminium(2)It is assembled to steel plate(1)In obtain arc tube, in steel plate(1)Upper surface welding
Upper arc flange(3), then in upper arc flange(3)With arc lower flange(4)Upper brill location hole, and by spacer bar(7)Installation
In location hole, finally at the both ends of arc tube, respectively welding one carries adjustable elongated hole(6)Connecting flange(5);
4)The processing of arc tube:Polished arc tube, preservative treatment, label mark, you can manufacture.
5. the manufacture craft of foamed aluminium bridge pier protection guard according to claim 4, which is characterized in that the step 1)
In, shaping includes rule circle, welding arc lower flange(4), the arc lower flange(4)It is welded on steel plate(1)Lower surface.
6. the manufacture craft of foamed aluminium bridge pier protection guard according to claim 4, which is characterized in that the step 2)
In, hot-pressing processing includes heating, pressure arc, shaping deburring.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810599035.XA CN108755393A (en) | 2018-06-12 | 2018-06-12 | A kind of foamed aluminium bridge pier protection guard and its manufacture craft |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810599035.XA CN108755393A (en) | 2018-06-12 | 2018-06-12 | A kind of foamed aluminium bridge pier protection guard and its manufacture craft |
Publications (1)
Publication Number | Publication Date |
---|---|
CN108755393A true CN108755393A (en) | 2018-11-06 |
Family
ID=64020964
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201810599035.XA Withdrawn CN108755393A (en) | 2018-06-12 | 2018-06-12 | A kind of foamed aluminium bridge pier protection guard and its manufacture craft |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN108755393A (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110258304A (en) * | 2019-06-26 | 2019-09-20 | 中铁二十三局集团建筑设计研究院有限公司 | A kind of joint structure of prefabricated reinforced concrete pier or column |
CN112942049A (en) * | 2021-02-05 | 2021-06-11 | 赵杰 | Intelligent support device of municipal administration large-span bridge building |
-
2018
- 2018-06-12 CN CN201810599035.XA patent/CN108755393A/en not_active Withdrawn
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110258304A (en) * | 2019-06-26 | 2019-09-20 | 中铁二十三局集团建筑设计研究院有限公司 | A kind of joint structure of prefabricated reinforced concrete pier or column |
CN112942049A (en) * | 2021-02-05 | 2021-06-11 | 赵杰 | Intelligent support device of municipal administration large-span bridge building |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN108755393A (en) | A kind of foamed aluminium bridge pier protection guard and its manufacture craft | |
CN208533354U (en) | A kind of foamed aluminium bridge pier protection guard | |
CN106833263A (en) | A kind of composite strengthens steel pipe and its manufacturing process | |
CN109760961A (en) | One kind is novel to connect liquid floating plate and its implementation entirely | |
CN209856530U (en) | High-strength impact-resistant steel wire mesh framework composite pipe | |
CN207846755U (en) | A kind of building heat preservation wall | |
CN207455614U (en) | A kind of chimney protective lining | |
CN204690778U (en) | A kind of foundation ring of wind generating set of stressed good overturn-preventing | |
CN213922019U (en) | Plastic steel winding composite tank | |
CN208500856U (en) | A kind of lithium battery composite packing film | |
CN211203171U (en) | Novel composite conveying steel pipe | |
CN204692796U (en) | A kind of composite pipe with helical corrugation stiffening rib outer surface coating | |
CN208023394U (en) | Bridge prestress concrete structure with pre- safeguard structure | |
CN209618037U (en) | A kind of storage tank of steel lining crosslinked polyethylene | |
CN207044799U (en) | A kind of sandwich with wear-resistant antiseptic property | |
CN207739192U (en) | A kind of bridge anti-collision device with wave structure | |
CN206926324U (en) | energy-absorbing unit body | |
CN107816172A (en) | A kind of bridging arrangement of roof composite board | |
CN108045337A (en) | Commercial car collision prevention girders | |
CN206947013U (en) | A kind of non-damageable high-voltage line cable | |
CN209729713U (en) | The oil of transformer becomes lead plumb joint insulating wrapping | |
CN214563489U (en) | Composite toughened glass | |
CN213145632U (en) | Outdoor overhead weather-proof pipe for natural gas | |
CN213775075U (en) | Cavity glass multilayer seal structure | |
CN213871491U (en) | Welded pipe with good damping function |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
WW01 | Invention patent application withdrawn after publication | ||
WW01 | Invention patent application withdrawn after publication |
Application publication date: 20181106 |