CN108731567A - A kind of method of precast concrete integral module demolition blasting steel angle structure - Google Patents

A kind of method of precast concrete integral module demolition blasting steel angle structure Download PDF

Info

Publication number
CN108731567A
CN108731567A CN201810505076.8A CN201810505076A CN108731567A CN 108731567 A CN108731567 A CN 108731567A CN 201810505076 A CN201810505076 A CN 201810505076A CN 108731567 A CN108731567 A CN 108731567A
Authority
CN
China
Prior art keywords
concrete
angle steel
steel
mold
pvc pipe
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201810505076.8A
Other languages
Chinese (zh)
Other versions
CN108731567B (en
Inventor
李本伟
陈德志
胡浩川
罗鹏
周应军
安玉东
甄梦阳
陈晨
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Sinosteel Wuhan Safety & Environmental Protection Research Institute Co Ltd
Original Assignee
Sinosteel Wuhan Safety & Environmental Protection Research Institute Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Sinosteel Wuhan Safety & Environmental Protection Research Institute Co Ltd filed Critical Sinosteel Wuhan Safety & Environmental Protection Research Institute Co Ltd
Priority to CN201810505076.8A priority Critical patent/CN108731567B/en
Publication of CN108731567A publication Critical patent/CN108731567A/en
Application granted granted Critical
Publication of CN108731567B publication Critical patent/CN108731567B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F42AMMUNITION; BLASTING
    • F42DBLASTING
    • F42D3/00Particular applications of blasting techniques
    • F42D3/02Particular applications of blasting techniques for demolition of tall structures, e.g. chimney stacks
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B28WORKING CEMENT, CLAY, OR STONE
    • B28BSHAPING CLAY OR OTHER CERAMIC COMPOSITIONS; SHAPING SLAG; SHAPING MIXTURES CONTAINING CEMENTITIOUS MATERIAL, e.g. PLASTER
    • B28B1/00Producing shaped prefabricated articles from the material
    • B28B1/14Producing shaped prefabricated articles from the material by simple casting, the material being neither forcibly fed nor positively compacted
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B28WORKING CEMENT, CLAY, OR STONE
    • B28BSHAPING CLAY OR OTHER CERAMIC COMPOSITIONS; SHAPING SLAG; SHAPING MIXTURES CONTAINING CEMENTITIOUS MATERIAL, e.g. PLASTER
    • B28B7/00Moulds; Cores; Mandrels
    • B28B7/16Moulds for making shaped articles with cavities or holes open to the surface, e.g. with blind holes
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B28WORKING CEMENT, CLAY, OR STONE
    • B28BSHAPING CLAY OR OTHER CERAMIC COMPOSITIONS; SHAPING SLAG; SHAPING MIXTURES CONTAINING CEMENTITIOUS MATERIAL, e.g. PLASTER
    • B28B7/00Moulds; Cores; Mandrels
    • B28B7/28Cores; Mandrels
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B28WORKING CEMENT, CLAY, OR STONE
    • B28BSHAPING CLAY OR OTHER CERAMIC COMPOSITIONS; SHAPING SLAG; SHAPING MIXTURES CONTAINING CEMENTITIOUS MATERIAL, e.g. PLASTER
    • B28B7/00Moulds; Cores; Mandrels
    • B28B7/34Moulds, cores, or mandrels of special material, e.g. destructible materials
    • B28B7/346Manufacture of moulds
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B28WORKING CEMENT, CLAY, OR STONE
    • B28BSHAPING CLAY OR OTHER CERAMIC COMPOSITIONS; SHAPING SLAG; SHAPING MIXTURES CONTAINING CEMENTITIOUS MATERIAL, e.g. PLASTER
    • B28B7/00Moulds; Cores; Mandrels
    • B28B7/34Moulds, cores, or mandrels of special material, e.g. destructible materials
    • B28B7/348Moulds, cores, or mandrels of special material, e.g. destructible materials of plastic material or rubber
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G23/00Working measures on existing buildings
    • E04G23/08Wrecking of buildings
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F42AMMUNITION; BLASTING
    • F42DBLASTING
    • F42D1/00Blasting methods or apparatus, e.g. loading or tamping

Landscapes

  • Engineering & Computer Science (AREA)
  • Chemical & Material Sciences (AREA)
  • Mechanical Engineering (AREA)
  • Manufacturing & Machinery (AREA)
  • Ceramic Engineering (AREA)
  • Architecture (AREA)
  • General Engineering & Computer Science (AREA)
  • Chemical Kinetics & Catalysis (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Electrochemistry (AREA)
  • Underground Structures, Protecting, Testing And Restoring Foundations (AREA)
  • Working Measures On Existing Buildindgs (AREA)

Abstract

The invention discloses a kind of methods of precast concrete integral module demolition blasting steel angle structure.Step includes:Step 1:Make one piece of mold angle steel identical with dismounting angle steel to be blasted;Step 2:It is assembled into hollow groove-shaped mold based on the mold angle steel;Step 3:Concrete is poured into a mould in hollow groove-shaped mold;Step 4:Pre-buried charging hole during pouring into a mould concrete;Obtain prefabricated powder charge module;Step 5:Precracking is cut at angle steel back to be removed;Step 6:It is packed into pack along the pre-buried charging hole of prefabricated powder charge module;Step 7:The prefabricated powder charge module for having been charged into pack is fixed on angle steel to be removed;Step 8:It detonates after the completion of preparation before explosion.The present invention uses 2# rock emulsion explosives, is easier to obtain compared with control explosive;Prefabricated component production method is simple, and can make prefabricated component in advance before construction, significantly saves time cost, reduces the duration.

Description

A kind of method of precast concrete integral module demolition blasting steel angle structure
Technical field
The invention belongs to engineering explosion technical fields, and in particular to angle steel steel structure member and construction of structures demolition blasting Method, more particularly to a kind of method of precast concrete integral module demolition blasting steel angle structure.
Background technology
More and more buildings use steel construction at present, as workshop, bridge, terminal, high ferro station, conference and exhibition center, greatly across Degree, large space, the divisible light steel house etc. used;But with steel construction because planning or service life the reasons needs such as expire are torn open It removes, traditional Blasting Demolition Technology cannot meet the needs of steel construction dismounting.
Small-sized steel construction is removed, using machine cuts dismounting method and chemical cleavage dismounting method;It is large-scale and super-huge When steel construction demolition blasting, since its structure sheet is as hollow even template material, powder charge can not be punched, is generally adopted Demolition blasting is carried out with cumulative blasting Charge, such as using Concentrated charge, the technique of outer charging explosion.
Concentrated charge explosion need to use high brisance detonating explosive, and such explosive is mostly tubing products, civilian to be difficult to realize;Together When the processing of high brisance detonating explosive Concentrated charge be only capable of jet action in plank Cut blasting, that is, be only capable of joint-cutting on the steel plate And can not generate big opening makes overall structure destroy unstability.
Outer charging explosion is close to object explosive to be removed and does work ability concentration of local in contact position, is not close to remove object explosive Energy, which is not applied directly to largely, to be removed on object, is largely flogged a dead horse, and generate explosion wave, blasting flyrock and make an uproar Sound is all not easy prevention and control, can not implement under the inhabitation of environment complexity and production environment.
The patent document that application for a patent for invention number is 201410202006.7 discloses a kind of tubular steel column structure construction and builds The blasting demolishing method of object, and in particular to section be a variety of tubular steel column structure components such as matrix pattern, day font and hollow and The blasting demolishing method of construction of structures, operating procedure are a, the casting concrete inside column steel construction to be blasted;B, concrete Maintenance;C, blasthole is bored in the positive oxyacetylene metal-cutting of column steel construction;D, the pre- joint-cutting on column steel construction;E, blasting parameter is determined And powder charge line;F, it protects;G, explosion.The technical solution builds concrete explosion using tubular Inner, is only applicable to cross-sectional area Larger cylindrical steel structure, construction site casting concrete and curing time are long, and drilling operation destroys casting concrete structure, Inside concrete damage is unknowable, influences explosive payload and judges and welded under complex environment and to pour operation difficulty big.
Angle steel is that more extensive classification is applied in steel construction, at present still without carrying out demolition blasting for angle steel steel construction Technique.
Invention content
Present invention seek to address that one of technical problem of the existing technology, special for the structure of steel angle structure construction of structures Point proposes a kind of method of precast concrete integral module demolition blasting steel angle structure.
Technical solution of the invention is:A kind of method of precast concrete integral module demolition blasting steel angle structure, Step includes:
Step 1:Make one piece of mold angle steel identical with dismounting angle steel to be blasted;
Step 2:It is assembled into hollow groove-shaped mold based on the mold angle steel;
Step 3:Concrete is poured into a mould in hollow groove-shaped mold;
Step 4:Pre-buried charging hole during pouring into a mould concrete;Obtain prefabricated powder charge module;
Step 5:Precracking is cut at angle steel back to be removed;
Step 6:It is packed into pack along the pre-buried charging hole of prefabricated powder charge module;
Step 7:The prefabricated powder charge module for having been charged into pack is fixed on angle steel to be removed;
Step 8:It detonates after the completion of preparation before explosion.
According to embodiments of the present invention, the concrete operation step of the step 2 is:Mold angle steel is lain against into ground, is used Two width bottom edge of angle steel and corresponding length sky side are assembled into the hollow groove-shaped mold of u shapes by three block baffles;
The concrete operation step of the step 3 is:Placing concrete in the hollow groove-shaped mold of u shapes;
The concrete operation step of the step 4 is:When concrete casting height is u shape groove height half, in the coagulation poured The pre-buried pvc pipe of a back cover is put on soil as pre-buried charging hole, pressing pre-buried pvc pipe makes it be absorbed in casting concrete, and Pre-buried pvc pipe central axes are overlapped with u shape slots central axes;One end closure of pvc pipe, another end opening, pvc pipe sealing are located at concrete Interior, pvc pipe opening is slightly longer than angle steel;Continue the placing concrete into u shapes hollow groove-shaped mold, until concrete after the completion of sedimentation Height is contour with two width of angle steel;The concrete of pouring is conserved, waits being demoulded after the completion of conserving, it is hollow to open u shapes Groove-shaped mold rejects three pieces of planks, obtains the prefabricated powder charge module being made of concrete, pvc pipe and mold angle steel.
According to embodiments of the present invention, the concrete operation step of the step 2 is:Make again one piece it is identical as the step 1 The mold angle steel of size;Two pieces of mold angle steel opening directions, which fix opening direction, becomes a cylindrical hollow girder steel flute profile mould Tool;
The concrete operation step of the step 3 is:Cylindrical hollow girder steel groove-shaped mold is vertically placed, casting concrete;
The concrete operation step of the step 4 is:Casting concrete height be cylindrical hollow girder steel groove-shaped mold height 1/3 ~ When 1/2, it is vertically inserted into pvc pipe, pvc pipe lower part back cover, upper opening, along cylindrical hollow girder steel groove-shaped mold inner wall and PVC Continue casting concrete between pipe outer wall, until after sedimentation between column hollow steel beam groove-shaped mold inner wall and pvc pipe outer wall Space filling is complete;The concrete of pouring is conserved, waits being demoulded after the completion of conserving, rejects one block of mold angle steel, obtain To the prefabricated powder charge module being made of concrete, pvc pipe and mold angle steel.
According to embodiments of the present invention, pack described in step 6 is 2# rock emulsion explosives and Nonel detonator.
According to embodiments of the present invention, the charging means described in step 6 are underground borehole blasting or continuous charging.
According to embodiments of the present invention, the concrete operation step of the step 2 ~ step 4 is:Mold angle steel is lain against ground Two width bottom edge of angle steel and corresponding length sky side are assembled into the hollow groove-shaped mold of u shapes by face using three block baffles;In angle steel Right angle is close to the pre-buried pvc pipe of the pre-buried back cover in angle steel side, and pvc pipe back cover is located in angle steel, pvc pipe is open and angle steel top Portion is concordant;The placing concrete into u shapes hollow groove-shaped mold covers pvc pipe, is further continued for pouring into the hollow groove-shaped mold of u shapes Concrete, until concrete height is identical as u shape channel opening height after the completion of sedimentation;The concrete of pouring is conserved, is waited for Demoulded after the completion of maintenance, open the hollow groove-shaped mold of u shapes and reject three pieces of planks and mold angle steel, obtain by concrete and The prefabricated eccentric module of overall assembled of pvc pipe composition.
The present invention realizes Prefabricated block assembled demolition blasting steel construction by four key technology points:
1, girder steel mold is made according to steel construction size to be removed, further according to the prefabricated powder charge module of girder steel mold;
2, powder charge module can be directly assembled on steel construction to be torn open;
3, charging hole is reserved in Prefabricated block, and selection dose, charging means, interval mode and interval can be adjusted according to actual conditions Species type;
4, when the pre-buried pvc pipe central charge of prefabricated powder charge module, pre-buried pvc pipe central axes must be with hollow girder steel central axes weight It closes;Ensure pvc pipe in hollow girder steel centre;When the pre-buried pvc pipe bias of prefabricated powder charge module is placed, when installation pre-buried pvc pipe Against waiting for quick-fried angle steel right angle.
Using above-mentioned technical proposal, the advantages of present invention compares existing method, has:
1, it using 2# rock emulsion explosives, is easier to obtain compared with control explosive;
2, explosive utilization rate is high, saves explosive cost, and smaller dose reaches target;
3, choosing multiple charging means and interval mode more make full use of explosive acting ability;
4, explosive is packed into inside angle steel, and explosion generates slungshot and shock wave harm is small, is easy protection;
5, prefabricated component production method is simple, and can make prefabricated component in advance before construction, significantly saves time cost, reduces work Phase;
6, prefabricated component installation is simple, easy to operate.
Description of the drawings
Fig. 1 is mold angle steel schematic diagram.
Fig. 2 is the hollow groove-shaped mold schematic diagram of u shapes.
Fig. 3 is overall assembled Prefabricated block schematic diagram.
Fig. 4 is that schematic diagram is completed in the assembly of prefabricated powder charge module.
Fig. 5 is prefabricated eccentric powder charge module diagram.
Fig. 6 is that schematic diagram is completed in prefabricated eccentric powder charge module assembly.
In figure:1- mold angle steel;The hollow groove-shaped mold of 2-u shapes;3- overall assembled Prefabricated blocks;The pre-buried pvc pipes of 4-;5- Dismounting angle steel to be blasted;The pre- joint-cuttings of 6-;7- emulsions.
Specific implementation mode
The present invention is described further with specific implementation method below in conjunction with the accompanying drawings, not to the limit of its protection domain System.
Embodiment one:
Make one and 5 size of dismounting angle steel to be blasted(80mm*80mm*8mm)Mold angle steel 1 in identical Fig. 1, long 150cm; Mold angle steel 1 is lain against into ground, using three block baffles by angle steel side and bottom package at the hollow groove-shaped mold 2 of u shapes, wherein Long baffle seals angle steel side, non-porous side's baffle seals angle steel bottom, trepanning(Diameter 42mm is located at angle steel interface center)Gear Plate seals at the top of angle steel;The casting concrete in the hollow groove-shaped mold 2 of u shapes(Label 300), pour after height 2cm from angle steel top Long 105cm, the pre-buried pvc pipe 4 of diameter 40cm are inserted at portion's perforated baffle;Continue to pour coagulation in the hollow groove-shaped mold of u shapes 2 Soil, until height is identical as angle steel vertical edge after concrete settlement.Three block baffles are removed after concrete curing 28d, are obtained by mold Angle steel 1, pre-buried pvc pipe 4 and coagulation local soil type at overall assembled Prefabricated block 3.Dismounting angle steel 150cm to be blasted is chosen, 50cm every 5cm to being cut into horizontal and vertical pre- joint-cutting 6 between 100cm(Long 40mm, wide 5mm), then by overall assembled Prefabricated block 3 is assembled into assembly as shown in Figure 4 with dismounting angle steel 5 to be blasted and completes structure, uses length 380mm, width 12.6mm nylon binding bands are fixed, each bandage spacing distance 15cm since top.It is packed into medicine along 4 nozzle of pre-buried pvc pipe It wraps assembly to complete in structure stage casing 50cm, wherein 2# rock emulsion explosives 7 are 150g(Charge positions divide 3 from the 50cm of bottom Section powder charge, every section of 50g, every section of airspace 15cm)With 3 hair ms-3 Nonel detonators.Carry out stemming blocking, protection, evacuation and It can detonate after preparation before the detonation such as warning.
1 size of mold angle steel is 80mm*80mm*8mm, long 150cm in embodiment one;Baffle is wooden rectangle baffle, Thickness 1cm, size are respectively 90mm*90*mm, 90mm*90mm and 90mm*150cm;Cement grade 300 in casting concrete, Water, sand, cement proportion 1:3:1;4 size of pre-buried pvc pipe is long 105cm, diameter 40cm, wall thickness 3mm;6 long 40mm of pre- joint-cutting, Wide 5mm, along 5 right angle back of dismounting angle steel to be blasted;Nylon binding belt length 38cm, width 12.6mm;It is filled per the airspaces 15cm Medicine 50g is packed into 1 hair detonator, uses 150g2# rock emulsion explosives, 3 hair ms-3 Nonel detonators in total.Final test effect is cut Disconnected length 50cm, destroys length 67cm.
Embodiment two:
Make identical with 5 size of the dismounting angle steel to be blasted mold angle steel of two sizes 1(80mm*80mm*8mm), long 1500mm; Two pieces of 1 opening directions of mold angle steel fix every 15cm as a column sky opening direction with 10# zinc plated mild carbon steels silk Heart girder steel mold;It is poured containing pre-buried pvc pipe 4 in cylindrical hollow girder steel mold(Diameter 40mm)Overall assembled prefabricated molds Block 3.It is cut into horizontal and vertical pre- joint-cutting 6 in dismounting angle steel 5 to be blasted(Long 35mm, wide 5mm), then overall assembled is pre- Molding block 3 and mold angle steel 1 are assembled into assembly as shown in Figure 4 with dismounting angle steel 5 to be blasted and complete structure.Along pre-buried PVC It is 150g that 4 nozzle of pipe, which is packed into 2# rock emulsion explosives 7,(Charge positions are in the 500mm of stage casing), blocked, protected, being evacuated and It can detonate after preparation before the detonation such as warning.
Embodiment three:
Make one and 5 size of dismounting angle steel to be blasted(80mm*80mm*8mm)Mold angle steel 1 in identical Fig. 1, long 150cm; Mold angle steel 1 is lain against into ground, using three block baffles by angle steel side and bottom package at the hollow groove-shaped mold 2 of u shapes, wherein Long baffle seals angle steel side, square baffle seals at the top and bottom of angle steel;It is close to right-angle side in angle steel and places long 105cm, diameter The pre-buried pvc pipe 4 of 40cm, pvc pipe bottom seal, the opening side's of being close to baffle are concordant with angle steel opening;In the hollow groove-shaped mold of u shapes Casting concrete in 2(Label 300), cover pre-buried pvc pipe 4;Continue the casting concrete in the hollow groove-shaped mold 2 of u shapes, until Height is concordant with angle steel vertical edge after concrete settlement.Three block baffles and mold angle steel 1 are removed after concrete curing 28d, obtain by Pre-buried pvc pipe 4 and coagulation local soil type at eccentric overall assembled Prefabricated block 3.5 length 150cm of dismounting angle steel to be blasted is chosen, Back is cut into horizontal and vertical pre- joint-cutting 6 every 5cm on the outside of angle steel right angle between at the beginning of 50cm first arrivals 100cm(It is long 40mm, wide 5mm), then by mold angle steel 1 and 5 clipping bias overall assembled Prefabricated block 3 of dismounting angle steel to be blasted, composition is cut Face is rectangular long tubular structure to be blasted, and structure is completed in assembly as shown in Figure 6.Use length 380mm, width 12.6mm Buddhist nun Imperial binding band fixes long tubular structure to be blasted, each bandage spacing distance 15cm since structural top to be blasted.Along pre- It buries 4 nozzle of pvc pipe to be packed into pack to assembly completion structure stage casing 50cm, wherein 2# rock emulsion explosives 7 are 150g(Powder charge position It sets from the 50cm of bottom, point 3 sections of powder charges, every section of 50g, every section of airspace 15cm)With 3 hair ms-3 Nonel detonators.Carry out big gun It can detonate after the preceding preparation of the detonations such as mud blocking, protection, evacuation and warning.
1 size of mold angle steel is 80mm*80mm*8mm, long 150cm in embodiment three;Baffle is wooden rectangle baffle, Thickness 1cm, size are respectively 90mm*90*mm, 90mm*90mm and 90mm*150cm;Cement grade 300 in casting concrete, Water, sand, cement proportion 1:3:1;4 size of pre-buried pvc pipe is long 105cm, diameter 40cm, wall thickness 3mm;6 long 40mm of pre- joint-cutting, Wide 5mm, along 5 right angle back of dismounting angle steel to be blasted;Nylon binding belt length 38cm, width 12.6mm;It is filled per the airspaces 15cm Medicine 50g is packed into 1 hair detonator, uses 150g2# rock emulsion explosives 7,3 to send out ms-3 Nonel detonators in total.Final test effect Shearing length 54cm destroys length 70cm.

Claims (6)

1. a kind of method of precast concrete integral module demolition blasting steel angle structure, characterization step include:
Step 1:Make one piece of mold angle steel identical with dismounting angle steel to be blasted;
Step 2:It is assembled into hollow groove-shaped mold based on the mold angle steel;
Step 3:Concrete is poured into a mould in hollow groove-shaped mold;
Step 4:Pre-buried charging hole during pouring into a mould concrete;Obtain prefabricated powder charge module;
Step 5:Precracking is cut at angle steel back to be removed;
Step 6:It is packed into pack along the pre-buried charging hole of prefabricated powder charge module;
Step 7:The prefabricated powder charge module for having been charged into pack is fixed on angle steel to be removed;
Step 8:It detonates after the completion of preparation before explosion.
2. a kind of method of precast concrete integral module demolition blasting steel angle structure according to claim 1, feature The concrete operation step for being the step 2 is:Mold angle steel is lain against into ground, using three block baffles by two width bottom edge of angle steel It is assembled into the hollow groove-shaped mold of u shapes with corresponding length sky side;
The concrete operation step of the step 3 is:Placing concrete in the hollow groove-shaped mold of u shapes;
The concrete operation step of the step 4 is:When concrete casting height is u shape groove height half, in the coagulation poured The pre-buried pvc pipe of a back cover is put on soil as pre-buried charging hole, pressing pre-buried pvc pipe makes it be absorbed in casting concrete, and Pre-buried pvc pipe central axes are overlapped with u shape slots central axes;One end closure of pvc pipe, another end opening, pvc pipe sealing are located at concrete Interior, pvc pipe opening is slightly longer than angle steel;Continue the placing concrete into u shapes hollow groove-shaped mold, until concrete after the completion of sedimentation Height is contour with two width of angle steel;The concrete of pouring is conserved, waits being demoulded after the completion of conserving, it is hollow to open u shapes Groove-shaped mold rejects three pieces of planks, obtains the prefabricated powder charge module being made of concrete, pvc pipe and mold angle steel.
3. a kind of method of precast concrete integral module demolition blasting steel angle structure according to claim 1, feature The concrete operation step for being the step 2 is:The mold angle steel of one piece of size identical as the step 1 is made again;By two pieces of moulds Have angle steel opening direction to fix as a cylindrical hollow girder steel groove-shaped mold opening direction;
The concrete operation step of the step 3 is:Cylindrical hollow girder steel groove-shaped mold is vertically placed, casting concrete;
The concrete operation step of the step 4 is:Casting concrete height be cylindrical hollow girder steel groove-shaped mold height 1/3 ~ When 1/2, it is vertically inserted into pvc pipe, pvc pipe lower part back cover, upper opening, along cylindrical hollow girder steel groove-shaped mold inner wall and PVC Continue casting concrete between pipe outer wall, until after sedimentation between column hollow steel beam groove-shaped mold inner wall and pvc pipe outer wall Space filling is complete;The concrete of pouring is conserved, waits being demoulded after the completion of conserving, rejects one block of mold angle steel, obtain To the prefabricated powder charge module being made of concrete, pvc pipe and mold angle steel.
4. a kind of method of precast concrete integral module demolition blasting steel angle structure according to claim 1, feature Be pack described in step 6 it is 2# rock emulsion explosives and Nonel detonator.
5. a kind of method of precast concrete integral module demolition blasting steel angle structure according to claim 1, feature Be charging means described in step 6 it is underground borehole blasting or continuous charging.
6. a kind of method of precast concrete integral module demolition blasting steel angle structure according to claim 1, feature The concrete operation step for being the step 2 ~ step 4 is:Mold angle steel is lain against into ground, it is using three block baffles that angle steel two is wide Degree bottom edge and corresponding length sky side are assembled into the hollow groove-shaped mold of u shapes;Right angle is close to pre-buried one of angle steel side in angle steel The pre-buried pvc pipe of back cover, pvc pipe back cover is located in angle steel, pvc pipe opening is concordant at the top of angle steel;Toward the hollow groove-shaped mold of u shapes Middle placing concrete covers pvc pipe, is further continued for the placing concrete into u shapes hollow groove-shaped mold, until coagulation after the completion of sedimentation Native height is identical as u shape channel opening height;The concrete of pouring is conserved, waits being demoulded after the completion of conserving, opens u shapes Hollow groove-shaped mold rejects three pieces of planks and mold angle steel, and it is prefabricated partially to obtain the overall assembled being made of concrete and pvc pipe Core module.
CN201810505076.8A 2018-05-24 2018-05-24 Method for blasting demolishing angle steel structure of precast concrete integral module Active CN108731567B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810505076.8A CN108731567B (en) 2018-05-24 2018-05-24 Method for blasting demolishing angle steel structure of precast concrete integral module

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810505076.8A CN108731567B (en) 2018-05-24 2018-05-24 Method for blasting demolishing angle steel structure of precast concrete integral module

Publications (2)

Publication Number Publication Date
CN108731567A true CN108731567A (en) 2018-11-02
CN108731567B CN108731567B (en) 2023-05-09

Family

ID=63935102

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810505076.8A Active CN108731567B (en) 2018-05-24 2018-05-24 Method for blasting demolishing angle steel structure of precast concrete integral module

Country Status (1)

Country Link
CN (1) CN108731567B (en)

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4339995A (en) * 1979-02-06 1982-07-20 Messerschmitt-Bolkow-Blohm Gmbh Method for destroying structures such as concrete walls
JP2005179924A (en) * 2003-12-16 2005-07-07 Sumitomo Mitsui Construction Co Ltd Method for blowing up and demolishing reinforced concrete structure
CN103938888A (en) * 2014-05-14 2014-07-23 中钢集团武汉安全环保研究院有限公司 Blasting demolition method for cylindrical steel column structure buildings
US20140318335A1 (en) * 2013-04-24 2014-10-30 Kacoh Co., Ltd. Steel-structure demolition method
CN104964624A (en) * 2015-07-01 2015-10-07 武汉宏伟交通爆破工程有限公司 Axial embedded blast hole of reinforced concrete beam and blasting demolition method
CN105823386A (en) * 2016-06-03 2016-08-03 武汉科技大学 Method for blasting demolition of reinforced concrete supporting beam in foundation pit
CN107858941A (en) * 2017-11-16 2018-03-30 南京交通工程有限公司 A kind of hydraulic pressure demolition removes Prestressed Continuous Box Beam bridge construction technique

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4339995A (en) * 1979-02-06 1982-07-20 Messerschmitt-Bolkow-Blohm Gmbh Method for destroying structures such as concrete walls
JP2005179924A (en) * 2003-12-16 2005-07-07 Sumitomo Mitsui Construction Co Ltd Method for blowing up and demolishing reinforced concrete structure
US20140318335A1 (en) * 2013-04-24 2014-10-30 Kacoh Co., Ltd. Steel-structure demolition method
CN103938888A (en) * 2014-05-14 2014-07-23 中钢集团武汉安全环保研究院有限公司 Blasting demolition method for cylindrical steel column structure buildings
CN104964624A (en) * 2015-07-01 2015-10-07 武汉宏伟交通爆破工程有限公司 Axial embedded blast hole of reinforced concrete beam and blasting demolition method
CN105823386A (en) * 2016-06-03 2016-08-03 武汉科技大学 Method for blasting demolition of reinforced concrete supporting beam in foundation pit
CN107858941A (en) * 2017-11-16 2018-03-30 南京交通工程有限公司 A kind of hydraulic pressure demolition removes Prestressed Continuous Box Beam bridge construction technique

Also Published As

Publication number Publication date
CN108731567B (en) 2023-05-09

Similar Documents

Publication Publication Date Title
KR102517885B1 (en) Blasting Method using Liner applied to Primer, Booster and Charge in a blasthole
CN100564802C (en) The method of crushing rock formation in the colliery
CN102287198B (en) Construction method for river-crossing shield tunnel crushed stratum communication channel
CN103938888B (en) The blasting demolishing method of a kind of tubular steel column structure construction of structures
CN106197178A (en) A kind of novel deep hole water pressure blasting demolition set and blasting method
CN104895574A (en) Construction method for controlling large cross section tunnel blasting vibration velocity
CN105423832A (en) Blast construction method of orientation window of thick-wall brick chimney
CN208263085U (en) A kind of precast concrete integral module of demolition blasting steel angle structure
CN105043177B (en) The method and device that a kind of sillar is broken
CN108731567A (en) A kind of method of precast concrete integral module demolition blasting steel angle structure
CN208432159U (en) A kind of Prefabricated block of demolition blasting H profile steel structure
CN109269367A (en) It is a kind of to exempt from punching construction method for reinforced concrete frame structure demolition blasting
CN108731566A (en) A kind of method of preformed particles medium module demolition blasting steel angle structure
CN108547472A (en) A kind of Prefabricated block of demolition blasting steel angle structure
CN108759600A (en) A kind of method of prefabricated aqueous medium module demolition blasting steel angle structure
CN208567660U (en) A kind of preformed particles medium module of demolition blasting steel angle structure
CN208567659U (en) A kind of precast concrete fission module of demolition blasting steel angle structure
CN104215136B (en) Reinforced beam demolition blasting blast hole projectile filling, blocking and pressure slag structure and demolition blasting method
CN110530218A (en) A method of exempt to punch demolition blasting angle steel
CN108731565A (en) A kind of Prefabricated block and method of demolition blasting H profile steel structure
CN108731564A (en) A kind of method of precast concrete fission module demolition blasting steel angle structure
CN208333273U (en) A kind of prefabricated aqueous medium module of demolition blasting steel angle structure
WO2015044623A1 (en) Improved directional gas pressure device
CN108827094B (en) Blasting demolition device and blasting method for H-shaped steel plant
CN109238051A (en) A kind of method that steel angle structure power transmission tower single column demolition blasting is got rid of the danger

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant