CN108729466A - A kind of large form method for supporting for constructing no holdfast concrete barricade - Google Patents

A kind of large form method for supporting for constructing no holdfast concrete barricade Download PDF

Info

Publication number
CN108729466A
CN108729466A CN201810530678.9A CN201810530678A CN108729466A CN 108729466 A CN108729466 A CN 108729466A CN 201810530678 A CN201810530678 A CN 201810530678A CN 108729466 A CN108729466 A CN 108729466A
Authority
CN
China
Prior art keywords
large form
concrete
bank protection
wire drawing
anchor pole
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201810530678.9A
Other languages
Chinese (zh)
Other versions
CN108729466B (en
Inventor
曾从伟
纪桂强
陈辉
陈国民
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Metallurgical Construction Engineering Group Co Ltd
Original Assignee
China Metallurgical Construction Engineering Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Metallurgical Construction Engineering Group Co Ltd filed Critical China Metallurgical Construction Engineering Group Co Ltd
Priority to CN201810530678.9A priority Critical patent/CN108729466B/en
Publication of CN108729466A publication Critical patent/CN108729466A/en
Application granted granted Critical
Publication of CN108729466B publication Critical patent/CN108729466B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D29/00Independent underground or underwater structures; Retaining walls
    • E02D29/02Retaining or protecting walls
    • E02D29/0258Retaining or protecting walls characterised by constructional features
    • E02D29/0275Retaining or protecting walls characterised by constructional features cast in situ

Landscapes

  • Engineering & Computer Science (AREA)
  • Environmental & Geological Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Refuge Islands, Traffic Blockers, Or Guard Fence (AREA)
  • Retaining Walls (AREA)

Abstract

The invention discloses a kind of large form method for supporting of no holdfast concrete barricade, including following process:It is segmented and is constructed from top to down using contrary sequence method, after the slope surface in every section of construction area excavates molding and completes body bank protection armature boring and slip casting, it is characterised in that:First, two ends of the fixed cantilever in bank protection anchor pole outer end and the rock end that enters of bank protection anchor pole are welded into a whole using tension rib, are formed " tripod structure ";Then, in two tip positions of cantilever arrangement " L " type to wire drawing bar, the pulling eye position that wire drawing bar is used to be correspondingly arranged on large form;And then, large form is installed after the completion of the binding of concrete barricade reinforcing bar, and large form is fastened to wire drawing bar using " L " shape;Finally, the suspension of platform frame and platform frame are installed on large form after large form is installed and fastened, and completely spreads springboard and installation round steel guardrail on platform frame, and uses steel pipe or shaped steel diagonal brace large form to reinforce the stability of large form.

Description

A kind of large form method for supporting for constructing no holdfast concrete barricade
Technical field
The invention belongs to concrete barricade fields, and in particular to a kind of large form method for supporting for constructing no holdfast concrete barricade.
Background technology
Be typically assembled with wooden model or small steel templates for formwork support structure when traditional concrete Retaining wall, and using plus If the holdfast of auxiliary reinforces the form of wire drawing bar as template, to prevent in concreting, mounted split pattern is by concrete Lateral pressure is excessive and generates the accident of sudden and violent mould.This kind of form of construction work, due to template assembly block number is more, the rigidity of itself compared with Small, presentation quality and flatness effect after concrete formation are generally extremely difficult to the requirement of clear-water concrete, need large area Grinding process, and due to adding a large amount of auxiliary holdfasts, it is few that template is used in turn number, considerably increases construction cost.
Based on this, how to design one kind and be easy to match with large form, and auxiliary holdfast need not be preset(Make concrete barricade Appearance piece is less, flatness higher), it is easily designed and construction, can be promoted concrete Retaining wall quality without holdfast concrete barricade. But how using easy to operate, bearing surely is leaned on, the large form method for supporting for constructing no holdfast concrete barricade easy to implement, is need The technical issues of considering to solve.
Invention content
In view of the above shortcomings of the prior art, the technical problem to be solved by the present invention is to:How a kind of operation letter is provided Just, bearing is surely leaned on, the large form method for supporting for constructing no holdfast concrete barricade easy to implement.
In order to solve the above-mentioned technical problem, present invention employs the following technical solutions:
A kind of large form method for supporting of no holdfast concrete barricade, including following process:It is segmented progress from top to down using contrary sequence method Construction, first, after the slope surface in every section of construction area excavates molding and completes the drilling of bank protection anchor pole 1 and slip casting, it is characterised in that: Using tension rib 2, the rock end that enters of two ends of the fixed cantilever in 1 outer end of bank protection anchor pole and bank protection anchor pole 1, to be welded into one whole Body is formed " tripod structure ";Then, wire drawing bar 3 uses wire drawing bar 3 in two tip positions of cantilever arrangement " L " type In the pulling eye position being correspondingly arranged on large form 5;And then, large form is installed after the completion of the binding of concrete barricade reinforcing bar 4 5, and large form 5 is fastened to wire drawing bar 3 using " L " shape;Finally, pacify on large form 5 after large form 5 is installed and fastened If platform frame suspension 11 and platform frame 6, and springboard 7 and installation round steel guardrail 8 are completely spread on platform frame 6, and Use steel pipe or 10 diagonal brace large form 5 of shaped steel to reinforce the stability of large form;After large form is reinforced, to concrete barricade reinforcing bar After 4 casting concretes form concrete barrier wall structure, then carry out the inverse construction for making hypomere region.
It compares compared with construction technology, the advantages of large form method for supporting of the present invention without holdfast concrete barricade is:
1, it rationally utilizes, reduces cost:Take full advantage of itself design bank protection anchor pole anchorage effect and large form advantage and Material property is welded into a whole using steel tie rock bank protection anchor pole cantilever end portion is entered, itself overhanging part is formed " tripod structure " makes its all concrete all be transmitted to bank protection bolt portion to the lateral pressure of large form, takes full advantage of and set The bank protection anchor pole anchor force of itself in meter reduces largely default holdfast, reduces construction cost and shorten operation work Phase.
2, easily designed and construction:It can be used in combination with large form, make full use of large form and have both large form tool Some advantage and characteristics(Construction area bigger, large form recycling, reduces construction cost), using concrete barricade without the big mould of holdfast Board supporting structure can shorten the duration of concrete Retaining wall, it is ensured that the quick formation of the concrete barricade under different geological conditions is realized Concrete formation face reaches the technical quality effect of clear-water concrete.
3, quality controllable, it is easy to operate:Take full advantage of big punching block good integrity, easy to operate feature, it is ensured that mixed Flat appearance, piece one after solidifying earth forming are good to, flatness, reduce the appearance processing of the concrete barricade in later stage;Its large form Reinforce it is simple, easy to assembly, and without setting up scaffold as operating platform.
Description of the drawings
Fig. 1 is the schematic diagram for using the present invention and constructing no holdfast concrete barricade side elevation in construction;
Fig. 2 is the scheme of installation for using the present invention and constructing no holdfast concrete barricade large form in construction;
Fig. 3 be use construct the present invention without holdfast concrete barricade construction when to the scheme of installation at wire drawing bar;
Fig. 4 is the side elevation schematic diagram for the operating platform that the large form method for supporting of the invention for constructing no holdfast concrete barricade is built;
Fig. 5 is the structural schematic diagram of guardrail part in Fig. 4.
In figure label for:
1-bank protection anchor pole, 2-tension ribs, 3-to wire drawing bar, 4-concrete barricade reinforcing bars, 5-large forms, 6-platform framves, 7-platform planks, 8-round steel guardrails, 9-cushion blocks, 10-diagonal braces, the suspension of 11-platform framves.
Specific implementation mode
The present invention is described in further detail below in conjunction with the accompanying drawings.
A kind of no holdfast concrete barricade, including concrete barricade reinforcing bar 4, the concrete barricade reinforcing bar 4 are used to construct the concrete of covering slope surface Barricade further includes bank protection anchor pole 1 and tension rib 2;
The oblique underthrust in described 1 one end of bank protection anchor pole is solid in the rock stratum of slopes, and the other end of the bank protection anchor pole 1 is exposed at outside slopes Portion and running through obliquely and is fixedly linked at the concrete barricade reinforcing bar 4 with the medium position in a jib-length direction, the cantilever It is abutted against with deviating from the outside of slope surface on the concrete barricade reinforcing bar 4;
It is located at entering to be respectively welded between rock end and be fixed in slopes on two ends of the cantilever and the bank protection anchor pole 1 A piece tension rib 2, and so that connection forms " tripod structure " jointly for the cantilever and the tension rib 2.
Wherein, cantilever and tension rib 2 are reinforcing bar.
Wherein, the bank protection anchor pole 1 using can cured slurries slip casting form(It can be inserted into reinforcing bar before slip casting or steel twists Line reinforces the intensity of bank protection anchor pole).The slip casting of architectural engineering is by certain curable slurries(Such as:Cement mortar)Inject rock In the crack of soil base or hole, by modes such as displacement, filling, extruding to improve the method for its physico-mechanical properties.
Include the following steps when above-mentioned no holdfast concrete Retaining wall:
(1)In side slope contrary sequence method(Contrary sequence method is a kind of existing Retaining wall engineering method, is segmentation from top to down(Layer)Operation)From After the molding of lower excavation and completing the drilling of body bank protection anchor pole 1 and slip casting, using tension rib 2 two ends of cantilever and bank protection anchor The rock end that enters of bar 1 is welded into a whole, and is formed " tripod structure ", according to the pulling eye position of large form in cantilever end position Set arrangement " L " type to wire drawing bar 3(It is made by reinforcing bar);Large form 5 is installed after the completion of the binding of concrete barricade reinforcing bar 4, and is used " L " shape fastens large form 5 to wire drawing bar 3, to meet the needs that concreting operates in construction, is installed tightly in large form 5 Platform frame suspension 11 and platform frame 6 are installed after Gu on it, and completely spreads 7 He of springboard on platform frame 6 Round steel guardrail 8 is installed, and uses steel pipe or 10 diagonal brace large form of shaped steel to reinforce the stability of large form, is completed in the above process After large form checks reinforcing, after casting concrete then forms concrete barrier wall structure, then carries out inverse subordinate's process of making and construct.
(2)Corresponding improvement to wire drawing bar 3:Since though the general intensity to wire drawing bar 3 used is high, shear behavior Difference, and replace original to wire drawing bar using " L " steel bar since the assembled area of large form 5 is big, when assembled, and stretch out in large form face It is welded again to wire drawing bar after plate is outer, or is directly welded and fixed reinforcing bar section on reinforcing bar, can effectively avoid security risk.
Large form method for supporting using the present invention solves more barricade appearance piece, poor flatness and need not be arranged The problem of assisting holdfast, can not only shorten the construction period, reduce the side slope exposed time, moreover it is possible to obtain significant mass effect and warp Ji benefit.Technological process of the large form method for supporting construction without holdfast concrete barricade using the present invention is as follows:
Side slope classification excavation → side slope amendment → floor slot is artificially formed → and bank protection armature boring and slip casting → steel tie apply → concrete barricade reinforcing bar binding → " L " shape applies → large form installation → operating platform installation → concreting to wire drawing bar reinforcing bar → large form dismounting → floor slot extends to form → next stage concrete Retaining wall → formation cycle operation(It is inverse to make to bottom).
Large form method for supporting construction using the present invention can shorten the duration of concrete Retaining wall, really without holdfast concrete barricade The quick formation of the concrete barricade under different geological conditions is protected, realizes that concrete formation face reaches the construction quality of clear-water concrete Effect;It saves project cost, can also synchronize and be included in relevant construction technical schemes, and according to meeting different geological conditions concrete The needs of barricade rapid shaping realize the perfect adaptation of Social benefit and economic benefit, make up the deficiency of existing construction method, with And enrich existing side slope supporting construction technical specification.
It the above is only the preferred embodiment of the present invention, it is noted that not departing from this for those skilled in the art Under the premise of technical solution, the technical solution for the several modifications and improvements made should equally be contemplated as falling within the claims requirement The range of protection.

Claims (1)

1. a kind of large form method for supporting of no holdfast concrete barricade, including following process:Be segmented from top to down using contrary sequence method into Row construction excavates molding in the slope surface of every section of construction area and completes body bank protection anchor pole first(1)It is special after drilling and slip casting Sign is:Using tension rib(2)Bank protection anchor pole(1)Two ends of the fixed cantilever in outer end and bank protection anchor pole(1)Enter rock End is welded into a whole, and is formed " tripod structure ";Then, in two tip positions of cantilever arrangement " L " type to wire drawing Bar(3), to wire drawing bar(3)For running through large form(5)On the pulling eye position that is correspondingly arranged;And then, in concrete barricade reinforcing bar (4)Large form is installed after the completion of binding(5), and using " L " shape to wire drawing bar(3)Fasten large form(5);Finally, in big mould Plate(5)In large form after installation fastening(5)On install platform frame suspension(11)And platform frame(6), and flat Platform supporting rack(6)On completely spread springboard(7)With installation round steel guardrail(8), and use steel pipe or shaped steel(10)Diagonal brace large form(5)With Reinforce the stability of large form;After large form is reinforced, to concrete barricade reinforcing bar(4)Casting concrete forms concrete barrier wall structure Afterwards, it then carries out against the construction for making hypomere region.
CN201810530678.9A 2018-05-29 2018-05-29 Large formwork supporting method for constructing anchor-free concrete retaining wall Active CN108729466B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810530678.9A CN108729466B (en) 2018-05-29 2018-05-29 Large formwork supporting method for constructing anchor-free concrete retaining wall

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810530678.9A CN108729466B (en) 2018-05-29 2018-05-29 Large formwork supporting method for constructing anchor-free concrete retaining wall

Publications (2)

Publication Number Publication Date
CN108729466A true CN108729466A (en) 2018-11-02
CN108729466B CN108729466B (en) 2020-07-21

Family

ID=63935782

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810530678.9A Active CN108729466B (en) 2018-05-29 2018-05-29 Large formwork supporting method for constructing anchor-free concrete retaining wall

Country Status (1)

Country Link
CN (1) CN108729466B (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111155533A (en) * 2020-01-16 2020-05-15 徐祥春 Basement reverse construction method unilateral shear wall template reinforcing method
CN112554208A (en) * 2020-11-03 2021-03-26 中铁二局集团有限公司 Cantilever support platform, supporting and retaining wall and construction method

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN202509765U (en) * 2012-04-06 2012-10-31 中国葛洲坝集团股份有限公司 Overhung platform template
CN203129203U (en) * 2013-01-25 2013-08-14 山东义泰建设工程有限公司 Rubble retaining wall reinforcing single-face formwork supporting system
CN105220874A (en) * 2015-09-11 2016-01-06 杭州江润科技有限公司 The construction method of basement superelevation exterior wall self-supporting single side formwork system
CN106192758A (en) * 2016-07-15 2016-12-07 中建五局第三建设有限公司 A kind of construction method utilizing the cantilever form large-scale high pier stud of construction
CN107013033A (en) * 2017-04-26 2017-08-04 中铁十八局集团有限公司 A kind of concrete side wall formwork for placing and its construction method
CN206736864U (en) * 2017-03-21 2017-12-12 中国葛洲坝集团三峡建设工程有限公司 Hydraulic self-lifting cantilever heavy type arch dam shuttering work platform
CN206844659U (en) * 2017-05-22 2018-01-05 中冶建工集团有限公司 Basement barricade single side formwork system

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN202509765U (en) * 2012-04-06 2012-10-31 中国葛洲坝集团股份有限公司 Overhung platform template
CN203129203U (en) * 2013-01-25 2013-08-14 山东义泰建设工程有限公司 Rubble retaining wall reinforcing single-face formwork supporting system
CN105220874A (en) * 2015-09-11 2016-01-06 杭州江润科技有限公司 The construction method of basement superelevation exterior wall self-supporting single side formwork system
CN106192758A (en) * 2016-07-15 2016-12-07 中建五局第三建设有限公司 A kind of construction method utilizing the cantilever form large-scale high pier stud of construction
CN206736864U (en) * 2017-03-21 2017-12-12 中国葛洲坝集团三峡建设工程有限公司 Hydraulic self-lifting cantilever heavy type arch dam shuttering work platform
CN107013033A (en) * 2017-04-26 2017-08-04 中铁十八局集团有限公司 A kind of concrete side wall formwork for placing and its construction method
CN206844659U (en) * 2017-05-22 2018-01-05 中冶建工集团有限公司 Basement barricade single side formwork system

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
杨福祥等: "动态调整立模法在用小钢模进行混凝土挡墙施工中的应用", 《浙江水利水电》 *

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111155533A (en) * 2020-01-16 2020-05-15 徐祥春 Basement reverse construction method unilateral shear wall template reinforcing method
CN112554208A (en) * 2020-11-03 2021-03-26 中铁二局集团有限公司 Cantilever support platform, supporting and retaining wall and construction method
CN112554208B (en) * 2020-11-03 2022-02-18 中铁二局集团有限公司 Cantilever support platform, supporting and retaining wall and construction method

Also Published As

Publication number Publication date
CN108729466B (en) 2020-07-21

Similar Documents

Publication Publication Date Title
CN108915728B (en) Tunnel arch wall preliminary bracing based on gantry type support invades limit and changes arch construction method
CN206956742U (en) High precipitous rock roadbed side slope repair system
CN108385512A (en) One kind being based on bolted modular assembly formula Hollow High Pier splicing structure and its practice
CN110242334B (en) Assembled FRP high-water-content material mining combined strut and construction method
CN104895073B (en) Can being dismounted for multiple times anchor cable construction system and its construction method
CN103711518A (en) Portable mine filling retaining wall
CN103088842A (en) Rubble retaining wall reinforced single-face pattern plate support system and construction method
CN108729466A (en) A kind of large form method for supporting for constructing no holdfast concrete barricade
CN108005255A (en) A kind of construction method of wall
CN113152339A (en) Concrete guardrail attached type fixed die pouring construction method
CN106968692A (en) A kind of construction method of tunnel excavation support structure and the supporting construction
CN105696620B (en) The construction method for the retaining wall structure that a kind of waste tire-breaking concrete is formed
CN107355008A (en) A kind of prefabricated attachment structure and method of newly-increased steel core concrete column and existing structure
CN208586640U (en) A kind of large form support construction for constructing no holdfast concrete barricade
CN206752693U (en) A kind of assembled steel reinforced concrete column of stirrup encryption and post splicing node
CN108560914A (en) Construct the large form support construction method for dismounting of no holdfast concrete barricade
CN209818080U (en) Segmental assembled pipe shed pouring construction structure
CN110863856A (en) Road-entering type cemented filling plugging wall and construction method thereof
CN203769849U (en) Portable mine filling barricade
CN208586641U (en) A kind of no holdfast concrete barricade
CN102767378A (en) Method for constructing distyle tunnel portal by framed bent
CN105951852B (en) A kind of adjustable formwork and construction method of the beam concrete construction of high slope sash
CN108130889A (en) Pump lock main body bottom plate and flow channel layer side wall step construction joint method for production
CN110905553B (en) Tunnel secondary lining finishing method for sleeve lining mould construction
CN208088534U (en) The concrete construction deformation joint structure of continuous placing can be achieved

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant