CN108729340A - A kind of bridge sound barrier acoustic fixing device and sound-absorbing method of plate installation - Google Patents

A kind of bridge sound barrier acoustic fixing device and sound-absorbing method of plate installation Download PDF

Info

Publication number
CN108729340A
CN108729340A CN201810961945.8A CN201810961945A CN108729340A CN 108729340 A CN108729340 A CN 108729340A CN 201810961945 A CN201810961945 A CN 201810961945A CN 108729340 A CN108729340 A CN 108729340A
Authority
CN
China
Prior art keywords
plate
abatvoix
bridge
fixing bolt
extending bracket
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201810961945.8A
Other languages
Chinese (zh)
Inventor
梁海波
梁翰诺
冯欣
胡峰
陈少杰
黄耀达
邓成
玉振云
覃继敏
何斌
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway 25th Bureau Group Co Ltd
Fourth Engineering Co Ltd of China Railway 25th Bureau Group Co Ltd
Original Assignee
China Railway 25th Bureau Group Co Ltd
Sixth Engineering Co Ltd of China Railway 25th Bureau Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway 25th Bureau Group Co Ltd, Sixth Engineering Co Ltd of China Railway 25th Bureau Group Co Ltd filed Critical China Railway 25th Bureau Group Co Ltd
Priority to CN201810961945.8A priority Critical patent/CN108729340A/en
Publication of CN108729340A publication Critical patent/CN108729340A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D19/00Structural or constructional details of bridges
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01FADDITIONAL WORK, SUCH AS EQUIPPING ROADS OR THE CONSTRUCTION OF PLATFORMS, HELICOPTER LANDING STAGES, SIGNS, SNOW FENCES, OR THE LIKE
    • E01F8/00Arrangements for absorbing or reflecting air-transmitted noise from road or railway traffic
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01FADDITIONAL WORK, SUCH AS EQUIPPING ROADS OR THE CONSTRUCTION OF PLATFORMS, HELICOPTER LANDING STAGES, SIGNS, SNOW FENCES, OR THE LIKE
    • E01F8/00Arrangements for absorbing or reflecting air-transmitted noise from road or railway traffic
    • E01F8/0005Arrangements for absorbing or reflecting air-transmitted noise from road or railway traffic used in a wall type arrangement
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01FADDITIONAL WORK, SUCH AS EQUIPPING ROADS OR THE CONSTRUCTION OF PLATFORMS, HELICOPTER LANDING STAGES, SIGNS, SNOW FENCES, OR THE LIKE
    • E01F8/00Arrangements for absorbing or reflecting air-transmitted noise from road or railway traffic
    • E01F8/0005Arrangements for absorbing or reflecting air-transmitted noise from road or railway traffic used in a wall type arrangement
    • E01F8/0017Plate-like elements
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01FADDITIONAL WORK, SUCH AS EQUIPPING ROADS OR THE CONSTRUCTION OF PLATFORMS, HELICOPTER LANDING STAGES, SIGNS, SNOW FENCES, OR THE LIKE
    • E01F8/00Arrangements for absorbing or reflecting air-transmitted noise from road or railway traffic
    • E01F8/0005Arrangements for absorbing or reflecting air-transmitted noise from road or railway traffic used in a wall type arrangement
    • E01F8/0023Details, e.g. foundations

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Sustainable Development (AREA)
  • Bridges Or Land Bridges (AREA)
  • Devices Affording Protection Of Roads Or Walls For Sound Insulation (AREA)

Abstract

A kind of bridge sound barrier acoustic fixing device and sound-absorbing method of plate installation, fixed plate and flange plate together form the column for fixing abatvoix, wherein, fixed plate optionally can be set as vertical or heeling condition, extending bracket extends on the outside of flange plate, and the external part of extending bracket is equipped with fixing bolt, and fixing bolt is fixed by the location nut of both sides, one end of fixing bolt is equipped with backing plate simultaneously, and rubber strip is set to backing plate between abatvoix.The placement space that fixed plate and flange plate surround can apply limit from the side of abatvoix and two sides, simultaneously, fixing bolt and backing plate, which apply abatvoix from abatvoix both sides, to be squeezed, rubber strip is mutually compressed with abatvoix always, and extending bracket has certain elasticity, and more accurate and effective pressure can be provided to abatvoix, to can both improve the fixing intensity of abatvoix, rubber strip and abatvoix can also be effectively avoided to fall, to greatly improve its security performance.

Description

A kind of bridge sound barrier acoustic fixing device and sound-absorbing method of plate installation
Technical field
The present invention relates to the mechanisms for fixing article, more particularly to a kind of abatvoix for fixing bridge sound barrier Fixing device, and using the fixing device installation bridge sound barrier acoustic method.
Background technology
Since vehicle will produce strong noise when high speed is current, the Health and Living of these noise on human bodies causes Extremely huge harm, so in order to mitigate the influence of noise, the Chang Huian on the bridge both sides fence by residential area, quotient area Sound barrier is filled to realize sound insulation and noise reduction.
Existing bridge noise barrier structure is as shown in Figure 1, the H profile steel 101 including being installed vertically on bridge, abatvoix 102 end is installed in the opening of the H-shaped in H profile steel, and rubber strip 103 is placed between abatvoix and H profile steel.This kind of bridge Noise barrier structure is due to that can not accomplish zero error between each parts, and rubber strip lacks external force and squeezes it, causes to inhale Soundboard can not be closely bonded with rubber strip.When vehicle by when, abatvoix will produce vibrations and end will reciprocating collision rubber Adhesive tape is easy to fall off so as to cause rubber strip, or even abatvoix damage is caused to fall and cause great security risk.
Invention content
The goal of the invention of the present invention is to provide a kind of fixing device and use for fixing bridge sound barrier acoustic The method that the fixing device installs bridge sound barrier acoustic, to improve the fixing intensity of abatvoix, reduce rubber strip fall off or The risk of abatvoix damage.
Bridge sound barrier acoustic fixing device of the present invention, including the fixed plate that is fixedly installed on bridge, Gu The plate face of fixed board is on bridge or is obliquely installed on bridge, and the two sides of fixed plate are separately installed with flange plate, and the wing Listrium is parallel with bridge direction, and fixed plate and two flange plates surround the placement space for placing abatvoix end, on two flange plates Opposite to each other to side be separately installed with extending bracket, one end of extending bracket is fixing end and is fixedly installed on flange plate, is prolonged The other end for stretching holder is external part and extend out to except the perspective plane of flange plate;Separately there is fixing bolt to extend through stretching for holder Outlet, and one end of fixing bolt is directed toward abatvoix and is equipped with backing plate, and rubber strip and phase are provided between backing plate and abatvoix It mutually pushes against, spiral shell is separately installed with to opposite location nut positioned at the both sides for extending through holder on fixing bolt.
Sound-absorbing method of plate installation of the present invention, includes the following steps:
A, location nut is screwed on fixing bolt, then passes through fixing bolt from the inside of extending bracket external part, then Location nut is screwed on fixing bolt;
B, the end of abatvoix is put between two opposite backing plates;
C, the location nut being installed on the fixing bolt on the outside of bridge is adjusted, then adjusts the fixing bolt being installed on the inside of bridge On location nut, so that two backing plates being relatively fixed on bolt is formed fixation to abatvoix from both sides.
Bridge sound barrier acoustic fixing device of the present invention and sound-absorbing method of plate installation, fixed plate and flange plate are total With the column formd for fixing abatvoix, wherein fixed plate optionally can be set as vertical or heeling condition, only need The installation place of itself and bridge has certain angle rather than is mutually parallel;And extending bracket from the outside of flange plate extend and Go out, the fixing bolt for being equipped with backing plate is penetrated on the external part of extending bracket, and positioned at extending bracket on fixing bolt Both sides are screwed into corresponding location nut;Then, one end of abatvoix is put into the sky of the placement between fixed plate and two flange plates In, at this point, it is opposite with backing plate in place of placement space on abatvoix, rubber strip is put into make to delay between this is opposite Punching, then turn the location nut being located on fixing bolt between extension between cushion block makes under the action of the location nut Cushion block and rubber strip compress abatvoix, then turn another location nut again, fixing bolt is positioned on extending bracket.It is logical The use for crossing the bridge sound barrier acoustic fixing device, bridge is installed under the premise of not changing abatvoix specification by abatvoix The placement space that Liang Shang, fixed plate and flange plate surround can apply limit from the side of abatvoix and two sides, meanwhile, it is installed on Fixing bolt and backing plate will apply abatvoix from abatvoix both sides and squeeze on extending bracket, on the one hand can make abatvoix and Rubber strip fits closely, and on the other hand, extending bracket has certain elasticity, and it is more accurate and effective to be provided to abatvoix Pressure.During the work time, the vibrations that automobile is travelled on bridge and generated will make fixed plate, flange plate and abatvoix production Raw synchronous vibrating, and should during, rubber strip under the action of extending bracket, fixing bolt and backing plate will always with abatvoix It mutually compressing, to can both improve the fixing intensity of abatvoix, it is possibility to have effect avoids rubber strip and abatvoix from falling, to Greatly improve its security performance.And when installing abatvoix, the fixing bolt on the outside of bridge is first adjusted, then adjust in bridge On the one hand the fixing bolt of side can more easily be such that abatvoix is arranged along bridge, be more bonded the arc shape of bridge, separately On the one hand, the fixing bolt on the inside of bridge is finally adjusted, operating personnel more easily can operate or adjust, be conducive to Improve the convenience and accuracy of installation.
Description of the drawings
Fig. 1 is the structural schematic diagram of existing highway bridge sound barrier.
Fig. 2 is the structural schematic diagram of bridge sound barrier acoustic fixing device of the present invention.
Fig. 3,4,5 are three kinds of different embodiments structural schematic diagrams of fixed plate and flange plate respectively.
Fig. 6 is the structural schematic diagram of extending bracket.
Specific implementation mode
A kind of bridge sound barrier acoustic fixing device, including the fixed plate 1 that is fixedly installed on bridge, the plate of fixed plate Face is on bridge or is obliquely installed on bridge, and the two sides of fixed plate are separately installed with flange plate 2, and flange plate and bridge Beam direction is parallel, and fixed plate and two flange plates surround the placement space for placing abatvoix end, on two flange plates opposite to each other to Side is separately installed with extending bracket 3, and one end of extending bracket is fixing end and is fixedly installed on flange plate, extending bracket The other end is external part and extend out to except the perspective plane of flange plate;Separately there is the external part that fixing bolt 4 extends through holder, and It is directed toward abatvoix and backing plate 5 is installed, rubber strip 6 is provided between backing plate and abatvoix and is mutually supported in one end of fixing bolt Tightly, spiral shell is separately installed with to opposite location nut 7 positioned at the both sides for extending through holder on fixing bolt.
As shown in Fig. 2, extending bracket extends on the outside of flange plate, the fixing bolt for being equipped with backing plate is penetrated and is prolonged It stretches on the external part of holder, and the both sides positioned at extending bracket on fixing bolt are screwed into corresponding location nut;Then, will One end of abatvoix is put into the placement space between fixed plate and two flange plates, at this point, on abatvoix close to placement space it Place is opposite with backing plate, and rubber strip is put into buffer between this is opposite, then turns and is located between extension on fixing bolt Location nut between cushion block makes cushion block and rubber strip compress abatvoix, then turns again under the action of the location nut Another location nut, fixing bolt is positioned on extending bracket.
The bridge sound barrier acoustic fixing device, fixed plate 1 can be arranged perpendicular to bridge, as shown in Figure 3;? It can be obliquely installed on bridge, as shown in Figure 4;To form bridge sound barrier of different shapes.In addition, flange plate 2 can be with Protrude from the wherein side of fixed plate 1, as shown in Figure 3,4, for installing unilateral abatvoix, similarly, flange plate 2 can also in Portion is connected to the side of fixed plate 1, and the both sides of flange plate extend to except the two sides of fixed plate, to install the sound-absorbing of both sides Plate, as shown in Figure 5.In addition, being separately installed with several pieces of extending brackets 3 in different height on flange plate 2, on each extending bracket It is provided with the fixing bolt 4 of backing plate 5;Or fixing bolt 4 is mounted on each extending bracket, all fixing bolts with it is same Block backing plate 5 is connected, and to realize different fixed effects, meets needed for different work.
As shown in fig. 6, extending bracket 3 includes the support plate 31 outwardly extended from flange plate 2, the end of support plate Equipped with the mounting plate 32 being mutually parallel with flange plate, the end of mounting plate is the external part of extending bracket, this kind of shape is prolonged It is simple to stretch supporting structure, be easy to make and installs, and can make extending bracket that there is certain elasticity, so as to preferably to inhaling Soundboard applies pressure, improves the fixing intensity of abatvoix.
Sound-absorbing method of plate installation of the present invention, includes the following steps:
A, location nut is screwed on fixing bolt, then passes through fixing bolt from the inside of extending bracket external part, then Location nut is screwed on fixing bolt;
B, the end of abatvoix is put between two opposite backing plates;
C, the location nut being installed on the fixing bolt on the outside of bridge is adjusted, then adjusts the fixing bolt being installed on the inside of bridge On location nut, so that two backing plates being relatively fixed on bolt is formed fixation to abatvoix from both sides.
The sound-absorbing method of plate installation is placed when being put into abatvoix between two backing plates in the both sides of abatvoix Rubber strip, and rubber strip is made to be positioned between abatvoix and backing plate, to form more safe and stable fixation using rubber strip Effect.
The sound-absorbing method of plate installation is first adjusted on fixing bolt when adjusting location nut to position fixing bolt Location nut between abatvoix and extending bracket, and location nut and the medial surface of extending bracket external part is made to offset; Then the location nut backwards to abatvoix one end on fixing bolt is adjusted again, and the location nut on the end is made to be stretched with extending bracket The lateral surface of outlet offsets.The location nut for first adjusting inside, makes the extension elongation of fixing bolt determine, is formed just to abatvoix Then the limit of step adjusts the location nut in outside, can both improve the convenience of operation again, be also beneficial to improve adjusting essence Degree.

Claims (9)

1. a kind of bridge sound barrier acoustic fixing device, it is characterised in that:Including the fixed plate being fixedly installed on bridge (1), the plate face of fixed plate on bridge or is obliquely installed on bridge, and the two sides of fixed plate are separately installed with flange plate (2), and flange plate is parallel with bridge direction, and fixed plate surrounds the placement space for placing abatvoix end with two flange plates, two On flange plate opposite to each other to side be separately installed with extending bracket(3), one end of extending bracket is fixing end and is fixedly installed in On flange plate, the other end of extending bracket is external part and extend out to except the perspective plane of flange plate;Separately there is fixing bolt(4)It wears The external part of extending bracket is crossed, and one end of fixing bolt is directed toward abatvoix and is equipped with backing plate(5), between backing plate and abatvoix It is provided with rubber strip(6)And mutually push against, it is located on fixing bolt and extends through the both sides of holder and be separately installed with spiral shell to opposite Location nut(7).
2. bridge sound barrier acoustic fixing device according to claim 1, it is characterised in that:Flange plate(2)It protrudes from Fixed plate(1)Wherein side.
3. bridge sound barrier acoustic fixing device according to claim 1, it is characterised in that:Flange plate(2)Middle part It is connected to fixed plate(1)Side, the both sides of flange plate extend to except the two sides of fixed plate.
4. bridge sound barrier acoustic fixing device according to claim 1, it is characterised in that:Flange plate(2)On in not It is same to be highly separately installed with several pieces of extending brackets(3), band backing plate is mounted on each extending bracket(5)Fixing bolt(4).
5. bridge sound barrier acoustic fixing device according to claim 1, it is characterised in that:Flange plate(2)On in not It is same to be highly separately installed with several pieces of extending brackets(3), fixing bolt is mounted on each extending bracket(4), all fixed spiral shells Bolt and same backing plate(5)It is connected.
6. the bridge sound barrier acoustic fixing device according to claim 1,4 or 5, it is characterised in that:Extending bracket(3) Including from flange plate(2)The support plate outwardly extended(31), the end of support plate is equipped with to be mutually parallel with flange plate Mounting plate(32), the end of mounting plate is the external part of extending bracket.
7. a kind of sound-absorbing method of plate installation, includes the following steps:
A, location nut is screwed on fixing bolt, then passes through fixing bolt from the inside of extending bracket external part, then Location nut is screwed on fixing bolt;
B, the end of abatvoix is put between two opposite backing plates;
C, the location nut being installed on the fixing bolt on the outside of bridge is adjusted, then adjusts the fixing bolt being installed on the inside of bridge On location nut, so that two backing plates being relatively fixed on bolt is formed fixation to abatvoix from both sides.
8. sound-absorbing method of plate installation according to claim 7, it is characterised in that:Between abatvoix to be put into two backing plates When, rubber strip is placed in the both sides of abatvoix, and rubber strip is made to be positioned between abatvoix and backing plate.
9. sound-absorbing method of plate installation according to claim 7, it is characterised in that:Location nut is being adjusted to position fixed spiral shell When bolt, the location nut on fixing bolt between abatvoix and extending bracket is first adjusted, and makes location nut and extends branch The medial surface of frame external part offsets;Then the location nut backwards to abatvoix one end on fixing bolt is adjusted again, and is made on the end Location nut and the lateral surface of extending bracket external part offset.
CN201810961945.8A 2018-08-22 2018-08-22 A kind of bridge sound barrier acoustic fixing device and sound-absorbing method of plate installation Pending CN108729340A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810961945.8A CN108729340A (en) 2018-08-22 2018-08-22 A kind of bridge sound barrier acoustic fixing device and sound-absorbing method of plate installation

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810961945.8A CN108729340A (en) 2018-08-22 2018-08-22 A kind of bridge sound barrier acoustic fixing device and sound-absorbing method of plate installation

Publications (1)

Publication Number Publication Date
CN108729340A true CN108729340A (en) 2018-11-02

Family

ID=63941581

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810961945.8A Pending CN108729340A (en) 2018-08-22 2018-08-22 A kind of bridge sound barrier acoustic fixing device and sound-absorbing method of plate installation

Country Status (1)

Country Link
CN (1) CN108729340A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110004825A (en) * 2019-04-17 2019-07-12 黑龙江建筑职业技术学院 The soundproof guardrail of bridge and application method
CN111962409A (en) * 2020-07-24 2020-11-20 中铁六局集团有限公司 Method for mounting sound barrier of GRC composite sound-absorbing board
CN112064879A (en) * 2020-09-26 2020-12-11 深圳千里马装饰集团有限公司 Tensioned metal mesh ceiling system and construction method thereof

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20050104054A1 (en) * 2003-11-19 2005-05-19 Cyro Industries, A Company Of The State Of New Jersey Traffic noise barrier system
CN101725119A (en) * 2009-12-30 2010-06-09 成都市新筑路桥机械股份有限公司 Sound barrier for high-speed railway
CN102926335A (en) * 2011-08-09 2013-02-13 秦皇岛耀华新材料有限公司 Composite noise reduction barrier
CN104912008A (en) * 2015-06-04 2015-09-16 南车二七车辆有限公司 Sound insulation plate for sound barrier
CN205529954U (en) * 2016-01-29 2016-08-31 河北金标建材科技股份有限公司 Sound barrier
CN107059673A (en) * 2017-06-27 2017-08-18 中国铁路设计集团有限公司 High-speed railway bridge sound barrier bolt overhauls formula connecting installation structure
CN206780216U (en) * 2017-02-28 2017-12-22 中建钢构有限公司 A kind of temporary fixture for being used to prevent that component from toppling over
CN208748505U (en) * 2018-08-22 2019-04-16 中铁二十五局集团第四工程有限公司 A kind of fixed device of bridge sound barrier acoustic

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20050104054A1 (en) * 2003-11-19 2005-05-19 Cyro Industries, A Company Of The State Of New Jersey Traffic noise barrier system
CN101725119A (en) * 2009-12-30 2010-06-09 成都市新筑路桥机械股份有限公司 Sound barrier for high-speed railway
CN102926335A (en) * 2011-08-09 2013-02-13 秦皇岛耀华新材料有限公司 Composite noise reduction barrier
CN104912008A (en) * 2015-06-04 2015-09-16 南车二七车辆有限公司 Sound insulation plate for sound barrier
CN205529954U (en) * 2016-01-29 2016-08-31 河北金标建材科技股份有限公司 Sound barrier
CN206780216U (en) * 2017-02-28 2017-12-22 中建钢构有限公司 A kind of temporary fixture for being used to prevent that component from toppling over
CN107059673A (en) * 2017-06-27 2017-08-18 中国铁路设计集团有限公司 High-speed railway bridge sound barrier bolt overhauls formula connecting installation structure
CN208748505U (en) * 2018-08-22 2019-04-16 中铁二十五局集团第四工程有限公司 A kind of fixed device of bridge sound barrier acoustic

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110004825A (en) * 2019-04-17 2019-07-12 黑龙江建筑职业技术学院 The soundproof guardrail of bridge and application method
CN111962409A (en) * 2020-07-24 2020-11-20 中铁六局集团有限公司 Method for mounting sound barrier of GRC composite sound-absorbing board
CN112064879A (en) * 2020-09-26 2020-12-11 深圳千里马装饰集团有限公司 Tensioned metal mesh ceiling system and construction method thereof

Similar Documents

Publication Publication Date Title
CN108729340A (en) A kind of bridge sound barrier acoustic fixing device and sound-absorbing method of plate installation
CN209325316U (en) A kind of mounting structure of electromechanical equipment
CN208748505U (en) A kind of fixed device of bridge sound barrier acoustic
KR20140098501A (en) Mounting structure for soundproof pannel
CN202626773U (en) Clip for fixing steel rail shock absorber on steel rail
CN202202275U (en) Sound barrier with composite structure
CN208533422U (en) Freeway guardrail buffer device for collision structure
CN205976533U (en) Concrete pumping pressure sensor's fixing device
CN101955106B (en) Elevator guide rail bracket
CN211261445U (en) Energy-saving refrigeration plant is with preventing external protection box of refrigeration plant that rocks
CN105666081B (en) The anti-torsion assembly tooling of hydraulic bushing after lower swing arm before a kind of automobile
CN109930432A (en) A kind of multimass piece two sides clamping device for track vibration-reducing
CN205112448U (en) Composite sheet press
ATE387585T1 (en) FASTENING FORK CONNECTION AND MOUNTING A PART TO A BEAM USING THE CONNECTION
CN108133681A (en) A kind of car holographic projector for facilitating adjusting
CN204551295U (en) A kind of full frame sound absorption reduction device
CN207992908U (en) Computer machine case protection device that takes precautions against earthquakes
CN207710177U (en) A kind of imitative type tooling for half end cone welding of turning for catalyst converter two
CN207106047U (en) A kind of tire bolt and wheel hub separator
CN207111815U (en) A kind of shock absorber that can limit three direction amplitudes
CN207423481U (en) A kind of clamp for vibration testing of vehicle-mounted stereo components
CN107394703B (en) It is a kind of for fixing the fixture of cable channel
CN204206071U (en) The connector that a kind of solar panels are installed
CN219731728U (en) Road and bridge noise reduction device
CN105277625B (en) Railway wheelset line flaw detection ultrasonic probe modular structure

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
TA01 Transfer of patent application right

Effective date of registration: 20190320

Address after: 545007 138 Heping Road, Liuzhou, the Guangxi Zhuang Autonomous Region

Applicant after: THE 4TH ENGINEERING CO., LTD.OF CHINA RAILWAY 25TH BUREAU GROUP

Applicant after: China Railway 25th Bureau Group Co., Ltd.

Address before: No. 75, No. 2 Hongyan Road, Liuzhou City, Guangxi Zhuang Autonomous Region

Applicant before: China Railway twenty-five Bureau Group Sixth Engineering Co., Ltd.

Applicant before: China Railway 25th Bureau Group Co., Ltd.

TA01 Transfer of patent application right