CN108723026A - A kind of water conservancy construction pipe-dredging guiding device - Google Patents
A kind of water conservancy construction pipe-dredging guiding device Download PDFInfo
- Publication number
- CN108723026A CN108723026A CN201810721272.9A CN201810721272A CN108723026A CN 108723026 A CN108723026 A CN 108723026A CN 201810721272 A CN201810721272 A CN 201810721272A CN 108723026 A CN108723026 A CN 108723026A
- Authority
- CN
- China
- Prior art keywords
- fixed plate
- pipe
- dredging
- turning set
- gland
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B08—CLEANING
- B08B—CLEANING IN GENERAL; PREVENTION OF FOULING IN GENERAL
- B08B9/00—Cleaning hollow articles by methods or apparatus specially adapted thereto
- B08B9/02—Cleaning pipes or tubes or systems of pipes or tubes
- B08B9/027—Cleaning the internal surfaces; Removal of blockages
- B08B9/04—Cleaning the internal surfaces; Removal of blockages using cleaning devices introduced into and moved along the pipes
- B08B9/043—Cleaning the internal surfaces; Removal of blockages using cleaning devices introduced into and moved along the pipes moved by externally powered mechanical linkage, e.g. pushed or drawn through the pipes
- B08B9/0436—Cleaning the internal surfaces; Removal of blockages using cleaning devices introduced into and moved along the pipes moved by externally powered mechanical linkage, e.g. pushed or drawn through the pipes provided with mechanical cleaning tools, e.g. scrapers, with or without additional fluid jets
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B08—CLEANING
- B08B—CLEANING IN GENERAL; PREVENTION OF FOULING IN GENERAL
- B08B9/00—Cleaning hollow articles by methods or apparatus specially adapted thereto
- B08B9/02—Cleaning pipes or tubes or systems of pipes or tubes
- B08B9/027—Cleaning the internal surfaces; Removal of blockages
- B08B9/04—Cleaning the internal surfaces; Removal of blockages using cleaning devices introduced into and moved along the pipes
- B08B9/043—Cleaning the internal surfaces; Removal of blockages using cleaning devices introduced into and moved along the pipes moved by externally powered mechanical linkage, e.g. pushed or drawn through the pipes
- B08B9/045—Cleaning the internal surfaces; Removal of blockages using cleaning devices introduced into and moved along the pipes moved by externally powered mechanical linkage, e.g. pushed or drawn through the pipes the cleaning devices being rotated while moved, e.g. flexible rotating shaft or "snake"
Landscapes
- Engineering & Computer Science (AREA)
- Mechanical Engineering (AREA)
- Sink And Installation For Waste Water (AREA)
Abstract
The invention discloses a kind of water conservancy construction pipe-dredging guiding devices, including push handle, one end of the push handle is equipped with the first fixed plate, the second fixed plate is installed in front of first fixed plate, fixed frame is installed in second fixed plate, first turning set is installed on the fixed frame, the first electric wire is installed below first turning set, control panel is installed below first electric wire, third fixed plate is installed below the control panel, the both sides of the third fixed plate are equipped with movable pulley, one end of the third fixed plate is installed by protective case, rotating bar is installed on the inside of first turning set.The present invention is mounted with elastic tube on pipe crimping circle, and gland is mounted in front of motor, and drill bit is equipped in gland, drives drill bit by motor, so that drill bit is rotated dredging pipeline, the efficiency of dredging is effectively increased by it.
Description
Technical field
The present invention relates to pipe-dredging guiding device field, specifically a kind of water conservancy construction pipe-dredging guiding device.
Background technology
Pipe-dredging is that a kind of commonly used maintenance service, pipe-dredging refer generally to family's downcomer in people's daily life
Road is dredged, closet pipe dredging, industrial pipeline dredging cleaning, and the pipeline that industrial pipeline is dredged is poor because of the dredging machine of duct size
Not bigger, the pipelines of 100MM once are dredged as family's dredging sewer.To big line pipe road dredging vehicle, high pressure
Cleaning vehicle is done.Pipe-dredging (dredging pipeline) services:When generally referring to line clogging or impeded drainage, using physically or chemically
Method make pipeline restore proper drainage or improve drainage condition service.Pipe-dredging service can specifically be divided into:Under dredging
Water channel, dredging closestool, dredging lavatory, dredging floor drain, dredging vegetable sink, dredging bathtub, dredging washbowl, dredging are squatted over a pit to relieve oneself, pipeline
Work-yard ponding is easily caused after blocking, when using drain cleaner under ponding and moist environment, it should use phase
The safety prevention measure answered, such as:Using electric leakage protector, host is placed in the dry place of no ponding.Operator wears insulation
Gloves wear insulated shoes or station on felt pad.
About pipe-dredging guiding device, there are still shortcomings at present, such as:It is inconvenient to use, safety is poor, dredging
Efficiency is low.
Invention content
The purpose of the present invention is to provide a kind of water conservancy construction pipe-dredging guiding devices, to solve to use in the prior art
Problem inconvenient, safety is poor, dredging efficiency is low.
To achieve the above object, the present invention provides the following technical solutions:A kind of water conservancy construction pipe-dredging guiding device, packet
Push handle is included, one end of the push handle is equipped with the first fixed plate, the second fixation is equipped in front of first fixed plate
Plate is equipped with fixed frame in second fixed plate, the first turning set, first turning set is equipped on the fixed frame
Lower section the first electric wire is installed, control panel is installed, the lower section installation of the control panel below first electric wire
There are third fixed plate, the both sides of the third fixed plate that movable pulley is installed, protective case is installed in one end of the third fixed plate,
Rotating bar is installed, one end of the rotating bar is equipped with the second turning set, the rotating bar on the inside of first turning set
Outside pipe crimping circle is installed, the side of the pipe crimping circle is equipped with swing handle, is equipped with elastic tube on the pipe crimping circle, institute
The inside for stating elastic tube is equipped with the second electric wire, and fixing buckle, one end installation of the elastic tube are equipped on second electric wire
There is protecting box, protective jacket is installed on the outside of the protecting box, the inside of the protecting box is equipped with motor, pacifies on the motor
Equipped with the 4th fixed plate, gland is installed in front of the motor, drill bit is installed in the gland.
Preferably, the motor is rotatablely connected with gland, and gland is fixedly connected with drill bit.
Preferably, the pipe crimping circle is rotatablely connected with rotating bar, and the first turning set of rotating bar is fixedly connected.
Preferably, the pipe crimping circle is rotatablely connected with elastic tube, and swing handle is fixedly connected with pipe crimping circle.
Preferably, the movable pulley is set as four, and four movable pulleys are separately mounted to the both sides of third fixed plate.
Compared with prior art, the beneficial effects of the invention are as follows:The present invention is mounted with elastic tube on pipe crimping circle, passes through volume
Pipeloop furls elastic tube, effectively increases retracting, is mounted with protecting box in the front end of elastic tube, horse is mounted in protecting box
It reaches, is mounted with electric wire in the inside of elastic tube, and electric wire is connect with motor, power transmission is effectively increased by it, in motor
Front is mounted with gland, and drill bit is equipped in gland, drives drill bit by motor, drill bit is made to rotate dredging pipeline,
The efficiency of dredging is effectively increased by it.
Description of the drawings
Fig. 1 is the structural diagram of the present invention.
Fig. 2 is the elastic tube structural schematic diagram of the present invention.
In figure:1- push handle, the first fixed plates of 2-, 3- fixed frames, the second fixed plates of 4-, the first turning sets of 5-, 6- first
Electric wire, 7- movable pulleys, 8 one control panels, 9- thirds fixed plate, 10- protective cases, 11- pipe crimpings circle, 12- elastic tubes, 13- second
Turning set, 14- swing handles, 15- fixing buckles, the second electric wires of 16-, 17- protective jackets, 18- glands, 19- drill bits, 20- protections
Box, the 4th fixed plates of 21-, 22- motors, 23- rotating bars.
Specific implementation mode
Following will be combined with the drawings in the embodiments of the present invention, and technical solution in the embodiment of the present invention carries out clear, complete
Site preparation describes, it is clear that described embodiments are only a part of the embodiments of the present invention, instead of all the embodiments.It is based on
Embodiment in the present invention, it is obtained by those of ordinary skill in the art without making creative efforts every other
Embodiment shall fall within the protection scope of the present invention.
Please refer to Fig.1~2, in the embodiment of the present invention, a kind of water conservancy construction pipe-dredging guiding device, including push handle 1,
One end of push handle 1 is equipped with the first fixed plate 2, and it is solid with push handle 1 first that the first fixed plate 2 is used for fixing the second fixed plate 4
The front of fixed board 2 is equipped with the second fixed plate 4, and fixed frame 3 is equipped in the second fixed plate 4, and fixed frame 3 is used for fixing first
Turning set 5 is equipped with the first turning set 5 on fixed frame 3, and the first turning set 5 is used for being sleeved in rotating bar 23, the first turning set 5
Lower section the first electric wire 6 is installed, the first electric wire 6 is used for connecting with control panel 8, and the lower section of the first electric wire 6 is equipped with control
Panel 8, control panel 8 are used for controlling motor 22, and the lower section of control panel 8 is equipped with third fixed plate 9, third fixed plate 9
Both sides are equipped with movable pulley 7, and movable pulley 7 is used for moving, and protective case 10 is installed in one end of third fixed plate 9, the first turning set 5
Inside is equipped with rotating bar 23, and rotating bar 23 is used for rotating pipe crimping circle 11, and one end of rotating bar 23 is equipped with the second turning set 13,
The outside of rotating bar 23 is equipped with pipe crimping circle 11, and pipe crimping circle 11 is used for furling elastic tube 12, and the side of pipe crimping circle 11, which is equipped with, to be turned
Dynamic handle 14, swing handle 14 are used for rotating pipe crimping circle 11, and elastic tube 12 is equipped on pipe crimping circle 11, and elastic tube 12 is used for dredging
The inside of pipeline, elastic tube 12 is equipped with the second electric wire 16, and the second electric wire 16 is used for connecting with motor 22, pacify on the second electric wire 16
Equipped with fixing buckle 15, one end of elastic tube 12 is equipped with protecting box 20, and protecting box 20 is used for protecting motor 22, protecting box 20 it is outer
Side is equipped with protective jacket 17, and the inside of protecting box 20 is equipped with motor 22, and motor 22 is used for driving gland 18, pacify on motor 22
Equipped with the 4th fixed plate 21, the front of motor 22 is equipped with gland 18, and gland 18 is used for driving drill bit 19, in gland 18
Drill bit 19 is installed, drill bit 19 is used for dredging pipeline, and motor 22 is rotatablely connected with gland 18, and gland 18 and drill bit 19 are solid
Fixed connection, pipe crimping circle 11 is rotatablely connected with rotating bar 23, and 23 first turning set 5 of rotating bar is fixedly connected, pipe crimping circle 11 and bullet
Property pipe 12 be rotatablely connected, and swing handle 14 is fixedly connected with pipe crimping circle 11, and movable pulley 7 is set as four, and four movable pulleys 7
It is separately mounted to the both sides of third fixed plate 9.
The present invention operation principle be:The promotion of push handle 1 is held, pipeline dredger is moved to by institute by movable pulley 7
It needs position to be then electrified to, pipe crimping circle 11 is then rotated by swing handle 14, it is artificial that elastic tube 12 is pulled to put into required pipeline,
Then motor 22 is manipulated by control panel 8, gland 18 is then driven by motor 22, drill bit 19 is driven by gland 18
Rotation has the function that dredging by the rotation of drill bit 19.
It is obvious to a person skilled in the art that invention is not limited to the details of the above exemplary embodiments, Er Qie
In the case of without departing substantially from spirit or essential attributes of the invention, the present invention can be realized in other specific forms.Therefore, no matter
From the point of view of which point, the present embodiments are to be considered as illustrative and not restrictive, and the scope of the present invention is by appended power
Profit requires rather than above description limits, it is intended that all by what is fallen within the meaning and scope of the equivalent requirements of the claims
Variation is included within the present invention.Any reference signs in the claims should not be construed as limiting the involved claims.
Claims (5)
1. a kind of water conservancy construction pipe-dredging guiding device, including push handle (1), it is characterised in that:The one of the push handle (1)
End is equipped with the first fixed plate (2), and the second fixed plate (4) is equipped in front of first fixed plate (2), and described second fixes
Fixed frame (3) is installed on plate (4), the first turning set (5), first turning set (5) are installed on the fixed frame (3)
Lower section the first electric wire (6) is installed, control panel (8), the control panel are installed below first electric wire (6)
(8) third fixed plate (9) is installed, the both sides of the third fixed plate (9) are equipped with movable pulley (7), the third below
One end installation protective case (10) of fixed plate (9), is equipped with rotating bar (23) on the inside of first turning set (5), described turn
One end of lever (23) is equipped with the second turning set (13), and pipe crimping circle (11) is equipped on the outside of the rotating bar (23), described
The side of pipe crimping circle (11) is equipped with swing handle (14), and elastic tube (12), the elasticity are equipped on the pipe crimping circle (11)
The inside of pipe (12) is equipped with the second electric wire (16), and fixing buckle (15), the elastic tube are equipped on second electric wire (16)
(12) one end is equipped with protecting box (20), and protective jacket (17), the protecting box are equipped on the outside of the protecting box (20)
(20) inside is equipped with motor (22), is equipped with the 4th fixed plate (21) on the motor (22), before the motor (22)
Side is equipped with gland (18), and drill bit (19) is equipped on the gland (18).
2. a kind of water conservancy construction pipe-dredging guiding device according to claim 1, it is characterised in that:The motor (22)
It is rotatablely connected with gland (18), and gland (18) is fixedly connected with drill bit (19).
3. a kind of water conservancy construction pipe-dredging guiding device according to claim 1, it is characterised in that:The pipe crimping circle
(11) it is rotatablely connected with rotating bar (23), and (23) first turning set (5) of rotating bar is fixedly connected.
4. a kind of water conservancy construction pipe-dredging guiding device according to claim 1, it is characterised in that:The pipe crimping circle
(11) it is rotatablely connected with elastic tube (12), and swing handle (14) is fixedly connected with pipe crimping circle (11).
5. a kind of water conservancy construction pipe-dredging guiding device according to claim 1, it is characterised in that:The movable pulley
(7) four are set as, and four movable pulleys (7) are separately mounted to the both sides of third fixed plate (9).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810721272.9A CN108723026A (en) | 2018-07-03 | 2018-07-03 | A kind of water conservancy construction pipe-dredging guiding device |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810721272.9A CN108723026A (en) | 2018-07-03 | 2018-07-03 | A kind of water conservancy construction pipe-dredging guiding device |
Publications (1)
Publication Number | Publication Date |
---|---|
CN108723026A true CN108723026A (en) | 2018-11-02 |
Family
ID=63926002
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201810721272.9A Pending CN108723026A (en) | 2018-07-03 | 2018-07-03 | A kind of water conservancy construction pipe-dredging guiding device |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN108723026A (en) |
Citations (12)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN2399455Y (en) * | 1999-12-04 | 2000-10-04 | 张嘉义 | Hand pipeline dredging appts. |
CA2472609A1 (en) * | 2004-06-28 | 2005-12-28 | Richard Gregoire | Pipe clearing system and device |
CN202164680U (en) * | 2011-02-13 | 2012-03-14 | 李顺堂 | Dredging clearer for sewer dirt |
CN203064917U (en) * | 2013-02-01 | 2013-07-17 | 福建龙马环卫装备股份有限公司 | Hose winder for dredging hose of sewer dredging vehicle |
CN104846982A (en) * | 2013-04-25 | 2015-08-19 | 中山市雅西环保科技有限公司 | Pipeline dredging apparatus |
CN205502157U (en) * | 2016-03-18 | 2016-08-24 | 合肥环城有线电视网络有限公司 | Online pipeline pull throughs |
CN105951949A (en) * | 2016-06-27 | 2016-09-21 | 恭城瑶族自治县恭城中学 | Portable sewer cleaner |
CN205839896U (en) * | 2016-06-07 | 2016-12-28 | 天津豪锋污泥处理技术研究所(有限合伙) | A kind of municipal sewage system tube cleaning arrangement |
CN207032407U (en) * | 2017-07-18 | 2018-02-23 | 吴宗炜 | A kind of pipe dredging device |
CN108005186A (en) * | 2018-01-23 | 2018-05-08 | 曹流 | A kind of electrical line dredge |
CN207512896U (en) * | 2017-09-19 | 2018-06-19 | 郑州星和凯贸易有限公司 | A kind of spring bucket dredging machine |
CN208613295U (en) * | 2018-07-03 | 2019-03-19 | 浙江融乐环境科技有限公司 | A kind of water conservancy construction pipe-dredging guiding device |
-
2018
- 2018-07-03 CN CN201810721272.9A patent/CN108723026A/en active Pending
Patent Citations (12)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN2399455Y (en) * | 1999-12-04 | 2000-10-04 | 张嘉义 | Hand pipeline dredging appts. |
CA2472609A1 (en) * | 2004-06-28 | 2005-12-28 | Richard Gregoire | Pipe clearing system and device |
CN202164680U (en) * | 2011-02-13 | 2012-03-14 | 李顺堂 | Dredging clearer for sewer dirt |
CN203064917U (en) * | 2013-02-01 | 2013-07-17 | 福建龙马环卫装备股份有限公司 | Hose winder for dredging hose of sewer dredging vehicle |
CN104846982A (en) * | 2013-04-25 | 2015-08-19 | 中山市雅西环保科技有限公司 | Pipeline dredging apparatus |
CN205502157U (en) * | 2016-03-18 | 2016-08-24 | 合肥环城有线电视网络有限公司 | Online pipeline pull throughs |
CN205839896U (en) * | 2016-06-07 | 2016-12-28 | 天津豪锋污泥处理技术研究所(有限合伙) | A kind of municipal sewage system tube cleaning arrangement |
CN105951949A (en) * | 2016-06-27 | 2016-09-21 | 恭城瑶族自治县恭城中学 | Portable sewer cleaner |
CN207032407U (en) * | 2017-07-18 | 2018-02-23 | 吴宗炜 | A kind of pipe dredging device |
CN207512896U (en) * | 2017-09-19 | 2018-06-19 | 郑州星和凯贸易有限公司 | A kind of spring bucket dredging machine |
CN108005186A (en) * | 2018-01-23 | 2018-05-08 | 曹流 | A kind of electrical line dredge |
CN208613295U (en) * | 2018-07-03 | 2019-03-19 | 浙江融乐环境科技有限公司 | A kind of water conservancy construction pipe-dredging guiding device |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN201424642Y (en) | Multidirectional throw-fly type snow-removing device with self-supply power | |
CN108005186A (en) | A kind of electrical line dredge | |
CN208613295U (en) | A kind of water conservancy construction pipe-dredging guiding device | |
CN108723026A (en) | A kind of water conservancy construction pipe-dredging guiding device | |
CN209291804U (en) | A kind of laying lifting construction device of water supply and sewerage pipeline | |
CN204608912U (en) | The medical drainage canal block-preventing device of a kind of operating room | |
CN107503391A (en) | A kind of dredging device for water conservancy projects | |
CN207017426U (en) | A kind of municipal pipeline dredger | |
WO2022142558A1 (en) | Municipal drainage and blow-off pipeline | |
CN209041846U (en) | A kind of building water supply and drainage silencing pipeline | |
CN107905972A (en) | A kind of portable water pumper based on solar power generation | |
CN212336243U (en) | Be applicable to rain sewage reposition of redundant personnel sleeve pipe for building | |
CN209760414U (en) | Sewage pipes for building water supply and drainage | |
CN208830452U (en) | Floor accumulated water treatment device when a kind of high-building construction | |
CN207727692U (en) | A kind of electric drainage device and the sink using the device | |
CN201835373U (en) | Floor drain water drainage device | |
CN221335829U (en) | Pipeline inner wall cleaning device for water conservancy construction | |
CN108571041A (en) | A kind of drainage canal block-preventing device | |
CN205839896U (en) | A kind of municipal sewage system tube cleaning arrangement | |
CN205502157U (en) | Online pipeline pull throughs | |
CN217204492U (en) | Construction rainfall drainage structures | |
CN103850343B (en) | A kind of eccentric apical axis for box culvert gets door express developed | |
CN221219085U (en) | Glass fiber reinforced plastic pump station with anti-blocking function | |
CN108483847A (en) | A kind of riverway sludge curing apparatus | |
CN217502064U (en) | High-efficiency energy-saving control device for water pump |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination |