CN108717621A - A kind of DAFC film industryizatioies management system - Google Patents

A kind of DAFC film industryizatioies management system Download PDF

Info

Publication number
CN108717621A
CN108717621A CN201810426622.9A CN201810426622A CN108717621A CN 108717621 A CN108717621 A CN 108717621A CN 201810426622 A CN201810426622 A CN 201810426622A CN 108717621 A CN108717621 A CN 108717621A
Authority
CN
China
Prior art keywords
film
item
controller
memory
dafc
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201810426622.9A
Other languages
Chinese (zh)
Inventor
魏越
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Chongqing Wei Wang Pictures Co Ltd
Original Assignee
Chongqing Wei Wang Pictures Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Chongqing Wei Wang Pictures Co Ltd filed Critical Chongqing Wei Wang Pictures Co Ltd
Priority to CN201810426622.9A priority Critical patent/CN108717621A/en
Publication of CN108717621A publication Critical patent/CN108717621A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/10Office automation; Time management
    • G06Q10/103Workflow collaboration or project management

Landscapes

  • Business, Economics & Management (AREA)
  • Human Resources & Organizations (AREA)
  • Strategic Management (AREA)
  • Engineering & Computer Science (AREA)
  • Entrepreneurship & Innovation (AREA)
  • Operations Research (AREA)
  • Economics (AREA)
  • Marketing (AREA)
  • Data Mining & Analysis (AREA)
  • Quality & Reliability (AREA)
  • Tourism & Hospitality (AREA)
  • Physics & Mathematics (AREA)
  • General Business, Economics & Management (AREA)
  • General Physics & Mathematics (AREA)
  • Theoretical Computer Science (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The present invention relates to management systems, system is managed more particularly to a kind of DAFC film industryizatioies, including controller, the first memory for storing project verification planning item and associated budget expenditure being connected with controller, what is be connected with controller prepares the second memory of item and associated budget expenditure for storing film, the third memory for storing test piece shooting and associated budget expenditure being connected with controller, the 4th memory for storing positive shooting and associated budget expenditure being connected with controller, the 5th memory for storing post-processing item and associated budget expenditure being connected with controller, what is be connected with controller sells the data processing unit for the data in each memory calculate with integration that the 6th memory that item and associated budget are paid is connected with controller for storing publicity;Technical solution provided by the present invention can effectively overcome present in the prior art cannot be to defect that film producing process is effectively managed.

Description

A kind of DAFC film industryizatioies management system
Technical field
The present invention relates to management systems, and in particular to a kind of DAFC film industryizatioies management system.
Background technology
In DAFC film industry management methods, " industrialization " is the working centre of execution level, and to reach " industry Change " project construction effect, the job placement of " can scalarization " is its premise, but " scalarization " is often that cultural industry is most difficult to Reach --- gold is valuable and beautiful priceless.DAFC film industryizatioies manage system just innovatively, comprehensively, at many levels, It solves the problems, such as to full industrial chain " scalarization " in cultural industry film market, knows what's what to reach investor, film-making The center demand that side's production film process has standard index, film-making more efficient.
DAFC film industries management method has carried out staged exhaustive division, each stage to the production of film project In production, the refinement action of two big work centre of film-making, executive arm, feedback etc. be obtained for quantization.It is given birth in project During production, staged work can be arranged according to project meeting and project reality, execute, feed back, be allowed Interim necessary work is accurately implemented.
Existing film making manages inadequate specification, leads to inefficiency." DAFC film industryizatioies manage system " It visualizes budget and pays graphic correlation, the Gantt chart generated according to project task job placement, provide classification permission management Project work task arrange in the functions such as inventory, can make every demand, assessment, technical indicator, project management etc. obtain into One step effective information is decomposed and is used.
Invention content
(One)The technical issues of solution
For the disadvantages mentioned above present in the prior art, the present invention provides a kind of DAFC film industryizatioies to manage system, can Effectively overcome present in the prior art cannot be to defect that film producing process is effectively managed.
(Two)Technical solution
In order to achieve the above object, the present invention is achieved by the following technical programs:
A kind of DAFC film industryizatioies management system, including controller, what is be connected with the controller plans for storing project verification Item and associated budget expenditure first memory, to the controller be connected for store film prepare item and it is related in advance The second memory for calculating expenditure, the third storage for storing test piece shooting and associated budget expenditure being connected with the controller Device, the 4th memory for storing positive shooting and associated budget expenditure being connected with the controller, with the controller Connected the 5th memory for storing post-processing item and associated budget expenditure, what is be connected with the controller is used to deposit The 6th memory of item and associated budget expenditure is sold in storage publicity;
The data processing unit for the data in each memory calculate with integration being connected with the controller, and it is described The connected data acquisition module for being acquired to the data after data processing unit processes of controller, is adopted with the data The connected Cloud Server of collection module, the encrypting module for Cloud Server to be encrypted being connected with the Cloud Server, with The touch display screen for inputting, showing information that the controller is connected, what is be connected with the controller is used to input papery The scanner of fileinfo.
Preferably, the data processing unit includes based on the data by being calculated the budget expenditure in each memory Calculate module, and for treated that data flow item corresponding in each memory integrated to data computation module Data Integration module.
Preferably, the encrypting module is encrypted Cloud Server using the encrypted modes of IIS.
Preferably, film-making flow is sold item and includes in project verification planning item, publicity, the film prepare item, Post-processing item includes production procedure and film-making flow.
Preferably, the film-making flow of the project verification planning item is that project verification is discussed, collects drama, drama is write, drama is examined Core, drama modification, playwright, screenwriter finalize a text, obtain mandate, obtain license, project planning, propaganda and plan, planning of promoting trade and investment, performing art planning.
Preferably, the production procedure that the film prepares item is to determine chief creating, drama final draft, concept drafting, Jing Dichu Survey, assess to scape, surveying again to scape, take scape scheme, the playscript with stage directions make, Storyboard make, special efficacy assessment, the fine arts color matching, take scape construction, Clothesization prepare, stage property prepares, the playscript with stage directions is finalized a text, performer fixes, performer's training.
Preferably, the film-making flow that the film prepares item is time planning, performer's selection, assesses to scape, takes scape side Case assessment takes the determination of scape scheme, project trade and investment promotion, period planning, performer's determination, businessman's determination, integrated planning, film-making guarantee, builds Group is implemented.
Preferably, the production procedure of the post-processing item is editing, acoustic processing, music making, film toning, sound Imitate makings, special effect making, packaging making, editing and composite, in blocks.
Preferably, the film-making flow of the post-processing item is the plan of a surname's hair, declares hair contact, poster to make, Xuan Fazhun It is standby.
Preferably, described publicize sells the film-making flow of item to determine shelves waiting, trailer dispensing, holding news conference, matchmaker Body report, hard wide dispensing, point reflect meeting, meet-and-greet.
(Three)Advantageous effect
Compared with prior art, a kind of DAFC film industryizatioies management system provided by the present invention carries out film producing process Staged exhaustive division, the refinement action of production, two big work centre of film-making in each stage, executive arm, Feedback file is obtained for quantization;The item in manufacturing process each stage is stored using different memories, by data Computing module can pay the budget in each memory and calculate, and Data Integration module can be handled data computation module The flow item corresponding in each memory of data afterwards is integrated so that budget and expenditure in manufacturing process are definitely It is careful, know what's what to reach investor, film-maker produce film process have standard index, production project it is more efficient in Heart demand;Controller can also calculate the data integrated according to data processing unit and provide visual budget and expenditure figure pair Than, according to project task job placement generate Gantt chart, provide classification permission management project work task arrange inventory, into One step improves the efficiency of film making.
The present invention also provides a kind of DAFC film industries management methods, including project verification planning manages, film prepares management, Management is sold in test piece shooting, post-processing management and publicity, and the project verification planning management includes project verification management, drama management and plan Draw management;The film prepares management:
S11 performers determine:By selecting the modes such as interview to determine film core creator in chief's list, and preliminary planning Project Operation Time, file included planning chart so as to control progress;
S12 dramas determine:The opinion for contacting with performer, comprehensive director and other related chief creatings, it is final to screen play determination to finalize a text, File includes drama final draft;
S13 concepts are drawn:Draw scene, the concept map that people sets, file includes concept picture proof;
Prepare to S14 scapes:With determining scape and information is recorded according to budget, and file includes location search table, scape ground data, scape the ground side of building Case and suggestion for revision;
S15 materials prepare:It is made including the playscript with stage directions and Storyboard makes;
S16 takes scape and construction:To scape scene carries out taking scape construction, determines all fine arts schemes of colour of film, while making bright True period planning, file include planning chart;
S17 clothesization and stage property prepare:Purchase makes clothes, cosmetics and stage property etc., makes the requirement of the trade and investment promotion businessman of cooperation, text Part includes that businessman requires table;
S18 materials and personnel determine:It fixes including playscript with stage directions determination and performer;
S19 performer's trainings:To thering is the role of dancing, wushu or musical instrument requirement to give training to adapt to the needs of film;
It needs to carry out interim summary for test piece result after the completion of the test piece shooting and proposes to adjust, file includes test piece It summarizes;
The post-processing management includes:
S21 editings;
S22 audio effect processings:All live faithful record sound are handled, amended record, while a surname's hair is made according to stage photo during shooting Poster;
S23 packagings make;
S24 synthesis is in blocks:Synthesis needs to prepare all and declares and send out data and material related simultaneously;
The publicity sells management and includes:
S31 determines shelves waiting;
S32 advance notice publications;
S33 media and communications;
S34 fond balances:Capital settlement is carried out to entire project;
S35 is shown.
Further, the project verification management includes that subject matter of identifying project is discussed in project verification, and file includes that project verification is reported.
Further, the drama management includes that drama is collected, drama is write, drama is changed and drama is finalized a text.
Further, the planning management includes project planning, the planning of a surname's hair, trade and investment promotion planning and performing art planning, file Including planning case, also need to carry out risk assessment and capital budgeting, file after the completion of the planning management to include budget table.
Further, prepare to the step S14 scapes include scape advanced exploration, scape assess, survey and take scape side again to scape Case determines, assesses to the scape and is determined the need for taking scape according to capital budgeting.
Further, the step S22 audio effect processings include acoustic processing, music processing, film toning, audio making And special effect making.
Further, the step S32 advance notices publication includes that trailer dispensing and news conference are held.
Further, the step S33 media and communications include media report, hard wide dispensing, point reflects meeting and meet-and-greet is called together It opens.
Advantageous effect
A kind of DAFC film industries management method provided by the invention, compared with existing known technology, of the invention has such as Lower advantageous effect:
1, staged exhaustive division has been carried out to the production of film project, in the work greatly of the production, film-making two in each stage The refinement action of the heart, executive arm, feedback file are obtained for quantization.During project construction progress, according to project Meeting and project reality arrange staged work, are executed, are fed back, and allow interim necessary work to obtain accurate It implements so that film producing process obtains further effective information and decomposes and use, and improves quality, effect that film is manufactured Rate is more standardized.
Description of the drawings
In order to more clearly explain the embodiment of the invention or the technical proposal in the existing technology, to embodiment or will show below There is attached drawing needed in technology description to be briefly described.It should be evident that the accompanying drawings in the following description is only this Some embodiments of invention for those of ordinary skill in the art without creative efforts, can be with Obtain other attached drawings according to these attached drawings.
Fig. 1 is the structural schematic diagram that a kind of DAFC film industryizatioies of the present invention manage system.
Fig. 2 is a kind of flow diagram of DAFC film industries management method of the present invention.
Specific implementation mode
In order to make the object, technical scheme and advantages of the embodiment of the invention clearer, below in conjunction with the embodiment of the present invention In attached drawing, technical scheme in the embodiment of the invention is clearly and completely described.Obviously, described embodiment is A part of the embodiment of the present invention, instead of all the embodiments.Based on the embodiments of the present invention, those of ordinary skill in the art The every other embodiment obtained without creative efforts, shall fall within the protection scope of the present invention.
A kind of DAFC film industryizatioies management system, as shown in Figure 1, including controller, what is be connected with controller is used to deposit Storage project verification planning item and associated budget expenditure first memory, be connected with controller for store film preparation item and The second memory of associated budget expenditure, the third for storing test piece shooting and associated budget expenditure being connected with controller are deposited Reservoir, the 4th memory for storing positive shooting and associated budget expenditure being connected with controller, is connected with controller The 5th memory for storing post-processing item and associated budget expenditure, what is be connected with controller sells for storing publicity 6th memory of item and associated budget expenditure;
The data processing unit for the data in each memory calculate with integration being connected with controller, with controller phase The data acquisition module for being acquired to the data after data processing unit processes even, is connected with data acquisition module Cloud Server, the encrypting module for Cloud Server to be encrypted being connected with Cloud Server, what is be connected with controller is used for Input, the touch display screen for showing information, the scanner for inputting paper document information being connected with controller.
Data processing unit includes the data computation module for being calculated the budget expenditure in each memory, and For to data computation module treated Data Integration mould that data flow item corresponding in each memory integrated Block.
Encrypting module is encrypted Cloud Server using the encrypted modes of IIS.
It includes film-making flow that project verification planning item, publicity, which sell item, and film prepares item, post-processing item is wrapped Include production procedure and film-making flow.
The film-making flow of project verification planning item discusses for project verification, collects drama, drama is write, drama is audited, drama is changed, Playwright, screenwriter finalizes a text, obtains mandate, obtains license, project planning, propaganda and plan, planning of promoting trade and investment, performing art planning.
Film prepare item production procedure be determine chief creating, drama final draft, concept draw, scape advanced exploration, scape assess, It surveys again to scape, take scape scheme, the playscript with stage directions makes, Storyboard makes, special efficacy assessment, fine arts color matching, take scape construction, clothesization prepare, road Tool prepares, the playscript with stage directions is finalized a text, performer fixes, performer's training.
Film prepares the film-making flow of item and selects for time planning, performer, assess to scape, take scape scheme evaluation, take scape Scheme determination, period planning, performer's determination, businessman's determination, integrated planning, film-making guarantee, is built to organize and be implemented at project trade and investment promotion.
The production procedure of post-processing item is editing, acoustic processing, music making, film toning, audio making, special efficacy It makes, is packaging makings, editing and composite, in blocks.
The film-making flow of post-processing item is the plan of a surname's hair, the contact of a surname's hair, poster makes, a surname's hair prepares.
The film-making flow that item is sold in publicity be determine shelves waiting, trailer is launched, hold news conference, media report, it is hard extensively It launches, point reflects meeting, meet-and-greet.
The item in manufacturing process each stage is stored using different memories, it can be right by data computation module Budget expenditure in each memory is calculated, Data Integration module can to data computation module treated data with respectively deposit Corresponding flow item is integrated in reservoir so that the budget and expenditure in manufacturing process are definitely careful, to reach Investor knows what's what, and film-maker, which produces film process, standard index, the more efficient center demand of production project.
Data acquisition module can be acquired the data after data processing unit processes, and be transmitted to Cloud Server In, carry out meeting convenient for making group and download data so that information is more symmetrical.Encrypting module can add Cloud Server It is close, it prevents making data from leaking and leads to the occurrence of acute saturating.
In addition, C8051F340 chips, which can be used, in controller completes aforesaid operations.
A kind of DAFC film industryizatioies management system provided by the present invention has carried out film producing process staged Exhaustive division, production, the refinement action of two big work centre of film-making in each stage, executive arm, feedback file Quantified;The item in manufacturing process each stage is stored using different memories, by data computation module energy Enough budget expenditures in each memory calculate, Data Integration module can to data computation module treated data with Corresponding flow item is integrated in each memory so that and the budget and expenditure in manufacturing process are definitely careful, to Reach investor to know what's what, film-maker, which produces film process, standard index, the more efficient center demand of production project;Control Device processed can also calculate the data integrated according to data processing unit and provide visual budget and pay graphic correlation, according to item The project work task arrangement inventory that mesh task job placement generates Gantt chart, provides classification permission management, further increases The efficiency of film making.
With reference to figure 2:Management, test piece are prepared in a kind of DAFC film industries management method, including project verification planning management, film Management is sold in shooting, post-processing management and publicity, and project verification planning management includes project verification management, drama management and planning management. Wherein project verification management includes that subject matter of identifying project is discussed in project verification, and file includes that project verification is reported.Drama management includes that drama is collected, is acute Originally it writes, drama modification and drama are finalized a text.The management of planning includes project planning, the planning of a surname's hair, trade and investment promotion planning and performing art planning, text Part includes planning case, also needs to carry out risk assessment and capital budgeting, file after the completion of planning management to include budget table.Film is prepared Management includes:
S11 performers determine:By selecting the modes such as interview to determine film core creator in chief's list, and preliminary planning Project Operation Time, file included planning chart so as to control progress;
S12 dramas determine:The opinion for contacting with performer, comprehensive director and other related chief creatings, it is final to screen play determination to finalize a text, File includes drama final draft;
S13 concepts are drawn:Draw scene, the concept map that people sets, file includes concept picture proof;
Prepare to S14 scapes:With determining scape and information is recorded according to budget, and file includes location search table, scape ground data, scape the ground side of building Case and suggestion for revision.It including scape assesses to advanced exploration, scape, survey and take to scape the determination of scape scheme again, assess to scape pre- according to fund Calculation determines the need for taking scape.
S15 materials prepare:It is made including the playscript with stage directions and Storyboard makes;
S16 takes scape and construction:To scape scene carries out taking scape construction, determines all fine arts schemes of colour of film, while making bright True period planning, file include planning chart;
S17 clothesization and stage property prepare:Purchase makes clothes, cosmetics and stage property etc., makes the requirement of the trade and investment promotion businessman of cooperation, text Part includes that businessman requires table;
S18 materials and personnel determine:It fixes including playscript with stage directions determination and performer;
S19 performer's trainings:To thering is the role of dancing, wushu or musical instrument requirement to give training to adapt to the needs of film;
It needs to carry out interim summary for test piece result after the completion of test piece shooting and proposes to adjust, file includes that test piece is total Knot;
Post-processing management includes:
S21 editings;
S22 audio effect processings:All live faithful record sound are handled, amended record, while a surname's hair is made according to stage photo during shooting Poster.Audio effect processing includes acoustic processing, music processing, film toning, audio makes and special effect making.
S23 packagings make;
S24 synthesis is in blocks:Synthesis needs to prepare all and declares and send out data and material related simultaneously;
Publicity sells management and includes:
S31 determines shelves waiting;
S32 advance notice publications:It is launched including trailer and news conference is held.
S33 media and communications:Including media report, hard wide dispensing, point reflects meeting and meet-and-greet is held.
S34 fond balances:Capital settlement is carried out to entire project;
S35 is shown.
It is generated when a film project confirms, the basic letter of meeting carry out project in " DAFC film industryizatioies manage system " Breath summarizes and examines.Quantitative analysis is carried out for " demand of playwright, screenwriter's creative art " during play writing, thus and to " director's skill Art demand " and " director work the playscript with stage directions " carry out perfect, and comprehensive assessment is carried out to creation scheme by DAFC joint laboratories(Film-making Risk, Investment Risks and demand)After analysis, with " DAFC film industryizatioies manage system " for operating software platform, wound is allowed Each plates such as work, investment, film-making production are organically combined.Wherein every demand, assessment, technical indicator, project management etc. one Item file of the series Jing Guo " scalarization ", visual budget and expenditure figure in " DAFC film industryizatioies manage system " Comparison, the project work task that permission management is classified according to the Gantt chart of project task job placement generation, offer arrange clear In the functions such as single, obtains further effective information and decompose and use.
The above embodiments are merely illustrative of the technical solutions of the present invention, rather than its limitations;Although with reference to the foregoing embodiments Invention is explained in detail, it will be understood by those of ordinary skill in the art that:It still can be to aforementioned each implementation Technical solution recorded in example is modified or equivalent replacement of some of the technical features;And these modification or It replaces, the essence of corresponding technical solution can't be made to be detached from the spirit and scope of various embodiments of the present invention technical solution.

Claims (10)

1. a kind of DAFC film industryizatioies manage system, it is characterised in that:Including controller, it is used for what the controller was connected The first memory of storage project verification planning item and associated budget expenditure, what is be connected with the controller is used to store film preparation The second memory of item and associated budget expenditure, what is be connected with the controller is used to store test piece shooting and associated budget branch The third memory gone out, the 4th memory for storing positive shooting and associated budget expenditure being connected with the controller, The 5th memory for storing post-processing item and associated budget expenditure being connected with the controller, with the controller Connected the 6th memory that item and associated budget expenditure are sold for storing publicity;
The data processing unit for the data in each memory calculate with integration being connected with the controller, and it is described The connected data acquisition module for being acquired to the data after data processing unit processes of controller, is adopted with the data The connected Cloud Server of collection module, the encrypting module for Cloud Server to be encrypted being connected with the Cloud Server, with The touch display screen for inputting, showing information that the controller is connected, what is be connected with the controller is used to input papery The scanner of fileinfo.
2. DAFC film industryizatioies according to claim 1 manage system, it is characterised in that:The data processing unit packet The data computation module for being calculated the budget expenditure in each memory is included, and for data computation module processing The Data Integration module that the flow item corresponding in each memory of data afterwards is integrated.
3. DAFC film industryizatioies according to claim 1 manage system, it is characterised in that:The encrypting module uses Cloud Server is encrypted in the encrypted modes of IIS.
4. DAFC film industryizatioies according to claim 1 manage system, it is characterised in that:The project verification planning item, It includes film-making flow that publicity, which sells item, and it includes production procedure and film-making that the film, which prepares item, post-processing item, Flow.
5. DAFC film industryizatioies according to claim 1 manage system, it is characterised in that:The project verification planning item Film-making flow is project verification discussion, collection drama, drama is write, drama is audited, drama is changed, playwright, screenwriter finalizes a text, acquisition authorizes, obtains License, project planning, propaganda and plan, planning of promoting trade and investment, performing art planning.
6. DAFC film industryizatioies according to claim 1 manage system, it is characterised in that:The film prepares item Production procedure be determine chief creating, drama final draft, concept draw, scape advanced exploration, scape assess, survey again to scape, taking scape scheme, the playscript with stage directions It makes, Storyboard makes, special efficacy assessment, fine arts color matching, take scape construction, clothesization prepare, stage property prepares, the playscript with stage directions is finalized a text, Yan Yuanding Adornment, performer's training.
7. DAFC film industryizatioies according to claim 1 manage system, it is characterised in that:The film prepares item Film-making flow is time planning, performer selects, assesses to scape, takes scape scheme evaluation, takes the determination of scape scheme, project is promoted trade and investment, the time Plan, businessman's determination, integrated planning, film-making guarantee, is built to organize and be implemented at performer's determination.
8. DAFC film industryizatioies according to claim 1 manage system, it is characterised in that:The post-processing item Production procedure is editing, acoustic processing, music making, film toning, audio making, special effect making, packaging makes, editing is closed At, in flakes.
9. DAFC film industryizatioies according to claim 1 manage system, it is characterised in that:The post-processing item Film-making flow is the plan of a surname's hair, the contact of a surname's hair, poster makes, a surname's hair prepares.
10. DAFC film industryizatioies according to claim 1 manage system, it is characterised in that:Item is sold in the publicity Film-making flow be determine shelves waiting, trailer is launched, hold news conference, media report, hard wide launched, is put and reflect meeting, meet-and-greet.
CN201810426622.9A 2018-05-07 2018-05-07 A kind of DAFC film industryizatioies management system Pending CN108717621A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810426622.9A CN108717621A (en) 2018-05-07 2018-05-07 A kind of DAFC film industryizatioies management system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810426622.9A CN108717621A (en) 2018-05-07 2018-05-07 A kind of DAFC film industryizatioies management system

Publications (1)

Publication Number Publication Date
CN108717621A true CN108717621A (en) 2018-10-30

Family

ID=63899418

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810426622.9A Pending CN108717621A (en) 2018-05-07 2018-05-07 A kind of DAFC film industryizatioies management system

Country Status (1)

Country Link
CN (1) CN108717621A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110765405A (en) * 2019-09-26 2020-02-07 西安石油大学 Schedule planning method based on priority degree

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1380621A (en) * 2002-05-21 2002-11-20 马峥 Computer management system for making video program
US20130275312A1 (en) * 2012-04-12 2013-10-17 Avid Technology, Inc. Methods and systems for collaborative media creation
CN104601960A (en) * 2015-01-30 2015-05-06 深圳市视晶无线技术有限公司 Video shooting control and management method and system
US9448696B1 (en) * 2005-01-11 2016-09-20 Dax Pft, Llc System and method for media content collaboration throughout a media production process
CN107194671A (en) * 2017-05-31 2017-09-22 首汇焦点(北京)科技有限公司 A kind of movie and television play makes whole process aided management system

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1380621A (en) * 2002-05-21 2002-11-20 马峥 Computer management system for making video program
US9448696B1 (en) * 2005-01-11 2016-09-20 Dax Pft, Llc System and method for media content collaboration throughout a media production process
US20130275312A1 (en) * 2012-04-12 2013-10-17 Avid Technology, Inc. Methods and systems for collaborative media creation
CN104601960A (en) * 2015-01-30 2015-05-06 深圳市视晶无线技术有限公司 Video shooting control and management method and system
CN107194671A (en) * 2017-05-31 2017-09-22 首汇焦点(北京)科技有限公司 A kind of movie and television play makes whole process aided management system

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110765405A (en) * 2019-09-26 2020-02-07 西安石油大学 Schedule planning method based on priority degree

Similar Documents

Publication Publication Date Title
Grosvold et al. Squaring the circle: Management, measurement and performance of sustainability in supply chains
Towse et al. Cultural economics
Woll Publishing for profit: successful bottom-line management for book publishers
Murphy et al. A tutorial on building policy models as mixed-complementarity problems
CA2360571A1 (en) Method and system for executing financial transactions via a communication medium
CN110517148A (en) Quantify control method, system and device that trading strategies execute
CN113795855A (en) Project management system
Timm et al. Towards a quality framework for enterprise architecture models
US20180260749A1 (en) System and method for filtering project information from display
Jain et al. E-procurement espousal and assessment framework: A case-based study of Indian automobile companies
CN108717621A (en) A kind of DAFC film industryizatioies management system
Kuehnel et al. Conceptualization, design, and implementation of EconBPC–A software artifact for the economic analysis of business process compliance
Raduški Basic management functions in culture and arts organisations
Rosdi et al. Hasilpedia: Transforming knowledge management at Inland Revenue Board of Malaysia
Schuir et al. Understanding the augmented and virtual reality business ecosystem: an e 3-value approach
Rogers et al. Fair use in the US economy: economic contribution of industries relying on fair use (2007)
US8275646B2 (en) Intellectual property assessments based on component business models
CN111626022A (en) Online education topic generation method and device, electronic equipment and storage medium
Knott et al. Uncovering potential barriers of using initial coin offerings to finance artistic projects
Lientz et al. Start right in e-business
CN105741009A (en) Dynamic method for collecting, tracking, storing and reporting development event efforts
Flynn et al. Managing Global Supply Chain Relationships: Operations, Strategies and Practices: Operations, Strategies and Practices
Rikhardsson Corporate environmental management and information technology
Khoong Reengineering in action: the quest for world-class excellence
Milani et al. Business Processes

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20181030