CN108717416A - Power equipment monitoring method, device, computer equipment and storage medium - Google Patents

Power equipment monitoring method, device, computer equipment and storage medium Download PDF

Info

Publication number
CN108717416A
CN108717416A CN201810277258.4A CN201810277258A CN108717416A CN 108717416 A CN108717416 A CN 108717416A CN 201810277258 A CN201810277258 A CN 201810277258A CN 108717416 A CN108717416 A CN 108717416A
Authority
CN
China
Prior art keywords
alarm information
power equipment
history
current
information
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201810277258.4A
Other languages
Chinese (zh)
Inventor
莫文雄
刘育权
王红斌
栾乐
许中
孔令明
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangzhou Power Supply Bureau Co Ltd
Original Assignee
Guangzhou Power Supply Bureau Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guangzhou Power Supply Bureau Co Ltd filed Critical Guangzhou Power Supply Bureau Co Ltd
Priority to CN201810277258.4A priority Critical patent/CN108717416A/en
Publication of CN108717416A publication Critical patent/CN108717416A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
    • G06Q50/06Energy or water supply

Landscapes

  • Business, Economics & Management (AREA)
  • Health & Medical Sciences (AREA)
  • Engineering & Computer Science (AREA)
  • Economics (AREA)
  • Public Health (AREA)
  • Water Supply & Treatment (AREA)
  • General Health & Medical Sciences (AREA)
  • Human Resources & Organizations (AREA)
  • Marketing (AREA)
  • Primary Health Care (AREA)
  • Strategic Management (AREA)
  • Tourism & Hospitality (AREA)
  • Physics & Mathematics (AREA)
  • General Business, Economics & Management (AREA)
  • General Physics & Mathematics (AREA)
  • Theoretical Computer Science (AREA)
  • Remote Monitoring And Control Of Power-Distribution Networks (AREA)

Abstract

This application involves a kind of power equipment monitoring method, device, computer equipment and storage mediums.Power equipment monitoring method, including:History alarm information is stored in database by the history alarm information for obtaining power equipment;The current alarm information of power equipment is obtained, and obtains the corresponding unit type of current alarm information;Corresponding history alarm information in database is inquired according to unit type, and the operating status of power equipment is monitored according to the history alarm information inquired.It can be provided technical support by carrying out mining analysis to history alarm information for the processing of current alarm information, improve the accuracy monitored to equipment running status using this method.

Description

Power equipment monitoring method, device, computer equipment and storage medium
Technical field
This application involves information monitoring technical fields, more particularly to a kind of power equipment monitoring method, device, computer Equipment and storage medium.
Background technology
Warning information by monitoring electric system can be monitored the power equipment in electric system.Electric system Warning information is usually (such as the protection equipment) generated by power equipment, is the weight of most of electric system determinations and analysis accident Will foundation, by can in real time be monitored to the operating status of power equipment to the monitoring of warning information.
Traditional power equipment monitoring method mainly obtains the equipment such as switch, main transformer by the server set on monitoring center Warning information, the operating status alarm description field of monitored equipment is included wherein in warning information, can be retouched according to alarm Field is stated to monitor equipment in real time.However, traditional power equipment monitoring method is only according to current alarm description field Equipment running status is monitored, accuracy is low.
Invention content
Based on this, it is necessary to which in view of the above technical problems, equipment running status monitoring precision can be improved by providing one kind Power equipment monitoring method, device, computer equipment and storage medium.
A kind of power equipment monitoring method, including:
The history alarm information is stored in database by the history alarm information for obtaining power equipment;Wherein, history alarm All warning information of each power equipment before information is current time;
The current alarm information of power equipment is obtained, and obtains the corresponding unit type of current alarm information;Wherein, described Current alarm information is all warning information of each power equipment of current time;
Corresponding history alarm information in the database is inquired according to the unit type, and according to the history inquired Warning information is monitored the operating status of power equipment.
In one embodiment, the power equipment monitoring method obtains the history alarm information of power equipment, by institute Stating the step of history alarm information is stored in database includes:
The history alarm information for obtaining each power equipment screens the history alarm information, and it is invalid to reject History alarm information, and effective history alarm information is stored in database.
In one embodiment, the power equipment monitoring method, obtains the current alarm information of power equipment, and obtains The step of taking current alarm information corresponding unit type include:
The current alarm information for obtaining each power equipment screens the current alarm information, and it is invalid to reject Current alarm information filters out effective current alarm information, and obtains the corresponding unit type of effective current alarm information.
In one embodiment, the power equipment monitoring method, the step of rejecting invalid history alarm information, wrap It includes:
The first specific field in history alarm information is compared with preset first reference field, when described first When specific field is inconsistent with first reference field, judge that the history alarm information is invalid history alarm information, Invalid history alarm information is rejected.
In one embodiment, the power equipment monitoring method, the step of rejecting invalid history alarm information number Including:
The history alarm information of involution in preset first time is determined as to invalid history alarm information, it will be invalid History alarm information is rejected.
In one embodiment, the power equipment monitoring method, the step of rejecting invalid current alarm information, wrap It includes:
The second specific field in current alarm information is compared with preset second reference field, when described second When specific field is inconsistent with second reference field, judge that the current alarm information is invalid current alarm information, The invalid current alarm information is rejected.
In one embodiment, the power equipment monitoring method, the step of rejecting invalid current alarm information, wrap It includes:
The current alarm information of involution in preset second time is determined as invalid current alarm information, it will be invalid Current alarm information is rejected.
A kind of power equipment monitoring device, including:
The history alarm information is stored in number by the first acquisition module, the history alarm information for obtaining power equipment According to library;Wherein, all warning information of each power equipment before history alarm information is current time;
Second acquisition module, the current alarm information for obtaining power equipment, and it is corresponding to obtain current alarm information Unit type;Wherein, the current alarm information is all warning information of each power equipment of current time;
Enquiry module, for inquiring corresponding history alarm information in the database, and root according to the unit type The operating status of power equipment is monitored according to the history alarm information inquired.
A kind of computer equipment, including memory, processor and storage can be run on a memory and on a processor Computer program, the processor realize following steps when executing the computer program:
The history alarm information is stored in database by the history alarm information for obtaining power equipment;Wherein, history alarm All warning information of each power equipment before information is current time;
The current alarm information of power equipment is obtained, and obtains the corresponding unit type of current alarm information;Wherein, described Current alarm information is all warning information of each power equipment of current time;
Corresponding history alarm information in the database is inquired according to the unit type, and according to the history inquired Warning information is monitored the operating status of power equipment.
A kind of computer readable storage medium, is stored thereon with computer program, and the computer program is held by processor Following steps are realized when row:
The history alarm information is stored in database by the history alarm information for obtaining power equipment;Wherein, history alarm All warning information of each power equipment before information is current time;
The current alarm information of power equipment is obtained, and obtains the corresponding unit type of current alarm information;Wherein, described Current alarm information is all warning information of each power equipment of current time;
Corresponding history alarm information in the database is inquired according to the unit type, and according to the history inquired Warning information is monitored the operating status of power equipment.
Above-mentioned power equipment monitoring method, device, computer equipment and storage medium, by the way that history alarm information to be stored in Database, can inquire corresponding history alarm information in database when monitoring current alarm information, and according to inquiring History alarm information the operating status of power equipment is monitored.Current alarm information and history alarm information can be passed through Combination power equipment is monitored, by history alarm information carry out mining analysis, be current alarm information processing Technical support is provided, the accuracy monitored to equipment running status is improved.
Description of the drawings
Fig. 1 is the applied environment figure of power equipment monitoring method in one embodiment;
Fig. 2 is the flow diagram of power equipment monitoring method in one embodiment;
Fig. 3 is the flow diagram of power equipment monitoring method in another embodiment;
Fig. 4 is the flow diagram of power equipment monitoring method in further embodiment;
Fig. 5 is the structure diagram of power equipment monitoring device in one embodiment;
Fig. 6 is the internal structure chart of one embodiment Computer equipment.
Specific implementation mode
It is with reference to the accompanying drawings and embodiments, right in order to make the object, technical solution and advantage of the application be more clearly understood The application is further elaborated.It should be appreciated that specific embodiment described herein is only used to explain the application, not For limiting the application.
Power equipment monitoring method provided by the present application, can be applied in application environment as shown in Figure 1.Wherein, it takes The power equipment 102 in monitoring center, electric system, which can be arranged, in business device 101 to be communicated with server 101, service Device 101 can be by receiving real-time monitoring of the warning information realization of power equipment 102 to power equipment 102.Wherein, electric power is set Standby 102 quantity can be multiple, and server 101 can use the server of the either multiple server compositions of independent server Cluster is realized.
In one embodiment, as shown in Fig. 2, providing a kind of power equipment monitoring method, it is applied to Fig. 1 in this way In server 101 for illustrate, include the following steps:
S201 obtains the history alarm information of power equipment, and history alarm information is stored in database;Wherein, history is accused All warning information of each power equipment before alert information is current time.
For step S201, power equipment can be the equipment such as switch or main transformer.Warning information be unit exception or Standby signal when equipment fault can be generated directly by power equipment, wherein and warning information can be alarm description field, Whether effective warning information can be assessed by the identification to each field contents in alarm description field.
S202, obtains the current alarm information of power equipment, and obtains the corresponding unit type of current alarm information;Its In, current alarm information is all warning information of each power equipment of current time.
In above-mentioned steps, current alarm information can be real-time warning information, can be with horse when monitoring warning information On warning information is analyzed, analysis warning information it is whether effective.
S203 inquires corresponding history alarm information in database according to unit type, and is accused according to the history inquired Alert information is monitored the operating status of power equipment.
It, can be according to the corresponding unit type inquiry of current alarm information with same in model device history in above-mentioned steps Type warning information.The history alarm information inquired can also be issued, for instructing inspection personnel's processing equipment different Normal or equipment fault.Alarm statistics query interface can also be designed according to database, may include selection substation, alarm type Etc. elements, keyword can also be directly inputted and inquired.It is inquiring in database after corresponding history alarm information, may be used also Real-time alarm-monitor interface is presented, for example, can be in GIS (Geographic Information System, geography letter Breath system) the whole substations for sending out alarm are shown on figure, it can also utilize to roll and play screen displaying and exceed the time limit the announcement of non-involution Alert information and Real-time Alarm information.
Above-described embodiment can be looked by the way that history alarm information is stored in database when monitoring current alarm information Ask corresponding history alarm information in database, and according to the history alarm information inquired to the operating status of power equipment into Row monitoring.Power equipment can be monitored by the combination of current alarm information and history alarm information, by history Warning information carries out mining analysis, and technical support can be provided for the processing of current alarm information, improves to equipment running status The accuracy of monitoring may be implemented the automatic monitoring of warning information and can show that history alarm is analyzed, there is historical data to dig Pick ability and alarm statistics analysis ability.
In one embodiment, for step S201, as shown in figure 3, can be by step S2011 by history alarm information It is stored in database:The history alarm information for obtaining each power equipment, screens history alarm information, rejects invalid go through History warning information, and effective history alarm information is stored in database.
Warning information in above-described embodiment can be SOE (Sequence Of Event, sequence of events recording) alarm letters Breath, can formulate history alarm validity rule, meet warning information as defined in history alarm validity and be considered effectively to go through Effective history alarm information is stored in database, will not meet and alert letter as defined in history alarm validity by history warning information Breath is considered invalid history alarm information, and invalid history alarm information is rejected.Believe for example, being alerted in statistical history When breath, the same unit exception may repeat to send out multiple warning information simultaneously.If received in one minute equipment send out it is more The identical warning information of item then can only press an Information Statistics, other warning information repeated do not repeat to count, and directly delete Fall.In addition, in one second multiple intervals send out warning information similar be considered accidentally to alert, these warning information are invalid.
Above-described embodiment can improve the reliable of history alarm information data by rejecting invalid history alarm information Property, further increase the accuracy to power equipment monitoring running state.
Further, in one embodiment, invalid history alarm information can be rejected by following steps:By history The first specific field in warning information is compared with preset first reference field, when the first specific field and first refer to When field is inconsistent, judgement history alarm information is invalid history alarm information, and invalid history alarm information is rejected.
In the above-described embodiments, the first specific field may include record whether there is or not debugging board field, it is corresponding first ginseng It can be " no debugging board " to examine field, at this point, when the first specific field is consistent with the first reference field, then illustrate that the history is accused The corresponding power equipment of police's information does not debug board, which is not as there is no debugging mode is in debugging State just alerts, and warning information is effective.When the first specific field and inconsistent the first reference field, then illustrate the history alarm The corresponding power equipment of information has debugging board, which is in debugging mode, is just alerted due to being in debugging mode, Warning information is invalid.In addition, the first specific field can also include the field of record switch and both sides disconnecting link position, corresponding the One reference field can be " switch and both sides disconnecting link are closing position ".When switch or disconnecting link are in point position, alarm, which cannot reflect, really sets Standby situation may have service work, therefore only the warning information of switch and both sides disconnecting link when closing position is only effective alarm letter Breath.First specific field can also include action (action) field, when action fields are action, it is believed that history alarm is believed Breath is effective.
Above-described embodiment can improve the reliable of history alarm information data by rejecting invalid history alarm information Property, further increase the accuracy to power equipment monitoring running state.
In one embodiment, invalid history alarm information can also be rejected by following steps:By preset first The history alarm information of involution in time is determined as invalid history alarm information, and invalid history alarm information is rejected.
In the above-described embodiments, it can be at the first time two hours, if history alarm information is the involution in two hours, Illustrate that electric system restores normal automatically in two hours, without counting the history alarm information, which is considered as In vain.If " being controlled back in addition, not detected in one minute before and after the locking information for detecting equipment in alarm description field Break on road ", then it is assumed that the history alarm information is invalid, because the warning information normally generated by device latchup is bound to one Control loop template in minute.When device latchup generate warning information be generated by bus connection switch or block switch, if Alarm detects " switch relay while acting " in 4 hours, then it is assumed that alarm is invalid, if because monitoring " switching relay Act simultaneously ", then explanation has the operation of falling busbar, will be considered that disconnecting control loop causes to send out warning information, this warning information is not It should count.
Above-described embodiment can improve the reliable of history alarm information data by rejecting invalid history alarm information Property, further increase the accuracy to power equipment monitoring running state.
In one embodiment, for step S202, as shown in figure 4, can be by step S2022 to current alarm information Carry out following processing:The current alarm information for obtaining each power equipment, screens current alarm information, and it is invalid to reject Current alarm information filters out effective current alarm information, and obtains the corresponding unit type of effective current alarm information.
In the above-described embodiments, current alarm validity rule can be formulated, meets and is accused as defined in current alarm validity Alert information is considered effective current alarm information, is further analyzed, will not meet to effective current alarm information Warning information as defined in current alarm validity is considered invalid current alarm information, and invalid history alarm information is carried out It rejects.For example, when counting current alarm information, if receiving a plurality of identical warning information that equipment is sent out in one minute, An Information Statistics then can be only pressed, the warning information that other are repeated directly is deleted without analyzing accordingly.In addition, one Three or more similar warning information of multiple interval hairs or multiple intervals being considered of sending out warning information similar in one second in minute It accidentally alerts, these warning information are invalid.When judging that current alarm information is effective, database can be inquired immediately, can also be incited somebody to action The corresponding history alarm information of current alarm information and data results play in real time.
Above-described embodiment can improve the reliable of current alarm information data by rejecting invalid current alarm information Property, further increase the accuracy to power equipment monitoring running state.
Further, in one embodiment, invalid current alarm information can be rejected by following steps:It will be current The second specific field in warning information is compared with preset second reference field, when the second specific field and second refer to When field is inconsistent, judgement current alarm information is invalid current alarm information, and invalid current alarm information is rejected.
In the above-described embodiments, the second specific field may include record whether there is or not debugging board field, it is corresponding second ginseng It can be " no debugging board " to examine field, at this point, when the second specific field is consistent with the second reference field, then illustrate the current announcement The corresponding power equipment of police's information does not debug board, which is not as there is no debugging mode is in debugging State just alerts, and warning information is effective.When the second specific field and inconsistent the second reference field, then illustrate the history alarm The corresponding power equipment of information has debugging board, which is in debugging mode, is just alerted due to being in debugging mode, Warning information is invalid.In addition, the second specific field can also include the field of record switch and both sides disconnecting link position, corresponding the Two reference fields can be " switch and both sides disconnecting link are closing position ".When switch or disconnecting link are in point position, alarm, which cannot reflect, really sets Standby situation may have service work, therefore only the warning information of switch and both sides disconnecting link when closing position is only effective alarm letter Breath.First specific field can also include action (action) field, when action fields are action, it is believed that current alarm is believed Breath is effective.
Above-described embodiment can improve the reliable of current alarm information data by rejecting invalid current alarm information Property, further increase the accuracy to power equipment monitoring running state.
In one embodiment, invalid current alarm information can also be rejected by following steps:By preset second The current alarm information of involution in time is determined as invalid current alarm information, and invalid current alarm information is rejected.
In the above-described embodiments, the second time can be one minute, and involution specification exception is restored automatically, because of monitoring in real time It is required that quickly judging, therefore set for the second time to one minute.If current alarm information is the involution in one minute, illustrate electricity Force system restores normal automatically in one minute, and without counting the current warning information, which is considered as in vain.Separately Outside, if not detected in one minute before and after the locking information for detecting equipment in alarm description field, " control loop is disconnected Line ", then it is assumed that the current warning information is invalid, because the warning information normally generated by device latchup was bound at one minute Interior control loop template.
It should be understood that although each step in the flow chart of Fig. 2-4 is shown successively according to the instruction of arrow, These steps are not that the inevitable sequence indicated according to arrow executes successively.Unless expressly stating otherwise herein, these steps Execution there is no stringent sequences to limit, these steps can execute in other order.Moreover, at least one in Fig. 2-4 Part steps may include that either these sub-steps of multiple stages or stage are not necessarily in synchronization to multiple sub-steps Completion is executed, but can be executed at different times, the execution sequence in these sub-steps or stage is also not necessarily successively It carries out, but can either the sub-step of other steps or at least part in stage be in turn or alternately with other steps It executes.
In an embodiment of the present invention, as shown in figure 5, also providing a kind of power equipment monitoring device, including:
History alarm information is stored in data by the first acquisition module 51, the history alarm information for obtaining power equipment Library;Wherein, all warning information of each power equipment before history alarm information is current time;
Second acquisition module 52, the current alarm information for obtaining power equipment, and obtain current alarm information correspondence Unit type;Wherein, current alarm information is all warning information of each power equipment of current time;
Enquiry module 53, for inquiring corresponding history alarm information in database according to unit type, and according to inquiry To history alarm information the operating status of power equipment is monitored.
In one embodiment, history alarm information can be stored in data by power equipment monitoring device by following steps Library:The history alarm information for obtaining each power equipment, screens history alarm information, rejects invalid history alarm letter Breath, and effective history alarm information is stored in database.
Further, in one embodiment, power equipment monitoring device can reject invalid go through by following steps History warning information:The first specific field in history alarm information is compared with preset first reference field, when first When specific field and inconsistent the first reference field, judgement history alarm information is invalid history alarm information, will be invalid History alarm information is rejected.
In one embodiment, power equipment monitoring device can also reject invalid history alarm letter by following steps Breath:The history alarm information of involution in preset first time is determined as to invalid history alarm information, by invalid history Warning information is rejected.
In one embodiment, following processing can be carried out to current alarm information:Obtain the current of each power equipment Warning information screens current alarm information, rejects invalid current alarm information, filters out effective current alarm letter Breath, and obtain the corresponding unit type of effective current alarm information.
Further, in one embodiment, power equipment monitoring device can be rejected invalid work as by following steps Preceding warning information:The second specific field in current alarm information is compared with preset second reference field, when second When specific field and inconsistent the second reference field, judgement current alarm information is invalid current alarm information, will be invalid Current alarm information is rejected.
In one embodiment, power equipment monitoring device can also reject invalid current alarm letter by following steps Breath:The current alarm information of involution in preset second time is determined as invalid current alarm information, it will be invalid current Warning information is rejected.
Specific about power equipment monitoring device limits the limit that may refer to above for power equipment monitoring method Fixed, details are not described herein.Modules in above-mentioned power equipment monitoring device can fully or partially through software, hardware and its It combines to realize.Above-mentioned each module can be embedded in or in the form of hardware independently of in the processor in computer equipment, can also It is stored in a software form in the memory in computer equipment, in order to which processor calls the above modules of execution corresponding Operation.
The term " comprising " and " having " of the embodiment of the present invention and their any deformations, it is intended that cover non-exclusive Including.Such as contain series of steps or the process, method, system, product or equipment of (module) unit are not limited to The step of listing or unit, but further include the steps that optionally not listing or unit, or further include optionally for these The intrinsic other steps of process, method, product or equipment or unit.
Referenced herein " embodiment " is it is meant that a particular feature, structure, or characteristic described can wrap in conjunction with the embodiments It is contained at least one embodiment of the application.Each position in the description occur the phrase might not each mean it is identical Embodiment, nor the independent or alternative embodiment with other embodiments mutual exclusion.Those skilled in the art explicitly and Implicitly understand, embodiment described herein can be combined with other embodiments.
In one embodiment, a kind of computer equipment is provided, which can be server, internal junction Composition can be as shown in Figure 6.The computer equipment include the processor connected by system bus, memory, network interface and Database.Wherein, the processor of the computer equipment is for providing calculating and control ability.The memory packet of the computer equipment Include non-volatile memory medium, built-in storage.The non-volatile memory medium is stored with operating system, computer program and data Library.The built-in storage provides environment for the operation of operating system and computer program in non-volatile memory medium.The calculating The database of machine equipment is for storing history alarm information data.The network interface of the computer equipment is used for and external terminal It is communicated by network connection.To realize a kind of power equipment monitoring method when the computer program is executed by processor.
It will be understood by those skilled in the art that structure shown in Fig. 6, is only tied with the relevant part of application scheme The block diagram of structure does not constitute the restriction for the computer equipment being applied thereon to application scheme, specific computer equipment May include either combining certain components than more or fewer components as shown in the figure or being arranged with different components.
In one embodiment, a kind of computer equipment is provided, including memory, processor and storage are on a memory And the computer program that can be run on a processor, processor realize following steps when executing computer program:
History alarm information is stored in database by the history alarm information for obtaining power equipment;Wherein, history alarm information For all warning information of each power equipment before current time;
The current alarm information of power equipment is obtained, and obtains the corresponding unit type of current alarm information;Wherein, currently Warning information is all warning information of each power equipment of current time;
Corresponding history alarm information in database is inquired according to unit type, and according to the history alarm information inquired The operating status of power equipment is monitored.
In one embodiment, processor execute computer program when, processor execute computer program when also realize with Lower step:The history alarm information for obtaining each power equipment, screens history alarm information, rejects invalid history and accuses Alert information, and effective history alarm information is stored in database.
In one embodiment, processor execute computer program when, processor execute computer program when also realize with Lower step:The current alarm information for obtaining each power equipment, screens current alarm information, rejects invalid current announcement Alert information, filters out effective current alarm information, and obtain the corresponding unit type of effective current alarm information.
In one embodiment, processor execute computer program when, processor execute computer program when also realize with Lower step:The first specific field in history alarm information is compared with preset first reference field, when first specified When field is inconsistent with the first reference field, judgement history alarm information is invalid history alarm information, by invalid history Warning information is rejected.
In one embodiment, processor execute computer program when, processor execute computer program when also realize with Lower step:The history alarm information of involution in preset first time is determined as to invalid history alarm information, it will be invalid History alarm information is rejected.
In one embodiment, processor execute computer program when, processor execute computer program when also realize with Lower step:The second specific field in current alarm information is compared with preset second reference field, when second specified When field and the second reference field are inconsistent, judgement current alarm information is invalid current alarm information, will be invalid current Warning information is rejected.
In one embodiment, processor execute computer program when, processor execute computer program when also realize with Lower step:The current alarm information of involution in preset second time is determined as invalid current alarm information, it will be invalid Current alarm information is rejected.
A kind of computer readable storage medium is stored thereon with computer program, when computer program is executed by processor Realize following steps:
History alarm information is stored in database by the history alarm information for obtaining power equipment;Wherein, history alarm information For all warning information of each power equipment before current time;
The current alarm information of power equipment is obtained, and obtains the corresponding unit type of current alarm information;Wherein, currently Warning information is all warning information of each power equipment of current time;
Corresponding history alarm information in database is inquired according to unit type, and according to the history alarm information inquired The operating status of power equipment is monitored.
In one embodiment, following steps are also realized when computer program is executed by processor:Each electric power is obtained to set Standby history alarm information, screens history alarm information, rejects invalid history alarm information, and by effective history Warning information is stored in database.
In one embodiment, following steps are also realized when computer program is executed by processor:Each electric power is obtained to set Standby current alarm information, screens current alarm information, rejects invalid current alarm information, filters out and effectively work as Preceding warning information, and obtain the corresponding unit type of effective current alarm information.
In one embodiment, following steps are also realized when computer program is executed by processor:By history alarm information In the first specific field be compared with preset first reference field, when the first specific field and the first reference field differ When cause, judgement history alarm information is invalid history alarm information, and invalid history alarm information is rejected.
In one embodiment, following steps are also realized when computer program is executed by processor:When by preset first The history alarm information of interior involution is determined as invalid history alarm information, and invalid history alarm information is rejected.
In one embodiment, following steps are also realized when computer program is executed by processor:By current alarm information In the second specific field be compared with preset second reference field, when the second specific field and the second reference field differ When cause, judgement current alarm information is invalid current alarm information, and invalid current alarm information is rejected.
In one embodiment, following steps are also realized when computer program is executed by processor:When by preset second The current alarm information of interior involution is determined as invalid current alarm information, and invalid current alarm information is rejected.
One of ordinary skill in the art will appreciate that realizing all or part of flow in above-described embodiment method, being can be with Instruct relevant hardware to complete by computer program, computer program can be stored in a non-volatile computer readable It takes in storage medium, the computer program is when being executed, it may include such as the flow of the embodiment of above-mentioned each method.Wherein, this Shen Any reference to memory, storage, database or other media used in each embodiment please provided, may each comprise Non-volatile and/or volatile memory.Nonvolatile memory may include read-only memory (ROM), programming ROM (PROM), electrically programmable ROM (EPROM), electrically erasable ROM (EEPROM) or flash memory.Volatile memory may include Random access memory (RAM) or external cache.By way of illustration and not limitation, RAM is available in many forms, Such as static state RAM (SRAM), dynamic ram (DRAM), synchronous dram (SDRAM), double data rate sdram (DDRSDRAM), enhancing Type SDRAM (ESDRAM), synchronization link (Synchlink) DRAM (SLDRAM), memory bus (Rambus) direct RAM (RDRAM), direct memory bus dynamic ram (DRDRAM) and memory bus dynamic ram (RDRAM) etc..
Each technical characteristic of above example can be combined arbitrarily, to keep description succinct, not to above-described embodiment In each technical characteristic it is all possible combination be all described, as long as however, the combination of these technical characteristics be not present lance Shield is all considered to be the range of this specification record.
Above example only expresses the several embodiments of the application, the description thereof is more specific and detailed, but can not Therefore it is construed as limiting the scope of the patent.It should be pointed out that for those of ordinary skill in the art, Under the premise of not departing from the application design, various modifications and improvements can be made, these belong to the protection domain of the application. Therefore, the protection domain of the application patent should be determined by the appended claims.

Claims (10)

1. a kind of power equipment monitoring method, which is characterized in that including:
The history alarm information is stored in database by the history alarm information for obtaining power equipment;Wherein, history alarm information For all warning information of each power equipment before current time;
The current alarm information of power equipment is obtained, and obtains the corresponding unit type of current alarm information;Wherein, described current Warning information is all warning information of each power equipment of current time;
Corresponding history alarm information in the database is inquired according to the unit type, and according to the history alarm inquired Information is monitored the operating status of power equipment.
2. power equipment monitoring method according to claim 1, which is characterized in that obtain the history alarm letter of power equipment It ceases, includes by the step of history alarm information deposit database:
The history alarm information for obtaining each power equipment screens the history alarm information, rejects invalid history Warning information, and effective history alarm information is stored in database.
3. the power equipment monitoring method according to claims 1 or 2 any one, which is characterized in that obtain power equipment Current alarm information, and the step of obtaining current alarm information corresponding unit type includes:
The current alarm information for obtaining each power equipment screens the current alarm information, rejects invalid current Warning information filters out effective current alarm information, and obtains the corresponding unit type of effective current alarm information.
4. power equipment monitoring method according to claim 2, which is characterized in that reject invalid history alarm information Step includes:
The first specific field in history alarm information is compared with preset first reference field, when described first specified When field is inconsistent with first reference field, judge that the history alarm information is invalid history alarm information, by nothing The history alarm information of effect is rejected.
5. power equipment monitoring method according to claim 2, which is characterized in that reject invalid history alarm information Step number includes:
The history alarm information of involution in preset first time is determined as to invalid history alarm information, by invalid history Warning information is rejected.
6. power equipment monitoring method according to claim 3, which is characterized in that reject invalid current alarm information Step includes:
The second specific field in current alarm information is compared with preset second reference field, when described second specified When field is inconsistent with second reference field, judge that the current alarm information is invalid current alarm information, by institute Invalid current alarm information is stated to reject.
7. power equipment monitoring method according to claim 3, which is characterized in that reject invalid current alarm information Step includes:
The current alarm information of involution in preset second time is determined as invalid current alarm information, it will be invalid current Warning information is rejected.
8. a kind of power equipment monitoring device, which is characterized in that including:
The history alarm information is stored in database by the first acquisition module, the history alarm information for obtaining power equipment; Wherein, all warning information of each power equipment before history alarm information is current time;
Second acquisition module, the current alarm information for obtaining power equipment, and obtain the corresponding equipment of current alarm information Model;Wherein, the current alarm information is all warning information of each power equipment of current time;
Enquiry module, for inquiring corresponding history alarm information in the database according to the unit type, and according to looking into The history alarm information ask is monitored the operating status of power equipment.
9. a kind of computer equipment, including memory, processor and storage are on a memory and the meter that can run on a processor Calculation machine program, which is characterized in that the processor realizes any one of claim 1 to 7 institute when executing the computer program The step of power equipment monitoring method stated.
10. a kind of computer readable storage medium, is stored thereon with computer program, which is characterized in that the computer program The step of power equipment monitoring method described in any one of claim 1 to 7 is realized when being executed by processor.
CN201810277258.4A 2018-03-30 2018-03-30 Power equipment monitoring method, device, computer equipment and storage medium Pending CN108717416A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810277258.4A CN108717416A (en) 2018-03-30 2018-03-30 Power equipment monitoring method, device, computer equipment and storage medium

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810277258.4A CN108717416A (en) 2018-03-30 2018-03-30 Power equipment monitoring method, device, computer equipment and storage medium

Publications (1)

Publication Number Publication Date
CN108717416A true CN108717416A (en) 2018-10-30

Family

ID=63898686

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810277258.4A Pending CN108717416A (en) 2018-03-30 2018-03-30 Power equipment monitoring method, device, computer equipment and storage medium

Country Status (1)

Country Link
CN (1) CN108717416A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111835083A (en) * 2020-06-08 2020-10-27 海南电网有限责任公司 Power supply information monitoring system, method and device, computer equipment and storage medium
CN112312209A (en) * 2020-10-30 2021-02-02 中移(杭州)信息技术有限公司 Comprehensive alarm generation method, device, server and storage medium
CN113205195A (en) * 2021-05-31 2021-08-03 中国银行股份有限公司 Method, device, equipment and storage medium for determining type of alarm information

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106161079A (en) * 2015-04-28 2016-11-23 小米科技有限责任公司 Fault feedback method and device
CN106169813A (en) * 2016-08-18 2016-11-30 成都云辰复兴信息技术有限公司 Wireless network maintaining method for transformer station
CN107341591A (en) * 2017-06-15 2017-11-10 国网浙江省电力公司嘉兴供电公司 A kind of transformer station's warning information Intelligent statistical analysis system and method
CN107609788A (en) * 2017-09-27 2018-01-19 广东电网有限责任公司佛山供电局 A kind of method and system of automatic identification of electric network fault signal with associating prediction scheme
CN107658980A (en) * 2017-09-29 2018-02-02 国网浙江省电力公司 A kind of analysis method and system for being used to check power system monitor warning information

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106161079A (en) * 2015-04-28 2016-11-23 小米科技有限责任公司 Fault feedback method and device
CN106169813A (en) * 2016-08-18 2016-11-30 成都云辰复兴信息技术有限公司 Wireless network maintaining method for transformer station
CN107341591A (en) * 2017-06-15 2017-11-10 国网浙江省电力公司嘉兴供电公司 A kind of transformer station's warning information Intelligent statistical analysis system and method
CN107609788A (en) * 2017-09-27 2018-01-19 广东电网有限责任公司佛山供电局 A kind of method and system of automatic identification of electric network fault signal with associating prediction scheme
CN107658980A (en) * 2017-09-29 2018-02-02 国网浙江省电力公司 A kind of analysis method and system for being used to check power system monitor warning information

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111835083A (en) * 2020-06-08 2020-10-27 海南电网有限责任公司 Power supply information monitoring system, method and device, computer equipment and storage medium
CN111835083B (en) * 2020-06-08 2022-03-04 海南电网有限责任公司 Power supply information monitoring system, method and device, computer equipment and storage medium
CN112312209A (en) * 2020-10-30 2021-02-02 中移(杭州)信息技术有限公司 Comprehensive alarm generation method, device, server and storage medium
CN113205195A (en) * 2021-05-31 2021-08-03 中国银行股份有限公司 Method, device, equipment and storage medium for determining type of alarm information

Similar Documents

Publication Publication Date Title
CN105116291A (en) Power grid operating steady state monitoring information-based fault diagnosis system and method
CN106124935A (en) Middle and low voltage network Fault Locating Method
CN109709936A (en) Equipment running status monitoring method, device, computer equipment and storage medium
CN106124878A (en) Integrated transformer health monitoring framework
CN108717416A (en) Power equipment monitoring method, device, computer equipment and storage medium
CN111562460B (en) Power distribution network power failure event detection research and judgment method, device, computer equipment and medium
CN101601057A (en) Electrical substation monitoring and diagnosis
CN103956831B (en) The intelligent diagnosing method of a kind of transmission line distribution transforming phase shortage alarm
CN108764596A (en) The monitoring method and monitoring system of the power failure of metering automation system
CN108539736B (en) Power failure event analysis method and system based on multi-source data and computer equipment
CN107065720A (en) Intelligent electric machine failure wave-recording early warning system
CN108181546B (en) Power distribution network fault positioning method and device and terminal equipment
CN113507691B (en) Information pushing system and method based on power distribution network cross-region service
CN111835083B (en) Power supply information monitoring system, method and device, computer equipment and storage medium
CN115313625A (en) Transformer substation monitoring method and system
US20180024203A1 (en) Detection of electric power system anomalies in streaming measurements
CN110838940B (en) Underground cable inspection task configuration method and device
CN117635106A (en) Power equipment monitoring method, system, terminal and storage medium
Babu et al. Reliability evaluation of distribution structures considering the presence of false trips
CN116125200A (en) Line fault locating method, device, system, equipment and readable storage medium
CN107024919B (en) A method of realizing nuclear leve digitlization I&C system in-service monitoring diagnosis
CN109558956A (en) The evaluation method that goes offline, device, computer equipment and the storage medium of measuring equipment
CN115208053A (en) Abnormity warning method, abnormity warning device, computer equipment and storage medium
CN114743703A (en) Reliability analysis method, device, equipment and storage medium for nuclear power station unit
CN116418121B (en) Substation secondary security system, method, device and computer equipment

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20181030