CN108717416A - Power equipment monitoring method, device, computer equipment and storage medium - Google Patents
Power equipment monitoring method, device, computer equipment and storage medium Download PDFInfo
- Publication number
- CN108717416A CN108717416A CN201810277258.4A CN201810277258A CN108717416A CN 108717416 A CN108717416 A CN 108717416A CN 201810277258 A CN201810277258 A CN 201810277258A CN 108717416 A CN108717416 A CN 108717416A
- Authority
- CN
- China
- Prior art keywords
- alarm information
- power equipment
- history
- current
- information
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 238000012544 monitoring process Methods 0.000 title claims abstract description 51
- 238000000034 method Methods 0.000 title claims abstract description 40
- 238000004590 computer program Methods 0.000 claims description 35
- 238000012806 monitoring device Methods 0.000 claims description 11
- 238000004364 calculation method Methods 0.000 claims 1
- 238000012545 processing Methods 0.000 abstract description 5
- 238000005065 mining Methods 0.000 abstract description 3
- 230000009471 action Effects 0.000 description 9
- 238000010586 diagram Methods 0.000 description 5
- 241000208340 Araliaceae Species 0.000 description 2
- 235000005035 Panax pseudoginseng ssp. pseudoginseng Nutrition 0.000 description 2
- 235000003140 Panax quinquefolius Nutrition 0.000 description 2
- 235000008434 ginseng Nutrition 0.000 description 2
- 239000000203 mixture Substances 0.000 description 2
- 230000008569 process Effects 0.000 description 2
- 230000008901 benefit Effects 0.000 description 1
- 238000013461 design Methods 0.000 description 1
- 230000005611 electricity Effects 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 230000002708 enhancing effect Effects 0.000 description 1
- 230000007717 exclusion Effects 0.000 description 1
- 210000004209 hair Anatomy 0.000 description 1
- 230000010365 information processing Effects 0.000 description 1
- 238000007689 inspection Methods 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 230000003068 static effect Effects 0.000 description 1
- 230000001360 synchronised effect Effects 0.000 description 1
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q50/00—Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
- G06Q50/06—Energy or water supply
Landscapes
- Business, Economics & Management (AREA)
- Health & Medical Sciences (AREA)
- Engineering & Computer Science (AREA)
- Economics (AREA)
- Public Health (AREA)
- Water Supply & Treatment (AREA)
- General Health & Medical Sciences (AREA)
- Human Resources & Organizations (AREA)
- Marketing (AREA)
- Primary Health Care (AREA)
- Strategic Management (AREA)
- Tourism & Hospitality (AREA)
- Physics & Mathematics (AREA)
- General Business, Economics & Management (AREA)
- General Physics & Mathematics (AREA)
- Theoretical Computer Science (AREA)
- Remote Monitoring And Control Of Power-Distribution Networks (AREA)
Abstract
This application involves a kind of power equipment monitoring method, device, computer equipment and storage mediums.Power equipment monitoring method, including:History alarm information is stored in database by the history alarm information for obtaining power equipment;The current alarm information of power equipment is obtained, and obtains the corresponding unit type of current alarm information;Corresponding history alarm information in database is inquired according to unit type, and the operating status of power equipment is monitored according to the history alarm information inquired.It can be provided technical support by carrying out mining analysis to history alarm information for the processing of current alarm information, improve the accuracy monitored to equipment running status using this method.
Description
Technical field
This application involves information monitoring technical fields, more particularly to a kind of power equipment monitoring method, device, computer
Equipment and storage medium.
Background technology
Warning information by monitoring electric system can be monitored the power equipment in electric system.Electric system
Warning information is usually (such as the protection equipment) generated by power equipment, is the weight of most of electric system determinations and analysis accident
Will foundation, by can in real time be monitored to the operating status of power equipment to the monitoring of warning information.
Traditional power equipment monitoring method mainly obtains the equipment such as switch, main transformer by the server set on monitoring center
Warning information, the operating status alarm description field of monitored equipment is included wherein in warning information, can be retouched according to alarm
Field is stated to monitor equipment in real time.However, traditional power equipment monitoring method is only according to current alarm description field
Equipment running status is monitored, accuracy is low.
Invention content
Based on this, it is necessary to which in view of the above technical problems, equipment running status monitoring precision can be improved by providing one kind
Power equipment monitoring method, device, computer equipment and storage medium.
A kind of power equipment monitoring method, including:
The history alarm information is stored in database by the history alarm information for obtaining power equipment;Wherein, history alarm
All warning information of each power equipment before information is current time;
The current alarm information of power equipment is obtained, and obtains the corresponding unit type of current alarm information;Wherein, described
Current alarm information is all warning information of each power equipment of current time;
Corresponding history alarm information in the database is inquired according to the unit type, and according to the history inquired
Warning information is monitored the operating status of power equipment.
In one embodiment, the power equipment monitoring method obtains the history alarm information of power equipment, by institute
Stating the step of history alarm information is stored in database includes:
The history alarm information for obtaining each power equipment screens the history alarm information, and it is invalid to reject
History alarm information, and effective history alarm information is stored in database.
In one embodiment, the power equipment monitoring method, obtains the current alarm information of power equipment, and obtains
The step of taking current alarm information corresponding unit type include:
The current alarm information for obtaining each power equipment screens the current alarm information, and it is invalid to reject
Current alarm information filters out effective current alarm information, and obtains the corresponding unit type of effective current alarm information.
In one embodiment, the power equipment monitoring method, the step of rejecting invalid history alarm information, wrap
It includes:
The first specific field in history alarm information is compared with preset first reference field, when described first
When specific field is inconsistent with first reference field, judge that the history alarm information is invalid history alarm information,
Invalid history alarm information is rejected.
In one embodiment, the power equipment monitoring method, the step of rejecting invalid history alarm information number
Including:
The history alarm information of involution in preset first time is determined as to invalid history alarm information, it will be invalid
History alarm information is rejected.
In one embodiment, the power equipment monitoring method, the step of rejecting invalid current alarm information, wrap
It includes:
The second specific field in current alarm information is compared with preset second reference field, when described second
When specific field is inconsistent with second reference field, judge that the current alarm information is invalid current alarm information,
The invalid current alarm information is rejected.
In one embodiment, the power equipment monitoring method, the step of rejecting invalid current alarm information, wrap
It includes:
The current alarm information of involution in preset second time is determined as invalid current alarm information, it will be invalid
Current alarm information is rejected.
A kind of power equipment monitoring device, including:
The history alarm information is stored in number by the first acquisition module, the history alarm information for obtaining power equipment
According to library;Wherein, all warning information of each power equipment before history alarm information is current time;
Second acquisition module, the current alarm information for obtaining power equipment, and it is corresponding to obtain current alarm information
Unit type;Wherein, the current alarm information is all warning information of each power equipment of current time;
Enquiry module, for inquiring corresponding history alarm information in the database, and root according to the unit type
The operating status of power equipment is monitored according to the history alarm information inquired.
A kind of computer equipment, including memory, processor and storage can be run on a memory and on a processor
Computer program, the processor realize following steps when executing the computer program:
The history alarm information is stored in database by the history alarm information for obtaining power equipment;Wherein, history alarm
All warning information of each power equipment before information is current time;
The current alarm information of power equipment is obtained, and obtains the corresponding unit type of current alarm information;Wherein, described
Current alarm information is all warning information of each power equipment of current time;
Corresponding history alarm information in the database is inquired according to the unit type, and according to the history inquired
Warning information is monitored the operating status of power equipment.
A kind of computer readable storage medium, is stored thereon with computer program, and the computer program is held by processor
Following steps are realized when row:
The history alarm information is stored in database by the history alarm information for obtaining power equipment;Wherein, history alarm
All warning information of each power equipment before information is current time;
The current alarm information of power equipment is obtained, and obtains the corresponding unit type of current alarm information;Wherein, described
Current alarm information is all warning information of each power equipment of current time;
Corresponding history alarm information in the database is inquired according to the unit type, and according to the history inquired
Warning information is monitored the operating status of power equipment.
Above-mentioned power equipment monitoring method, device, computer equipment and storage medium, by the way that history alarm information to be stored in
Database, can inquire corresponding history alarm information in database when monitoring current alarm information, and according to inquiring
History alarm information the operating status of power equipment is monitored.Current alarm information and history alarm information can be passed through
Combination power equipment is monitored, by history alarm information carry out mining analysis, be current alarm information processing
Technical support is provided, the accuracy monitored to equipment running status is improved.
Description of the drawings
Fig. 1 is the applied environment figure of power equipment monitoring method in one embodiment;
Fig. 2 is the flow diagram of power equipment monitoring method in one embodiment;
Fig. 3 is the flow diagram of power equipment monitoring method in another embodiment;
Fig. 4 is the flow diagram of power equipment monitoring method in further embodiment;
Fig. 5 is the structure diagram of power equipment monitoring device in one embodiment;
Fig. 6 is the internal structure chart of one embodiment Computer equipment.
Specific implementation mode
It is with reference to the accompanying drawings and embodiments, right in order to make the object, technical solution and advantage of the application be more clearly understood
The application is further elaborated.It should be appreciated that specific embodiment described herein is only used to explain the application, not
For limiting the application.
Power equipment monitoring method provided by the present application, can be applied in application environment as shown in Figure 1.Wherein, it takes
The power equipment 102 in monitoring center, electric system, which can be arranged, in business device 101 to be communicated with server 101, service
Device 101 can be by receiving real-time monitoring of the warning information realization of power equipment 102 to power equipment 102.Wherein, electric power is set
Standby 102 quantity can be multiple, and server 101 can use the server of the either multiple server compositions of independent server
Cluster is realized.
In one embodiment, as shown in Fig. 2, providing a kind of power equipment monitoring method, it is applied to Fig. 1 in this way
In server 101 for illustrate, include the following steps:
S201 obtains the history alarm information of power equipment, and history alarm information is stored in database;Wherein, history is accused
All warning information of each power equipment before alert information is current time.
For step S201, power equipment can be the equipment such as switch or main transformer.Warning information be unit exception or
Standby signal when equipment fault can be generated directly by power equipment, wherein and warning information can be alarm description field,
Whether effective warning information can be assessed by the identification to each field contents in alarm description field.
S202, obtains the current alarm information of power equipment, and obtains the corresponding unit type of current alarm information;Its
In, current alarm information is all warning information of each power equipment of current time.
In above-mentioned steps, current alarm information can be real-time warning information, can be with horse when monitoring warning information
On warning information is analyzed, analysis warning information it is whether effective.
S203 inquires corresponding history alarm information in database according to unit type, and is accused according to the history inquired
Alert information is monitored the operating status of power equipment.
It, can be according to the corresponding unit type inquiry of current alarm information with same in model device history in above-mentioned steps
Type warning information.The history alarm information inquired can also be issued, for instructing inspection personnel's processing equipment different
Normal or equipment fault.Alarm statistics query interface can also be designed according to database, may include selection substation, alarm type
Etc. elements, keyword can also be directly inputted and inquired.It is inquiring in database after corresponding history alarm information, may be used also
Real-time alarm-monitor interface is presented, for example, can be in GIS (Geographic Information System, geography letter
Breath system) the whole substations for sending out alarm are shown on figure, it can also utilize to roll and play screen displaying and exceed the time limit the announcement of non-involution
Alert information and Real-time Alarm information.
Above-described embodiment can be looked by the way that history alarm information is stored in database when monitoring current alarm information
Ask corresponding history alarm information in database, and according to the history alarm information inquired to the operating status of power equipment into
Row monitoring.Power equipment can be monitored by the combination of current alarm information and history alarm information, by history
Warning information carries out mining analysis, and technical support can be provided for the processing of current alarm information, improves to equipment running status
The accuracy of monitoring may be implemented the automatic monitoring of warning information and can show that history alarm is analyzed, there is historical data to dig
Pick ability and alarm statistics analysis ability.
In one embodiment, for step S201, as shown in figure 3, can be by step S2011 by history alarm information
It is stored in database:The history alarm information for obtaining each power equipment, screens history alarm information, rejects invalid go through
History warning information, and effective history alarm information is stored in database.
Warning information in above-described embodiment can be SOE (Sequence Of Event, sequence of events recording) alarm letters
Breath, can formulate history alarm validity rule, meet warning information as defined in history alarm validity and be considered effectively to go through
Effective history alarm information is stored in database, will not meet and alert letter as defined in history alarm validity by history warning information
Breath is considered invalid history alarm information, and invalid history alarm information is rejected.Believe for example, being alerted in statistical history
When breath, the same unit exception may repeat to send out multiple warning information simultaneously.If received in one minute equipment send out it is more
The identical warning information of item then can only press an Information Statistics, other warning information repeated do not repeat to count, and directly delete
Fall.In addition, in one second multiple intervals send out warning information similar be considered accidentally to alert, these warning information are invalid.
Above-described embodiment can improve the reliable of history alarm information data by rejecting invalid history alarm information
Property, further increase the accuracy to power equipment monitoring running state.
Further, in one embodiment, invalid history alarm information can be rejected by following steps:By history
The first specific field in warning information is compared with preset first reference field, when the first specific field and first refer to
When field is inconsistent, judgement history alarm information is invalid history alarm information, and invalid history alarm information is rejected.
In the above-described embodiments, the first specific field may include record whether there is or not debugging board field, it is corresponding first ginseng
It can be " no debugging board " to examine field, at this point, when the first specific field is consistent with the first reference field, then illustrate that the history is accused
The corresponding power equipment of police's information does not debug board, which is not as there is no debugging mode is in debugging
State just alerts, and warning information is effective.When the first specific field and inconsistent the first reference field, then illustrate the history alarm
The corresponding power equipment of information has debugging board, which is in debugging mode, is just alerted due to being in debugging mode,
Warning information is invalid.In addition, the first specific field can also include the field of record switch and both sides disconnecting link position, corresponding the
One reference field can be " switch and both sides disconnecting link are closing position ".When switch or disconnecting link are in point position, alarm, which cannot reflect, really sets
Standby situation may have service work, therefore only the warning information of switch and both sides disconnecting link when closing position is only effective alarm letter
Breath.First specific field can also include action (action) field, when action fields are action, it is believed that history alarm is believed
Breath is effective.
Above-described embodiment can improve the reliable of history alarm information data by rejecting invalid history alarm information
Property, further increase the accuracy to power equipment monitoring running state.
In one embodiment, invalid history alarm information can also be rejected by following steps:By preset first
The history alarm information of involution in time is determined as invalid history alarm information, and invalid history alarm information is rejected.
In the above-described embodiments, it can be at the first time two hours, if history alarm information is the involution in two hours,
Illustrate that electric system restores normal automatically in two hours, without counting the history alarm information, which is considered as
In vain.If " being controlled back in addition, not detected in one minute before and after the locking information for detecting equipment in alarm description field
Break on road ", then it is assumed that the history alarm information is invalid, because the warning information normally generated by device latchup is bound to one
Control loop template in minute.When device latchup generate warning information be generated by bus connection switch or block switch, if
Alarm detects " switch relay while acting " in 4 hours, then it is assumed that alarm is invalid, if because monitoring " switching relay
Act simultaneously ", then explanation has the operation of falling busbar, will be considered that disconnecting control loop causes to send out warning information, this warning information is not
It should count.
Above-described embodiment can improve the reliable of history alarm information data by rejecting invalid history alarm information
Property, further increase the accuracy to power equipment monitoring running state.
In one embodiment, for step S202, as shown in figure 4, can be by step S2022 to current alarm information
Carry out following processing:The current alarm information for obtaining each power equipment, screens current alarm information, and it is invalid to reject
Current alarm information filters out effective current alarm information, and obtains the corresponding unit type of effective current alarm information.
In the above-described embodiments, current alarm validity rule can be formulated, meets and is accused as defined in current alarm validity
Alert information is considered effective current alarm information, is further analyzed, will not meet to effective current alarm information
Warning information as defined in current alarm validity is considered invalid current alarm information, and invalid history alarm information is carried out
It rejects.For example, when counting current alarm information, if receiving a plurality of identical warning information that equipment is sent out in one minute,
An Information Statistics then can be only pressed, the warning information that other are repeated directly is deleted without analyzing accordingly.In addition, one
Three or more similar warning information of multiple interval hairs or multiple intervals being considered of sending out warning information similar in one second in minute
It accidentally alerts, these warning information are invalid.When judging that current alarm information is effective, database can be inquired immediately, can also be incited somebody to action
The corresponding history alarm information of current alarm information and data results play in real time.
Above-described embodiment can improve the reliable of current alarm information data by rejecting invalid current alarm information
Property, further increase the accuracy to power equipment monitoring running state.
Further, in one embodiment, invalid current alarm information can be rejected by following steps:It will be current
The second specific field in warning information is compared with preset second reference field, when the second specific field and second refer to
When field is inconsistent, judgement current alarm information is invalid current alarm information, and invalid current alarm information is rejected.
In the above-described embodiments, the second specific field may include record whether there is or not debugging board field, it is corresponding second ginseng
It can be " no debugging board " to examine field, at this point, when the second specific field is consistent with the second reference field, then illustrate the current announcement
The corresponding power equipment of police's information does not debug board, which is not as there is no debugging mode is in debugging
State just alerts, and warning information is effective.When the second specific field and inconsistent the second reference field, then illustrate the history alarm
The corresponding power equipment of information has debugging board, which is in debugging mode, is just alerted due to being in debugging mode,
Warning information is invalid.In addition, the second specific field can also include the field of record switch and both sides disconnecting link position, corresponding the
Two reference fields can be " switch and both sides disconnecting link are closing position ".When switch or disconnecting link are in point position, alarm, which cannot reflect, really sets
Standby situation may have service work, therefore only the warning information of switch and both sides disconnecting link when closing position is only effective alarm letter
Breath.First specific field can also include action (action) field, when action fields are action, it is believed that current alarm is believed
Breath is effective.
Above-described embodiment can improve the reliable of current alarm information data by rejecting invalid current alarm information
Property, further increase the accuracy to power equipment monitoring running state.
In one embodiment, invalid current alarm information can also be rejected by following steps:By preset second
The current alarm information of involution in time is determined as invalid current alarm information, and invalid current alarm information is rejected.
In the above-described embodiments, the second time can be one minute, and involution specification exception is restored automatically, because of monitoring in real time
It is required that quickly judging, therefore set for the second time to one minute.If current alarm information is the involution in one minute, illustrate electricity
Force system restores normal automatically in one minute, and without counting the current warning information, which is considered as in vain.Separately
Outside, if not detected in one minute before and after the locking information for detecting equipment in alarm description field, " control loop is disconnected
Line ", then it is assumed that the current warning information is invalid, because the warning information normally generated by device latchup was bound at one minute
Interior control loop template.
It should be understood that although each step in the flow chart of Fig. 2-4 is shown successively according to the instruction of arrow,
These steps are not that the inevitable sequence indicated according to arrow executes successively.Unless expressly stating otherwise herein, these steps
Execution there is no stringent sequences to limit, these steps can execute in other order.Moreover, at least one in Fig. 2-4
Part steps may include that either these sub-steps of multiple stages or stage are not necessarily in synchronization to multiple sub-steps
Completion is executed, but can be executed at different times, the execution sequence in these sub-steps or stage is also not necessarily successively
It carries out, but can either the sub-step of other steps or at least part in stage be in turn or alternately with other steps
It executes.
In an embodiment of the present invention, as shown in figure 5, also providing a kind of power equipment monitoring device, including:
History alarm information is stored in data by the first acquisition module 51, the history alarm information for obtaining power equipment
Library;Wherein, all warning information of each power equipment before history alarm information is current time;
Second acquisition module 52, the current alarm information for obtaining power equipment, and obtain current alarm information correspondence
Unit type;Wherein, current alarm information is all warning information of each power equipment of current time;
Enquiry module 53, for inquiring corresponding history alarm information in database according to unit type, and according to inquiry
To history alarm information the operating status of power equipment is monitored.
In one embodiment, history alarm information can be stored in data by power equipment monitoring device by following steps
Library:The history alarm information for obtaining each power equipment, screens history alarm information, rejects invalid history alarm letter
Breath, and effective history alarm information is stored in database.
Further, in one embodiment, power equipment monitoring device can reject invalid go through by following steps
History warning information:The first specific field in history alarm information is compared with preset first reference field, when first
When specific field and inconsistent the first reference field, judgement history alarm information is invalid history alarm information, will be invalid
History alarm information is rejected.
In one embodiment, power equipment monitoring device can also reject invalid history alarm letter by following steps
Breath:The history alarm information of involution in preset first time is determined as to invalid history alarm information, by invalid history
Warning information is rejected.
In one embodiment, following processing can be carried out to current alarm information:Obtain the current of each power equipment
Warning information screens current alarm information, rejects invalid current alarm information, filters out effective current alarm letter
Breath, and obtain the corresponding unit type of effective current alarm information.
Further, in one embodiment, power equipment monitoring device can be rejected invalid work as by following steps
Preceding warning information:The second specific field in current alarm information is compared with preset second reference field, when second
When specific field and inconsistent the second reference field, judgement current alarm information is invalid current alarm information, will be invalid
Current alarm information is rejected.
In one embodiment, power equipment monitoring device can also reject invalid current alarm letter by following steps
Breath:The current alarm information of involution in preset second time is determined as invalid current alarm information, it will be invalid current
Warning information is rejected.
Specific about power equipment monitoring device limits the limit that may refer to above for power equipment monitoring method
Fixed, details are not described herein.Modules in above-mentioned power equipment monitoring device can fully or partially through software, hardware and its
It combines to realize.Above-mentioned each module can be embedded in or in the form of hardware independently of in the processor in computer equipment, can also
It is stored in a software form in the memory in computer equipment, in order to which processor calls the above modules of execution corresponding
Operation.
The term " comprising " and " having " of the embodiment of the present invention and their any deformations, it is intended that cover non-exclusive
Including.Such as contain series of steps or the process, method, system, product or equipment of (module) unit are not limited to
The step of listing or unit, but further include the steps that optionally not listing or unit, or further include optionally for these
The intrinsic other steps of process, method, product or equipment or unit.
Referenced herein " embodiment " is it is meant that a particular feature, structure, or characteristic described can wrap in conjunction with the embodiments
It is contained at least one embodiment of the application.Each position in the description occur the phrase might not each mean it is identical
Embodiment, nor the independent or alternative embodiment with other embodiments mutual exclusion.Those skilled in the art explicitly and
Implicitly understand, embodiment described herein can be combined with other embodiments.
In one embodiment, a kind of computer equipment is provided, which can be server, internal junction
Composition can be as shown in Figure 6.The computer equipment include the processor connected by system bus, memory, network interface and
Database.Wherein, the processor of the computer equipment is for providing calculating and control ability.The memory packet of the computer equipment
Include non-volatile memory medium, built-in storage.The non-volatile memory medium is stored with operating system, computer program and data
Library.The built-in storage provides environment for the operation of operating system and computer program in non-volatile memory medium.The calculating
The database of machine equipment is for storing history alarm information data.The network interface of the computer equipment is used for and external terminal
It is communicated by network connection.To realize a kind of power equipment monitoring method when the computer program is executed by processor.
It will be understood by those skilled in the art that structure shown in Fig. 6, is only tied with the relevant part of application scheme
The block diagram of structure does not constitute the restriction for the computer equipment being applied thereon to application scheme, specific computer equipment
May include either combining certain components than more or fewer components as shown in the figure or being arranged with different components.
In one embodiment, a kind of computer equipment is provided, including memory, processor and storage are on a memory
And the computer program that can be run on a processor, processor realize following steps when executing computer program:
History alarm information is stored in database by the history alarm information for obtaining power equipment;Wherein, history alarm information
For all warning information of each power equipment before current time;
The current alarm information of power equipment is obtained, and obtains the corresponding unit type of current alarm information;Wherein, currently
Warning information is all warning information of each power equipment of current time;
Corresponding history alarm information in database is inquired according to unit type, and according to the history alarm information inquired
The operating status of power equipment is monitored.
In one embodiment, processor execute computer program when, processor execute computer program when also realize with
Lower step:The history alarm information for obtaining each power equipment, screens history alarm information, rejects invalid history and accuses
Alert information, and effective history alarm information is stored in database.
In one embodiment, processor execute computer program when, processor execute computer program when also realize with
Lower step:The current alarm information for obtaining each power equipment, screens current alarm information, rejects invalid current announcement
Alert information, filters out effective current alarm information, and obtain the corresponding unit type of effective current alarm information.
In one embodiment, processor execute computer program when, processor execute computer program when also realize with
Lower step:The first specific field in history alarm information is compared with preset first reference field, when first specified
When field is inconsistent with the first reference field, judgement history alarm information is invalid history alarm information, by invalid history
Warning information is rejected.
In one embodiment, processor execute computer program when, processor execute computer program when also realize with
Lower step:The history alarm information of involution in preset first time is determined as to invalid history alarm information, it will be invalid
History alarm information is rejected.
In one embodiment, processor execute computer program when, processor execute computer program when also realize with
Lower step:The second specific field in current alarm information is compared with preset second reference field, when second specified
When field and the second reference field are inconsistent, judgement current alarm information is invalid current alarm information, will be invalid current
Warning information is rejected.
In one embodiment, processor execute computer program when, processor execute computer program when also realize with
Lower step:The current alarm information of involution in preset second time is determined as invalid current alarm information, it will be invalid
Current alarm information is rejected.
A kind of computer readable storage medium is stored thereon with computer program, when computer program is executed by processor
Realize following steps:
History alarm information is stored in database by the history alarm information for obtaining power equipment;Wherein, history alarm information
For all warning information of each power equipment before current time;
The current alarm information of power equipment is obtained, and obtains the corresponding unit type of current alarm information;Wherein, currently
Warning information is all warning information of each power equipment of current time;
Corresponding history alarm information in database is inquired according to unit type, and according to the history alarm information inquired
The operating status of power equipment is monitored.
In one embodiment, following steps are also realized when computer program is executed by processor:Each electric power is obtained to set
Standby history alarm information, screens history alarm information, rejects invalid history alarm information, and by effective history
Warning information is stored in database.
In one embodiment, following steps are also realized when computer program is executed by processor:Each electric power is obtained to set
Standby current alarm information, screens current alarm information, rejects invalid current alarm information, filters out and effectively work as
Preceding warning information, and obtain the corresponding unit type of effective current alarm information.
In one embodiment, following steps are also realized when computer program is executed by processor:By history alarm information
In the first specific field be compared with preset first reference field, when the first specific field and the first reference field differ
When cause, judgement history alarm information is invalid history alarm information, and invalid history alarm information is rejected.
In one embodiment, following steps are also realized when computer program is executed by processor:When by preset first
The history alarm information of interior involution is determined as invalid history alarm information, and invalid history alarm information is rejected.
In one embodiment, following steps are also realized when computer program is executed by processor:By current alarm information
In the second specific field be compared with preset second reference field, when the second specific field and the second reference field differ
When cause, judgement current alarm information is invalid current alarm information, and invalid current alarm information is rejected.
In one embodiment, following steps are also realized when computer program is executed by processor:When by preset second
The current alarm information of interior involution is determined as invalid current alarm information, and invalid current alarm information is rejected.
One of ordinary skill in the art will appreciate that realizing all or part of flow in above-described embodiment method, being can be with
Instruct relevant hardware to complete by computer program, computer program can be stored in a non-volatile computer readable
It takes in storage medium, the computer program is when being executed, it may include such as the flow of the embodiment of above-mentioned each method.Wherein, this Shen
Any reference to memory, storage, database or other media used in each embodiment please provided, may each comprise
Non-volatile and/or volatile memory.Nonvolatile memory may include read-only memory (ROM), programming ROM
(PROM), electrically programmable ROM (EPROM), electrically erasable ROM (EEPROM) or flash memory.Volatile memory may include
Random access memory (RAM) or external cache.By way of illustration and not limitation, RAM is available in many forms,
Such as static state RAM (SRAM), dynamic ram (DRAM), synchronous dram (SDRAM), double data rate sdram (DDRSDRAM), enhancing
Type SDRAM (ESDRAM), synchronization link (Synchlink) DRAM (SLDRAM), memory bus (Rambus) direct RAM
(RDRAM), direct memory bus dynamic ram (DRDRAM) and memory bus dynamic ram (RDRAM) etc..
Each technical characteristic of above example can be combined arbitrarily, to keep description succinct, not to above-described embodiment
In each technical characteristic it is all possible combination be all described, as long as however, the combination of these technical characteristics be not present lance
Shield is all considered to be the range of this specification record.
Above example only expresses the several embodiments of the application, the description thereof is more specific and detailed, but can not
Therefore it is construed as limiting the scope of the patent.It should be pointed out that for those of ordinary skill in the art,
Under the premise of not departing from the application design, various modifications and improvements can be made, these belong to the protection domain of the application.
Therefore, the protection domain of the application patent should be determined by the appended claims.
Claims (10)
1. a kind of power equipment monitoring method, which is characterized in that including:
The history alarm information is stored in database by the history alarm information for obtaining power equipment;Wherein, history alarm information
For all warning information of each power equipment before current time;
The current alarm information of power equipment is obtained, and obtains the corresponding unit type of current alarm information;Wherein, described current
Warning information is all warning information of each power equipment of current time;
Corresponding history alarm information in the database is inquired according to the unit type, and according to the history alarm inquired
Information is monitored the operating status of power equipment.
2. power equipment monitoring method according to claim 1, which is characterized in that obtain the history alarm letter of power equipment
It ceases, includes by the step of history alarm information deposit database:
The history alarm information for obtaining each power equipment screens the history alarm information, rejects invalid history
Warning information, and effective history alarm information is stored in database.
3. the power equipment monitoring method according to claims 1 or 2 any one, which is characterized in that obtain power equipment
Current alarm information, and the step of obtaining current alarm information corresponding unit type includes:
The current alarm information for obtaining each power equipment screens the current alarm information, rejects invalid current
Warning information filters out effective current alarm information, and obtains the corresponding unit type of effective current alarm information.
4. power equipment monitoring method according to claim 2, which is characterized in that reject invalid history alarm information
Step includes:
The first specific field in history alarm information is compared with preset first reference field, when described first specified
When field is inconsistent with first reference field, judge that the history alarm information is invalid history alarm information, by nothing
The history alarm information of effect is rejected.
5. power equipment monitoring method according to claim 2, which is characterized in that reject invalid history alarm information
Step number includes:
The history alarm information of involution in preset first time is determined as to invalid history alarm information, by invalid history
Warning information is rejected.
6. power equipment monitoring method according to claim 3, which is characterized in that reject invalid current alarm information
Step includes:
The second specific field in current alarm information is compared with preset second reference field, when described second specified
When field is inconsistent with second reference field, judge that the current alarm information is invalid current alarm information, by institute
Invalid current alarm information is stated to reject.
7. power equipment monitoring method according to claim 3, which is characterized in that reject invalid current alarm information
Step includes:
The current alarm information of involution in preset second time is determined as invalid current alarm information, it will be invalid current
Warning information is rejected.
8. a kind of power equipment monitoring device, which is characterized in that including:
The history alarm information is stored in database by the first acquisition module, the history alarm information for obtaining power equipment;
Wherein, all warning information of each power equipment before history alarm information is current time;
Second acquisition module, the current alarm information for obtaining power equipment, and obtain the corresponding equipment of current alarm information
Model;Wherein, the current alarm information is all warning information of each power equipment of current time;
Enquiry module, for inquiring corresponding history alarm information in the database according to the unit type, and according to looking into
The history alarm information ask is monitored the operating status of power equipment.
9. a kind of computer equipment, including memory, processor and storage are on a memory and the meter that can run on a processor
Calculation machine program, which is characterized in that the processor realizes any one of claim 1 to 7 institute when executing the computer program
The step of power equipment monitoring method stated.
10. a kind of computer readable storage medium, is stored thereon with computer program, which is characterized in that the computer program
The step of power equipment monitoring method described in any one of claim 1 to 7 is realized when being executed by processor.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810277258.4A CN108717416A (en) | 2018-03-30 | 2018-03-30 | Power equipment monitoring method, device, computer equipment and storage medium |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810277258.4A CN108717416A (en) | 2018-03-30 | 2018-03-30 | Power equipment monitoring method, device, computer equipment and storage medium |
Publications (1)
Publication Number | Publication Date |
---|---|
CN108717416A true CN108717416A (en) | 2018-10-30 |
Family
ID=63898686
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201810277258.4A Pending CN108717416A (en) | 2018-03-30 | 2018-03-30 | Power equipment monitoring method, device, computer equipment and storage medium |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN108717416A (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111835083A (en) * | 2020-06-08 | 2020-10-27 | 海南电网有限责任公司 | Power supply information monitoring system, method and device, computer equipment and storage medium |
CN112312209A (en) * | 2020-10-30 | 2021-02-02 | 中移(杭州)信息技术有限公司 | Comprehensive alarm generation method, device, server and storage medium |
CN113205195A (en) * | 2021-05-31 | 2021-08-03 | 中国银行股份有限公司 | Method, device, equipment and storage medium for determining type of alarm information |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106161079A (en) * | 2015-04-28 | 2016-11-23 | 小米科技有限责任公司 | Fault feedback method and device |
CN106169813A (en) * | 2016-08-18 | 2016-11-30 | 成都云辰复兴信息技术有限公司 | Wireless network maintaining method for transformer station |
CN107341591A (en) * | 2017-06-15 | 2017-11-10 | 国网浙江省电力公司嘉兴供电公司 | A kind of transformer station's warning information Intelligent statistical analysis system and method |
CN107609788A (en) * | 2017-09-27 | 2018-01-19 | 广东电网有限责任公司佛山供电局 | A kind of method and system of automatic identification of electric network fault signal with associating prediction scheme |
CN107658980A (en) * | 2017-09-29 | 2018-02-02 | 国网浙江省电力公司 | A kind of analysis method and system for being used to check power system monitor warning information |
-
2018
- 2018-03-30 CN CN201810277258.4A patent/CN108717416A/en active Pending
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106161079A (en) * | 2015-04-28 | 2016-11-23 | 小米科技有限责任公司 | Fault feedback method and device |
CN106169813A (en) * | 2016-08-18 | 2016-11-30 | 成都云辰复兴信息技术有限公司 | Wireless network maintaining method for transformer station |
CN107341591A (en) * | 2017-06-15 | 2017-11-10 | 国网浙江省电力公司嘉兴供电公司 | A kind of transformer station's warning information Intelligent statistical analysis system and method |
CN107609788A (en) * | 2017-09-27 | 2018-01-19 | 广东电网有限责任公司佛山供电局 | A kind of method and system of automatic identification of electric network fault signal with associating prediction scheme |
CN107658980A (en) * | 2017-09-29 | 2018-02-02 | 国网浙江省电力公司 | A kind of analysis method and system for being used to check power system monitor warning information |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111835083A (en) * | 2020-06-08 | 2020-10-27 | 海南电网有限责任公司 | Power supply information monitoring system, method and device, computer equipment and storage medium |
CN111835083B (en) * | 2020-06-08 | 2022-03-04 | 海南电网有限责任公司 | Power supply information monitoring system, method and device, computer equipment and storage medium |
CN112312209A (en) * | 2020-10-30 | 2021-02-02 | 中移(杭州)信息技术有限公司 | Comprehensive alarm generation method, device, server and storage medium |
CN113205195A (en) * | 2021-05-31 | 2021-08-03 | 中国银行股份有限公司 | Method, device, equipment and storage medium for determining type of alarm information |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN105116291A (en) | Power grid operating steady state monitoring information-based fault diagnosis system and method | |
CN106124935A (en) | Middle and low voltage network Fault Locating Method | |
CN109709936A (en) | Equipment running status monitoring method, device, computer equipment and storage medium | |
CN106124878A (en) | Integrated transformer health monitoring framework | |
CN108717416A (en) | Power equipment monitoring method, device, computer equipment and storage medium | |
CN111562460B (en) | Power distribution network power failure event detection research and judgment method, device, computer equipment and medium | |
CN101601057A (en) | Electrical substation monitoring and diagnosis | |
CN103956831B (en) | The intelligent diagnosing method of a kind of transmission line distribution transforming phase shortage alarm | |
CN108764596A (en) | The monitoring method and monitoring system of the power failure of metering automation system | |
CN108539736B (en) | Power failure event analysis method and system based on multi-source data and computer equipment | |
CN107065720A (en) | Intelligent electric machine failure wave-recording early warning system | |
CN108181546B (en) | Power distribution network fault positioning method and device and terminal equipment | |
CN113507691B (en) | Information pushing system and method based on power distribution network cross-region service | |
CN111835083B (en) | Power supply information monitoring system, method and device, computer equipment and storage medium | |
CN115313625A (en) | Transformer substation monitoring method and system | |
US20180024203A1 (en) | Detection of electric power system anomalies in streaming measurements | |
CN110838940B (en) | Underground cable inspection task configuration method and device | |
CN117635106A (en) | Power equipment monitoring method, system, terminal and storage medium | |
Babu et al. | Reliability evaluation of distribution structures considering the presence of false trips | |
CN116125200A (en) | Line fault locating method, device, system, equipment and readable storage medium | |
CN107024919B (en) | A method of realizing nuclear leve digitlization I&C system in-service monitoring diagnosis | |
CN109558956A (en) | The evaluation method that goes offline, device, computer equipment and the storage medium of measuring equipment | |
CN115208053A (en) | Abnormity warning method, abnormity warning device, computer equipment and storage medium | |
CN114743703A (en) | Reliability analysis method, device, equipment and storage medium for nuclear power station unit | |
CN116418121B (en) | Substation secondary security system, method, device and computer equipment |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20181030 |
|
RJ01 | Rejection of invention patent application after publication |