CN108715500A - A kind of metal plating waste water processing equipment - Google Patents

A kind of metal plating waste water processing equipment Download PDF

Info

Publication number
CN108715500A
CN108715500A CN201810859260.2A CN201810859260A CN108715500A CN 108715500 A CN108715500 A CN 108715500A CN 201810859260 A CN201810859260 A CN 201810859260A CN 108715500 A CN108715500 A CN 108715500A
Authority
CN
China
Prior art keywords
top surface
case
pipe
waste water
processing equipment
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn
Application number
CN201810859260.2A
Other languages
Chinese (zh)
Inventor
李梦平
李华想
吕家琦
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201810859260.2A priority Critical patent/CN108715500A/en
Publication of CN108715500A publication Critical patent/CN108715500A/en
Withdrawn legal-status Critical Current

Links

Classifications

    • CCHEMISTRY; METALLURGY
    • C02TREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
    • C02FTREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
    • C02F9/00Multistage treatment of water, waste water or sewage
    • CCHEMISTRY; METALLURGY
    • C02TREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
    • C02FTREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
    • C02F1/00Treatment of water, waste water, or sewage
    • C02F1/001Processes for the treatment of water whereby the filtration technique is of importance
    • CCHEMISTRY; METALLURGY
    • C02TREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
    • C02FTREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
    • C02F1/00Treatment of water, waste water, or sewage
    • C02F1/28Treatment of water, waste water, or sewage by sorption
    • CCHEMISTRY; METALLURGY
    • C02TREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
    • C02FTREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
    • C02F1/00Treatment of water, waste water, or sewage
    • C02F1/48Treatment of water, waste water, or sewage with magnetic or electric fields
    • CCHEMISTRY; METALLURGY
    • C02TREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
    • C02FTREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
    • C02F1/00Treatment of water, waste water, or sewage
    • C02F1/52Treatment of water, waste water, or sewage by flocculation or precipitation of suspended impurities
    • C02F1/5281Installations for water purification using chemical agents
    • CCHEMISTRY; METALLURGY
    • C02TREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
    • C02FTREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
    • C02F1/00Treatment of water, waste water, or sewage
    • C02F1/66Treatment of water, waste water, or sewage by neutralisation; pH adjustment
    • CCHEMISTRY; METALLURGY
    • C02TREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
    • C02FTREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
    • C02F2103/00Nature of the water, waste water, sewage or sludge to be treated
    • C02F2103/16Nature of the water, waste water, sewage or sludge to be treated from metallurgical processes, i.e. from the production, refining or treatment of metals, e.g. galvanic wastes
    • CCHEMISTRY; METALLURGY
    • C02TREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
    • C02FTREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
    • C02F2209/00Controlling or monitoring parameters in water treatment
    • C02F2209/11Turbidity

Landscapes

  • Life Sciences & Earth Sciences (AREA)
  • Hydrology & Water Resources (AREA)
  • Engineering & Computer Science (AREA)
  • Environmental & Geological Engineering (AREA)
  • Water Supply & Treatment (AREA)
  • Chemical & Material Sciences (AREA)
  • Organic Chemistry (AREA)
  • Water Treatment By Sorption (AREA)

Abstract

The present invention relates to electroplating waste water treatment equipment technical fields, and disclose a kind of metal plating waste water processing equipment, including pedestal, the top surface of the pedestal is installed with supporting rod, the quantity of the supporting rod is two, Rose Box is installed between two supporting rods, the inner wall of the Rose Box is installed with plain gauze.The metal plating waste water processing equipment, by assisting flabellum, so that the electroplating wastewater quickly flowed provides a power-assisted for rotary shaft, accelerate the velocity of rotation of rotary shaft, so that auxiliary flabellum can be with steel brush quick rotation and by plain gauze, active carbon filter screen, the particulate matter and metal of quartz sand strainer and the attachment of magnetic force net left side brush the inside of slag trapping box, avoid plain gauze, active carbon filter screen, the problem of quartz sand strainer and magnetic force net are blocked by particulate matter, facilitate the particulate matter inside worker's cleaning slag trapping box, improve the practicability of the metal plating waste water processing equipment.

Description

A kind of metal plating waste water processing equipment
Technical field
The present invention relates to electroplating waste water treatment equipment technical field, specially a kind of metal plating waste water processing equipment.
Background technology
The waste water and waste liquid of electroplating facility discharge, including plating piece rinse water, useless tank liquor, component cooling water and the flushing surface water Deng containing noxious materials such as chromium, nickel, cadmium, cyanogen, bronsted lowry acids and bases bronsted lowries, the health of people being endangered, in people and animals being caused acute such as cyanogen Poison, lethal, low concentration long term can also cause slow poisoning, and cadmium can make kidney that lesion occur, and can cause itai-itai, sexavalence Chromium can cause lung cancer, stomach tract disease and anaemia, and can be in bone, the dirty interior accumulation of spleen and liver, and therefore, electroplating wastewater must be controlled strictly System, deals carefully with.
The processing unit of existing electroplating wastewater using removal of heavy metal ions device remove electroplating wastewater in heavy metal from Then electroplating wastewater is discharged to the processing that sewage treatment plant carries out ammonia nitrogen and organic matter, water treatment technology by son by sewage network There are resins exchange, electrolysis, chemical method and air supporting etc., electrolysis high energy consumption to need to expend a large amount of metallic irons, be not suitable for generating The more high-concentration chromium-containing wastewater of sludge quantity, while the effect for removing Cyanide in Waste Water is bad, chemical agent and Bubble-floating Method useization It learns drug redox to neutralize, carries out mud-water separation with air supporting floating method, because electroplating sludge is than great, and contain in waste water A variety of organic additives, in actual use dissolved air flotation are not thorough, and operational management is inconvenient, and chemical agent and the precipitation method make With long operational time is separated by solid-liquid separation in the process, sedimentation basin, which has sludge, to be rolled up, and water outlet is difficult to ensure stably reaching standard.
For problem set forth above, existing publication number CN204803171U discloses a kind of electroplating waste processing equipment, Particulate matter and part metals in electroplating effluent are removed by activated charcoal strainer, quartz sand filtration net and bar magnet, passes through turbidity Instrument monitors the pure and impure degree of settling tank supernatant, and the organic contamination in electroplating wastewater is cleared up by spongy polymer adsorbing material Object, still, the electroplating waste processing equipment use after a period of time activated charcoal strainer and quartz sand filtration network capacity easily by Grain object blocks, and needs activated charcoal strainer and quartz sand filtration net disassembling cleaning, very troublesome, and is not equipped with turbid Instrument cleaning device is spent, causes the testing result of the pure and impure degree of settling tank supernatant inaccurate, influences the quality that waste water is discharged, pollution Environment, while spongy polymer adsorbing material is directly fixedly mounted on inside adsorption tank, is replaced after sorbing material saturation non- Often trouble, increases the workload of worker, thus there is an urgent need for design one kind be convenient to clean particulate matter, turbidity detection accuracy it is high and It is convenient for changing the metal plating waste water processing equipment of sorbing material.
Invention content
(1) the technical issues of solving
For the deficiency of above-mentioned documents, the present invention provides a kind of metal plating waste water processing equipments, have and are convenient for The advantages that cleaning particulate matter, turbidity detection accuracy are high and are convenient for changing sorbing material, solves electroplating waste processing equipment It is easily blocked, needs activated charcoal strainer by particulate matter using activated charcoal strainer after a period of time and quartz sand filtration network capacity Cleaning is disassembled with quartz sand filtration net, it is very troublesome, and it is not equipped with transmissometer cleaning device, lead to settling tank supernatant The testing result of the pure and impure degree of liquid is inaccurate, influences the quality that waste water is discharged, and pollutes environment, while spongy polymer adsorption material Material is directly fixedly mounted on inside adsorption tank, is replaced after sorbing material saturation and is bothered very much, increases the workload of worker Problem.
(2) technical solution
It is convenient to clean particulate matter, turbidity detection accuracy height and the purpose for being convenient for changing sorbing material for realization is above-mentioned, The present invention provides the following technical solutions:Peace is fixed in the top surface of a kind of metal plating waste water processing equipment, including pedestal, the pedestal Equipped with supporting rod, the quantity of the supporting rod is two, and Rose Box, the filtering are installed between two supporting rods The inner wall of case is installed with plain gauze, and the inner wall of the Rose Box is installed with the activated carbon on the right side of plain gauze Strainer, the inner wall of the Rose Box are installed with the quartz sand strainer on the right side of active carbon filter screen, the Rose Box it is interior Wall is installed with the magnetic force net on the right side of quartz sand strainer, and the right side movable sleeve of the filtering box cavity is connected to rotation Axis, the left end of the rotary shaft sequentially pass through magnetic force net, quartz sand strainer, active carbon filter screen and plain gauze and in Rose Box The left side pivot bush unit of chamber, the outside of the rotary shaft and magnetic force net, quartz sand strainer, active carbon filter screen and plain gauze are equal Pivot bush unit, the external stability of the rotary shaft are socketed with the driving flabellum on the left of plain gauze, the rotary shaft it is outer Portion's fixing sleeve is connected to auxiliary flabellum, and the right side of the auxiliary flabellum is installed with steel brush, and the bottom surface of the Rose Box is fixed Slag trapping box is installed, the top of the supporting rod is installed with exhausted bath box, and the top surface of the exhausted bath box, which is fixed, is communicated with feed liquor Pipe, the top surface of the exhausted bath box are installed with the booster pump on the right side of inlet tube, and the left side of the booster pump passes through increasing Pressure pipe is connected to exhausted bath box fixation, flow tank is placed on the right side of the pedestal, the left side of the flow tank passes through woven hose It is connected to the fixation of the right end of Rose Box bottom surface, the left end of the flow tank top surface is installed with support column, the support column Top is installed with flocculant case, and the bottom of the flocculant case, which is fixed, is communicated with flocculant pipe, the bottom of the flocculant pipe End, which runs through the top surface of flow tank and extends to the inside of flow tank and fix, is communicated with shower, and the right end of the flow tank top surface is solid Dingan County is equipped with support stick, and the top of the support stick is installed with filtered water tank, and the bottom of the filtered water tank, which is fixed, to be communicated with clearly Water pipe, the top surface of the flow tank are installed with the water circulating pump between flocculant case and filtered water tank, the recirculated water The left side of pump is fixed and is communicated with sample feeding pipe, and the top surface of the flow tank is installed with the turbidity on the left of water circulating pump Instrument, the left end of the sample feeding pipe are fixed with the right side of transmissometer and are connected to, and the bottom surface of the transmissometer, which is fixed, is communicated with vomit pipe, The bottom end of the vomit pipe runs through the top surface of flow tank and extends to the inside of flow tank, and the right side of the water circulating pump is fixed It is communicated with probe tube, the other end of the probe tube runs through the top surface of flow tank and extends to the inside of flow tank, the clear water The bottom end of pipe is connected to probe tube fixation, and the right side of the flow tank, which is fixed, is communicated with liquid suction pipe, the right end of the liquid suction pipe Fixed to be communicated with neutralization case, the top surface of the liquid suction pipe is installed with driving water pump, and the top surface for neutralizing case is fixedly mounted There are stirring motor, the output shaft of the stirring motor to be installed with agitating shaft, the bottom end of the agitating shaft is through neutralization case Top surface and with the bottom surface pivot bush unit that neutralizes case, the agitating shaft and the top surface pivot bush unit for neutralizing case, the agitating shaft it is outer Portion's fixing sleeve is connected to mixing leaf, and the external stability of the agitating shaft is socketed with the stirring rod above mixing leaf, the neutralization The top surface of case is installed with the positioning column on the left of stirring motor, and the top of the positioning column is installed with acid & alkali liquid Case, the bottom of the soda acid liquid case, which is fixed, is communicated with buret, and the right end for neutralizing box cavity bottom surface is installed with positioning The bottom surface of channel steel, the locating slot steel inner cavity is installed with telescopic rod, and the top of the telescopic rod is installed with lifter plate, The external activity of the telescopic rod is socketed with buffer spring, the both ends of the buffer spring bottom surface with locating slot steel inner cavity respectively It is fixedly connected with the bottom surface of lifter plate, the top surface of the lifter plate is installed with adsorption plate, and the top surface for neutralizing case is fixed The cover board being equipped with right over the adsorption plate, the bottom of the exhausted bath box, which is fixed, is communicated with communicating pipe, the communicating pipe it is another One end is connected to the fixation of the left end of Rose Box top surface.
Preferably, the quantity of the auxiliary flabellum is four, and four auxiliary flabellums are located at plain gauze, activated carbon The quantity in the left side of strainer, quartz sand strainer and magnetic force net, the slag trapping box is four, and four slag trapping box are auxiliary with four respectively Flabellum is helped to be adapted, the bottom surface of the Rose Box offers leakage cinder hole compatible with slag trapping box, and the bottom surface of slag trapping box is fixed It is communicated with leakage slag pipe, the front of the leakage slag pipe is installed with leakage slag valve.
Preferably, the one end of the communicating pipe far from exhausted bath box is located at the surface of driving flabellum, and the front of communicating pipe It is installed with flow control valve, the front of the inlet tube is installed with liquid feed valve.
Preferably, the inner wall of the exhausted bath box is installed with locating rod, and the external activity of the locating rod is socketed with rotation Rotating vane piece.
Preferably, the bottom end of the bottom end of the flow tank left side and neutralization case left side fixation is communicated with slag-discharge pipe, The top surface of the slag-discharge pipe is installed with deslagging valve, and the bottom end for neutralizing case right side, which is fixed, is communicated with discharge tube, and puts The top surface of water pipe is installed with discharging valve.
Preferably, the bottom end of the buret through the top surface for neutralizing case and is installed with nozzle, and buret is just Face is installed with soda acid hydraulic control valve.
Preferably, the inner wall for neutralizing case is installed with the gag lever post at left and right sides of stirring rod, and gag lever post External activity be socketed with paddle.
Preferably, the top surface for neutralizing case is installed with PH meters, and the bottom surface of the PH meters is installed with detecting head, The bottom end of the detecting head runs through the top surface for neutralizing case and extends to the inside for neutralizing case.
Preferably, the top surface of the lifter plate is installed with gasket, and the bottom surface of cover board is installed with cushion pad, The top surface for neutralizing case offers and adsorption plate and the compatible loose slot of cover board.
(3) advantageous effect
Compared with prior art, the present invention provides a kind of metal plating waste water processing equipment, have following
Advantageous effect:
1, the metal plating waste water processing equipment, passes through the cooperation of booster pump and pressure inlet so that the electricity inside exhausted bath box Waste electroplating can be quickly flowed into the inside of Rose Box by communicating pipe and provide an active force for driving flabellum so that driving Flabellum can be rotated with rotary shaft, by assisting flabellum so that the electroplating wastewater quickly flowed provides one for rotary shaft Power-assisted accelerates the velocity of rotation of rotary shaft so that auxiliary flabellum can with steel brush quick rotation and by plain gauze, Active carbon filter screen, the particulate matter of quartz sand strainer and the attachment of magnetic force net left side and metal brush the inside of slag trapping box, avoid The problem of plain gauze, active carbon filter screen, quartz sand strainer and magnetic force net are blocked by particulate matter facilitates worker and clears up slag trapping box Internal particulate matter, improves the practicability of the metal plating waste water processing equipment.
2, the metal plating waste water processing equipment, passes through water circulating pump so that the supernatant inside flow tank can pass through Probe tube and sample feeding pipe enter the inside of transmissometer, the turbidity that people monitor supernatant inside flow tank are facilitated, by putting Expects pipe so that the supernatant inside transmissometer can return to the inside of flow tank, pass through the first flow divider and the second flow divider Cooperation so that the clear water inside filtered water tank can be entered the inside of transmissometer by probe tube and sample feeding pipe and will be inside transmissometer It cleans up, is ready for detection next time, avoid supernatant and remain in the internal influence of transmissometer and detect knot next time The problem of fruit, increases the accuracy of metal plating waste water processing equipment detection turbidity, improves the metal plating waste water The practicability of processing equipment.
3, the metal plating waste water processing equipment, passes through locating slot steel so that worker can be fast and accurately by adsorption plate The inside for sticking into locating slot steel passes through the cooperation of cover board and fixing bolt so that worker quick and easy can consolidate adsorption plate It lives calmly, by buffer spring, provides a upward active force for lifter plate so that worker is adsorbed after detachable cover plate gets off Plate can automatic spring, facilitate worker and disassemble adsorption plate, final enable worker's quick-replaceable adsorption plate, reduction The workload of worker, improves the practicability of the metal plating waste water processing equipment.
Description of the drawings
Fig. 1 is schematic structural view of the invention;
Fig. 2 is the front view of Fig. 1;
Fig. 3 is the internal structure schematic diagram of Rose Box in Fig. 1;
Fig. 4 is structure enlargement diagram at A of the present invention;
Fig. 5 is structure enlargement diagram at B of the present invention.
In figure:1, pedestal;2, supporting rod;3, Rose Box;4, plain gauze;5, active carbon filter screen;6, quartz sand strainer;7, Magnetic force net;8, rotary shaft;9, flabellum is driven;10, flabellum is assisted;11, steel brush;12, slag trapping box;13, exhausted bath box;14, inlet tube; 15, booster pump;16, pressure inlet;17, flow tank;18, woven hose;19, support column;20, flocculant case;21, flocculant pipe;22, Shower;23, support stick;24, filtered water tank;25, water pipe;26, water circulating pump;27, sample feeding pipe;28, transmissometer;29, vomit pipe; 30, probe tube;31, liquid suction pipe;32, case is neutralized;33, water pump is driven;34, stirring motor;35, agitating shaft;36, leaf is mixed;37, Stirring rod;38, positioning column;39, soda acid liquid case;40, buret;41, locating slot steel;42, telescopic rod;43, lifter plate;44, delay Rush spring;45, adsorption plate;46, cover board;47, communicating pipe.
Specific implementation mode
Following will be combined with the drawings in the embodiments of the present invention, and technical solution in the embodiment of the present invention carries out clear, complete Site preparation describes, it is clear that described embodiments are only a part of the embodiments of the present invention, instead of all the embodiments.It is based on Embodiment in the present invention, it is obtained by those of ordinary skill in the art without making creative efforts every other Embodiment shall fall within the protection scope of the present invention.
- 5 are please referred to Fig.1, a kind of metal plating waste water processing equipment, including pedestal 1, the top surface of pedestal 1 are installed with The quantity of supporting rod 2, supporting rod 2 is two, and Rose Box 3 is installed between two supporting rods 2, and the inner wall of Rose Box 3 is solid Dingan County is equipped with plain gauze 4, and the inner wall of Rose Box 3 is installed with the active carbon filter screen 5 positioned at 4 right side of plain gauze, filtering The inner wall of case 3 is installed with the quartz sand strainer 6 positioned at 5 right side of active carbon filter screen, and the inner wall of Rose Box 3 is installed with position Magnetic force net 7 in 6 right side of quartz sand strainer, the right side movable sleeve of 3 inner cavity of Rose Box are connected to rotary shaft 8, the left end of rotary shaft 8 Sequentially pass through magnetic force net 7, quartz sand strainer 6, active carbon filter screen 5 and plain gauze 4 and with the left side of 3 inner cavity of Rose Box activity Socket, outside and magnetic force net 7, the 4 equal pivot bush unit of quartz sand strainer 6, active carbon filter screen 5 and plain gauze of rotary shaft 8, rotation The external stability of axis 8 is socketed with the driving flabellum 9 positioned at 4 left side of plain gauze, and the external stability of rotary shaft 8 is socketed with auxiliary fan The quantity of leaf 10, auxiliary flabellum 10 is four, and four auxiliary flabellums 10 are located at plain gauze 4, active carbon filter screen 5, stone The quantity in the left side of sand strainer 6 and magnetic force net 7, slag trapping box 12 is four, and four slag trapping box 12 are fanned with four auxiliary respectively Leaf 10 is adapted, and the bottom surface of Rose Box 3 offers leakage cinder hole compatible with slag trapping box 12, and the bottom surface of slag trapping box 12 is fixed and connected It is connected with leakage slag pipe, the front of leakage slag pipe is installed with leakage slag valve, utilizes slag trapping box 12 so that the solid particle and gold brushed off The inside of slag trapping box 12 can be concentrated on by belonging to, and is utilized leakage slag pipe and leaked the cooperation of slag valve so that worker can be simple and quick The solid particle and metal inside slag trapping box 12 are cleared up, the workload of worker is reduced, improves metal plating waste water processing The right side of the practicability of equipment, auxiliary flabellum 10 is installed with steel brush 11, and the bottom surface of Rose Box 3 is installed with slag trapping box 12, the top of supporting rod 2 is installed with exhausted bath box 13, and the inner wall of exhausted bath box 13 is installed with locating rod, locating rod it is outer Portion's movable sleeve is connected to rotating vane, utilizes the cooperation of locating rod and rotating vane so that rotating vane can be with the stream of waste liquid It moves and rotates, the solid particles sediment avoided in 13 inside waste liquid of exhausted bath box blocks communicating pipe 47 in the bottom of exhausted bath box 13 Problem improves the practicability of the metal plating waste water processing equipment, and the top surface of exhausted bath box 13, which is fixed, is communicated with inlet tube 14, gives up The top surface of liquid case 13 is installed with the booster pump 15 positioned at 14 right side of inlet tube, the model QBY-50 of booster pump 15, supercharging The left side of pump 15 is connected to by pressure inlet 16 with the fixation of exhausted bath box 13, and the right side of pedestal 1 is placed with flow tank 17, flow tank 17 The bottom end of left side and the bottom end fixation for neutralizing 32 left side of case are communicated with slag-discharge pipe, and the front of slag-discharge pipe, which is installed with, puts Slag valve, the bottom end fixation for neutralizing 32 right side of case is communicated with discharge tube, and the top surface of discharge tube is installed with discharging valve, utilizes The cooperation of slag-discharge pipe and deslagging valve so that worker can simply and easily clear up flow tank 17 and neutralize consolidating for 32 inner chamber bottom surface of case Body, improves the practicability of the metal plating waste water processing equipment, and the left side of flow tank 17 passes through woven hose 18 and Rose Box 3 The right end of bottom surface fixes connection, and the left end of 17 top surface of flow tank is installed with support column 19, and peace is fixed on the top of support column 19 Equipped with flocculant case 20, the bottom of flocculant case 20, which is fixed, is communicated with flocculant pipe 21, and the bottom end of flocculant pipe 21 is through sedimentation The top surface of case 17 and extend to flow tank 17 inside and it is fixed be communicated with shower 22, the right end of 17 top surface of flow tank is fixedly mounted There are support stick 23, the top of support stick 23 to be installed with filtered water tank 24, the bottom of filtered water tank 24, which is fixed, is communicated with water pipe 25, The top surface of flow tank 17 is installed with the water circulating pump 26 between flocculant case 20 and filtered water tank 24, water circulating pump 26 Model RS15-6, the left side of water circulating pump 26, which is fixed, is communicated with sample feeding pipe 27, and the top surface of flow tank 17 is installed with position Transmissometer 28 in 26 left side of water circulating pump, the model ZS-600 of transmissometer 28, left end and the transmissometer 28 of sample feeding pipe 27 Connection is fixed in right side, and the bottom surface of transmissometer 28, which is fixed, is communicated with vomit pipe 29, and the bottom end of vomit pipe 29 is through flow tank 17 Top surface and the inside for extending to flow tank 17, the right side of water circulating pump 26, which is fixed, is communicated with probe tube 30, probe tube 30 it is another One end runs through the top surface of flow tank 17 and extends to the inside of flow tank 17, and the bottom end of water pipe 25 is fixed with probe tube 30 to be connected Logical, the front of water pipe 25 is installed with the second flow divider, and the front of probe tube 30 is installed with positioned at water pipe 25 First flow divider on right side, the right side of flow tank 17, which is fixed, is communicated with liquid suction pipe 31, and the right end fixation of liquid suction pipe 31 is communicated with Case 32 is neutralized, the inner wall for neutralizing case 32 is installed with the solid filter screen positioned at 45 left side of adsorption plate, utilizes solid filter screen So that the solid neutralized inside case 32 will not block adsorption plate 45, the practicability of the metal plating waste water processing equipment is improved, The top surface for neutralizing case 32 is installed with PH meters, and the bottom surface of PH meters is installed with detecting head, and the bottom end of detecting head is through neutralization The top surface of case 32 simultaneously extends to the inside for neutralizing case 32, and the model PHG-8099C of PH meters is matched using PH meters and detecting head It closes so that worker can observe the acid-base property for neutralizing 32 inside waste liquid of case in real time, avoid worker's sample detection acid-base property back and forth The problem of, the practicability of the metal plating waste water processing equipment is improved, the inner wall for neutralizing case 32 is installed with positioned at stirring The gag lever post of 37 left and right sides of bar, and the external activity of gag lever post is socketed with paddle, utilizes gag lever post and paddle so that it stirs Mixing leaf can rotate with the flowing of waste water, so that the waste water neutralized inside case 32 can mix more with acid & alkali liquid Uniformly, the practicability of the metal plating waste water processing equipment is improved, the top surface of liquid suction pipe 31 is installed with driving water pump 33, The model WQ25-24-3KW of water pump 33 is driven, the top surface for neutralizing case 32 is installed with stirring motor 34, stirring motor 34 The output shaft of model Y80M2-2, stirring motor 34 are installed with agitating shaft 35, and the bottom end of agitating shaft 35 is through neutralization case 32 Top surface and with neutralize case 32 bottom surface pivot bush unit, agitating shaft 35 with neutralize case 32 top surface pivot bush unit, agitating shaft 35 External stability is socketed with mixing leaf 36, and the external stability of agitating shaft 35 is socketed with the stirring rod 37 positioned at 36 top of mixing leaf, in It is installed with the positioning column 38 positioned at 34 left side of stirring motor with the top surface of case 32, the top of positioning column 38 is installed with acid Lye tank 39, the bottom of soda acid liquid case 39, which is fixed, is communicated with buret 40, and the bottom end of buret 40 is through the top surface for neutralizing case 32 And it is installed with nozzle, and the front of buret 40 is installed with soda acid hydraulic control valve, utilizes soda acid hydraulic control valve so that Acid & alkali liquid inside soda acid liquid case 39 can enter the inside for neutralizing case 32 with constant speed, and utilize nozzle so that soda acid The enough surfaces for being uniformly sprayed at electroplating wastewater of liquid energy, localized heat release acutely causes bumping to cause during avoiding acid-base neutralization Dangerous problem improves the practicability of the metal plating waste water processing equipment, and the right end for neutralizing 32 inner chamber bottom surface of case fixes peace Equipped with locating slot steel 41, the bottom surface of 41 inner cavity of locating slot steel is installed with telescopic rod 42, and the top of telescopic rod 42 is fixedly mounted There is lifter plate 43, the top surface of lifter plate 43 is installed with gasket, and the bottom surface of cover board 46 is installed with cushion pad, neutralizes The top surface of case 32 offer with adsorption plate 45 and the compatible loose slot of cover board 46, using the cooperation of gasket and cushion pad, So that the edge of adsorption plate 45 will not reveal waste water, and utilize loose slot so that the replacement adsorption plate that people can be quick and easy 45, the practicability of the metal plating waste water processing equipment is improved, the external activity of telescopic rod 42 is socketed with buffer spring 44, delays The both ends for rushing spring 44 are fixedly connected with the bottom surface of the bottom surface of 41 inner cavity of locating slot steel and lifter plate 43 respectively, the top of lifter plate 43 Face is installed with adsorption plate 45, and the top surface for neutralizing case 32 is installed with the cover board 46 positioned at 45 surface of adsorption plate, cover board 46 are fixedly connected by fixing bolt with the top surface for neutralizing case 32, and the bottom of exhausted bath box 13, which is fixed, is communicated with communicating pipe 47, is connected to The one end of pipe 47 far from exhausted bath box 13 is located at the surface of driving flabellum 9, and the front of communicating pipe 47 is installed with flow control The front of valve processed, inlet tube 14 is installed with liquid feed valve, and being located at driving using the one end of communicating pipe 47 far from exhausted bath box 13 fans Setting right over leaf 9 so that the waste water energy of flowing can be by driving flabellum 9 that rotary shaft 8 is pushed to rotate, and utilizes feed liquor Valve so that the air pressure inside exhausted bath box 13 will not be revealed, and the practicability of the metal plating waste water processing equipment, communicating pipe are improved 47 other end is connected to the fixation of the left end of 3 top surface of Rose Box.
When work, electroplating wastewater is imported to by inlet tube 14 inside of exhausted bath box 13 first, liquid feed valve is then shut off, connects Unlatching booster pump 15, the pressure inside exhausted bath box 13 slowly increases later, then opens flow control valve, then exhausted bath box 13 Internal electroplating wastewater quickly flows into the inside of Rose Box 3 by inlet tube 14, and Rose Box 3 is rotated with rotary shaft 8 later, so Afterwards auxiliary flabellum 10 rotated in the electroplating wastewater of flowing and spin up axis 8 rotation speed, then assist flabellum 10 with 11 quick rotation of steel brush and the particle for adhering to plain gauze 4, active carbon filter screen 5, quartz sand strainer 6 and 7 left side of magnetic force net Object and metal brush the inside of slag trapping box 12, and waste water enters the inside of flow tank 17 later, then the wadding inside flocculant case 20 Solidifying agent sprays the surface to waste water by flocculant pipe 21 and shower 22, then stands a period of time, later ON cycle water pump 26, then the supernatant inside flow tank 17 enter the inside of transmissometer 28 by probe tube 30 and sample feeding pipe 27, then turbidity Instrument 28 detects the turbidity of supernatant, and the supernatant inside transmissometer 28 is returned to by vomit pipe 29 in flow tank 17 later Portion, be then shut off the first flow divider and open the second flow divider, then the clear water inside filtered water tank 24 by probe tube 30 and into The inside of the entrance transmissometer 28 of sample pipe 27 is simultaneously clean by 28 internal washing of transmissometer, opens driving water pump 33 later, then settles The qualified supernatant in 17 inside of case enters the inside for neutralizing case 32 by probe tube 30, then opens stirring motor 34, then stirs It mixes motor 34 to be stirred waste liquid by agitating shaft 35, mixing leaf 36 and stirring rod 37, then opens soda acid hydraulic control valve, it The acid & alkali liquid inside soda acid liquid case 39 enters the inside for neutralizing case 32 by buret 40 afterwards, then neutralizes 32 inside waste liquid of case Acid-base property reaches specified requirement, and then adsorption plate 45 removes the organic matter in waste water, then opens discharging valve, neutralizes case later Waste water inside 32 is discharged to the outside for neutralizing case 32, when needing replacing adsorption plate 45, first by fixing bolt, by cover board 46 disassemble, then the automatic spring under the active force of buffer spring 44 of adsorption plate 45, then take out old adsorption plate 45 simultaneously New adsorption plate 45 is inserted into the inside of locating slot steel 41, press down on adsorption plate 45 later and original is fixedly mounted back in cover board 46 Position, you can.
In conclusion the metal plating waste water processing equipment, passes through the cooperation of booster pump 15 and pressure inlet 16 so that waste liquid Electroplating wastewater inside case 13 can be quickly flowed into the inside of Rose Box 3 by communicating pipe 47 and provide one for driving flabellum 9 A active force so that driving flabellum 9 can be rotated with rotary shaft 8, by assisting flabellum 10 so that the plating quickly flowed is useless Water is that rotary shaft 8 provides a power-assisted, accelerates the velocity of rotation of rotary shaft 8, so that auxiliary flabellum 10 can be with 11 quick rotation of steel brush and the particle for adhering to plain gauze 4, active carbon filter screen 5, quartz sand strainer 6 and 7 left side of magnetic force net Object and metal brush the inside of slag trapping box 12, avoid plain gauze 4,7 quilt of active carbon filter screen 5, quartz sand strainer 6 and magnetic force net The problem of particulate matter blocks facilitates the particulate matter inside worker's cleaning slag trapping box 12, improves metal plating waste water processing The practicability of equipment;Pass through water circulating pump 26 so that the supernatant inside flow tank 17 can pass through probe tube 30 and sample feeding pipe 27 enter the inside of transmissometer 28, facilitate the turbidity of people's monitoring 17 inside supernatant of flow tank and are made by vomit pipe 29 Supernatant inside transmissometer 28 can return to the inside of flow tank 17, pass through matching for the first flow divider and the second flow divider It closes so that clear water filtered water tank 24 inside can be by the inside of probe tube 30 and the entrance transmissometer 28 of sample feeding pipe 27 and by turbidity 28 internal washing of instrument is clean, is ready for detection next time, avoids supernatant and remain under the internal influence of transmissometer 28 The problem of one-time detection result, increases the accuracy of metal plating waste water processing equipment detection turbidity, improves the electricity Plate the practicability of industrial wastewater treatment device;Pass through locating slot steel 41 so that worker can fast and accurately block adsorption plate 45 Into the inside of locating slot steel 41, pass through the cooperation of cover board 46 and fixing bolt so that worker can be quick and easy by adsorption plate 45 fix, and by buffer spring 44, provide a upward active force for lifter plate 43 so that worker dismantles cover board 46 After getting off adsorption plate 45 can automatic spring, facilitate worker and disassemble adsorption plate 45, finally enable worker quick Adsorption plate 45 is replaced, reduces the workload of worker, improves the practicability of the metal plating waste water processing equipment;Solves electricity Electroplating wastewater treatment device is easily blocked by particulate matter using activated charcoal strainer after a period of time and quartz sand filtration network capacity, is needed Activated charcoal strainer and quartz sand filtration net are disassembled into cleaning, it is very troublesome, and it is not equipped with transmissometer cleaning device, Cause the testing result of the pure and impure degree of settling tank supernatant inaccurate, influence the quality that waste water is discharged, pollutes environment, while sponge Shape polymer adsorbing material is directly fixedly mounted on inside adsorption tank, is replaced after sorbing material saturation and is bothered very much, increases The problem of workload of worker.
It should be noted that herein, relational terms such as first and second and the like are used merely to a reality Body or operation are distinguished with another entity or operation, are deposited without necessarily requiring or implying between these entities or operation In any actual relationship or order or sequence.Moreover, the terms "include", "comprise" or its any other variant are intended to Non-exclusive inclusion, so that the process, method, article or equipment including a series of elements is not only wanted including those Element, but also include other elements that are not explicitly listed, or further include for this process, method, article or equipment Intrinsic element.
It although an embodiment of the present invention has been shown and described, for the ordinary skill in the art, can be with Understanding without departing from the principles and spirit of the present invention can carry out these embodiments a variety of variations, modification, replace And modification, the scope of the present invention is defined by the appended.

Claims (9)

1. a kind of metal plating waste water processing equipment, including pedestal (1), it is characterised in that:Peace is fixed in the top surface of the pedestal (1) Equipped with supporting rod (2), the quantity of the supporting rod (2) is two, and Rose Box is installed between two supporting rods (2) (3), the inner wall of the Rose Box (3) is installed with plain gauze (4), and the inner wall of the Rose Box (3) is installed with position The inner wall of active carbon filter screen (5) on the right side of plain gauze (4), the Rose Box (3) is installed with positioned at active carbon filter screen (5) inner wall of the quartz sand strainer (6) on the right side of, the Rose Box (3) is installed with the magnetic on the right side of quartz sand strainer (6) The right side movable sleeve of power net (7), Rose Box (3) inner cavity is connected to rotary shaft (8), and the left end of the rotary shaft (8) is successively Through magnetic force net (7), quartz sand strainer (6), active carbon filter screen (5) and plain gauze (4) and with the left side of Rose Box (3) inner cavity Face pivot bush unit, outside and magnetic force net (7), quartz sand strainer (6), active carbon filter screen (5) and the common filter of the rotary shaft (8) The external stability of net (4) equal pivot bush unit, the rotary shaft (8) is socketed with the driving flabellum on the left of plain gauze (4) (9), the external stability of the rotary shaft (8) is socketed with auxiliary flabellum (10), and peace is fixed in the right side of the auxiliary flabellum (10) Equipped with steel brush (11), the bottom surface of the Rose Box (3) is installed with slag trapping box (12), and the top of the supporting rod (2) is fixed Exhausted bath box (13) is installed, the top surface of the exhausted bath box (13), which is fixed, is communicated with inlet tube (14), the top of the exhausted bath box (13) Face is installed with the booster pump (15) on the right side of inlet tube (14), and the left side of the booster pump (15) passes through pressure inlet (16) it is connected to exhausted bath box (13) fixation, flow tank (17), a left side for the flow tank (17) is placed on the right side of the pedestal (1) Side is connected to by woven hose (18) with the fixation of the right end of Rose Box (3) bottom surface, and the left end of flow tank (17) top surface is fixed Support column (19) is installed, the top of the support column (19) is installed with flocculant case (20), the flocculant case (20) Bottom fix and be communicated with flocculant pipe (21), the bottom end of the flocculant pipe (21) is through the top surface of flow tank (17) and extension To the inside of flow tank (17) and fixation be communicated with shower (22), the right end of flow tank (17) top surface is installed with support The top of stick (23), the support stick (23) is installed with filtered water tank (24), and connection is fixed in the bottom of the filtered water tank (24) There are water pipe (25), the top surface of the flow tank (17) to be installed between flocculant case (20) and filtered water tank (24) Water circulating pump (26), the left side of the water circulating pump (26), which is fixed, is communicated with sample feeding pipe (27), the top of the flow tank (17) Face is installed with the transmissometer (28) on the left of water circulating pump (26), left end and the transmissometer (28) of the sample feeding pipe (27) Right side fix connection, the bottom surface of the transmissometer (28) is fixed and is communicated with vomit pipe (29), the bottom of the vomit pipe (29) End runs through the top surface of flow tank (17) and extends to the inside of flow tank (17), and the right side of the water circulating pump (26), which is fixed, to be connected It is connected with probe tube (30), the other end of the probe tube (30) through the top surface of flow tank (17) and extends to flow tank (17) The bottom end of inside, the water pipe (25) is connected to probe tube (30) fixation, and connection is fixed in the right side of the flow tank (17) There is liquid suction pipe (31), the right end fixation of the liquid suction pipe (31), which is communicated with, neutralizes case (32), and the top surface of the liquid suction pipe (31) is solid Dingan County is installed with stirring motor (34), the stirring motor equipped with driving water pump (33), the top surface for neutralizing case (32) (34) output shaft is installed with agitating shaft (35), the bottom end of the agitating shaft (35) through the top surface for neutralizing case (32) and with Neutralize the bottom surface pivot bush unit of case (32), the agitating shaft (35) and the top surface pivot bush unit for neutralizing case (32), the agitating shaft (35) external stability is socketed with mixing leaf (36), and the external stability of the agitating shaft (35) is socketed on mixing leaf (36) The stirring rod (37) of side, the top surface for neutralizing case (32) are installed with the positioning column on the left of stirring motor (34) (38), the top of the positioning column (38) is installed with soda acid liquid case (39), and the bottom of the soda acid liquid case (39), which is fixed, to be connected It is connected with buret (40), the right end for neutralizing case (32) inner chamber bottom surface is installed with locating slot steel (41), the locating slot The bottom surface of steel (41) inner cavity is installed with telescopic rod (42), and the top of the telescopic rod (42) is installed with lifter plate (43), the external activity of the telescopic rod (42) is socketed with buffer spring (44), the both ends of the buffer spring (44) respectively with The bottom surface of locating slot steel (41) inner cavity is fixedly connected with the bottom surface of lifter plate (43), and the top surface of the lifter plate (43) is fixedly mounted There are adsorption plate (45), the top surface for neutralizing case (32) to be installed with the cover board (46) right over adsorption plate (45), institute The bottom fixation for stating exhausted bath box (13) is communicated with communicating pipe (47), the other end and Rose Box (3) top surface of the communicating pipe (47) Left end fix connection.
2. a kind of metal plating waste water processing equipment according to claim 1, it is characterised in that:The auxiliary flabellum (10) Quantity be four, and four auxiliary flabellums (10) be located at plain gauze (4), active carbon filter screen (5), quartz sand strainer (6) and the left side of magnetic force net (7), the quantity of the slag trapping box (12) is four, and four slag trapping box (12) are auxiliary with four respectively Flabellum (10) is helped to be adapted, the bottom surface of the Rose Box (3) offers and the compatible leakage cinder hole of slag trapping box (12), and slag trapping box (12) bottom surface, which is fixed, is communicated with leakage slag pipe, and the front of the leakage slag pipe is installed with leakage slag valve.
3. a kind of metal plating waste water processing equipment according to claim 1, it is characterised in that:The communicating pipe (47) is remote One end from exhausted bath box (13) is located at the surface of driving flabellum (9), and the front of communicating pipe (47) is installed with flow control The front of valve processed, the inlet tube (14) is installed with liquid feed valve.
4. a kind of metal plating waste water processing equipment according to claim 1, it is characterised in that:The exhausted bath box (13) Inner wall is installed with locating rod, and the external activity of the locating rod is socketed with rotating vane.
5. a kind of metal plating waste water processing equipment according to claim 1, it is characterised in that:The flow tank (17) is left The bottom end of side and the bottom end for neutralizing case (32) left side, which are fixed, is communicated with slag-discharge pipe, and the top surface of the slag-discharge pipe is fixedly mounted There is deslagging valve, the bottom end for neutralizing case (32) right side, which is fixed, is communicated with discharge tube, and the top surface of discharge tube is installed with Discharging valve.
6. a kind of metal plating waste water processing equipment according to claim 1, it is characterised in that:The buret (40) Bottom end is through the top surface for neutralizing case (32) and is installed with nozzle, and the front of buret (40) is installed with soda acid hydraulic control Valve processed.
7. a kind of metal plating waste water processing equipment according to claim 1, it is characterised in that:The neutralization case (32) Inner wall is installed with the gag lever post at left and right sides of stirring rod (37), and the external activity of gag lever post is socketed with paddle.
8. a kind of metal plating waste water processing equipment according to claim 1, it is characterised in that:The neutralization case (32) Top surface is installed with PH meters, and the bottom surface of the PH meters is installed with detecting head, and the bottom end of the detecting head is through neutralization case (32) top surface simultaneously extends to the inside for neutralizing case (32).
9. a kind of metal plating waste water processing equipment according to claim 1, it is characterised in that:The lifter plate (43) Top surface is installed with gasket, and the bottom surface of cover board (46) is installed with cushion pad, and the top surface for neutralizing case (32) is opened Equipped with adsorption plate (45) and the compatible loose slot of cover board (46).
CN201810859260.2A 2018-07-31 2018-07-31 A kind of metal plating waste water processing equipment Withdrawn CN108715500A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810859260.2A CN108715500A (en) 2018-07-31 2018-07-31 A kind of metal plating waste water processing equipment

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810859260.2A CN108715500A (en) 2018-07-31 2018-07-31 A kind of metal plating waste water processing equipment

Publications (1)

Publication Number Publication Date
CN108715500A true CN108715500A (en) 2018-10-30

Family

ID=63913689

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810859260.2A Withdrawn CN108715500A (en) 2018-07-31 2018-07-31 A kind of metal plating waste water processing equipment

Country Status (1)

Country Link
CN (1) CN108715500A (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109292886A (en) * 2018-10-31 2019-02-01 南京合茂自动化科技有限公司 Apparatus for recovering metal in a kind of electroplating wastewater
CN109570457A (en) * 2019-01-23 2019-04-05 山西大通铸业有限公司 A kind of automatic plus ferrosilicon equipment with dedusting function
CN109734159A (en) * 2018-12-20 2019-05-10 河南宝联环保科技有限公司 A kind of efficient process water adsorption plant of adjustable magnetic force
CN114227482A (en) * 2021-12-15 2022-03-25 宁波邵金塑料制品有限公司 Sand grinding machine
CN115125606A (en) * 2022-06-27 2022-09-30 江西麦得豪新材料有限公司 Passivation treatment device for preventing copper foil from oxidation

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109292886A (en) * 2018-10-31 2019-02-01 南京合茂自动化科技有限公司 Apparatus for recovering metal in a kind of electroplating wastewater
CN109734159A (en) * 2018-12-20 2019-05-10 河南宝联环保科技有限公司 A kind of efficient process water adsorption plant of adjustable magnetic force
CN109570457A (en) * 2019-01-23 2019-04-05 山西大通铸业有限公司 A kind of automatic plus ferrosilicon equipment with dedusting function
CN114227482A (en) * 2021-12-15 2022-03-25 宁波邵金塑料制品有限公司 Sand grinding machine
CN114227482B (en) * 2021-12-15 2023-03-03 宁波邵金塑料制品有限公司 Sand grinding machine
CN115125606A (en) * 2022-06-27 2022-09-30 江西麦得豪新材料有限公司 Passivation treatment device for preventing copper foil from oxidation
CN115125606B (en) * 2022-06-27 2023-05-09 江西麦得豪新材料有限公司 Passivation treatment device for copper foil oxidation prevention

Similar Documents

Publication Publication Date Title
CN108715500A (en) A kind of metal plating waste water processing equipment
CN208791350U (en) A kind of sanitary sewage centralized processor
CN117339294A (en) Large-particle impurity filtering device and filtering method for water quality detection
CN205088040U (en) Sewage treatment plant carries mark technological transformation degree of depth filtration system
CN208500578U (en) A kind of sewage disposal device of replaceable strainer
CN216303482U (en) Highly integrated water purification treatment equipment with filtering capability
CN210945153U (en) Wastewater multi-stage treatment device
CN214031994U (en) Sewage treatment equipment
CN211946606U (en) Industrial wastewater sedimentation treatment device
CN108203179A (en) A kind of intelligence fast sewage treatment device
CN207699335U (en) A kind of intelligence fast sewage treatment device
CN218382734U (en) Water quality monitoring device
CN111892207A (en) Water purification device with filtering capability
CN118495756B (en) Pretreatment equipment and detection method for chlorophenols in wastewater
CN217377538U (en) Integrated treatment device for chemical sewage
CN111392834A (en) Treatment facility of nitrogenous waste water
CN109607881A (en) A kind of municipal works sewage disposal device
CN211946600U (en) A treatment facility for chemical industry sewage
CN221370806U (en) Waste water recovery device
CN208617556U (en) A kind of movable type underground water pollution prevention and treatment device
CN219167882U (en) Wastewater treatment structure
CN214192807U (en) Prevent environmental engineering sewage treatment plant of jam
CN220845520U (en) Industrial sewage treatment device
CN220116247U (en) Industrial sewage treatment equipment
CN212050883U (en) Industrial wastewater treatment equipment

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
WW01 Invention patent application withdrawn after publication
WW01 Invention patent application withdrawn after publication

Application publication date: 20181030