CN108704946A - A kind of galvanized wire production draw-off gear - Google Patents

A kind of galvanized wire production draw-off gear Download PDF

Info

Publication number
CN108704946A
CN108704946A CN201810776412.2A CN201810776412A CN108704946A CN 108704946 A CN108704946 A CN 108704946A CN 201810776412 A CN201810776412 A CN 201810776412A CN 108704946 A CN108704946 A CN 108704946A
Authority
CN
China
Prior art keywords
fixed
galvanized wire
welded
casing
pipeline
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201810776412.2A
Other languages
Chinese (zh)
Inventor
孟凡桐
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Tianjin Xiang Ya Metal Products Co Ltd
Original Assignee
Tianjin Xiang Ya Metal Products Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Tianjin Xiang Ya Metal Products Co Ltd filed Critical Tianjin Xiang Ya Metal Products Co Ltd
Priority to CN201810776412.2A priority Critical patent/CN108704946A/en
Publication of CN108704946A publication Critical patent/CN108704946A/en
Pending legal-status Critical Current

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B21MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
    • B21CMANUFACTURE OF METAL SHEETS, WIRE, RODS, TUBES OR PROFILES, OTHERWISE THAN BY ROLLING; AUXILIARY OPERATIONS USED IN CONNECTION WITH METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL
    • B21C1/00Manufacture of metal sheets, metal wire, metal rods, metal tubes by drawing
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B21MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
    • B21CMANUFACTURE OF METAL SHEETS, WIRE, RODS, TUBES OR PROFILES, OTHERWISE THAN BY ROLLING; AUXILIARY OPERATIONS USED IN CONNECTION WITH METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL
    • B21C1/00Manufacture of metal sheets, metal wire, metal rods, metal tubes by drawing
    • B21C1/16Metal drawing by machines or apparatus in which the drawing action is effected by other means than drums, e.g. by a longitudinally-moved carriage pulling or pushing the work or stock for making metal sheets, bars, or tubes
    • B21C1/27Carriages; Drives
    • B21C1/28Carriages; Connections of grippers thereto; Grippers
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B21MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
    • B21CMANUFACTURE OF METAL SHEETS, WIRE, RODS, TUBES OR PROFILES, OTHERWISE THAN BY ROLLING; AUXILIARY OPERATIONS USED IN CONNECTION WITH METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL
    • B21C9/00Cooling, heating or lubricating drawing material

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Metal Extraction Processes (AREA)

Abstract

The invention discloses a kind of galvanized wire production draw-off gears,Including casing,The side of the casing has been bolted fuel reserve tank,The inside of fuel reserve tank is equipped with pipeline by screw,Valve is equipped with by screw on pipeline,The other end of pipeline is fixed with nozzle by screw,The inner wall both sides of casing are fixed with track by rivet,Track slidably connects slide bar,The side of slide bar has been screwed phase bar,The other end of phase bar is fixed with telescopic rod by rivet,The other end of telescopic rod is welded with spring,The other end of spring is welded with spring anchor block,The other side of spring anchor block is welded with working beam,Pass through pipeline,Fuel reserve tank,The isostructural setting of nozzle,When being processed to galvanized wire,Personnel can be by observing galvanized wire surface,Such as occur falling off and painting oil processing can be carried out to iron wire with the valve in opening conduits,The quality of production that iron wire can be improved in this procedure is added.

Description

A kind of galvanized wire production draw-off gear
Technical field
The present invention relates to galvanized wire production technical field more particularly to a kind of galvanized wire production draw-off gears.
Background technology
Galvanized wire has good toughness and elasticity, and zinc amount can reach 300 grams per square meters in highest, has zinc coat Thickness, the characteristics such as corrosion resistance is strong, it is process using high-quality low-carbon steel rod bundle, and galvanized wire is divided into as galvanizing silk and cold plating Zinc silk (electrogalvanizing silk) is to use high-quality mild steel, by works such as drawing molding, acid pickling and rust removing, high annealing, galvanizing, coolings Skill flow is process.The both ends of galvanized wire are usually first fixed and are being drawn when carrying out drawing link by the prior art It pulls out, needs to dismantle both ends again when carrying out next process, waste a large amount of working time in this way, working efficiency is not Height, and in process galvanized wire surface zinc it is easy to fall off need to coat antirust oil iron wire surface is protected, and It is not easy to carry out oiling to iron wire surface after processed or oiling excessively results in waste of resources.
Invention content
The purpose of the present invention is to solve the disadvantage that working efficiency is low, oiling is inconvenient exists in the prior art, and carry A kind of galvanized wire production draw-off gear gone out.
To achieve the goals above, present invention employs following technical solutions:
A kind of galvanized wire production draw-off gear, including casing, the side of the casing have been bolted oil storage Case, the inside of fuel reserve tank are equipped with pipeline by screw, are equipped with valve by screw on pipeline, the other end of pipeline passes through spiral shell Nail is fixed with nozzle, and the inner wall both sides of casing are fixed with track by rivet, and track slidably connects slide bar, the side of slide bar It is screwed phase bar, the other end of phase bar is fixed with telescopic rod by rivet, and the other end of telescopic rod is welded with The other end of spring, spring is welded with spring anchor block, and the other side of spring anchor block is welded with working beam, the both sides of working beam It is screwed firm bar, the inner wall both sides of firm bar are fixed with sliding rail by rivet, and sliding rail, which slidably connects, to be stretched Contracting bar.
Preferably, the other end of the slide bar is semi-circular shape, and the side wall of slide bar one end is bonded with rubber layer.
Preferably, the side of the casing offers movable span, and working beam is embedded in the inside of movable span, working beam it is another End has been screwed handle.
Preferably, the inner wall side of the casing is fixed with fixed seat by screw, and the side of fixed seat is welded with fixation The outer cover of bar, fixed link is equipped with galvanized wire, and the outer cover of fixed link is equipped with nut.
Preferably, the both ends of the sliding rail are welded with limited block, and the both ends of track are welded with limited block.
Preferably, the center of the working beam and the center of fixed seat be on the same axis.
The beneficial effects of the invention are as follows:
1, pass through pipeline, fuel reserve tank, the isostructural setting of nozzle, when being processed to galvanized wire, Ren Yuanke in the present invention With by observing galvanized wire surface, painting oil processing can be carried out with the valve in opening conduits to iron wire by such as occurring falling off, it is added The quality of production of iron wire can be improved in this procedure.
2, galvanized wire is made to be drawn by fixed seat, slide bar, track, the isostructural setting of working beam in the present invention When pulling out, personnel only need one end of fixed galvanized wire, and the other end is clamped while working beam pulls, in working beam It is unclamped when pushing back, reduces heavy workload, improved work efficiency.
Description of the drawings
Fig. 1 is a kind of positive structure schematic of galvanized wire production draw-off gear proposed by the present invention;
Fig. 2 is a kind of partial enlargement structural representation of galvanized wire production draw-off gear proposed by the present invention.
In figure:1 casing, 2 fuel reserve tanks, 3 pipelines, 4 fixed seats, 5 galvanized wires, 6 working beams, 7 phase bars, 8 telescopic rods, 9 Sliding rail, 10 firm bars, 11 tracks, 12 geometrical clamps, 13 rubber layers, 14 slide bars.
Specific implementation mode
Following will be combined with the drawings in the embodiments of the present invention, and technical solution in the embodiment of the present invention carries out clear, complete Site preparation describes, it is clear that described embodiments are only a part of the embodiments of the present invention, instead of all the embodiments.
Referring to Fig.1-2, a kind of galvanized wire production draw-off gear, including casing 1, the side of the casing 1 pass through spiral shell Bolt is fixed with fuel reserve tank 2, and the side of casing 1 offers movable span, and working beam 6 is embedded in the inside of movable span, working beam 6 it is another End has been screwed handle, and the inside of fuel reserve tank 2 is equipped with pipeline 3 by screw, passes through pipeline 3, fuel reserve tank 2, nozzle Isostructural setting, when being processed to galvanized wire, personnel can be by observing galvanized wire surface, and such as occurring falling off can beat Valve on open pipe road carries out painting oil processing to iron wire, and the quality of production that iron wire can be improved in this procedure is added, passes through on pipeline 3 Screw is equipped with valve, and the other end of pipeline 3 is fixed with nozzle by screw, and the inner wall both sides of casing 1 are fixed by rivet There are track 11, the inner wall side of casing 1 to be fixed with fixed seat 4 by screw, passes through fixed seat 4, slide bar 14, track 11, work 6 isostructural setting of bar, makes galvanized wire when carrying out drawing, and personnel only need one end of fixed galvanized wire, and the other end It is clamped while working beam 6 pulls, is unclamped when working beam 6 pushes back, reduce heavy workload, improve work effect The side of rate, fixed seat 4 is welded with fixed link, and the outer cover of fixed link is equipped with galvanized wire 5, and the outer cover of fixed link is equipped with spiral shell Mother, track 11 slidably connect slide bar 14, and the other end of slide bar 14 is semi-circular shape, and the side wall of 14 one end of slide bar is bonded with rubber Layer 13, the side of slide bar 14 has been screwed phase bar 7, and the other end of phase bar 7 is fixed with telescopic rod 8 by rivet, The other end of telescopic rod 8 is welded with spring, and the other end of spring is welded with spring anchor block, the other side welding of spring anchor block There is working beam 6, on the same axis with the center of fixed seat 4, the both sides of working beam 6 are solid by screw at the center of working beam 6 Surely there is firm bar 10, the inner wall both sides of firm bar 10 are fixed with sliding rail 9 by rivet, and the both ends of sliding rail 9 are welded with limited block, The both ends of track 11 are welded with limited block, and sliding rail 9 slidably connects telescopic rod 8.
Embodiment one, when work, personnel by the one ends wound of galvanized wire 5 in the fixed link of 4 side of fixed seat, then One end of galvanized wire 5 is clamped, the other end of galvanized wire 5 is then placed on geometrical clamp by the nut being tightened on bar 12 centre pulls working beam 6 then to right side, and slide bar 14 slides on the rail 11 at this time, and one end of slide bar 14 is installed with rolling Pearl can slide on the rail 11, and track 11 is skewed, and the slide bar of both sides is close to each other at this time, after pulling a distance, Geometrical clamp 12 clamps iron wire, and the rubber layer 13 on geometrical clamp 12 plays a protective role to iron wire, and is further clamping In can adapt to the variation of clamping dynamics without damaging iron wire, telescopic rod 8 is to the internal contraction of firm bar 10, spring stress at this time Compression pulls on working beam 6, and geometrical clamp 12 continues clamping iron wire and pulls to the right, so that galvanized wire 5 is stretched, when slide bar 14 When sliding into the end of sliding rail 9, completes the drawing to galvanized wire 5 and process.
Embodiment two, after drawer makees, such as there is the case where zinc falls off, people in the surface of personal observations' galvanized wire 5 Member can be with the valve in opening conduits 3, and the oil on fuel reserve tank 2 can carry out oil spout to prevent iron zinc from giving birth to by nozzle to iron wire Rust.
The foregoing is only a preferred embodiment of the present invention, but scope of protection of the present invention is not limited thereto, Any one skilled in the art in the technical scope disclosed by the present invention, according to the technique and scheme of the present invention and its Inventive concept is subject to equivalent substitution or change, should be covered by the protection scope of the present invention.

Claims (6)

1. a kind of galvanized wire production draw-off gear, including casing (1), which is characterized in that the side of the casing (1) passes through Bolt is fixed with fuel reserve tank (2), and the inside of fuel reserve tank (2) is equipped with pipeline (3) by screw, and pipeline is pacified on (3) by screw Equipped with valve, the other end of pipeline (3) is fixed with nozzle by screw, and the inner wall both sides of casing (1) are fixed with by rivet Track (11), track (11) slidably connect slide bar (14), and the side of slide bar (14) has been screwed phase bar (7), phase The other end of position bar (7) is fixed with telescopic rod (8) by rivet, and the other end of telescopic rod (8) is welded with spring, spring it is another End is welded with spring anchor block, and the other side of spring anchor block is welded with working beam (6), and the both sides of working beam (6) pass through spiral shell Silk is fixed with firm bar (10), and the inner wall both sides of firm bar (10) are fixed with sliding rail (9) by rivet, and sliding rail (9) sliding connects It is connected to telescopic rod (8).
2. a kind of galvanized wire production draw-off gear according to claim 1, which is characterized in that the slide bar (14) The other end is semi-circular shape, and the side wall of slide bar (14) one end is bonded with rubber layer (13).
3. a kind of galvanized wire production draw-off gear according to claim 1, which is characterized in that the casing (1) Side offers movable span, the inside of the embedded movable span of working beam (6), and the other end of working beam (6) has been screwed handle Hand.
4. a kind of galvanized wire production draw-off gear according to claim 1, which is characterized in that the casing (1) Inner wall side is fixed with fixed seat (4) by screw, and the side of fixed seat (4) is welded with fixed link, and the outside of fixed link is arranged There are galvanized wire (5), the outer cover of fixed link to be equipped with nut.
5. a kind of galvanized wire production draw-off gear according to claim 1, which is characterized in that the sliding rail (9) Both ends are welded with limited block, and the both ends of track (11) are welded with limited block.
6. a kind of galvanized wire production draw-off gear according to claim 1, which is characterized in that the working beam (6) Center and fixed seat (4) center on the same axis.
CN201810776412.2A 2018-07-09 2018-07-09 A kind of galvanized wire production draw-off gear Pending CN108704946A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810776412.2A CN108704946A (en) 2018-07-09 2018-07-09 A kind of galvanized wire production draw-off gear

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810776412.2A CN108704946A (en) 2018-07-09 2018-07-09 A kind of galvanized wire production draw-off gear

Publications (1)

Publication Number Publication Date
CN108704946A true CN108704946A (en) 2018-10-26

Family

ID=63875070

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810776412.2A Pending CN108704946A (en) 2018-07-09 2018-07-09 A kind of galvanized wire production draw-off gear

Country Status (1)

Country Link
CN (1) CN108704946A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113405608A (en) * 2021-07-07 2021-09-17 淮南泰隆机械制造有限公司 Iron wire galvanizing film monitoring system and working method thereof
CN114682638A (en) * 2022-04-01 2022-07-01 南通星诺冷冻设备有限公司 Hollow self-cooling copper busbar blank production equipment

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113405608A (en) * 2021-07-07 2021-09-17 淮南泰隆机械制造有限公司 Iron wire galvanizing film monitoring system and working method thereof
CN114682638A (en) * 2022-04-01 2022-07-01 南通星诺冷冻设备有限公司 Hollow self-cooling copper busbar blank production equipment
CN114682638B (en) * 2022-04-01 2023-10-13 台州市品冠洁具有限公司 Hollow self-cooling copper busbar blank production equipment

Similar Documents

Publication Publication Date Title
CN108704946A (en) A kind of galvanized wire production draw-off gear
AU2019219859B2 (en) Corrosion-resistant rail and manufacturing method thereof
CN208450228U (en) Draw-off gear is used in a kind of production of galvanized wire
CN101127263A (en) Large diameter copper casting steel wire continuous hot-dipping tin preparation method
CN201851787U (en) Straight-through grid cable tray
CN205817898U (en) A kind of three-jaw grasping mechanism
CN105042191A (en) Corrosion-resistant high-strength support/hanger assembly and manufacturing technology thereof
JP3164654U (en) High corrosion resistance iron parts
CN102409286A (en) Corrosion-resistant and alkali-resistant treatment method for pipe piece connecting piece of metro
CN216780843U (en) Simple clamp for welding and clamping condenser flat tube
CN214040906U (en) Clamping device for hot dip galvanized steel wire fatigue test
RU112109U1 (en) CONTACT NET SUSPENSION CONSOLE FOR ELECTRIFIED TRANSPORT
CN211344301U (en) Tensile wear-resistant stainless steel pipe
JP3790398B2 (en) Coated steel with excellent cross section corrosion resistance
CN203603175U (en) Anti-corrosion structure of wind power generator foundation prestress component and wind power generator foundation
CN208816481U (en) Antidetonation attachment base
CN110964989A (en) Overweight type rigid steel conduit for nuclear power and manufacturing method thereof
CN207485815U (en) A kind of novel high corrosion resistant anchor bolt
CN216143301U (en) Wear-resisting seamless steel pipe who prevents scraping effectual and long service life
CN207811792U (en) A kind of Quick Connect Kit for calcium-aluminium core cabling wire
CN106119691A (en) A kind of ocean structure steel plate and manufacture method thereof
CN220727374U (en) Clamp type pipeline bracket for section steel beams
CN215521565U (en) Hexagonal nut for high-pressure high-strength petroleum pipeline
CN219102398U (en) Seamless steel pipe with good rust-proof effect
CN213598721U (en) Corrosion-resistant electromechanical engineering antidetonation support of high strength

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20181026

WD01 Invention patent application deemed withdrawn after publication