CN108696592A - A kind of design method of inter-linked controlling method based on MDC, system and system - Google Patents

A kind of design method of inter-linked controlling method based on MDC, system and system Download PDF

Info

Publication number
CN108696592A
CN108696592A CN201810469431.0A CN201810469431A CN108696592A CN 108696592 A CN108696592 A CN 108696592A CN 201810469431 A CN201810469431 A CN 201810469431A CN 108696592 A CN108696592 A CN 108696592A
Authority
CN
China
Prior art keywords
alarm
data
mdc
linkage
unit
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201810469431.0A
Other languages
Chinese (zh)
Inventor
李俊山
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhengzhou Yunhai Information Technology Co Ltd
Original Assignee
Zhengzhou Yunhai Information Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhengzhou Yunhai Information Technology Co Ltd filed Critical Zhengzhou Yunhai Information Technology Co Ltd
Priority to CN201810469431.0A priority Critical patent/CN108696592A/en
Publication of CN108696592A publication Critical patent/CN108696592A/en
Pending legal-status Critical Current

Links

Classifications

    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04LTRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
    • H04L67/00Network arrangements or protocols for supporting network services or applications
    • H04L67/01Protocols
    • H04L67/12Protocols specially adapted for proprietary or special-purpose networking environments, e.g. medical networks, sensor networks, networks in vehicles or remote metering networks
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04LTRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
    • H04L41/00Arrangements for maintenance, administration or management of data switching networks, e.g. of packet switching networks
    • H04L41/06Management of faults, events, alarms or notifications

Landscapes

  • Engineering & Computer Science (AREA)
  • Computer Networks & Wireless Communication (AREA)
  • Signal Processing (AREA)
  • Health & Medical Sciences (AREA)
  • Computing Systems (AREA)
  • General Health & Medical Sciences (AREA)
  • Medical Informatics (AREA)
  • Alarm Systems (AREA)

Abstract

The design method of the inter-linked controlling method, system and system that the embodiment of the invention discloses a kind of based on MDC.Control system includes data source, trigger, alarm processor and linkage controller, the data source includes the data in MDC, the trigger is for building coordinated signals template, the alarm processor is used to carry out alarming processing to alarm prompt according to the coordinated signals template of structure, and linkage controller is used to carry out combined operation to managed object according to the handling result of alarm processor.The present invention, to the linkage management that power & environment supervision system and IT facilities monitor, realizes fault self-recovery, contributes to the unified management of data center, improve the efficiency of management by building coordinated signals template.

Description

A kind of design method of inter-linked controlling method based on MDC, system and system
Technical field
The present invention relates to the coordinated signals technical field of MDC, specifically a kind of inter-linked controlling method based on MDC, The design method of system and system.
Background technology
MDC (Module Data Center, modular data center) is the New Generation of IDC portion based on cloud computing Administration's form uses modularized design to cope with the trend of the servers such as cloud computing, virtualization, centralization, high densification development Theory reduces coupling of the infrastructure to building environment to the greatest extent.Be integrated with power supply and distribution, refrigeration, cabinet, air-flow containment, The subsystems such as comprehensive wiring, power & environment supervision, improve the whole efficiency of operation of data center, realize rapid deployment, resilient expansion and Green energy conservation
With the rapid development of big data information industry, the development of data center also enters a new stage.Management System is the important component configured inside data center.Traditional management system mainly based on power & environment supervision, has more Kind data-interface, can access UPS (Uninterruptible Power System/Uninterruptible Power Supply, i.e. uninterruptible power supply), power distribution cabinet, precision air conditioner, gate inhibition, Temperature Humidity Sensor, smoke detector, temperature detector, A variety of monitored object such as leakage sensor, turning roof window and web camera,
Unified management, which requires power & environment supervision system and IT facilities to monitor, will carry out linkage management.Linkage tube in the prior art Reason, it is mainly real by microcontroller or PLC (Programmable Logic Controller, programmable logic controller (PLC)) It is existing, all it is to be driven with the input/output signal of circuit, realizes and execute coordinated signals, management object is few, the efficiency of management is low,.
Invention content
Provided in the embodiment of the present invention a kind of inter-linked controlling method based on MDC, system and system design method, with Solve the problems, such as that coordinated signals management object is few in the prior art, efficiency is low.
In order to solve the above-mentioned technical problem, the embodiment of the invention discloses following technical solutions:
First aspect present invention provides a kind of coordinated control system based on MDC, including data source, trigger, alarm Processor and linkage controller, the data source include the data in MDC, and the trigger is used to build coordinated signals template, The alarm processor is used to carry out alarming processing to alarm prompt according to the coordinated signals template of structure, and linkage controller is used for Combined operation is carried out to managed object according to the handling result of alarm processor.
With reference to first aspect, in first aspect in the first possible realization method, the data source include operating system, Application program, IT hardware and network;Data in the data source include power & environment supervision data, fault ticket data, daily record point Analyse data and IT system data.
With reference to first aspect, in second of possible realization method of first aspect, the trigger includes the first configuration Module, the second configuration module and package module;First configuration module is used for the action that operates in disposition data source, and described the Two configuration modules are used for configuration condition parameter;The package module is for corresponding to the action of the conditional parameter and operation And it is packaged into coordinated signals template.
With reference to first aspect, in first aspect in the third possible realization method, the alarm processor includes alarm Restrain unit, derivative Alarm Unit, primary and secondary Alarm Unit and alarm dither mask unit;
Alarm convergence unit restrains alarm signal by virtual signal, the derivative Alarm Unit for pair In the case that the same type alarm quantity of generation is more than setting value in unit interval, the higher derivative announcement of an alarm grade is generated Alert, the primary and secondary Alarm Unit is for distinguishing alarm grade, and when different grades of alarm generates, the only main alarm of display carries Show, the alarm dither mask unit, which is used to that return difference to be arranged at alarm threshold, has eliminated frequent alarm.
With reference to first aspect, in the 4th kind of possible realization method of first aspect, the linkage controller uses script The mode of linkage and order linkage carries out combined operation to managed object.
Second aspect of the present invention provides a kind of design method of the coordinated control system based on MDC, includes the following steps:
Acquisition source, the decision logic of data information and the trigger mechanism of alarm of configuration data;
Combined operation of the configuration linkage controller after alarm occurs;
The decision logic, trigger mechanism and combined operation of data will be packaged.
Third aspect present invention provides a kind of inter-linked controlling method based on MDC, includes the following steps:
The data information in data source is obtained, analyzes the data information, and send out the event for meeting alarm triggered condition Go out alarm prompt;
Statistical disposition is carried out to the alarm prompt, and linkage behaviour is carried out to managed object according to statistical disposition result Make.
In conjunction with the third aspect, in the third aspect in the first possible realization method, the combined operation is joined by script Dynamic or order linkage mode is realized.
The effect provided in invention content is only the effect of embodiment, rather than invents all whole effects, above-mentioned A technical solution in technical solution has the following advantages that or advantageous effect:
1, by building coordinated signals template, to the linkage management that power & environment supervision system and IT facilities monitor, failure is realized Self-healing contributes to the unified management of data center, improves the efficiency of management.
2, script linkage can be used in linkage controller and order linkage two ways realizes that the linkage to managed object is grasped Make, realization method is flexible, and manages object for all data sources in MDC, and management is comprehensive.
When 3, increasing alarm coordinated signals logic in systems, without modifying to MDC monitoring system kernel programs, prop up Hold dynamic expansion.
Description of the drawings
In order to more clearly explain the embodiment of the invention or the technical proposal in the existing technology, to embodiment or will show below There is attached drawing needed in technology description to be briefly described, it should be apparent that, for those of ordinary skill in the art Speech, without creative efforts, other drawings may also be obtained based on these drawings.
Fig. 1 is the structural schematic diagram of system of the present invention;
Fig. 2 is that system interlink of the present invention controls exemplary application scenario diagram;
Fig. 3 is the flow diagram of design method of the present invention;
Fig. 4 is the flow diagram of control method of the present invention.
Specific implementation mode
In order to clarify the technical characteristics of the invention, below by specific implementation mode, and its attached drawing is combined, to this hair It is bright to be described in detail.Following disclosure provides many different embodiments or example is used for realizing the different knots of the present invention Structure.In order to simplify disclosure of the invention, hereinafter the component of specific examples and setting are described.In addition, the present invention can be with Repeat reference numerals and/or letter in different examples.This repetition is that for purposes of simplicity and clarity, itself is not indicated Relationship between various embodiments and/or setting is discussed.It should be noted that illustrated component is not necessarily to scale in the accompanying drawings It draws.Present invention omits the descriptions to known assemblies and treatment technology and process to avoid the present invention is unnecessarily limiting.
As shown in Figure 1, the coordinated control system of the present invention includes data source, trigger, alarm processor and coordinated signals Device.
Data source is operating system, application program, IT hardware, network, data center's infrastructure etc., including data have Power & environment supervision data, fault ticket data, log analysis data and IT system data etc..
Within the scope of MDC, a typical data center is also exactly made of this few partial data source.
Data center's total management system based on MDC is by southbound interface, data source power & environment supervision data, failure work Forms data, log analysis data and IT system data grabber are to data center's total management system based on MDC.
Power & environment supervision data include mainly:Have a variety of data-interfaces, can monitor UPS, power distribution cabinet, precision air conditioner, gate inhibition, A variety of monitoring such as Temperature Humidity Sensor, smoke detector, temperature detector, leakage sensor, turning roof window and web camera The data of object.Fault ticket data include mainly:Telephone service fault ticket and manual entry fault ticket, are related to MDC The various physics and virtual facility data of data center.Log analysis data include mainly:The IP of visitor, the time of access, The data IT system data such as information of client used in the target webpage of access, the address in source and visitor are mainly wrapped It includes:The data of the equipment such as server, storage device, the network equipment, virtual machine.
Trigger is for building coordinated signals template.Trigger includes the first configuration module, the second configuration module and encapsulation Module.Wherein the first configuration module is used for the action that operates in disposition data source, for example, open skylight, open audible-visual annunciator or Illumination etc. is opened, the second configuration module is used for configuration condition parameter, and conditional parameter includes data information and trigger condition, such as cigarette The data information of sensor, trigger condition alert for data superthreshold;Package module is used for the dynamic of conditional parameter and respective operations It is bound and is packaged into coordinated signals template.MDC data center managements event often involves multiple applications, task kind Class, task execution mode are different from, so in the realization of trigger, it is data core, data to realize memory database Data variation triggering is realized in binding.
As shown in Fig. 2, linkage target is that the acquisition source of data and linkage controller carry out combined operation in data source Object.As shown in the figure, when distich moving-target server is controlled, the data information of acquisition has UPS, the trigger condition of alarm Respectively remaining capacity is less than 20%, and the combined operation of configuration is closing motion.
The event that coordinated signals template can be built includes acknowledged alarm, alerts and force to terminate, typing Event Annotation, lock and accuse The alert page, outputting alarm, close alarm sounding, equipment control, the confirmation of failure control command, MDC alarm shields, device mask, Maintenance expert suggests, checks expert advice, the maintenance of all filter conditions, personal filter condition maintenance, Template Manager, collection tube Reason, server admin, user management, alarm notification management, log in, exit, kicking out of, send control command, order of removing controls, Confirm that newly-increased control command, expert advice, expert advice modification, expert advice is deleted, filter condition is newly-increased, filter condition is deleted Remove, filter condition modification, configuration change, office's station engineering state setting, alarm test etc..
Alarm processor is used to carry out alarming processing to alarm prompt according to the coordinated signals template of structure.Alarm is divided into one Grade alarm, two level alarm, three-level alarm and level Four alarm.Server delay machine causes power-supply system, air-conditioning system to exit service, And safety fire fighting reason causes the alarm of serviced core business failure or shutdown to be defined as Level 1Alarming, it may be to power supply The alarm that system, air-conditioning system cause whole out of service or runnability to decline is defined as two level alarm, power-supply system, air-conditioning The part of appliance failure occurred in system, or the part of appliance failure caused by security context factor is possible, but do not influence equipment The alarm of overall operation performance is defined as three-level and alerts, the indicative alarm of maintenance that equipment is sent in power-supply system, air-conditioning system Information is defined as level Four alarm.
Alarm processor fully considered alarm thread management, alarm filter, the mechanism such as event-driven and intellectual analysis, It ensure that stability, the reliability of entire data center's total management system processing.In order to adapt to the multithreading work of MDC services Scene develops iterator function, realizes and executes identical instruction in sequence on batch server, user only needs to configure together The instruction of sample, input object set swarm parameter, system can carry out independent process and operation on the thread automatically generated.
Alarm processor includes alarm convergence unit, derivative Alarm Unit, primary and secondary Alarm Unit and alarm dither mask list Member.Alarm convergence unit restrains alarm signal by virtual signal, and derivative Alarm Unit is used for being produced in the unit interval In the case that raw same type alarm quantity is more than setting value, the higher derivative alarm of an alarm grade, primary and secondary alarm are generated Unit is for distinguishing alarm grade, when different grades of alarm generates, only shows main alarm prompt, alerts dither mask list Member has eliminated frequent alarm for return difference to be arranged at alarm threshold.
Linkage controller is used to carry out combined operation to managed object according to the handling result of alarm processor.Linkage control In the realization of device processed, the configuration technology of object-oriented is used, input condition and the behaviour of coordinated signals can not only be set dynamically It acts, the application of a plurality of coordinated signals can also be increased in real time.In the configuration technology of object-oriented realizes in coordinated signals Deposit data library is data core, realizes that data variation triggering executes operational motion using issue mechanism is subscribed to, visualization interface is real Operable interface configuration is showed.The management that linkage controller is serviced using issue mechanism is subscribed to.The service concentrated is provided Registration, service subscription, information on services notice and service monitoring function.
Linkage controller goes to realize service connection by the way of plug-in unit.Script linkage and order linkage two may be used Kind mode carries out combined operation to managed object.Script linkage mainly sends script life to the network equipment and application management It enables.Order linkage is that coordinated signals are carried out by way of interface protocol, and used mode is HTTP RPC interface protocols, tool Body includes login interface, configures interface, alarm interface.
Login interface obtains logging on authentication by the username and password of advance interface configurations.Configuration interface can obtain After obtaining logging on authentication, the information inquiry of MDC is carried out, information inquiry can also be carried out to having equipment in MDC.Alarm interface can After obtaining logging on authentication, according to the configuration interface of MDC, to obtain corresponding alert command linkage information, alert command connection Dynamic information includes the places MDC title, device name, device id, alarm Sequence Id, alarm name, alarm meaning, alarm Time started alerts grade, alarm triggered value, interlocking equipment ID, combined operation order, linkage parameter transmission content etc..
As shown in figure 3, the design procedure of coordinated control system of the present invention is:S11, the acquisition source of configuration data, data The decision logic of information and the trigger mechanism of alarm;S12, combined operation of the configuration linkage controller after alarm occurs;S13, The decision logic, trigger mechanism and combined operation of data will be packaged.
The acquisition source of data can there are many kinds of, including monitoring.File analysis etc., this system use branch in design Hold multiple systems docking obtain alarm mode, after having selected monitoring alarm, need configuration monitoring source application, alarm Filtration treatment scheme, the logic of abnormality processing.
As shown in figure 4, the step of inter-linked controlling method of the present invention, is:S21 obtains the data information in data source, analysis The data information, and alarm prompt is sent out to the event for meeting alarm triggered condition;S22 carries out Statistics Division to alarm prompt Reason, and combined operation is carried out to managed object according to statistical disposition result.
Include mainly alarm convergence, derivative alarm, primary and secondary alarm, alarm overturning to the statistical disposition that alarm prompt carries out (high frequency time alarm) and alarm dither mask.
Alarm convergence:The convergence of alarm signal is realized by virtual signal.
Derivative alarm:When multiple same type alarms generate and meet certain condition, a new alarm is generated.Derivative alarm Generation logic:It is reached a certain level when certain class alerts the quantity (density occurs) generated in the unit interval, generates a derivative Alarm, the grade of the alarm are generally than original alarm higher grade.When generation density is less than to a certain degree, which terminates.
Primary and secondary alerts:It when multiple alarm notifications generate, chooses an alarm and does main alarm, other alarms are used as secondary announcement It is alert, it avoids mainly alerting and be flooded by warning information.Primary and secondary alarm operation logic be:When alerting generation, minor alarm caching After a certain period of time, main alarm is waited for generate, if main alarm generates, minor alarm does not show a warehousing.If arrived Certain time does not wait until mainly to alert, then minor alarm it is normal on give.
Alarm overturning (high frequency time alarm):When continuous 30 minutes of certain alarm signal is more than 6, then it is assumed that be high frequency time Alarm, this alarm " description field " after 30 minutes indicate " high frequency time alarm " printed words, hereafter should shield and continuously report Alarm, restores normally to report again until being unsatisfactory for Rule of judgment.
Alert dither mask:When certain signal fluctuates around alarm threshold value, alarm can be frequently generated, signal is set when configuring Difference is put back into eliminate frequent alarm.
Combined operation in step S22 is realized in such a way that script links or orders linkage.
The above is the preferred embodiment of the present invention, for those skilled in the art, Without departing from the principles of the invention, several improvements and modifications can also be made, these improvements and modifications are also regarded as this hair Bright protection domain.

Claims (8)

1. a kind of coordinated control system based on MDC, it is characterized in that:Including data source, trigger, alarm processor and linkage control Device processed, the data source include the data in MDC, and the trigger is for building coordinated signals template, the alarm processor For carrying out alarming processing to alarm prompt according to the coordinated signals template of structure, linkage controller is used for according to alarm processor Handling result to managed object carry out combined operation.
2. a kind of coordinated control system based on MDC according to claim 1, it is characterized in that:The data source includes behaviour Make system, application program, IT hardware and network;Data in the data source include power & environment supervision data, fault ticket data, Log analysis data and IT system data.
3. a kind of coordinated control system based on MDC according to claim 1, it is characterized in that:The trigger includes the One configuration module, the second configuration module and package module;The action that first configuration module is used to operate in disposition data source, Second configuration module is used for configuration condition parameter;The package module be used for by the action of the conditional parameter and operation into Row is corresponding and is packaged into coordinated signals template.
4. a kind of coordinated control system based on MDC according to claim 1, it is characterized in that:The alarm processor packet Include alarm convergence unit, derivative Alarm Unit, primary and secondary Alarm Unit and alarm dither mask unit;
The alarm convergence unit restrains alarm signal by virtual signal, and the derivative Alarm Unit is used for unit In the case that the same type alarm quantity generated in time is more than setting value, the higher derivative alarm of an alarm grade is generated, The primary and secondary Alarm Unit only shows main alarm prompt, institute for distinguishing alarm grade when different grades of alarm generates It states alarm dither mask unit and has eliminated frequent alarm for return difference to be arranged at alarm threshold.
5. a kind of coordinated control system based on MDC according to claim 1, it is characterized in that:The linkage controller is adopted It is linked with script and the mode of linkage is ordered to carry out combined operation to managed object.
6. a kind of design method of the coordinated control system based on MDC, it is characterized in that:Include the following steps:
Acquisition source, the decision logic of data information and the trigger mechanism of alarm of configuration data;
Combined operation of the configuration linkage controller after alarm occurs;
The decision logic, trigger mechanism and combined operation of data will be packaged.
7. a kind of inter-linked controlling method based on MDC, it is characterized in that:Include the following steps:
The data information in data source is obtained, analyzes the data information, and announcement is sent out to the event for meeting alarm triggered condition Alert prompt;
Statistical disposition is carried out to the alarm prompt, and combined operation is carried out to managed object according to statistical disposition result.
8. a kind of inter-linked controlling method based on MDC according to claim 7, it is characterized in that:The combined operation passes through Script links or the mode of order linkage is realized.
CN201810469431.0A 2018-05-16 2018-05-16 A kind of design method of inter-linked controlling method based on MDC, system and system Pending CN108696592A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810469431.0A CN108696592A (en) 2018-05-16 2018-05-16 A kind of design method of inter-linked controlling method based on MDC, system and system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810469431.0A CN108696592A (en) 2018-05-16 2018-05-16 A kind of design method of inter-linked controlling method based on MDC, system and system

Publications (1)

Publication Number Publication Date
CN108696592A true CN108696592A (en) 2018-10-23

Family

ID=63846432

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810469431.0A Pending CN108696592A (en) 2018-05-16 2018-05-16 A kind of design method of inter-linked controlling method based on MDC, system and system

Country Status (1)

Country Link
CN (1) CN108696592A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109640052A (en) * 2018-12-26 2019-04-16 视联动力信息技术股份有限公司 Data processing method and device
CN113747125A (en) * 2021-09-02 2021-12-03 北京百度网讯科技有限公司 Weak current monitoring linkage method, device, system, equipment and storage medium

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101626497A (en) * 2009-08-10 2010-01-13 杭州华三通信技术有限公司 Alarm linkage method and alarm linkage device
CN101937610A (en) * 2009-09-23 2011-01-05 中国电信股份有限公司泉州分公司 Method for triggering linkage action between security equipment and monitoring equipment
CN104820601A (en) * 2015-05-13 2015-08-05 广州市优泰安防技术有限公司 A security and protection linkage method
CN105159150A (en) * 2015-07-23 2015-12-16 北京章鱼智数科技有限公司 Intelligent equipment linkage control method
CN105471671A (en) * 2015-11-10 2016-04-06 国云科技股份有限公司 Method for customizing monitoring rules of cloud platform resources
US20160334770A1 (en) * 2015-05-14 2016-11-17 Honeywell International Inc. Apparatus and method for using configurable rules linking triggers with actions to support notifications associated with industrial process control and automation system
CN107272535A (en) * 2017-07-11 2017-10-20 武汉虹信技术服务有限责任公司 The linkage and interlock method of a kind of intelligent building management system
CN107302466A (en) * 2017-08-25 2017-10-27 郑州云海信息技术有限公司 A kind of power & environment supervision system big data analysis platform and method

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101626497A (en) * 2009-08-10 2010-01-13 杭州华三通信技术有限公司 Alarm linkage method and alarm linkage device
CN101937610A (en) * 2009-09-23 2011-01-05 中国电信股份有限公司泉州分公司 Method for triggering linkage action between security equipment and monitoring equipment
CN104820601A (en) * 2015-05-13 2015-08-05 广州市优泰安防技术有限公司 A security and protection linkage method
US20160334770A1 (en) * 2015-05-14 2016-11-17 Honeywell International Inc. Apparatus and method for using configurable rules linking triggers with actions to support notifications associated with industrial process control and automation system
CN105159150A (en) * 2015-07-23 2015-12-16 北京章鱼智数科技有限公司 Intelligent equipment linkage control method
CN105471671A (en) * 2015-11-10 2016-04-06 国云科技股份有限公司 Method for customizing monitoring rules of cloud platform resources
CN107272535A (en) * 2017-07-11 2017-10-20 武汉虹信技术服务有限责任公司 The linkage and interlock method of a kind of intelligent building management system
CN107302466A (en) * 2017-08-25 2017-10-27 郑州云海信息技术有限公司 A kind of power & environment supervision system big data analysis platform and method

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109640052A (en) * 2018-12-26 2019-04-16 视联动力信息技术股份有限公司 Data processing method and device
CN113747125A (en) * 2021-09-02 2021-12-03 北京百度网讯科技有限公司 Weak current monitoring linkage method, device, system, equipment and storage medium

Similar Documents

Publication Publication Date Title
JP5207651B2 (en) Construction of automation system controller
CN107302466B (en) Big data analysis platform and method for dynamic loop monitoring system
US6711613B1 (en) Remote power control system
CN102447570B (en) Monitoring device and method based on health degree analysis
CN109002031A (en) A method of applied to monitoring device fault diagnosis and intelligent early-warning
CN106656632A (en) Machine room monitoring system fusing Ethernet protocol with Internet of Things protocol, and information processing and control method
CN110851320A (en) Server downtime supervision method, system, terminal and storage medium
CN104168459A (en) Remote monitoring system
WO2019227592A1 (en) Solar system control method and apparatus, central controller, and solar system
CN111431754A (en) Fault analysis method and system for power distribution and utilization communication network
CN108696592A (en) A kind of design method of inter-linked controlling method based on MDC, system and system
EP3571820B1 (en) Management of federated systems
CN110752959A (en) Intelligent substation process layer physical link fault positioning system
CN115460051A (en) Equipment linkage model configuration method based on industry Internet of things scene
CN115658420A (en) Database monitoring method and system
Wäfler et al. Interdependency modeling in smart grid and the influence of ICT on dependability
Prudenzi et al. Smartening hospital electrical distribution for enhancing resilience
CN110488895A (en) A kind of computer room intelligent maintenance management system
CN114006940A (en) Building integrated management information pushing method, system, computer and storage medium
CN109783314A (en) Information technoloy equipment method for managing and monitoring and server
CN115313642A (en) Power system scene and configuration oriented trusteeship system and trusteeship method
EP3528065A1 (en) Method for monitoring, managing and controlled shutdown of control and/or computational units
CN108494603A (en) Dispatching automation comprehensively monitoring and intelligent warning system
CN108632114A (en) Standardization for rds data web network equipment configures automatic checking method
Bernard et al. Monitoring control applications at CERN

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20181023