CN108683252A - Nuclear power plant's power supply system - Google Patents

Nuclear power plant's power supply system Download PDF

Info

Publication number
CN108683252A
CN108683252A CN201810560631.7A CN201810560631A CN108683252A CN 108683252 A CN108683252 A CN 108683252A CN 201810560631 A CN201810560631 A CN 201810560631A CN 108683252 A CN108683252 A CN 108683252A
Authority
CN
China
Prior art keywords
switch
power supply
load
electroplax
distribution
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201810560631.7A
Other languages
Chinese (zh)
Inventor
宋鹏飞
翟长春
赵禹
阮阳
闫建华
孙佳梁
宋树林
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China General Nuclear Power Corp
China Nuclear Power Engineering Co Ltd
Original Assignee
China General Nuclear Power Corp
China Nuclear Power Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China General Nuclear Power Corp, China Nuclear Power Engineering Co Ltd filed Critical China General Nuclear Power Corp
Priority to CN201810560631.7A priority Critical patent/CN108683252A/en
Publication of CN108683252A publication Critical patent/CN108683252A/en
Pending legal-status Critical Current

Links

Classifications

    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J11/00Circuit arrangements for providing service supply to auxiliaries of stations in which electric power is generated, distributed or converted
    • GPHYSICS
    • G21NUCLEAR PHYSICS; NUCLEAR ENGINEERING
    • G21DNUCLEAR POWER PLANT
    • G21D1/00Details of nuclear power plant
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E30/00Energy generation of nuclear origin

Abstract

The invention discloses a kind of nuclear power plant's power supply systems, including the first power supply, second source, third power supply, the first distribution electroplax, the second distribution electroplax and third to distribute electroplax;When the first power supply, second source and third power supply are run, the first power supply, second source and third power supply are able to distribute electroplax by the first distribution electroplax, the second distribution electroplax and third to be the first load, the second load and third load supplying;When second source is out of service, the first power supply can be the second load supplying by the first distribution electroplax and the second distribution electroplax;When third power supply is out of service, it is third load supplying that the first power supply can distribute electroplax by the first distribution electroplax and third;When the first power supply is out of service, second source can be the first load supplying by the second distribution electroplax and the first distribution electroplax or third power supply can be the first load supplying by third distribution electroplax and the first distribution electroplax.

Description

Nuclear power plant's power supply system
Technical field
The invention belongs to nuclear power station technical fields, it is more particularly related to a kind of nuclear power plant's power supply system.
Background technology
Nuclear power station includes six operational modes:Reactor capability operational mode, steam generator cooling normal shutdown pattern, Safety Injection Residual heat removal cooling normal shutdown pattern, the cold shutdown pattern of repair, cold shutdown pattern of reloading and reactor unload completely Material pattern.
Under reactor capability operational mode, the fever of nuclear power station reactor core is converted into electric energy by steam turbine generator, then by electricity Gas distribution board provides power supply for used in nuclear power station electric equipment.Under other shutdown patterns or complete unloading pattern, steam turbine generator It shuts down, nuclear power station stops providing electric energy, and nuclear power station needs to carry out the maintenance and maintenance work to electric power station system equipment, to ensure core Power station equipment overhauls and the normal development of maintenance work, nuclear power plant need the electrical equipment to being operated during unit Shutdown to hold It is continuous that power supply is provided.
The nuclear power station maintenance period, there are two types of existing power supply plans, respectively " overhaul again power supply box scheme " and " online to hand over Fork interconnects power supply plan again "." overhaul again power supply box scheme " includes four parts:Normal power source distribution board, overhaul are powered again matches Power supply box and included 12m cables are powered drawer again again for electroplax, overhaul, this scheme by cable length due to being limited, Wu Fashi Now to the power supply of a large amount of power loads;Safety level power load and non-security grade power load cannot be distinguished;It is less economical, reliable Property is low." online cross interconnected power supply plan again " includes four parts:Respectively include two power supply groups, unit transformers of two row power supplys Depressor, main distributing board and distribution electroplax;This scheme electrical system is complicated, and place capacity demand is big, of high cost, and flexibility is poor.
In view of this, it is necessory to provide a kind of simple system, at low cost, flexible nuclear power plant's power supply system of powering.
Invention content
It is an object of the invention to:A kind of simple system is provided, at low cost, flexible nuclear power plant's power supply system of powering.
In order to achieve the above-mentioned object of the invention, the present invention provides a kind of nuclear power plant's power supply system, including the first power supply, the second electricity Source, third power supply, the first distribution electroplax, the second distribution electroplax and third distribute electroplax;The first distribution electroplax and described the One power supply, the second distribution electroplax, third distribution electroplax and the first load are connected;It is described second distribution electroplax with it is described Second source and the second load are connected;The third distribution electroplax is connected with the third power supply and third load;When described When one power supply, the second source and the third power supply are run, first power supply, the second source and third electricity It is described first negative that source, which is able to distribute electroplax, the second distribution electroplax and the third to distribute electroplax by described first, Load, second load and the third load supplying;When the second source is out of service, first power supply can lead to It is second load supplying to cross the first distribution electroplax and the second distribution electroplax;When the third power supply is out of service When, first power supply can distribute electroplax by described first and the third distributes electroplax as the third load supplying; When first power supply is out of service, the second source can distribute electroplax and the first distribution electricity by described second Disk is first load supplying or the third power supply can distribute electroplax and the first distribution electricity by the third Disk is first load supplying.
As a kind of improvement of nuclear power plant's power supply system of the present invention, the first distribution electroplax includes first switch, second Switch, third switch and the first distribution bus;The first end of the first switch is connected with first power supply, and described first opens The second end of pass is connected with first distribution bus, and the first end of the second switch is connected with the second distribution electroplax, The second end of the second switch is connected with first distribution bus, and the first end of the third switch is distributed with the third Electroplax is connected, and the second end of the third switch is connected with first distribution bus, and first load is matched with described first Goddess of lightning's line is connected;When first power supply is run, the first switch is closed, and the second switch and third switch are disconnected It opens, first power supply is first load supplying by the first switch;When the second source is out of service, institute It states first switch and the second switch is closed, the third switch disconnects, and first power supply passes through the first switch, institute It is second load supplying to state second switch and the second distribution electroplax;It is described when the third power supply is out of service First switch and third switch are closed, and the second switch disconnects, and first power supply passes through the first switch, described Third switchs and third distribution electroplax is the third load supplying.
As a kind of improvement of nuclear power plant's power supply system of the present invention, the second distribution electroplax includes the 4th switch, the 5th Switch and the second distribution bus;The first end of 4th switch is connected with the second source, and the second of the 4th switch End is connected with second distribution bus, and the first end of the 5th switch is connected with the first end of the second switch, described The second end of 5th switch is connected with second distribution bus, and second load is connected with second distribution bus;When When the second source operation, the 4th switch is closed, and the 5th switch disconnects, and the second source passes through the described 4th Switch is second load supplying;When the second source is out of service, the first switch, the second switch and institute It states the 5th switch to be closed, the third switch and the 4th switch disconnect, and first power supply passes through the first switch, institute It is second load supplying to state second switch and the 5th switch.
As a kind of improvement of nuclear power plant's power supply system of the present invention, the third distribution electroplax includes the 6th switch, the 7th Switch and third distribution bus;The first end of 6th switch is connected with the third power supply, and the second of the 6th switch End is connected with the third distribution bus, and the first end of the 7th switch is connected with the first end that the third switchs, described The second end of 7th switch is connected with the third distribution bus, and the third load is connected with the third distribution bus;When When the third power supply operation, the 6th switch is closed, and the 7th switch disconnects, and the third power supply passes through the described 6th Switch is the third load supplying;When the third power supply is out of service, the first switch, third switch and institute It states the 7th switch to be closed, the second switch and the 6th switch disconnect, and first power supply passes through the first switch, institute It is the third load supplying to state third switch and the 7th switch.
As a kind of improvement of nuclear power plant's power supply system of the present invention, when first power supply is out of service, the described 4th Switch, the 5th switch and the second switch are closed, and the first switch and third switch disconnect, second electricity Source is switched by the described 4th, the 5th switch and the second switch are first load supplying;Or the third Switch, the 6th switch and the 7th switch are closed, and the first switch and the second switch disconnect, the third electricity Source is switched by the described 6th, the 7th switch and third switch are first load supplying.
As a kind of improvement of nuclear power plant's power supply system of the present invention, further include the first main distributing board, the second main distributing board and Third main distributing board;First main distributing board is connected between first power supply and the first end of the first switch, is used In by the first switch be first load supplying or for except it is described first load, it is described second load and the third Load supplying other than load;Second main distributing board be connected to the second source with it is described 4th switch first end it Between, for being switched for second load supplying or for except first load, second load and institute by the described 4th State the load supplying other than third load;The third main distributing board is connected to the of the third power supply and the 6th switch Between one end, for be the third load supplying by the 6th switch or being except described first load, described second negative Load supplying other than load and third load.
Further include the first transformer, the second transformer and third as a kind of improvement of nuclear power plant's power supply system of the present invention Transformer;First transformer is connected between first power supply and first main distributing board, for described first Power supply is depressured;Second transformer is connected between the second source and second main distributing board, for institute Second source is stated to be depressured;The third transformer is connected between the third power supply and the third main distributing board, is used It is depressured in the third power supply.
Compared with the existing technology, nuclear power plant's power supply system provided by the invention, by be arranged the first power supply, second source and Third power supply so that when the second source is out of service, first power supply can by it is described first distribute electroplax and The second distribution electroplax is second load supplying;When the third power supply is out of service, first power supply can Electroplax is distributed by described first and the third distributes electroplax as the third load supplying;When first power supply exits fortune When row, it is that first load supplies that the second source can distribute electroplax and the first distribution electroplax by described second It is that first load supplies that electricity or the third power supply can distribute electroplax and the first distribution electroplax by the third Electricity;Ensure that when need to the equipment of first power supply, the one of connection of the second source and the third power supply into When row repair, adjacent power supply can realize the power supply to respective load, to ensure the progress of maintenance work.The nuclear power of the present invention Factory's power supply system simple system, at low cost, power supply is flexible.
Description of the drawings
Below in conjunction with the drawings and specific embodiments, nuclear power plant's power supply system of the present invention and its technique effect are carried out detailed Illustrate, wherein:
Fig. 1 is the structural schematic diagram for nuclear power plant's power supply system that embodiment of the present invention provides.
Fig. 2 is the concrete structure schematic diagram for nuclear power plant's power supply system that embodiment of the present invention provides.
Specific implementation mode
It is clear in order to make the purpose of the present invention, technical solution and advantageous effects be more clear, below in conjunction with this hair Attached drawing in bright embodiment is clearly and completely described the technical solution in embodiment of the present invention, it is clear that retouched The embodiment stated is only some embodiments of the invention, rather than whole embodiments.Based on the reality in the present invention Apply mode, every other embodiment obtained by those of ordinary skill in the art without making creative efforts, It shall fall within the protection scope of the present invention.
Referring to Fig. 1, a kind of nuclear power plant's power supply system 100 provided by the invention, including the first power supply 10, second source 20, third power supply 30, first distributes electroplax 40, second and distributes electroplax 50 and third distribution electroplax 60.The first distribution electroplax 40 are connected with first power supply 10, the second distribution electroplax 50, third distribution electroplax 60 and first load 201.Institute The second distribution electroplax 50 is stated with the load of the second source 20 and second 202 to be connected.Third distribution electroplax 60 and described the Three power supplys 30 and third load 203 are connected.When first power supply 10, the second source 20 and the third power supply 30 are run When, first power supply 10, the second source 20 and the third power supply 30 are able to distribute electroplax by described first 40, it is described second distribution electroplax 50 and the third distribution electroplax 60 be it is described first load 201, it is described second load 202 and 203 power supply of third load.When the second source 20 is out of service, first power supply 10 can pass through described first It is 202 power supply of the second load to distribute electroplax 40 and the second distribution electroplax 50.When the third power supply 30 is out of service When, first power supply 10 can distribute electroplax 40 by described first and the third is distributed electroplax 60 and loaded for the third 203 power supplies.When first power supply 10 is out of service, the second source 20 can by it is described second distribute electroplax 50 and The first distribution electroplax 40 is that 201 power supply of the first load or the third power supply 30 can be by the thirds point Distribution board 60 and the first distribution electroplax 40 are 201 power supply of the first load.
It should be noted that nuclear power station maintenance period, first power supply 10, the second source 20 and third electricity Source 30 is connected with utility grid respectively.During nuclear power station Power operation, i.e., described first power supply 10, the second source 20 and institute Third power supply 30 is stated to run, first power supply 10, the second source 20 and the third power supply 30 respectively with nuclear power station Generator be connected, it is described first load 201, it is described second load 202 and the third load 203 respectively by it is described first electricity Source 10, the second source 20 and the third power supply 30 power supply.When need pair equipment being connect with first power supply 10 into When row repair, first power supply 10 is out of service, while first load 201 needs to keep power supply to ensure maintenance work Progress, the second source 20 or the third power supply 30 are described first to load 201 power supplies.When needs pair and described second When the equipment that power supply 20 connects repairs, the second source 20 is out of service, while second load 202 needs to keep Power supply is 202 power supply of the second load to ensure the progress of maintenance work, first power supply 10.When needing pair and described the When the equipment of three power supplys 30 connection repairs, the third power supply 30 is out of service, while third load 203 needs to protect Power supply is held to ensure that the progress of maintenance work, first power supply 10 are 203 power supply of third load.It the same time, can only The equipment of the one of connection of first power supply 10, the second source 20 and the third power supply 30 is repaired.
Referring to Fig. 2, further, the first distribution electroplax 40 is opened including first switch K1, second switch K2, third Close K3 and the first distribution bus 41.The first end of the first switch K1 is connected with first power supply 10, the first switch The second end of K1 is connected with first distribution bus 41, and the first end of the second switch K2 distributes electroplax 50 with described second Be connected, the second end of the second switch K2 is connected with first distribution bus 41, the first end of the third switch K3 and Third distribution electroplax 60 is connected, and the second end of the third switch K3 is connected with first distribution bus 41, and described the One load 201 is connected with first distribution bus 41.When first power supply 10 is run, the first switch K1 is closed, The second switch K2 and third switch K3 is disconnected, and first power supply 10 is described first by the first switch K1 201 power supply of load.When the second source 20 is out of service, the first switch K1 and the second switch K2 are closed, institute It states third switch K3 to disconnect, first power supply 10 passes through the first switch K1, the second switch K2 and second point described Distribution board 50 is 202 power supply of the second load.When the third power supply 30 is out of service, the first switch K1 and described Third switch K3 is closed, and the second switch K2 is disconnected, and first power supply 10 is opened by the first switch K1, the third It is 203 power supply of third load to close K3 and third distribution electroplax 60.
The second distribution electroplax 50 includes the 4th switch K4, the 5th switch K5 and the second distribution bus 51.Described 4th The first end of switch K4 is connected with the second source 20, second end and second distribution bus 51 of the 4th switch K4 It is connected, the first end of the 5th switch K5 is connected with the first end of the second switch K2, and the second of the 5th switch K5 End is connected with second distribution bus 51, and second load 202 is connected with second distribution bus 51.When described second When power supply 20 is run, the 4th switch K4 is closed, and the 5th switch K5 is disconnected, and the second source 20 passes through the described 4th Switch K4 is 202 power supply of the second load.When the second source 20 is out of service, the first switch K1, described Two switch K2 and the 5th switch K5 are closed, and the third switch K3 and the 4th switch K4 are disconnected, first power supply 10 load 202 power supplies by the first switch K1, the second switch K2 and the 5th switch K5 for described second.
The third distribution electroplax 60 includes the 6th switch K6, the 7th switch K7 and third distribution bus 61.Described 6th The first end of switch K6 is connected with the third power supply 30, second end and the third distribution bus 61 of the 6th switch K6 It is connected, the first end of the 7th switch K7 is connected with the first end of the third switch K3, and the second of the 7th switch K7 End is connected with the third distribution bus 61, and the third load 203 is connected with the third distribution bus 61.When the third When power supply 30 is run, the 6th switch K6 is closed, and the 7th switch K7 is disconnected, and the third power supply 30 passes through the described 6th Switch K6 is 203 power supply of third load.When the third power supply 30 is out of service, the first switch K1, described Three switch K3 and the 7th switch K7 are closed, and the second switch K2 and the 6th switch K6 are disconnected, first power supply 10 are powered by the first switch K1, the third switch K3 and the 7th switch K7 for third load 203.
When first power supply 10 is out of service, the second switch K2, the 4th switch K4 and the described 5th are opened Close K5 be closed, the first switch K1 and the third switch K3 disconnection, the second source 20 by the 4th switch K4, The 5th switch K5 and second switch K2 is 201 power supply of the first load;Or the third switch K3, described Six switch K6 and the 7th switch K7 are closed, and the first switch K1 and the second switch K2 are disconnected, the third power supply 30 load 201 power supplies by the 6th switch K6, the 7th switch K7 and the third switch K3 for described first.
Nuclear power plant's power supply system 100 further includes the first main distributing board 70, the second main distributing board 80 and third main distribution Disk 90.First main distributing board 70 is connected between first power supply 10 and the first end of the first switch K1, is used for It is 201 power supply of the first load by the first switch K1 or is other power loads (except described first loads 201, institute State the load other than the second load 202 and third load 203) power supply.Second main distributing board 80 is connected to described Between two power supplys 20 and the first end of the 4th switch K4, for being second load 202 by the 4th switch K4 Power supply is other power loads (in addition to first load 201, second load 202 and third load 203 Load) power supply.The third main distributing board 90 is connected between the third power supply 30 and the first end of the 6th switch K6, For being 203 power supply of third load by the 6th switch K6 or being that other power loads (remove described first to load 201, second load 202 and the third load the load other than 203) power supply.
Nuclear power plant's power supply system 100 further includes the first transformer 101, the second transformer 102 and third transformer 103.First transformer 101 is connected between first power supply 10 and first main distributing board 70, for described First power supply 10 is depressured.Second transformer 102 is connected to the second source 20 and second main distributing board 80 Between, for being depressured to the second source 20.The third transformer 103 be connected to the third power supply 30 with it is described Between third main distributing board 90, for being depressured to the third power supply 30.
In the present embodiment, first main distributing board 70 and first transformer 101 are and first power supply The equipment of 10 connections, when first main distributing board 70 or first transformer 101 repair, first power supply 10 exits Operation;Second main distributing board 80 and second transformer 102 are the equipment being connect with the second source 20, when described When second main distributing board 80 or second transformer 102 repair, the second source 20 is out of service;The third main distribution Disk 90 and the third transformer 103 are the equipment being connect with the third power supply 30, when the third main distributing board 90 or institute When stating the repair of third transformer 103, the third power supply 30 is out of service.
Nuclear power plant's power supply system provided by the invention, by the way that the first power supply, second source and third power supply is arranged so that when When the second source is out of service, first power supply can pass through the first distribution electroplax and the second distribution electroplax For second load supplying;When the third power supply is out of service, first power supply can be distributed by described first Electroplax and third distribution electroplax are the third load supplying;When first power supply is out of service, second electricity It is first load supplying or third electricity that source can distribute electroplax and the first distribution electroplax by described second It is first load supplying that source can distribute electroplax and the first distribution electroplax by the third;It ensure that when needs pair When the equipment of the one of connection of first power supply, the second source and the third power supply repairs, adjacent electricity Source can realize the power supply to respective load, to ensure the progress of maintenance work.Nuclear power plant's power supply system system letter of the present invention Single, at low cost, power supply is flexible.
It these are only embodiments of the present invention, be not intended to limit the scope of the invention, it is every to utilize the present invention Equivalent structure or equivalent flow shift made by specification and accompanying drawing content is applied directly or indirectly in other relevant technologies Field is included within the scope of the present invention.

Claims (7)

1. a kind of nuclear power plant's power supply system, it is characterised in that:Including the first power supply, second source, third power supply, the first distribution electricity Disk, the second distribution electroplax and third distribute electroplax;The first distribution electroplax and first power supply, the second distribution electricity Disk, third distribution electroplax and the first load are connected;The second distribution electroplax and the second source and the second load phase Even;The third distribution electroplax is connected with the third power supply and third load;When first power supply, the second source and When third power supply operation, first power supply, the second source and the third power supply are able to by described the It is first load, second load and institute that one distribution electroplax, the second distribution electroplax and the third, which distribute electroplax, State third load supplying;When the second source is out of service, first power supply can distribute electroplax by described first And the second distribution electroplax is second load supplying;When the third power supply is out of service, the first power supply energy Enough electroplax is distributed by described first and the third distributes electroplax as the third load supplying;When first power supply exits When operation, it is that first load supplies that the second source can distribute electroplax and the first distribution electroplax by described second It is that first load supplies that electricity or the third power supply can distribute electroplax and the first distribution electroplax by the third Electricity.
2. nuclear power plant's power supply system according to claim 1, it is characterised in that:The first distribution electroplax is opened including first Pass, second switch, third switch and the first distribution bus;The first end of the first switch is connected with first power supply, institute The second end for stating first switch is connected with first distribution bus, the first end of the second switch and the second distribution electricity Disk is connected, and the second end of the second switch is connected with first distribution bus, the first end that the third switchs with it is described Third distributes electroplax and is connected, and the second end of the third switch is connected with first distribution bus, first load and institute The first distribution bus is stated to be connected;When first power supply is run, the first switch is closed, the second switch and described the Three switches disconnect, and first power supply is first load supplying by the first switch;When the second source exits When operation, the first switch and the second switch are closed, and the third switch disconnects, and first power supply passes through described the One switch, the second switch and the second distribution electroplax are second load supplying;When the third power supply exits fortune When row, the first switch and third switch are closed, and the second switch disconnects, and first power supply passes through described first Switch, third switch and third distribution electroplax are the third load supplying.
3. nuclear power plant's power supply system according to claim 2, it is characterised in that:The second distribution electroplax is opened including the 4th Pass, the 5th switch and the second distribution bus;The first end of 4th switch is connected with the second source, the 4th switch Second end be connected with second distribution bus, it is described 5th switch first end and the second switch first end phase Even, the second end of the 5th switch is connected with second distribution bus, second load and second distribution bus It is connected;When the second source is run, the 4th switch is closed, and the 5th switch disconnects, and the second source passes through 4th switch is second load supplying;When the second source is out of service, the first switch, described second Switch and the 5th switch are closed, and third switch and the 4th switch disconnect, and first power supply passes through described the One switch, the second switch and the 5th switch are second load supplying.
4. nuclear power plant's power supply system according to claim 3, it is characterised in that:The third distribution electroplax is opened including the 6th Pass, the 7th switch and third distribution bus;The first end of 6th switch is connected with the third power supply, the 6th switch Second end be connected with the third distribution bus, the first end phase that is switched with the third of first end of the 7th switch Even, the second end of the 7th switch is connected with the third distribution bus, the third load and the third distribution bus It is connected;When the third power supply is run, the 6th switch is closed, and the 7th switch disconnects, and the third power supply passes through 6th switch is the third load supplying;When the third power supply is out of service, the first switch, the third Switch and the 7th switch are closed, and the second switch and the 6th switch disconnect, and first power supply passes through described the One switch, third switch and the 7th switch are the third load supplying.
5. nuclear power plant's power supply system according to claim 4, it is characterised in that:When first power supply is out of service, 4th switch, the 5th switch and the second switch are closed, and the first switch and third switch disconnect, institute It is first load supplying that second source, which is stated, by the 4th switch, the 5th switch and the second switch;Or The third switch, the 6th switch and the 7th switch are closed, and the first switch and the second switch disconnect, institute It is first load supplying that third power supply, which is stated, by the 6th switch, the 7th switch and third switch.
6. nuclear power plant's power supply system according to claim 5, it is characterised in that:Further include the first main distributing board, the second master Distribution board and third main distributing board;First main distributing board is connected to the first end of first power supply and the first switch Between, for by the first switch be first load supplying or for except it is described first load, it is described second load and Load supplying other than the third load;Second main distributing board is connected to the second source and the 4th switch Between first end, for being second load supplying by the 4th switch or being except first load, described second Load supplying other than load and third load;The third main distributing board is connected to the third power supply and the described 6th Between the first end of switch, for being switched for the third load supplying or for except first load, institute by the described 6th State the load supplying other than the second load and third load.
7. nuclear power plant's power supply system according to claim 6, it is characterised in that:Further include the first transformer, the second transformation Device and third transformer;First transformer is connected between first power supply and first main distributing board, for pair First power supply is depressured;Second transformer is connected between the second source and second main distributing board, For being depressured to the second source;The third transformer is connected to the third power supply and the third main distributing board Between, for being depressured to the third power supply.
CN201810560631.7A 2018-05-25 2018-05-25 Nuclear power plant's power supply system Pending CN108683252A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810560631.7A CN108683252A (en) 2018-05-25 2018-05-25 Nuclear power plant's power supply system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810560631.7A CN108683252A (en) 2018-05-25 2018-05-25 Nuclear power plant's power supply system

Publications (1)

Publication Number Publication Date
CN108683252A true CN108683252A (en) 2018-10-19

Family

ID=63809702

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810560631.7A Pending CN108683252A (en) 2018-05-25 2018-05-25 Nuclear power plant's power supply system

Country Status (1)

Country Link
CN (1) CN108683252A (en)

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US6385023B1 (en) * 1998-11-19 2002-05-07 Asea Brown Boveri Ag Reclosing apparatus for auxiliary systems
CN201584809U (en) * 2009-10-27 2010-09-15 中国海洋石油总公司 Looped network control system of medium-voltage power grid
WO2012163731A2 (en) * 2011-05-30 2012-12-06 Siemens Aktiengesellschaft Method for operating a generator in an electrical system, and electrical system having such a generator
CN204145070U (en) * 2014-10-31 2015-02-04 深圳供电局有限公司 A kind of grid-connected photovoltaic inverter and transformer station's integration power-supply system
CN105680559A (en) * 2016-04-06 2016-06-15 国家电网公司 Substation DC system

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US6385023B1 (en) * 1998-11-19 2002-05-07 Asea Brown Boveri Ag Reclosing apparatus for auxiliary systems
CN201584809U (en) * 2009-10-27 2010-09-15 中国海洋石油总公司 Looped network control system of medium-voltage power grid
WO2012163731A2 (en) * 2011-05-30 2012-12-06 Siemens Aktiengesellschaft Method for operating a generator in an electrical system, and electrical system having such a generator
CN204145070U (en) * 2014-10-31 2015-02-04 深圳供电局有限公司 A kind of grid-connected photovoltaic inverter and transformer station's integration power-supply system
CN105680559A (en) * 2016-04-06 2016-06-15 国家电网公司 Substation DC system

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
尚成枝: "舰船环形区域配电结构及可靠性分析", 《船舶电气》 *

Similar Documents

Publication Publication Date Title
Cao et al. Minimization of transmission loss in meshed AC/DC grids with VSC-MTDC networks
KR101127672B1 (en) Apparatus and method for controlling distributed power
CN103701203A (en) Direct current system for nuclear power plant
Gupta et al. Available transfer capability enhancement by unified power flow controller
CN112072718B (en) Multi-unit gas and steam combined cycle power station reactive load control method
CN209448443U (en) A kind of power plant generator side interconnection wiring system
CN106788140A (en) A kind of modularization common DC bus photovoltaic energy storage system
CN202586124U (en) Bypass operation trolley capable of being used to replace distribution transformer without cutting off power
CN108683252A (en) Nuclear power plant's power supply system
CN204465015U (en) Without the need to drawing the wiring system of power supply outward when a kind of power plant list returns back out line
Zhang et al. Line loss reduction with distributed energy storage systems
CN202872386U (en) Grid-connected power generation system with countercurrent-prevention device
CN108233371A (en) Marine wind electric field combines hair electric power system with island microgrid
CN111463786B (en) Power consumption enterprise internal flexible networking system with multiple distribution transformers
CN208508527U (en) DC power-supply system including photovoltaic module
CN202978051U (en) Bypass load transporting vehicle
CN207426694U (en) DC micro-electric web frame
CN105978134B (en) A kind of uninterrupted power exchanger for alternating-current system
CN112049728A (en) Uninterrupted operation system and method based on vehicle-mounted gas turbine generator set
CN205595795U (en) Unified power flow controller of many operational modes
CN101986510B (en) Automatic emergency power supply
CN220325337U (en) Data center electrical architecture
CN205178628U (en) Stand -by power supply system of marine wind field fan
CN106611994B (en) Standby power supply system of offshore wind field fan
CN203691053U (en) High-risk power consumption user emergency power supply connection structure

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20181019