CN108679927A - A kind of cooling equipment of coating - Google Patents
A kind of cooling equipment of coating Download PDFInfo
- Publication number
- CN108679927A CN108679927A CN201810615797.4A CN201810615797A CN108679927A CN 108679927 A CN108679927 A CN 108679927A CN 201810615797 A CN201810615797 A CN 201810615797A CN 108679927 A CN108679927 A CN 108679927A
- Authority
- CN
- China
- Prior art keywords
- main
- bucket
- cooling bucket
- paint
- cooling
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
- 238000001816 cooling Methods 0.000 title claims abstract description 135
- 239000011248 coating agent Substances 0.000 title claims abstract description 56
- 238000000576 coating method Methods 0.000 title claims abstract description 56
- 239000003973 paint Substances 0.000 claims abstract description 79
- 150000003839 salts Chemical class 0.000 claims abstract description 52
- 238000003756 stirring Methods 0.000 claims abstract description 13
- 238000007599 discharging Methods 0.000 claims abstract description 5
- 238000003825 pressing Methods 0.000 claims description 12
- 238000005516 engineering process Methods 0.000 abstract description 3
- 239000007788 liquid Substances 0.000 description 19
- 238000009938 salting Methods 0.000 description 19
- 230000000694 effects Effects 0.000 description 15
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 description 15
- 239000000203 mixture Substances 0.000 description 10
- 238000000034 method Methods 0.000 description 5
- 230000005484 gravity Effects 0.000 description 4
- 238000002844 melting Methods 0.000 description 4
- 230000008018 melting Effects 0.000 description 4
- 230000008569 process Effects 0.000 description 4
- 230000008020 evaporation Effects 0.000 description 3
- 238000001704 evaporation Methods 0.000 description 3
- 238000010422 painting Methods 0.000 description 3
- 238000002360 preparation method Methods 0.000 description 3
- 230000000903 blocking effect Effects 0.000 description 2
- 230000006835 compression Effects 0.000 description 2
- 238000007906 compression Methods 0.000 description 2
- 235000013399 edible fruits Nutrition 0.000 description 2
- 239000010410 layer Substances 0.000 description 2
- 239000000463 material Substances 0.000 description 2
- 238000002156 mixing Methods 0.000 description 2
- 229920000728 polyester Polymers 0.000 description 2
- 239000003507 refrigerant Substances 0.000 description 2
- 206010053615 Thermal burn Diseases 0.000 description 1
- 229920006243 acrylic copolymer Polymers 0.000 description 1
- 230000009471 action Effects 0.000 description 1
- 230000008859 change Effects 0.000 description 1
- 239000011247 coating layer Substances 0.000 description 1
- 125000004122 cyclic group Chemical group 0.000 description 1
- 238000010586 diagram Methods 0.000 description 1
- 238000002474 experimental method Methods 0.000 description 1
- 239000000284 extract Substances 0.000 description 1
- 238000007710 freezing Methods 0.000 description 1
- 230000008014 freezing Effects 0.000 description 1
- 239000004615 ingredient Substances 0.000 description 1
- 238000009413 insulation Methods 0.000 description 1
- 239000000155 melt Substances 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 239000002245 particle Substances 0.000 description 1
- 239000000049 pigment Substances 0.000 description 1
- 238000001556 precipitation Methods 0.000 description 1
- 238000005057 refrigeration Methods 0.000 description 1
- 238000007789 sealing Methods 0.000 description 1
- 238000010257 thawing Methods 0.000 description 1
Classifications
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F25—REFRIGERATION OR COOLING; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS; MANUFACTURE OR STORAGE OF ICE; LIQUEFACTION SOLIDIFICATION OF GASES
- F25D—REFRIGERATORS; COLD ROOMS; ICE-BOXES; COOLING OR FREEZING APPARATUS NOT OTHERWISE PROVIDED FOR
- F25D31/00—Other cooling or freezing apparatus
Landscapes
- Engineering & Computer Science (AREA)
- Chemical & Material Sciences (AREA)
- Combustion & Propulsion (AREA)
- Physics & Mathematics (AREA)
- Mechanical Engineering (AREA)
- Thermal Sciences (AREA)
- General Engineering & Computer Science (AREA)
- Application Of Or Painting With Fluid Materials (AREA)
Abstract
The present invention relates to cooling technology fields, specifically disclose a kind of cooling equipment of coating, including main cooling bucket, the side of main cooling bucket is equipped with icehouse, ice cube is preset in icehouse, main cooling bucket is connected to icehouse, it is slidably connected on the madial wall of main cooling bucket and blocks the baffle that ice cube enters in main cooling bucket, it is arranged with main paint can in main cooling bucket, it is connected with the first elastic component between main paint can and main cooling bucket, it is connected with transport unit between baffle and main paint can, it is rotatably connected to stirring rod in main paint can, stirring rod is connected with motor, it is also associated with feed pipe and discharge nozzle in main paint can, feed pipe is connected with feed pump, discharge nozzle is connected with discharging pump, the lower section of main paint can is equipped with the bushing being laterally arranged, bushing is slidably connected in main cooling bucket, it is connected with the second elastic component between bushing and main cooling bottom of the barrel.It can repeatedly be cooled down to coating using the technical program, while salt can also be recycled, it is cost-effective.
Description
Technical field
The present invention relates to cooling technology field, the cooling equipment of specially a kind of coating.
Background technology
Pigment, amorphous polyester, semicrystalline polyester and acrylic copolymer would generally be added in the preparation process of coating
Deng, during preparation for so that each ingredient between fully merge, it can be heated, at the same also be avoided that caking etc. feelings
Condition.It after the completion of coating preparation, needs to carry out mounted box or barrelling to coating, in order to avoid damage adds during barrelling and mounted box
Work machine and scald staff, need to cool down to coating.
A kind of Portable refrigeration device of Publication No. CN201935503U, including a babinet, insulation cover and insulating layer,
There are one frozen coating in insulating layer, frozen coating is interior to be filled with refrigerant, is freezing chamber inside frozen coating, includes salt in frozen coating
Layer and ice sheet, there is a demarcation strip between ice sheet and salt deposit, keep demarcation strip broken by shaking household freezer when use, after demarcation strip is broken
Ice sheet is mixed with salt deposit contact start, and the water generated after mixing penetrates down into salt deposit, and salt particle, which persistently melts, generates water at low temperature,
There are following technical problems for above-mentioned technical proposal:1, it needs to break demarcation strip when mixing salt and ice
Broken to can be only achieved cooling effect, cost is higher;2, vibrations when need the regular hour that could be crushed demarcation strip, the used time compared with
It is long;3, it is stationary state to need cooling object, then there may be cannot be fully cooled apart from the fractional object of refrigerant farther out,
I.e. cooling degree is inconsistent.
Invention content
The invention is intended to provide a kind of cooling equipment of coating, to solve the problems, such as how to be fully cooled to coating.
The present invention provides base case:A kind of cooling equipment of coating, including main cooling bucket, the side of main cooling bucket are set
There is icehouse, ice cube is preset in icehouse, main cooling bucket is connected to icehouse, is slidably connected on the madial wall of main cooling bucket and is blocked ice
Block enters the baffle in main cooling bucket, and salt is preset in main cooling bucket, main paint can, main coating are slidably connected in main cooling bucket
It is connected with the first elastic component between bucket and main cooling bucket, driving section, main coating bottom of the barrel are connected between baffle and main paint can
It is rotatably connected to vertically arranged leading screw, nut is arranged on leading screw, leading screw is connect with nut thread, and nut is fixedly connected on master
On cooling bucket, leading screw is equipped with stirring rod in the axial direction, and feed pipe and discharge nozzle are also associated in main paint can, and feed pipe connects
It is connected with feed pump, discharge nozzle is communicated with discharging pump, and the lower section of main paint can is equipped with the bushing being laterally arranged, and bushing is slidably connected at
In main cooling bucket, the second elastic component is connected between bushing and main cooling bottom of the barrel, bushing is equipped with can be by between main paint can
It has a rest the leakage hole blocked, the side wall of main cooling bucket is equipped with osculum, and osculum is located at the lower section of bushing, and osculum is communicated with draining
Pipe, drainpipe are equipped with pressure valve, and the bottom of main cooling bucket is communicated with circulation pipe, pressure valve is also connected on circulation pipe, is recycled
The other end of pipe is connected to the top of main cooling bucket.
The operation principle of base case:It is used to be packed into the coating for needing to cool equipped with main paint can, is equipped with driving section,
It drives baffle to move when can be moved down by main paint can, so that ice cube is fallen into main cooling bucket, can be melted by ice cube
Change the heat for siphoning away coating, be equipped with the first elastic component, main paint can be made to reset.Equipped with leading screw and nut, master can be passed through
When paint can moves down under the effect of gravity drive leading screw move, due to nut be fixed on it is main cooling bucket in, leading screw to
It can rotate when lower mobile, to drive stirring rod to rotate, the stirring to coating be realized with this, enables coating and ice
Block comes into full contact with, and accelerates the cooling of coating.Ice cube can be allowed to rest on bushing equipped with bushing, at the same allow it is ice melting at water
It falls into below bushing.The heat of coating is siphoned away when can dissolve and dilute by salt equipped with salt.When main paint can is pressed on bushing
And when blocking leakage hole, moved down by increasing the gravitational force urges bushing in main paint can, thus by bushing lower section and main painting
The mixture of the salting liquid and salt in space between charging basket bottom is squeezed out from circulation pipe and is fallen at the top of main cooling bucket, is allowed
The mixture of salting liquid and salt is fallen above ice cube under the effect of gravity, can be with ice cube and the water being attached on ice cube
It comes into full contact with, the abundant dissolving to salt is realized with this.
The advantageous effect of base case is:
1, it is equipped with bushing and main paint can, blocks the leakage hole on bushing when can be moved down by main paint can, at this time
A closed space is formed below bushing between main coating bottom of the barrel, by increasing the gravitational force urges bushing in main paint can
It moves down, to squeeze out the salting liquid in the space below bushing between main coating bottom of the barrel from circulation pipe and from master
It is fallen at the top of cooling bucket, the abundant dissolving to salt is realized with this, makes full use of resource, it is cost-effective.
2, it is equipped with ice cube and salt, the heat in coating can be siphoned away by the process of ice melting Cheng Shui, salt is dissolved in water
Process siphon away the heat in coating again, achieve the effect that double endotherm, reinforce the cooling-down effect to coating.
3, it is equipped with stirring rod, leading screw and nut, stirring rod can be driven to rotate by the process to addition coating, then
Coating is stirred by stirring rod, so that coating is come into full contact with the ice cube in main cooling bucket, further strengthens cooling effect.
Further, drainpipe is connected to the other end at osculum and is communicated with preliminary cooling bucket, is equipped in preliminary cooling bucket
The inlet side of preliminary paint can, feed pump is connected in preliminary paint can.It can be to applying before coating carries out main cooling step
Material tentatively cool down, and reinforces the cooling effect of coating.
Further, driving section includes vertically arranged closure rack, is closed rack and is connected on baffle, is closed on rack and nibbles
Conjunction has gear, the other side that gear is engaged with closure rack to be engaged with vertically arranged promotion rack, push rack and main coating
Bucket is fixedly connected.Compared to pulley is set as, the engagement effect of wheel and rack is more preferable, the case where being not likely to produce skidding.
Further, it is arranged with locating ring outside main paint can, main paint can is slidably connected in locating ring, and locating ring, which is fixed, to be connected
It is connected on main cooling bucket, the first elastic component is connected between locating ring and main paint can.Main painting can be avoided to a certain extent
The case where charging basket run-off the straight, to avoid the coating in main paint can from dropping out, moreover it is possible to main paint can be avoided to fail to block completely
The case where leakage hole, occurs.
Further, it is equipped with the check valve being only capable of inside main cooling bucket to outside on drainpipe and circulation pipe.It can keep away
The mixture for exempting from salt and salting liquid is flow backwards into main cooling bucket.
Further, the bottom of tentatively cooling bucket is coniform, and preliminary cooling bottom of the barrel is communicated with plus salt pipe, adds the another of salt pipe
One end is connected to the top of main cooling bucket, and it is from preliminary cooling bucket to main cooling bucket plus salt to add salt pipe to be connected with the direction of motion
Pump.It is set as coniform to be easy to collect the salt being precipitated, the salt of precipitation can be reused.
Further, main cooling bottom of the barrel is coniform, and circulation pipe is connected to the lowest point of main cooling bucket.It can will fail
The salt of fully dissolved is collected, and further dilutes salting liquid or dissolving salt, salt is made to can make full use of, cost-effective.
Further, the lower section of main paint can is equipped with the pressing plate that can intermittently block leakage hole, connects between pressing plate and main paint can
It is connected to connector.It is equipped with gap between i.e. main paint can and bushing, ice cube or water can be enable to touch main paint can
Bottom further strengthens cooling effect.
Description of the drawings
Fig. 1 is the schematic diagram of the embodiment of the present invention.
Specific implementation mode
It is further described below by specific implementation mode:
Reference numeral in Figure of description includes:Circulation pipe 1, main cooling bucket 2, locating ring 3, the first elastic component 31, ice
Room 4, baffle 5 are closed rack 51, gear 52, push rack 53, main paint can 6, pressing plate 7, bushing 8, the 9, second elasticity of check valve
Part 91, pressure valve 10, drainpipe 11, preliminary cooling bucket 12, preliminary paint can 13, feed pipe 14 plus salt pipe 15, nut 16, silk
Thick stick 17, stirring rod 18, discharge nozzle 19.
Embodiment is substantially as shown in Fig. 1:A kind of cooling equipment of coating, including main cooling bucket 2, a left side for main cooling bucket 2
Side is equipped with icehouse 4, and ice cube is preset in icehouse 4, and the left side wall of main cooling bucket 2 is equipped with into ice mouth, connects into ice mouth and icehouse 4
It is logical, slidably connect the baffle 5 blocked into ice mouth on the madial wall of main cooling bucket 2.Upper weld in main cooling bucket 2 has positioning
Ring 3 slidably connects main paint can 6 in locating ring 3, the first elastic component 31 is connected between locating ring 3 and main paint can 6, this
The first elastic component 31 in embodiment is tension spring and outer cover is equipped with resilient sleeve.It is equipped between baffle 5 and main paint can 6 vertical
The closure rack 51 of setting is closed on rack 51 and is engaged with gear 52, and the right side of gear 52 is engaged with vertically arranged promotion tooth
Item 53 pushes the right side of rack 53 to be welded with main paint can 6.6 lower rotation of main paint can is connected with vertically arranged leading screw 17,
Nut 16 is arranged on leading screw 17, leading screw 17 is threadedly coupled with nut 16, and nut 16 is welded on main cooling bucket 2,17 edge of leading screw
Axis direction is equipped with stirring rod 18.The lower section of main paint can 6 is horizontally arranged with bushing 8, and salt is preset on bushing 8.Bushing 8 is slided
Dynamic to be connected in main cooling bucket 2, bushing 8 and main cooling bucket are connected with the second elastic component 91 between 2 bottom, and the in the present embodiment
Two elastic components 91 are compression spring and outer sheath is equipped with resilient sleeve.Bushing 8 is equipped with leakage hole, and the lower section of main paint can 6 is equipped with interval
The pressing plate 7 for blocking leakage hole, is connected with connector between pressing plate 7 and main paint can 6, the connector in the present embodiment is connecting rod.
The side wall of main cooling bucket 2 is equipped with osculum, and osculum is located at the lower section of bushing 8, and osculum is communicated with drainpipe 11, drainpipe
11 are equipped with pressure valve 10 and are only capable of being communicated with bottom to external check valve 9,11 other end of drainpipe inside main cooling bucket 2
For coniform preliminary cooling bucket 12, it tentatively is equipped with preliminary paint can 13 in cooling bucket 12, charging is also associated in main paint can 6
Pipe 14 and discharge nozzle 19, feed pipe 14 are communicated with feed pump (being not drawn into figure), and discharge nozzle 19 is connected with discharging pump and (is not drawn in figure
Go out), the inlet side of feed pipe 14 is connected to preliminary paint can 13.The bottom of main cooling bucket 2 is communicated with circulation pipe 1, on circulation pipe 1
It is connected with pressure valve 10 and is only capable of inside main cooling bucket 2 to external check valve 9, the other end of circulation pipe 1 and main cooling bucket 2
Top connection.12 bottom of preliminary cooling bucket is communicated with plus salt pipe 15, and the top of the other end and main cooling bucket 2 of salt pipe 15 is added to connect
Logical, it is from preliminary cooling bucket 12 to main cooling bucket 2 plus salt pump (being not drawn into figure) to add salt pipe 15 to be connected with the direction of motion.
Specific implementation process is as follows:To first be poured into preliminary paint can 13 and need cooling coating, restart feed pump from
Coating in preliminary paint can 13 extracts in a part to main paint can 6.After coating enters in main paint can 6, in main paint can 6
Gravity increase, to stretch the first elastic component 31 deform upon so that main paint can 6 moves down.Main paint can 6 is to moving down
It can be driven while dynamic and rack 53 is pushed to move down, can rotated with moving gear 52 when rack 53 being pushed to move down, gear 52
Closure rack 51 is driven to move up.Being closed rack 51 drives baffle 5 to move up, to open into ice mouth so that in icehouse 4
Ice cube fall into main cooling bucket 2.
When ice cube touches main paint can 6, since the coating material temperature in main paint can 6 is higher, ice cube can absorbing coating
Temperature and thawing.It is ice melting at the bottom of main cooling bucket 2 that can be fallen into from the leakage hole of bushing 8 of water, position can be dissolved
Salt in 2 bottom of main cooling bucket, can absorb heat, then can further strengthen cooling effect when dissolving to form salting liquid due to salt
Fruit.
Main paint can 6 can drive leading screw 17 to move down while moving down, since thread bush is equipped with spiral shell on leading screw 17
Mother 16, nut 16 are fixedly connected on main cooling bucket 2, can rotate when leading screw 17 moves down, to drive stirring rod 18
It rotates, coating is stirred by the rotation of stirring rod 18 so that coating can come into full contact with ice cube.
It can be moved down with dynamic pressure plate 7 when main paint can 6 moves down, to which pressing plate 7 is pressed on bushing 8 and block leakage
Hole, since the leakage hole on bushing 8 at this time has been pushed down by pressing plate 7, then 8 lower section of bushing becomes sealing with the space in main cooling bucket 2
The space closed.Continue to input coating into main paint can 6, main paint can 6 will continue to move down and push down on bushing 8, leakage
Plate 8 can drive the compression of the second elastic component 91 to deform upon when being pushed, to which bushing 8 can move down.Bushing 8 moves down
When can squeeze the lower section of bushing 8 and the space in main cooling bucket 2,8 lower section of bushing and the pressure in the space in main cooling bucket 2 increase at this time
Add.Due to ice melting at flow can be formed when water, then the salt on bushing 8 may be washed out from leakage hole and be fallen in main cooling
The bottom of bucket 2, and salt can be sunken to the bottom of salting liquid due to the density that density is more than salting liquid, when 8 lower section of bushing and main cooling
The pressure in the space in bucket 2 can blow-off pressure valve 10 when being more than the value that pressure valve 10 is set so that the salt of 2 bottom of main cooling bucket with
The mixture of salting liquid is squeezed out from circulation pipe 1, and is fallen into main cooling bucket 2 from the top of main cooling bucket 2 through circulation pipe 1, by
Fail to come into full contact with salt for the mixture of ice and water in 2 top of main cooling bucket, then the concentration of salt is smaller so that salt and salting liquid
Mixture fully can dissolve and dilute with positioned at the ice on main cooling 2 top of bucket and the mixture of water, further strengthen cooling
Effect.
Pressing plate 7 can also make the salting liquid between 8 lower section of bushing and 2 bottom of main cooling bucket from row while pushing bushing 8
It squeezes out at water hole, and is flowed in preliminary cooling bucket 12 by drainpipe 11, when salting liquid is contacted with preliminary paint can 13, due to
Temperature in preliminary paint can 13 is higher than the temperature of salting liquid, can accelerate the evaporation of water in salting liquid, and water evaporation when can be taken away
Heat, it is tentatively cooling so as to be carried out to the coating in preliminary paint can 13.After water evaporation, the ratio of the water in salting liquid becomes
It is few, a part of salt, the mixture of forming salt and salting liquid can be precipitated.Restart plus salt pump, by preliminary paint can 13 salt with
The mixture of salting liquid is delivered in main cooling bucket 2 in salt pipe 15 from adding, and is fallen into from the top of main cooling bucket 2, further plus
Strong cooling effect, and salt is recycled, it is cost-effective.
After the cooling of coating in main paint can 6 to be done, start discharging pump, by the coating in main paint can 6 from main painting
It is taken away in charging basket 6.The weight in main paint can 6 tapers at this time, and main paint can 6 restores the power of deformation in the first elastic component 31
Under the action of can move up, to leave bushing 8 with dynamic pressure plate 7, bushing 8 restores the work of the power of deformation in the second elastic component 91
It can be moved up under, at this time the state between pressing plate 7 and bushing 8 to be in close contact.When dividing completely between pressing plate 7 and bushing 8
From rear, the salting liquid of 8 top of bushing and the salt for failing dissolving can flow to the bottom of main cooling bucket 2 under the effect of gravity, can
Mixture for cyclic salt next time and salting liquid is prepared.
Above-described is only the embodiment of the present invention, and the common sense such as well known concrete structure and characteristic are not made herein in scheme
Excessive description, technical field that the present invention belongs to is all before one skilled in the art know the applying date or priority date
Ordinary technical knowledge can know the prior art all in the field, and with using routine experiment hand before the date
The ability of section, one skilled in the art can improve in conjunction with self-ability and implement under the enlightenment that the application provides
This programme, some typical known features or known method should not implement the application as one skilled in the art
Obstacle.It should be pointed out that for those skilled in the art, without departing from the structure of the invention, can also make
Go out several modifications and improvements, these should also be considered as protection scope of the present invention, these all do not interfere with the effect that the present invention is implemented
Fruit and patent practicability.The scope of protection required by this application should be based on the content of the claims, the tool in specification
The records such as body embodiment can be used for explaining the content of claim.
Claims (8)
1. a kind of cooling equipment of coating, it is characterised in that:Including main cooling bucket, the side of main cooling bucket is equipped with icehouse, icehouse
Inside be preset with ice cube, main cooling bucket be connected to icehouse, slidably connected on the madial wall of main cooling bucket block ice cube enter lead it is cold
But the baffle in bucket is preset with salt in main cooling bucket, main paint can, main paint can and main cooling is slidably connected in main cooling bucket
It is connected with the first elastic component between bucket, driving section is connected between baffle and main paint can, main paint can lower rotation is connected with
Vertically arranged leading screw is arranged with nut on leading screw, and leading screw is connect with nut thread, and nut is fixedly connected on main cooling bucket,
Leading screw is equipped with stirring rod in the axial direction, is also associated with feed pipe and discharge nozzle in main paint can, feed pipe is communicated with charging
Pump, discharge nozzle are communicated with discharging pump, and the lower section of main paint can is equipped with the bushing being laterally arranged, and bushing is slidably connected at main cooling bucket
It is interior, it is connected with the second elastic component between bushing and main cooling bottom of the barrel, bushing is equipped with and can be blocked by main paint can interval
The side wall of leakage hole, main cooling bucket is equipped with osculum, and osculum is located at the lower section of bushing, and osculum is communicated with drainpipe, draining
Pipe is equipped with pressure valve, and the bottom of main cooling bucket is communicated with circulation pipe, is also connected with pressure valve on circulation pipe, circulation pipe it is another
The top with main cooling bucket is held to be connected to.
2. a kind of cooling equipment of coating according to claim 1, it is characterised in that:Drainpipe is connected to another with osculum
One end is communicated with preliminary cooling bucket, and preliminary paint can is equipped in preliminary cooling bucket, and the feed end of feed pump is connected in preliminary coating
In bucket.
3. a kind of cooling equipment of coating according to claim 2, it is characterised in that:Driving section includes vertically arranged closes
Rack is closed, rack is closed and is connected on baffle, be closed on rack and be engaged with gear, the other side that gear is engaged with closure rack is nibbled
Conjunction has vertically arranged promotion rack, and rack is pushed to be fixedly connected with main paint can.
4. a kind of cooling equipment of coating according to claim 3, it is characterised in that:It is arranged with positioning outside main paint can
Ring, main paint can are slidably connected in locating ring, and locating ring is fixedly connected on main cooling bucket, and the first elastic component is connected to positioning
Between ring and main paint can.
5. a kind of cooling equipment of coating according to claim 4, it is characterised in that:It is equipped on drainpipe and circulation pipe
It is only capable of inside main cooling bucket to external check valve.
6. a kind of cooling equipment of coating according to claim 5, it is characterised in that:The bottom of preliminary cooling bucket is circular cone
Shape, preliminary cooling bottom of the barrel is communicated with plus salt pipe, adds the other end of salt pipe to be connected to the top of main cooling bucket, salt pipe is added to be connected with
The direction of motion is from preliminary cooling bucket to main cooling bucket plus salt pump.
7. a kind of cooling equipment of coating according to claim 6, it is characterised in that:Main cooling bottom of the barrel be it is coniform,
Circulation pipe is connected to the lowest point of main cooling bucket.
8. a kind of cooling equipment of coating according to claim 7, it is characterised in that:The lower section of main paint can is equipped with can
Interval blocks the pressing plate of leakage hole, and connector is connected between pressing plate and main paint can.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810615797.4A CN108679927B (en) | 2018-06-14 | 2018-06-14 | Cooling equipment of coating |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810615797.4A CN108679927B (en) | 2018-06-14 | 2018-06-14 | Cooling equipment of coating |
Publications (2)
Publication Number | Publication Date |
---|---|
CN108679927A true CN108679927A (en) | 2018-10-19 |
CN108679927B CN108679927B (en) | 2024-07-23 |
Family
ID=63811031
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201810615797.4A Active CN108679927B (en) | 2018-06-14 | 2018-06-14 | Cooling equipment of coating |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN108679927B (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN113318669A (en) * | 2021-05-25 | 2021-08-31 | 山东消博士消毒科技股份有限公司 | Cooling device is used in disinfectant production |
Citations (17)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1433337A (en) * | 2000-01-31 | 2003-07-30 | 利乐拉瓦尔集团及财务有限公司 | Mixing method and apparatus |
CN1505471A (en) * | 2001-04-26 | 2004-06-16 | ������������ʽ���� | Cooling tank |
US20110041546A1 (en) * | 2009-06-23 | 2011-02-24 | Nathan Linder | Refreezable ice barrel |
CN201935503U (en) * | 2010-12-10 | 2011-08-17 | 宗鹏晖 | Portable refrigeration equipment |
CN202092396U (en) * | 2011-05-20 | 2011-12-28 | 上海市宝山区青少年科学技术指导站 | Instant cooling device adopting heat absorption principle that salt dissolving in water |
US20130019626A1 (en) * | 2011-07-20 | 2013-01-24 | Daihen Corporation | Cooling Unit And Work Piece Conveying Equipment Using It |
CN104607473A (en) * | 2014-12-30 | 2015-05-13 | 山东钢铁股份有限公司 | Rolled workpiece cooling device and method |
CN104833172A (en) * | 2015-03-16 | 2015-08-12 | 泰兴市东圣食品科技有限公司 | Material liquid cooling device |
CN106091516A (en) * | 2016-08-26 | 2016-11-09 | 温州市凯宇五金有限公司 | A kind of five metals rapid chiller of making iron block |
CN206192017U (en) * | 2016-08-16 | 2017-05-24 | 广州宝之泰电子科技有限公司 | Quick cooling arrangement of high temperature worker's solution |
CN206269480U (en) * | 2016-12-09 | 2017-06-20 | 伟志股份有限公司 | Beverage cooling device |
CN107126867A (en) * | 2017-06-27 | 2017-09-05 | 盐城永悦新材料有限公司 | Temperature-controlled cooling device is mixed after a kind of thermosetting powder coating |
CN107149912A (en) * | 2017-06-27 | 2017-09-12 | 盐城永悦新材料有限公司 | Temperature-controlled cooling device is mixed after a kind of thermosetting powder coating |
CN107433066A (en) * | 2017-09-04 | 2017-12-05 | 陈立国 | The special multiple separation cooling back installation of Chemical Manufacture |
CN207095164U (en) * | 2017-07-12 | 2018-03-13 | 滕如阳 | A kind of medicine production cooling device |
CN107875928A (en) * | 2017-12-08 | 2018-04-06 | 百世杉集团有限公司 | A kind of coating dispersion machine with refrigerating function |
CN208282495U (en) * | 2018-06-14 | 2018-12-25 | 重庆阿罗网络科技有限公司 | A kind of cooling equipment of coating |
-
2018
- 2018-06-14 CN CN201810615797.4A patent/CN108679927B/en active Active
Patent Citations (17)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1433337A (en) * | 2000-01-31 | 2003-07-30 | 利乐拉瓦尔集团及财务有限公司 | Mixing method and apparatus |
CN1505471A (en) * | 2001-04-26 | 2004-06-16 | ������������ʽ���� | Cooling tank |
US20110041546A1 (en) * | 2009-06-23 | 2011-02-24 | Nathan Linder | Refreezable ice barrel |
CN201935503U (en) * | 2010-12-10 | 2011-08-17 | 宗鹏晖 | Portable refrigeration equipment |
CN202092396U (en) * | 2011-05-20 | 2011-12-28 | 上海市宝山区青少年科学技术指导站 | Instant cooling device adopting heat absorption principle that salt dissolving in water |
US20130019626A1 (en) * | 2011-07-20 | 2013-01-24 | Daihen Corporation | Cooling Unit And Work Piece Conveying Equipment Using It |
CN104607473A (en) * | 2014-12-30 | 2015-05-13 | 山东钢铁股份有限公司 | Rolled workpiece cooling device and method |
CN104833172A (en) * | 2015-03-16 | 2015-08-12 | 泰兴市东圣食品科技有限公司 | Material liquid cooling device |
CN206192017U (en) * | 2016-08-16 | 2017-05-24 | 广州宝之泰电子科技有限公司 | Quick cooling arrangement of high temperature worker's solution |
CN106091516A (en) * | 2016-08-26 | 2016-11-09 | 温州市凯宇五金有限公司 | A kind of five metals rapid chiller of making iron block |
CN206269480U (en) * | 2016-12-09 | 2017-06-20 | 伟志股份有限公司 | Beverage cooling device |
CN107126867A (en) * | 2017-06-27 | 2017-09-05 | 盐城永悦新材料有限公司 | Temperature-controlled cooling device is mixed after a kind of thermosetting powder coating |
CN107149912A (en) * | 2017-06-27 | 2017-09-12 | 盐城永悦新材料有限公司 | Temperature-controlled cooling device is mixed after a kind of thermosetting powder coating |
CN207095164U (en) * | 2017-07-12 | 2018-03-13 | 滕如阳 | A kind of medicine production cooling device |
CN107433066A (en) * | 2017-09-04 | 2017-12-05 | 陈立国 | The special multiple separation cooling back installation of Chemical Manufacture |
CN107875928A (en) * | 2017-12-08 | 2018-04-06 | 百世杉集团有限公司 | A kind of coating dispersion machine with refrigerating function |
CN208282495U (en) * | 2018-06-14 | 2018-12-25 | 重庆阿罗网络科技有限公司 | A kind of cooling equipment of coating |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN113318669A (en) * | 2021-05-25 | 2021-08-31 | 山东消博士消毒科技股份有限公司 | Cooling device is used in disinfectant production |
Also Published As
Publication number | Publication date |
---|---|
CN108679927B (en) | 2024-07-23 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN107702397A (en) | It is a kind of to go out ice cube trash ice ice machine automatically | |
CN208282495U (en) | A kind of cooling equipment of coating | |
CN108679927A (en) | A kind of cooling equipment of coating | |
CN110841326A (en) | Crystallization kettle for chemical production | |
CN117327935B (en) | Aluminum alloy degassing refining device with cleaning function | |
CN208920661U (en) | A kind of energy-saving oil temperature control film-making ice maker | |
CN108444210A (en) | A kind of energy saving quick beverage refrigeration machine | |
CN219589270U (en) | Water-cooling refrigerator capable of circularly refrigerating | |
CN208949156U (en) | A kind of composite heat transfer particle cooling device | |
CN115505702A (en) | Medium-thickness aluminum plate quenching device | |
CN202052514U (en) | Temperature adjusting device for liquid preparation tank | |
CN207515305U (en) | It is a kind of to go out ice cube trash ice ice machine automatically | |
CN209230110U (en) | A kind of continuous-production-type ice machine | |
CN208218776U (en) | Thermal desorption lime-ash recycling and processing device | |
CN209680039U (en) | A kind of dry and wet mud mixing arrangement | |
CN208744417U (en) | A kind of plastic part trimming jig | |
KR101960409B1 (en) | Rock Salt Agitation Apparatus for Snow Removal Solution | |
CN216814791U (en) | Refrigeration plant of anti-icing effect | |
CN212584398U (en) | Anti-freezing ball valve | |
CN205919554U (en) | Absorption type refrigerating unit | |
CN215176437U (en) | Cooling machine | |
CN110435073A (en) | A kind of hot melt adhesive production system with automatic dividing function | |
CN221055358U (en) | Uniform cooling device for compound fertilizer production | |
CN216204532U (en) | Ice slurry conveying system | |
CN221483967U (en) | Water chiller with good energy-saving effect |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
TA01 | Transfer of patent application right | ||
TA01 | Transfer of patent application right |
Effective date of registration: 20240626 Address after: 272200 Jining Chemical Industry Development Zone, Jinxiang County, Jining City, Shandong Province Applicant after: Jining Chuangjia Chemical Technology Co.,Ltd. Country or region after: China Address before: No. 2-1, Building 31, San Village, Yangjiaping West Suburb, Jiulongpo District, Chongqing, 400050 Applicant before: CHONGQING ALUO NETWORK TECHNOLOGY Co.,Ltd. Country or region before: China |
|
GR01 | Patent grant | ||
GR01 | Patent grant |