CN108679927A - A kind of cooling equipment of coating - Google Patents

A kind of cooling equipment of coating Download PDF

Info

Publication number
CN108679927A
CN108679927A CN201810615797.4A CN201810615797A CN108679927A CN 108679927 A CN108679927 A CN 108679927A CN 201810615797 A CN201810615797 A CN 201810615797A CN 108679927 A CN108679927 A CN 108679927A
Authority
CN
China
Prior art keywords
main
bucket
cooling bucket
paint
cooling
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201810615797.4A
Other languages
Chinese (zh)
Other versions
CN108679927B (en
Inventor
罗德富
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jining Chuangjia Chemical Technology Co ltd
Original Assignee
Chongqing Arrow Network Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Chongqing Arrow Network Technology Co Ltd filed Critical Chongqing Arrow Network Technology Co Ltd
Priority to CN201810615797.4A priority Critical patent/CN108679927B/en
Publication of CN108679927A publication Critical patent/CN108679927A/en
Application granted granted Critical
Publication of CN108679927B publication Critical patent/CN108679927B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F25REFRIGERATION OR COOLING; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS; MANUFACTURE OR STORAGE OF ICE; LIQUEFACTION SOLIDIFICATION OF GASES
    • F25DREFRIGERATORS; COLD ROOMS; ICE-BOXES; COOLING OR FREEZING APPARATUS NOT OTHERWISE PROVIDED FOR
    • F25D31/00Other cooling or freezing apparatus

Landscapes

  • Engineering & Computer Science (AREA)
  • Chemical & Material Sciences (AREA)
  • Combustion & Propulsion (AREA)
  • Physics & Mathematics (AREA)
  • Mechanical Engineering (AREA)
  • Thermal Sciences (AREA)
  • General Engineering & Computer Science (AREA)
  • Application Of Or Painting With Fluid Materials (AREA)

Abstract

The present invention relates to cooling technology fields, specifically disclose a kind of cooling equipment of coating, including main cooling bucket, the side of main cooling bucket is equipped with icehouse, ice cube is preset in icehouse, main cooling bucket is connected to icehouse, it is slidably connected on the madial wall of main cooling bucket and blocks the baffle that ice cube enters in main cooling bucket, it is arranged with main paint can in main cooling bucket, it is connected with the first elastic component between main paint can and main cooling bucket, it is connected with transport unit between baffle and main paint can, it is rotatably connected to stirring rod in main paint can, stirring rod is connected with motor, it is also associated with feed pipe and discharge nozzle in main paint can, feed pipe is connected with feed pump, discharge nozzle is connected with discharging pump, the lower section of main paint can is equipped with the bushing being laterally arranged, bushing is slidably connected in main cooling bucket, it is connected with the second elastic component between bushing and main cooling bottom of the barrel.It can repeatedly be cooled down to coating using the technical program, while salt can also be recycled, it is cost-effective.

Description

A kind of cooling equipment of coating
Technical field
The present invention relates to cooling technology field, the cooling equipment of specially a kind of coating.
Background technology
Pigment, amorphous polyester, semicrystalline polyester and acrylic copolymer would generally be added in the preparation process of coating Deng, during preparation for so that each ingredient between fully merge, it can be heated, at the same also be avoided that caking etc. feelings Condition.It after the completion of coating preparation, needs to carry out mounted box or barrelling to coating, in order to avoid damage adds during barrelling and mounted box Work machine and scald staff, need to cool down to coating.
A kind of Portable refrigeration device of Publication No. CN201935503U, including a babinet, insulation cover and insulating layer, There are one frozen coating in insulating layer, frozen coating is interior to be filled with refrigerant, is freezing chamber inside frozen coating, includes salt in frozen coating Layer and ice sheet, there is a demarcation strip between ice sheet and salt deposit, keep demarcation strip broken by shaking household freezer when use, after demarcation strip is broken Ice sheet is mixed with salt deposit contact start, and the water generated after mixing penetrates down into salt deposit, and salt particle, which persistently melts, generates water at low temperature,
There are following technical problems for above-mentioned technical proposal:1, it needs to break demarcation strip when mixing salt and ice Broken to can be only achieved cooling effect, cost is higher;2, vibrations when need the regular hour that could be crushed demarcation strip, the used time compared with It is long;3, it is stationary state to need cooling object, then there may be cannot be fully cooled apart from the fractional object of refrigerant farther out, I.e. cooling degree is inconsistent.
Invention content
The invention is intended to provide a kind of cooling equipment of coating, to solve the problems, such as how to be fully cooled to coating.
The present invention provides base case:A kind of cooling equipment of coating, including main cooling bucket, the side of main cooling bucket are set There is icehouse, ice cube is preset in icehouse, main cooling bucket is connected to icehouse, is slidably connected on the madial wall of main cooling bucket and is blocked ice Block enters the baffle in main cooling bucket, and salt is preset in main cooling bucket, main paint can, main coating are slidably connected in main cooling bucket It is connected with the first elastic component between bucket and main cooling bucket, driving section, main coating bottom of the barrel are connected between baffle and main paint can It is rotatably connected to vertically arranged leading screw, nut is arranged on leading screw, leading screw is connect with nut thread, and nut is fixedly connected on master On cooling bucket, leading screw is equipped with stirring rod in the axial direction, and feed pipe and discharge nozzle are also associated in main paint can, and feed pipe connects It is connected with feed pump, discharge nozzle is communicated with discharging pump, and the lower section of main paint can is equipped with the bushing being laterally arranged, and bushing is slidably connected at In main cooling bucket, the second elastic component is connected between bushing and main cooling bottom of the barrel, bushing is equipped with can be by between main paint can It has a rest the leakage hole blocked, the side wall of main cooling bucket is equipped with osculum, and osculum is located at the lower section of bushing, and osculum is communicated with draining Pipe, drainpipe are equipped with pressure valve, and the bottom of main cooling bucket is communicated with circulation pipe, pressure valve is also connected on circulation pipe, is recycled The other end of pipe is connected to the top of main cooling bucket.
The operation principle of base case:It is used to be packed into the coating for needing to cool equipped with main paint can, is equipped with driving section, It drives baffle to move when can be moved down by main paint can, so that ice cube is fallen into main cooling bucket, can be melted by ice cube Change the heat for siphoning away coating, be equipped with the first elastic component, main paint can be made to reset.Equipped with leading screw and nut, master can be passed through When paint can moves down under the effect of gravity drive leading screw move, due to nut be fixed on it is main cooling bucket in, leading screw to It can rotate when lower mobile, to drive stirring rod to rotate, the stirring to coating be realized with this, enables coating and ice Block comes into full contact with, and accelerates the cooling of coating.Ice cube can be allowed to rest on bushing equipped with bushing, at the same allow it is ice melting at water It falls into below bushing.The heat of coating is siphoned away when can dissolve and dilute by salt equipped with salt.When main paint can is pressed on bushing And when blocking leakage hole, moved down by increasing the gravitational force urges bushing in main paint can, thus by bushing lower section and main painting The mixture of the salting liquid and salt in space between charging basket bottom is squeezed out from circulation pipe and is fallen at the top of main cooling bucket, is allowed The mixture of salting liquid and salt is fallen above ice cube under the effect of gravity, can be with ice cube and the water being attached on ice cube It comes into full contact with, the abundant dissolving to salt is realized with this.
The advantageous effect of base case is:
1, it is equipped with bushing and main paint can, blocks the leakage hole on bushing when can be moved down by main paint can, at this time A closed space is formed below bushing between main coating bottom of the barrel, by increasing the gravitational force urges bushing in main paint can It moves down, to squeeze out the salting liquid in the space below bushing between main coating bottom of the barrel from circulation pipe and from master It is fallen at the top of cooling bucket, the abundant dissolving to salt is realized with this, makes full use of resource, it is cost-effective.
2, it is equipped with ice cube and salt, the heat in coating can be siphoned away by the process of ice melting Cheng Shui, salt is dissolved in water Process siphon away the heat in coating again, achieve the effect that double endotherm, reinforce the cooling-down effect to coating.
3, it is equipped with stirring rod, leading screw and nut, stirring rod can be driven to rotate by the process to addition coating, then Coating is stirred by stirring rod, so that coating is come into full contact with the ice cube in main cooling bucket, further strengthens cooling effect.
Further, drainpipe is connected to the other end at osculum and is communicated with preliminary cooling bucket, is equipped in preliminary cooling bucket The inlet side of preliminary paint can, feed pump is connected in preliminary paint can.It can be to applying before coating carries out main cooling step Material tentatively cool down, and reinforces the cooling effect of coating.
Further, driving section includes vertically arranged closure rack, is closed rack and is connected on baffle, is closed on rack and nibbles Conjunction has gear, the other side that gear is engaged with closure rack to be engaged with vertically arranged promotion rack, push rack and main coating Bucket is fixedly connected.Compared to pulley is set as, the engagement effect of wheel and rack is more preferable, the case where being not likely to produce skidding.
Further, it is arranged with locating ring outside main paint can, main paint can is slidably connected in locating ring, and locating ring, which is fixed, to be connected It is connected on main cooling bucket, the first elastic component is connected between locating ring and main paint can.Main painting can be avoided to a certain extent The case where charging basket run-off the straight, to avoid the coating in main paint can from dropping out, moreover it is possible to main paint can be avoided to fail to block completely The case where leakage hole, occurs.
Further, it is equipped with the check valve being only capable of inside main cooling bucket to outside on drainpipe and circulation pipe.It can keep away The mixture for exempting from salt and salting liquid is flow backwards into main cooling bucket.
Further, the bottom of tentatively cooling bucket is coniform, and preliminary cooling bottom of the barrel is communicated with plus salt pipe, adds the another of salt pipe One end is connected to the top of main cooling bucket, and it is from preliminary cooling bucket to main cooling bucket plus salt to add salt pipe to be connected with the direction of motion Pump.It is set as coniform to be easy to collect the salt being precipitated, the salt of precipitation can be reused.
Further, main cooling bottom of the barrel is coniform, and circulation pipe is connected to the lowest point of main cooling bucket.It can will fail The salt of fully dissolved is collected, and further dilutes salting liquid or dissolving salt, salt is made to can make full use of, cost-effective.
Further, the lower section of main paint can is equipped with the pressing plate that can intermittently block leakage hole, connects between pressing plate and main paint can It is connected to connector.It is equipped with gap between i.e. main paint can and bushing, ice cube or water can be enable to touch main paint can Bottom further strengthens cooling effect.
Description of the drawings
Fig. 1 is the schematic diagram of the embodiment of the present invention.
Specific implementation mode
It is further described below by specific implementation mode:
Reference numeral in Figure of description includes:Circulation pipe 1, main cooling bucket 2, locating ring 3, the first elastic component 31, ice Room 4, baffle 5 are closed rack 51, gear 52, push rack 53, main paint can 6, pressing plate 7, bushing 8, the 9, second elasticity of check valve Part 91, pressure valve 10, drainpipe 11, preliminary cooling bucket 12, preliminary paint can 13, feed pipe 14 plus salt pipe 15, nut 16, silk Thick stick 17, stirring rod 18, discharge nozzle 19.
Embodiment is substantially as shown in Fig. 1:A kind of cooling equipment of coating, including main cooling bucket 2, a left side for main cooling bucket 2 Side is equipped with icehouse 4, and ice cube is preset in icehouse 4, and the left side wall of main cooling bucket 2 is equipped with into ice mouth, connects into ice mouth and icehouse 4 It is logical, slidably connect the baffle 5 blocked into ice mouth on the madial wall of main cooling bucket 2.Upper weld in main cooling bucket 2 has positioning Ring 3 slidably connects main paint can 6 in locating ring 3, the first elastic component 31 is connected between locating ring 3 and main paint can 6, this The first elastic component 31 in embodiment is tension spring and outer cover is equipped with resilient sleeve.It is equipped between baffle 5 and main paint can 6 vertical The closure rack 51 of setting is closed on rack 51 and is engaged with gear 52, and the right side of gear 52 is engaged with vertically arranged promotion tooth Item 53 pushes the right side of rack 53 to be welded with main paint can 6.6 lower rotation of main paint can is connected with vertically arranged leading screw 17, Nut 16 is arranged on leading screw 17, leading screw 17 is threadedly coupled with nut 16, and nut 16 is welded on main cooling bucket 2,17 edge of leading screw Axis direction is equipped with stirring rod 18.The lower section of main paint can 6 is horizontally arranged with bushing 8, and salt is preset on bushing 8.Bushing 8 is slided Dynamic to be connected in main cooling bucket 2, bushing 8 and main cooling bucket are connected with the second elastic component 91 between 2 bottom, and the in the present embodiment Two elastic components 91 are compression spring and outer sheath is equipped with resilient sleeve.Bushing 8 is equipped with leakage hole, and the lower section of main paint can 6 is equipped with interval The pressing plate 7 for blocking leakage hole, is connected with connector between pressing plate 7 and main paint can 6, the connector in the present embodiment is connecting rod. The side wall of main cooling bucket 2 is equipped with osculum, and osculum is located at the lower section of bushing 8, and osculum is communicated with drainpipe 11, drainpipe 11 are equipped with pressure valve 10 and are only capable of being communicated with bottom to external check valve 9,11 other end of drainpipe inside main cooling bucket 2 For coniform preliminary cooling bucket 12, it tentatively is equipped with preliminary paint can 13 in cooling bucket 12, charging is also associated in main paint can 6 Pipe 14 and discharge nozzle 19, feed pipe 14 are communicated with feed pump (being not drawn into figure), and discharge nozzle 19 is connected with discharging pump and (is not drawn in figure Go out), the inlet side of feed pipe 14 is connected to preliminary paint can 13.The bottom of main cooling bucket 2 is communicated with circulation pipe 1, on circulation pipe 1 It is connected with pressure valve 10 and is only capable of inside main cooling bucket 2 to external check valve 9, the other end of circulation pipe 1 and main cooling bucket 2 Top connection.12 bottom of preliminary cooling bucket is communicated with plus salt pipe 15, and the top of the other end and main cooling bucket 2 of salt pipe 15 is added to connect Logical, it is from preliminary cooling bucket 12 to main cooling bucket 2 plus salt pump (being not drawn into figure) to add salt pipe 15 to be connected with the direction of motion.
Specific implementation process is as follows:To first be poured into preliminary paint can 13 and need cooling coating, restart feed pump from Coating in preliminary paint can 13 extracts in a part to main paint can 6.After coating enters in main paint can 6, in main paint can 6 Gravity increase, to stretch the first elastic component 31 deform upon so that main paint can 6 moves down.Main paint can 6 is to moving down It can be driven while dynamic and rack 53 is pushed to move down, can rotated with moving gear 52 when rack 53 being pushed to move down, gear 52 Closure rack 51 is driven to move up.Being closed rack 51 drives baffle 5 to move up, to open into ice mouth so that in icehouse 4 Ice cube fall into main cooling bucket 2.
When ice cube touches main paint can 6, since the coating material temperature in main paint can 6 is higher, ice cube can absorbing coating Temperature and thawing.It is ice melting at the bottom of main cooling bucket 2 that can be fallen into from the leakage hole of bushing 8 of water, position can be dissolved Salt in 2 bottom of main cooling bucket, can absorb heat, then can further strengthen cooling effect when dissolving to form salting liquid due to salt Fruit.
Main paint can 6 can drive leading screw 17 to move down while moving down, since thread bush is equipped with spiral shell on leading screw 17 Mother 16, nut 16 are fixedly connected on main cooling bucket 2, can rotate when leading screw 17 moves down, to drive stirring rod 18 It rotates, coating is stirred by the rotation of stirring rod 18 so that coating can come into full contact with ice cube.
It can be moved down with dynamic pressure plate 7 when main paint can 6 moves down, to which pressing plate 7 is pressed on bushing 8 and block leakage Hole, since the leakage hole on bushing 8 at this time has been pushed down by pressing plate 7, then 8 lower section of bushing becomes sealing with the space in main cooling bucket 2 The space closed.Continue to input coating into main paint can 6, main paint can 6 will continue to move down and push down on bushing 8, leakage Plate 8 can drive the compression of the second elastic component 91 to deform upon when being pushed, to which bushing 8 can move down.Bushing 8 moves down When can squeeze the lower section of bushing 8 and the space in main cooling bucket 2,8 lower section of bushing and the pressure in the space in main cooling bucket 2 increase at this time Add.Due to ice melting at flow can be formed when water, then the salt on bushing 8 may be washed out from leakage hole and be fallen in main cooling The bottom of bucket 2, and salt can be sunken to the bottom of salting liquid due to the density that density is more than salting liquid, when 8 lower section of bushing and main cooling The pressure in the space in bucket 2 can blow-off pressure valve 10 when being more than the value that pressure valve 10 is set so that the salt of 2 bottom of main cooling bucket with The mixture of salting liquid is squeezed out from circulation pipe 1, and is fallen into main cooling bucket 2 from the top of main cooling bucket 2 through circulation pipe 1, by Fail to come into full contact with salt for the mixture of ice and water in 2 top of main cooling bucket, then the concentration of salt is smaller so that salt and salting liquid Mixture fully can dissolve and dilute with positioned at the ice on main cooling 2 top of bucket and the mixture of water, further strengthen cooling Effect.
Pressing plate 7 can also make the salting liquid between 8 lower section of bushing and 2 bottom of main cooling bucket from row while pushing bushing 8 It squeezes out at water hole, and is flowed in preliminary cooling bucket 12 by drainpipe 11, when salting liquid is contacted with preliminary paint can 13, due to Temperature in preliminary paint can 13 is higher than the temperature of salting liquid, can accelerate the evaporation of water in salting liquid, and water evaporation when can be taken away Heat, it is tentatively cooling so as to be carried out to the coating in preliminary paint can 13.After water evaporation, the ratio of the water in salting liquid becomes It is few, a part of salt, the mixture of forming salt and salting liquid can be precipitated.Restart plus salt pump, by preliminary paint can 13 salt with The mixture of salting liquid is delivered in main cooling bucket 2 in salt pipe 15 from adding, and is fallen into from the top of main cooling bucket 2, further plus Strong cooling effect, and salt is recycled, it is cost-effective.
After the cooling of coating in main paint can 6 to be done, start discharging pump, by the coating in main paint can 6 from main painting It is taken away in charging basket 6.The weight in main paint can 6 tapers at this time, and main paint can 6 restores the power of deformation in the first elastic component 31 Under the action of can move up, to leave bushing 8 with dynamic pressure plate 7, bushing 8 restores the work of the power of deformation in the second elastic component 91 It can be moved up under, at this time the state between pressing plate 7 and bushing 8 to be in close contact.When dividing completely between pressing plate 7 and bushing 8 From rear, the salting liquid of 8 top of bushing and the salt for failing dissolving can flow to the bottom of main cooling bucket 2 under the effect of gravity, can Mixture for cyclic salt next time and salting liquid is prepared.
Above-described is only the embodiment of the present invention, and the common sense such as well known concrete structure and characteristic are not made herein in scheme Excessive description, technical field that the present invention belongs to is all before one skilled in the art know the applying date or priority date Ordinary technical knowledge can know the prior art all in the field, and with using routine experiment hand before the date The ability of section, one skilled in the art can improve in conjunction with self-ability and implement under the enlightenment that the application provides This programme, some typical known features or known method should not implement the application as one skilled in the art Obstacle.It should be pointed out that for those skilled in the art, without departing from the structure of the invention, can also make Go out several modifications and improvements, these should also be considered as protection scope of the present invention, these all do not interfere with the effect that the present invention is implemented Fruit and patent practicability.The scope of protection required by this application should be based on the content of the claims, the tool in specification The records such as body embodiment can be used for explaining the content of claim.

Claims (8)

1. a kind of cooling equipment of coating, it is characterised in that:Including main cooling bucket, the side of main cooling bucket is equipped with icehouse, icehouse Inside be preset with ice cube, main cooling bucket be connected to icehouse, slidably connected on the madial wall of main cooling bucket block ice cube enter lead it is cold But the baffle in bucket is preset with salt in main cooling bucket, main paint can, main paint can and main cooling is slidably connected in main cooling bucket It is connected with the first elastic component between bucket, driving section is connected between baffle and main paint can, main paint can lower rotation is connected with Vertically arranged leading screw is arranged with nut on leading screw, and leading screw is connect with nut thread, and nut is fixedly connected on main cooling bucket, Leading screw is equipped with stirring rod in the axial direction, is also associated with feed pipe and discharge nozzle in main paint can, feed pipe is communicated with charging Pump, discharge nozzle are communicated with discharging pump, and the lower section of main paint can is equipped with the bushing being laterally arranged, and bushing is slidably connected at main cooling bucket It is interior, it is connected with the second elastic component between bushing and main cooling bottom of the barrel, bushing is equipped with and can be blocked by main paint can interval The side wall of leakage hole, main cooling bucket is equipped with osculum, and osculum is located at the lower section of bushing, and osculum is communicated with drainpipe, draining Pipe is equipped with pressure valve, and the bottom of main cooling bucket is communicated with circulation pipe, is also connected with pressure valve on circulation pipe, circulation pipe it is another The top with main cooling bucket is held to be connected to.
2. a kind of cooling equipment of coating according to claim 1, it is characterised in that:Drainpipe is connected to another with osculum One end is communicated with preliminary cooling bucket, and preliminary paint can is equipped in preliminary cooling bucket, and the feed end of feed pump is connected in preliminary coating In bucket.
3. a kind of cooling equipment of coating according to claim 2, it is characterised in that:Driving section includes vertically arranged closes Rack is closed, rack is closed and is connected on baffle, be closed on rack and be engaged with gear, the other side that gear is engaged with closure rack is nibbled Conjunction has vertically arranged promotion rack, and rack is pushed to be fixedly connected with main paint can.
4. a kind of cooling equipment of coating according to claim 3, it is characterised in that:It is arranged with positioning outside main paint can Ring, main paint can are slidably connected in locating ring, and locating ring is fixedly connected on main cooling bucket, and the first elastic component is connected to positioning Between ring and main paint can.
5. a kind of cooling equipment of coating according to claim 4, it is characterised in that:It is equipped on drainpipe and circulation pipe It is only capable of inside main cooling bucket to external check valve.
6. a kind of cooling equipment of coating according to claim 5, it is characterised in that:The bottom of preliminary cooling bucket is circular cone Shape, preliminary cooling bottom of the barrel is communicated with plus salt pipe, adds the other end of salt pipe to be connected to the top of main cooling bucket, salt pipe is added to be connected with The direction of motion is from preliminary cooling bucket to main cooling bucket plus salt pump.
7. a kind of cooling equipment of coating according to claim 6, it is characterised in that:Main cooling bottom of the barrel be it is coniform, Circulation pipe is connected to the lowest point of main cooling bucket.
8. a kind of cooling equipment of coating according to claim 7, it is characterised in that:The lower section of main paint can is equipped with can Interval blocks the pressing plate of leakage hole, and connector is connected between pressing plate and main paint can.
CN201810615797.4A 2018-06-14 2018-06-14 Cooling equipment of coating Active CN108679927B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810615797.4A CN108679927B (en) 2018-06-14 2018-06-14 Cooling equipment of coating

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810615797.4A CN108679927B (en) 2018-06-14 2018-06-14 Cooling equipment of coating

Publications (2)

Publication Number Publication Date
CN108679927A true CN108679927A (en) 2018-10-19
CN108679927B CN108679927B (en) 2024-07-23

Family

ID=63811031

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810615797.4A Active CN108679927B (en) 2018-06-14 2018-06-14 Cooling equipment of coating

Country Status (1)

Country Link
CN (1) CN108679927B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113318669A (en) * 2021-05-25 2021-08-31 山东消博士消毒科技股份有限公司 Cooling device is used in disinfectant production

Citations (17)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1433337A (en) * 2000-01-31 2003-07-30 利乐拉瓦尔集团及财务有限公司 Mixing method and apparatus
CN1505471A (en) * 2001-04-26 2004-06-16 ������������ʽ���� Cooling tank
US20110041546A1 (en) * 2009-06-23 2011-02-24 Nathan Linder Refreezable ice barrel
CN201935503U (en) * 2010-12-10 2011-08-17 宗鹏晖 Portable refrigeration equipment
CN202092396U (en) * 2011-05-20 2011-12-28 上海市宝山区青少年科学技术指导站 Instant cooling device adopting heat absorption principle that salt dissolving in water
US20130019626A1 (en) * 2011-07-20 2013-01-24 Daihen Corporation Cooling Unit And Work Piece Conveying Equipment Using It
CN104607473A (en) * 2014-12-30 2015-05-13 山东钢铁股份有限公司 Rolled workpiece cooling device and method
CN104833172A (en) * 2015-03-16 2015-08-12 泰兴市东圣食品科技有限公司 Material liquid cooling device
CN106091516A (en) * 2016-08-26 2016-11-09 温州市凯宇五金有限公司 A kind of five metals rapid chiller of making iron block
CN206192017U (en) * 2016-08-16 2017-05-24 广州宝之泰电子科技有限公司 Quick cooling arrangement of high temperature worker's solution
CN206269480U (en) * 2016-12-09 2017-06-20 伟志股份有限公司 Beverage cooling device
CN107126867A (en) * 2017-06-27 2017-09-05 盐城永悦新材料有限公司 Temperature-controlled cooling device is mixed after a kind of thermosetting powder coating
CN107149912A (en) * 2017-06-27 2017-09-12 盐城永悦新材料有限公司 Temperature-controlled cooling device is mixed after a kind of thermosetting powder coating
CN107433066A (en) * 2017-09-04 2017-12-05 陈立国 The special multiple separation cooling back installation of Chemical Manufacture
CN207095164U (en) * 2017-07-12 2018-03-13 滕如阳 A kind of medicine production cooling device
CN107875928A (en) * 2017-12-08 2018-04-06 百世杉集团有限公司 A kind of coating dispersion machine with refrigerating function
CN208282495U (en) * 2018-06-14 2018-12-25 重庆阿罗网络科技有限公司 A kind of cooling equipment of coating

Patent Citations (17)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1433337A (en) * 2000-01-31 2003-07-30 利乐拉瓦尔集团及财务有限公司 Mixing method and apparatus
CN1505471A (en) * 2001-04-26 2004-06-16 ������������ʽ���� Cooling tank
US20110041546A1 (en) * 2009-06-23 2011-02-24 Nathan Linder Refreezable ice barrel
CN201935503U (en) * 2010-12-10 2011-08-17 宗鹏晖 Portable refrigeration equipment
CN202092396U (en) * 2011-05-20 2011-12-28 上海市宝山区青少年科学技术指导站 Instant cooling device adopting heat absorption principle that salt dissolving in water
US20130019626A1 (en) * 2011-07-20 2013-01-24 Daihen Corporation Cooling Unit And Work Piece Conveying Equipment Using It
CN104607473A (en) * 2014-12-30 2015-05-13 山东钢铁股份有限公司 Rolled workpiece cooling device and method
CN104833172A (en) * 2015-03-16 2015-08-12 泰兴市东圣食品科技有限公司 Material liquid cooling device
CN206192017U (en) * 2016-08-16 2017-05-24 广州宝之泰电子科技有限公司 Quick cooling arrangement of high temperature worker's solution
CN106091516A (en) * 2016-08-26 2016-11-09 温州市凯宇五金有限公司 A kind of five metals rapid chiller of making iron block
CN206269480U (en) * 2016-12-09 2017-06-20 伟志股份有限公司 Beverage cooling device
CN107126867A (en) * 2017-06-27 2017-09-05 盐城永悦新材料有限公司 Temperature-controlled cooling device is mixed after a kind of thermosetting powder coating
CN107149912A (en) * 2017-06-27 2017-09-12 盐城永悦新材料有限公司 Temperature-controlled cooling device is mixed after a kind of thermosetting powder coating
CN207095164U (en) * 2017-07-12 2018-03-13 滕如阳 A kind of medicine production cooling device
CN107433066A (en) * 2017-09-04 2017-12-05 陈立国 The special multiple separation cooling back installation of Chemical Manufacture
CN107875928A (en) * 2017-12-08 2018-04-06 百世杉集团有限公司 A kind of coating dispersion machine with refrigerating function
CN208282495U (en) * 2018-06-14 2018-12-25 重庆阿罗网络科技有限公司 A kind of cooling equipment of coating

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113318669A (en) * 2021-05-25 2021-08-31 山东消博士消毒科技股份有限公司 Cooling device is used in disinfectant production

Also Published As

Publication number Publication date
CN108679927B (en) 2024-07-23

Similar Documents

Publication Publication Date Title
CN107702397A (en) It is a kind of to go out ice cube trash ice ice machine automatically
CN208282495U (en) A kind of cooling equipment of coating
CN108679927A (en) A kind of cooling equipment of coating
CN110841326A (en) Crystallization kettle for chemical production
CN117327935B (en) Aluminum alloy degassing refining device with cleaning function
CN208920661U (en) A kind of energy-saving oil temperature control film-making ice maker
CN108444210A (en) A kind of energy saving quick beverage refrigeration machine
CN219589270U (en) Water-cooling refrigerator capable of circularly refrigerating
CN208949156U (en) A kind of composite heat transfer particle cooling device
CN115505702A (en) Medium-thickness aluminum plate quenching device
CN202052514U (en) Temperature adjusting device for liquid preparation tank
CN207515305U (en) It is a kind of to go out ice cube trash ice ice machine automatically
CN209230110U (en) A kind of continuous-production-type ice machine
CN208218776U (en) Thermal desorption lime-ash recycling and processing device
CN209680039U (en) A kind of dry and wet mud mixing arrangement
CN208744417U (en) A kind of plastic part trimming jig
KR101960409B1 (en) Rock Salt Agitation Apparatus for Snow Removal Solution
CN216814791U (en) Refrigeration plant of anti-icing effect
CN212584398U (en) Anti-freezing ball valve
CN205919554U (en) Absorption type refrigerating unit
CN215176437U (en) Cooling machine
CN110435073A (en) A kind of hot melt adhesive production system with automatic dividing function
CN221055358U (en) Uniform cooling device for compound fertilizer production
CN216204532U (en) Ice slurry conveying system
CN221483967U (en) Water chiller with good energy-saving effect

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
TA01 Transfer of patent application right
TA01 Transfer of patent application right

Effective date of registration: 20240626

Address after: 272200 Jining Chemical Industry Development Zone, Jinxiang County, Jining City, Shandong Province

Applicant after: Jining Chuangjia Chemical Technology Co.,Ltd.

Country or region after: China

Address before: No. 2-1, Building 31, San Village, Yangjiaping West Suburb, Jiulongpo District, Chongqing, 400050

Applicant before: CHONGQING ALUO NETWORK TECHNOLOGY Co.,Ltd.

Country or region before: China

GR01 Patent grant
GR01 Patent grant