CN108678394A - Steel construction piece mounting device and steel construction piece installation method - Google Patents

Steel construction piece mounting device and steel construction piece installation method Download PDF

Info

Publication number
CN108678394A
CN108678394A CN201810298388.6A CN201810298388A CN108678394A CN 108678394 A CN108678394 A CN 108678394A CN 201810298388 A CN201810298388 A CN 201810298388A CN 108678394 A CN108678394 A CN 108678394A
Authority
CN
China
Prior art keywords
segment component
steel construction
construction piece
lead screw
hydraulic pressure
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201810298388.6A
Other languages
Chinese (zh)
Inventor
欧阳超
黎健
王聪
朱小兵
王仕观
向峰
孙海洋
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Science and Industry Corp Ltd
Original Assignee
China Construction Steel Structure Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Steel Structure Corp Ltd filed Critical China Construction Steel Structure Corp Ltd
Priority to CN201810298388.6A priority Critical patent/CN108678394A/en
Publication of CN108678394A publication Critical patent/CN108678394A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G21/00Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
    • E04G21/14Conveying or assembling building elements
    • E04G21/16Tools or apparatus
    • E04G21/18Adjusting tools; Templates
    • E04G21/1841Means for positioning building parts or elements

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Lining And Supports For Tunnels (AREA)

Abstract

The invention discloses a kind of steel construction piece mounting devices, and for installing steel construction piece, which includes first segment component and second segment component, which includes:Lead screw, hydraulic jack, hydraulic pressure storage device and valve, one end of the lead screw is fixed on the end of the first segment component, the other end of the lead screw is fixed on the end of the hydraulic jack, the sectional dimension of the hydraulic jack piston is matched with the sectional dimension of the second segment component, and it is fastened in the second segment component, the second segment component inside is set to form airtight chamber, the hydraulic pressure storage device is connected to the valve, it is communicated with the airtight chamber, to adjust the indoor hydraulic pressure of the closed chamber, the hydraulic jack is pushed to move, the embodiment of the invention also discloses a kind of steel construction piece installation methods, it is adjustable in length direction that steel construction piece can be achieved, steel construction piece is installed within the scope of large error.

Description

Steel construction piece mounting device and steel construction piece installation method
Technical field
The present invention relates to the realm of building construction more particularly to a kind of steel construction piece mounting device and steel construction piece installation sides Method.
Background technology
With social development, all kinds of engineering structure forms are more and more novel, and Suo Chengjie is largely used in longspan structure Structure, advantage are that steel using amount is few and can realize that overlength overhangs, and can meet the high performance requirement of building.
In construction, partial component need to again be installed after the unloading of rope bearing structure or after the completion of cable stretching, but at this time The installation space of component has changed, if continuing according to original design installation component, it will generate error, can not ensure component Installation is complete, and state meets actual conditions.
Invention content
The main purpose of the present invention is to provide a kind of steel construction piece mounting device and steel construction piece installation methods, it is intended to The prior art is solved when installing steel construction piece, can not achieve the technical issues of installing steel construction piece within the scope of large error.
To achieve the above object, first aspect present invention provides a kind of steel construction piece mounting device, for installing steel construction Part, the steel construction piece include first segment component and second segment component, offer through-hole on the side wall of the second segment component, institute Stating device includes:
Lead screw, hydraulic jack, hydraulic pressure storage device and valve;
One end of the lead screw is fixed on the end of the first segment component, and the other end of the lead screw is fixed on the liquid On the end for pressing jack;
The sectional dimension of the hydraulic jack piston is matched with the sectional dimension of the second segment component, and is fastened on institute It states in second segment component, so that the second segment component inside is formed airtight chamber, the airtight chamber is for storing liquid;
The hydraulic pressure storage device, for providing liquid to the airtight chamber, described in the hydraulic pressure storage device connection Valve, the valve are fixed in the through-hole on the second segment component sidewall, are communicated with the airtight chamber, for controlling liquid Body enters the airtight chamber, or, being discharged out of described airtight chamber, to adjust the indoor hydraulic pressure of the closed chamber, pushes institute State hydraulic jack movement.
Second aspect of the present invention provides a kind of steel construction piece installation method, and the steel construction piece is installed by mounting device, The mounting device includes lead screw, hydraulic jack, hydraulic pressure storage device, valve and hydraulic detection device, the steel construction piece Including first segment component and second segment component, through-hole is offered on the side wall of the second segment component, the method includes:
One end of the lead screw is fixed on to the end of the first segment component, the other end of the lead screw is fixed on described On the end of hydraulic jack;
The hydraulic jack piston is fastened in the second segment component, so that the second segment component inside is formed close Closed chamber room, the sectional dimension of the hydraulic jack piston are matched with the sectional dimension of the second segment component;
The valve is opened, liquid is imported out of described hydraulic pressure storage device and enters the airtight chamber, or, from described close Liquid is discharged in closed chamber room and pushes the hydraulic pressure into the hydraulic pressure storage device to change the indoor hydraulic pressure of the closed chamber Jack moves, and the lead screw follows the hydraulic jack to move, and changes the length of the steel construction piece;
When the detected value that the hydraulic detection device is shown is consistent with preset value, the valve is closed.
From it is found that using the built-in hydraulic jack in second segment component, then making hydraulic pressure thousand in the embodiments of the present invention Jin top is fixedly connected with lead screw, and lead screw is fixedly connected with first segment component, by changing the indoor hydraulic pressure of closed chamber, pushes hydraulic jack Top movement realizes steel construction piece in length side to push the lead screw being connected with hydraulic jack and the movement of first segment component To adjustable, steel construction piece is installed within the scope of large error.
Description of the drawings
In order to more clearly explain the embodiment of the invention or the technical proposal in the existing technology, to embodiment or will show below There is attached drawing needed in technology description to be briefly described, it should be apparent that, the accompanying drawings in the following description is only this Some embodiments of invention for those skilled in the art without creative efforts, can also basis These attached drawings obtain other attached drawings.
Fig. 1 is the structural representation that the steel construction piece mounting device that first embodiment of the invention provides is mounted on steel construction piece Figure;
Fig. 2 is that limiting device is mounted on steel construction piece in the steel construction piece mounting device that second embodiment of the invention provides Structural schematic diagram;
Fig. 3 is that sealing device is mounted on steel construction piece in the steel construction piece mounting device that third embodiment of the invention provides Structural schematic diagram;
Fig. 4 is the implementation process schematic diagram for the steel construction piece installation method that fourth embodiment of the invention provides.
Specific implementation mode
In order to make the invention's purpose, features and advantages of the invention more obvious and easy to understand, below in conjunction with the present invention Attached drawing in embodiment, technical scheme in the embodiment of the invention is clearly and completely described, it is clear that described reality It is only a part of the embodiment of the present invention to apply example, and not all embodiments.Based on the embodiments of the present invention, people in the art The every other embodiment that member is obtained without making creative work, shall fall within the protection scope of the present invention.
The embodiment of the present invention is applied to, after the unloading of rope bearing structure or after the completion of cable stretching, when steel construction piece actual installation When the theoretical length of space length and steel construction piece is not inconsistent, by using suitable hydraulic jack and lead screw etc., in certain model Steel construction piece is elongated or shortened in enclosing, and is adapted to actual installation space length, is kept the adjustable space of steel construction piece big, realize larger mistake Steel construction piece installation in poor range.
Referring to Fig. 1, the steel construction piece mounting device that Fig. 1, which is first embodiment of the invention, to be provided is mounted on steel construction piece Structural schematic diagram, which includes first segment component 10 and second segment component 11, first segment component 10 and second segment structure It is separated with certain distance between part 11, through-hole is offered on the side wall of the second segment component 11, the steel construction piece mounting device packet It includes:
Lead screw 12, hydraulic jack 13, valve 14 and hydraulic pressure storage device 15.
One end of lead screw 12 is fixed on the end of first segment component 10, and the other end of lead screw 12 is fixed on hydraulic jack 13 End on, to ensure to be fixedly connected between lead screw 12 and first segment component 10 and hydraulic jack 13, formed whole.
In this present embodiment, it should be noted that can lead between lead screw 12 and first segment component 10 and hydraulic jack 13 It crosses and the mode that is connected and fixed such as is bolted and welds, in practical application, as long as ensureing lead screw 12 and first segment component 10 and hydraulic pressure It is fixedly connected as an entirety between jack 13, and relative position between three in the immutable entirety, i.e., should belong to this In the protection domain of inventive embodiments.
The sectional dimension of the piston of hydraulic jack 13 is matched with the sectional dimension of second segment component 11, and is fastened on second In section component 11, to ensure that gap is not present between the piston of hydraulic jack 13 and the contact surface of second segment component 11, to Airtight chamber 16 is formed between hydraulic jack 13 and second segment component 11, airtight chamber 16 is for storing liquid.
Further, the liquid stored in the hydraulic pressure storage device 15 is hydraulic oil, which can be hydraulic pressure Pumping plant.
Hydraulic pressure storage device 15 is connected to valve 14, and valve 14 fixes in the through-hole on 11 side wall of second segment component, valve 14 communicate with airtight chamber 16, enter airtight chamber 16 for controlling liquid, or, the discharge out of airtight chamber 16, is then adjusted Hydraulic pressure in airtight chamber 16 pushes hydraulic jack 13 to move.
Further, which further includes hydraulic detection device 17, and hydraulic detection device 17 is mounted on On valve 14, for detecting the hydraulic pressure in airtight chamber 16.
Specifically, when detecting that the hydraulic pressure in airtight chamber 16 reaches preset value, valve 14 is closed, at this point, in hydraulic pressure Under the promotion of jack 13, steel construction piece has stretched to preset length.
In embodiments of the present invention, using the built-in hydraulic jack in second segment component, then hydraulic jack is made to fix Connection wire rod, lead screw are fixedly connected with first segment component, and by changing the indoor hydraulic pressure of closed chamber, promotion hydraulic jack moves, To push the lead screw that is connected with hydraulic jack and first segment component to move, it is adjustable in length direction to realize steel construction piece, Steel construction piece is installed within the scope of large error.
Referring to Fig. 2, Fig. 2 is that limiting device is mounted in the steel construction piece mounting device that second embodiment of the invention provides Structural schematic diagram on steel construction piece, the present embodiment and first embodiment the difference is that, the steel construction piece mounting device Further include:
Limiting device 18.
Limiting device 18 screws on lead screw 12, is used for after closing valve 14, rotary limit device 18, until limit Device 18 is bonded second segment component 11, to limit the movement of second segment component 11.
Specifically, after importing liquid and entering the interior exclusion liquid of airtight chamber 16 or airtight chamber 16, that is, change close Hydraulic pressure in closed chamber room 16 then pushes hydraulic jack 13 to predeterminated position, tentatively completes steel construction under the action of pressure The installation of part.But increase at any time, the hydraulic pressure in airtight chamber 16 can increase and become smaller at any time, under pressure action, cause Hydraulic jack 13 moves, i.e., steel construction piece elongation shortens.At this point, being combined with limiting device 18 on lead screw 12, wait for preliminary After installation is complete, by the rotation of limiting device 18 to being bonded with second segment component 11, then by limiting device 18 and second segment component 11 It is fixed together, utilizes the relationship that screws togather between limiting device 18 and lead screw 12, the not easily shifted feature of non-rotating state, limitation Lead screw 12 moves, to which the hydraulic jack 13 that limitation is connect with lead screw 12 moves, to which limitation and lead screw 12 connect The first segment component 10 connect moves, fixed entire steel construction piece.
Referring to Fig. 3, Fig. 3 is that sealing device is mounted in the steel construction piece mounting device that third embodiment of the invention provides Structural schematic diagram on steel construction piece, the present embodiment and first embodiment the difference is that, the steel construction piece mounting device Further include:
Sealing device 19.
The length of sealing device 19 is identical as the distance between limiting device 18 and first segment component 10 length, sealing device 19 fix between limiting device 18 and first segment component 10, i.e., fix 19 one end of sealing device with first segment component 10, separately One end is fixed with limiting device 18, and hydraulic jack 13 can be further prevented to be subjected to displacement, that is, prevent first segment component 10 from following Hydraulic jack 13 is subjected to displacement, and further fixes entire steel construction piece.
Referring to Fig. 4, Fig. 4 is the implementation process signal for the steel construction piece installation method that fourth embodiment of the invention provides Figure, it should be noted that this steel construction piece installation method installs steel construction piece by the mounting device described in above-described embodiment, Therefore the mounting device includes lead screw 12, hydraulic jack 13, valve 14, hydraulic detection device 15 and hydraulic pressure storage device 16, is somebody's turn to do Steel construction piece includes first segment component 10 and second segment component 11, and through-hole is offered on the side wall of second segment component 11, the steel knot Component installation method includes:
S401, the end that one end of lead screw is fixed on to first segment component, the other end of the lead screw are fixed on hydraulic jack On the end on top;
Referring to Fig. 1, one end of lead screw 12 is fixed on the end of first segment component 10, the other end of lead screw 12 is fixed on liquid On the end for pressing jack 13, to ensure to be fixedly connected between lead screw 12 and first segment component 10 and hydraulic jack 13, formed It is whole.
S402, the hydraulic jack piston is fastened in second segment component, is formed between the second segment component closed Chamber, the sectional dimension of the hydraulic jack piston are matched with the sectional dimension of the second segment component;
Fig. 1 please be participate in, the sectional dimension of the piston of hydraulic jack 13 is matched with the sectional dimension of second segment component 11, and It is fastened in second segment component 11, to ensure to be not present between the piston of hydraulic jack 13 and the contact surface of second segment component 11 Gap, to form airtight chamber 16 between hydraulic jack 13 and second segment component 11, airtight chamber 16 is for storing liquid.
More, one end of lead screw 12 is fixed on before the end of first structure part 10, setting is screwed on lead screw 12 Limiting device 18.
S403, Open valve import liquid into the airtight chamber, or, from the airtight chamber out of hydraulic pressure storage device Interior discharge liquid enters the hydraulic pressure storage device, to change the indoor hydraulic pressure of the closed chamber, the hydraulic jack is pushed to move, and The lead screw follows the hydraulic jack to move, and changes the length of steel construction piece;
Specifically, when the liquid stored in hydraulic pressure storage device 15 enters airtight chamber 16, airtight chamber by valve 14 Hydraulic pressure in 16 increases, and pushes hydraulic jack 13 to be moved to 10 direction of first segment component, due to lead screw 12 and hydraulic jack 13 are fixed together, therefore lead screw 12 follows hydraulic jack 13 to move, since lead screw 12 is fixedly connected with first segment component 10, therefore the One section of component 10 moves, steel construction piece elongation.
It is discharged when by the liquid in airtight chamber 16, the hydraulic pressure in airtight chamber 16 reduces, and hydraulic jack 13 is pushed to move Dynamic, since lead screw 12 and hydraulic jack 13 are fixed together, therefore lead screw 12 follows hydraulic jack 13 to move, due to lead screw 12 It is fixedly connected with first segment component 10, therefore first segment component 10 moves, steel construction piece elongation.
Further, the liquid in hydraulic pressure storage device 15 is hydraulic oil.
S404, when the detected value that hydraulic detection device is shown is consistent with preset value, close valve;
While injection hydraulic oil enters airtight chamber 16, the liquid in airtight chamber 16 is detected using hydraulic detection device 17 Pressure can get information about internal force situation of the steel structure member in elongation process, work as signal detecting by observing the value of hydralic pressure gauge The hydraulic pressure value that device 17 is shown is with preset value when being consistent, and stops supply hydraulic pressure, closing valve 14, at this point, steel construction piece jack to Preset length.
Wherein, it should be noted that when the liquid in hydraulic pressure storage device 15 is hydraulic oil, hydraulic detection device 17 is Hydraulic pressure oil meter detects the oil pressure in airtight chamber 16.
S405, rotary limit device make the limiting device be moved to the second segment component, until limiting device fitting should The limiting device and the second segment component are fixed together by second segment component, to limit second segment component movement;
Referring to Fig. 2, steel construction piece is jacked to preset length, the limiting device 18 on rotary screw 12 makes limit fill It sets 18 to move to second segment component 11, until limiting device 18 is bonded second segment component 11, then by limiting device 18 and second segment Component 11 is fixed together.Utilize the relationship that screws togather between limiting device 18 and lead screw 12, the not easily shifted spy of non-rotating state Point, prevents lead screw 12 from moving, that is, prevents the hydraulic jack being connect with lead screw 12 13 from moving, fixed steel construction piece.
Wherein, the fixed form between limiting device 18 and second segment component 11 is not limited, can be used bolt fix or Both it is welded and fixed, in the embodiment of the present invention, fixed using groove welding manner.
S406, according to the distance between the first segment component and limiting device length, select identical as the distance length Sealing device, one end of the sealing device and the first segment component are fixed, the other end is fixed with the limiting device, with connection The first segment component and second segment component, sealing and fixed steel construction piece.
Referring to Fig. 3, passing through the identical sealing of the distance length between selection and first segment component 10 and limiting device 18 Device 19, and one end and first segment component 10 are fixed, the other end is fixed with limiting device 18, can further prevent hydraulic pressure thousand Jin top 13 is subjected to displacement, that is, is prevented first segment component 10 from hydraulic jack 13 being followed to be subjected to displacement, further fixed entire steel knot Component.
In embodiments of the present invention, using the built-in hydraulic jack in second segment component, then hydraulic jack is made to fix Connection wire rod, lead screw are fixedly connected with first segment component, and by changing the indoor hydraulic pressure of closed chamber, promotion hydraulic jack moves, To push the lead screw that is connected with hydraulic jack and first segment component to move, it is adjustable in length direction to realize steel construction piece, Steel construction piece is installed within the scope of large error.
It should be noted that for each method embodiment above-mentioned, describe, therefore it is all expressed as a series of for simplicity Combination of actions, but those skilled in the art should understand that, the present invention is not limited by the described action sequence because According to the present invention, certain steps may be used other sequences or be carried out at the same time.Secondly, those skilled in the art should also know It knows, embodiment described in this description belongs to preferred embodiment, and involved action might not all be that the present invention must Must.
In the above-described embodiments, it all emphasizes particularly on different fields to the description of each embodiment, there is no the portion being described in detail in some embodiment Point, it may refer to the associated description of other embodiments.
It is the description to a kind of steel construction piece mounting device provided by the present invention and steel construction piece installation method above, For those skilled in the art, the thought of embodiment, has in specific embodiments and applications according to the present invention Change place, to sum up, the content of the present specification should not be construed as limiting the invention.

Claims (10)

1. a kind of steel construction piece mounting device, for installing steel construction piece, the steel construction piece includes first segment component and second Section component, offers through-hole on the side wall of the second segment component, which is characterized in that described device includes:
Lead screw, hydraulic jack, hydraulic pressure storage device and valve;
One end of the lead screw is fixed on the end of the first segment component, and the other end of the lead screw is fixed on the hydraulic pressure thousand On the end on jin top;
The sectional dimension of the hydraulic jack piston is matched with the sectional dimension of the second segment component, and is fastened on described In two sections of components, the second segment component inside is set to form airtight chamber, the airtight chamber is for storing liquid;
The hydraulic pressure storage device, for providing liquid to the airtight chamber, the hydraulic pressure storage device is connected to the valve, The valve fixes in the through-hole on the second segment component sidewall, is communicated with the airtight chamber, for control liquid into Enter the airtight chamber, or, being discharged out of described airtight chamber, to adjust the indoor hydraulic pressure of the closed chamber, pushes the liquid Press jack movement.
2. mounting device according to claim 1, which is characterized in that the mounting device further includes:
Hydraulic detection device;
The hydraulic detection device is mounted on the valve, for detecting the indoor hydraulic pressure of the closed chamber.
3. mounting device according to claim 1, which is characterized in that the mounting device further includes:
Limiting device;
The limiting device screws on the lead screw, for after closing the valve, rotating the limiting device, until The limiting device is bonded the second segment component, is moved with limiting the second segment component.
4. mounting device according to claim 1, which is characterized in that the mounting device further includes:
Sealing device;
The length of the sealing device is identical as the distance between the limiting device and the first segment component length;
The sealing device fixes between the limiting device and the first segment component, for connecting the first segment component With the second segment component, to seal and fix the steel construction piece.
5. mounting device according to claim 1, which is characterized in that the liquid stored in the hydraulic pressure storage device is liquid Pressure oil.
6. a kind of steel construction piece installation method, which is characterized in that install the steel construction piece, the installation dress by mounting device It sets including lead screw, hydraulic jack, hydraulic pressure storage device, valve and hydraulic detection device, the steel construction piece includes first segment Component and second segment component offer through-hole on the side wall of the second segment component, the method includes:
One end of the lead screw is fixed on to the end of the first segment component, the other end of the lead screw is fixed on the hydraulic pressure On the end of jack;
The hydraulic jack piston is fastened in the second segment component, the second segment component inside is made to form closed chamber Room, the sectional dimension of the hydraulic jack piston are matched with the sectional dimension of the second segment component;
The valve is opened, the airtight chamber is forced the fluid into out of described hydraulic pressure storage device, or, from the airtight chamber Interior discharge liquid pushes the hydraulic jack into the hydraulic pressure storage device to change the indoor hydraulic pressure of the closed chamber It is mobile, and the lead screw follows the hydraulic jack to move, and changes the length of the steel construction piece;
When the detected value that the hydraulic detection device is shown is consistent with preset value, the valve is closed.
7. installation method according to claim 6, which is characterized in that described one end by the lead screw is fixed on described Before the end of one section of component, including:
Installation limiting device is screwed on the lead screw.
8. installation method according to claim 7, which is characterized in that it is described to close after the valve, including:
The limiting device is rotated, the limiting device is made to be moved to the second segment component, until the limiting device is bonded The second segment component;
The limiting device and the second segment component are fixed together, moved with limiting the second segment component.
9. installation method according to claim 8, which is characterized in that described by the limiting device and the second segment structure After part is fixed together, including:
According to the distance between the first segment component and the limiting device length, select length identical as the distance length Sealing device.
10. installation method according to claim 8, which is characterized in that the selection length is identical as the distance length Sealing device after include:
One end of the sealing device and the first segment component are fixed, the other end is fixed with the limiting device, with connection The first segment component and the second segment component, sealing and the fixed steel construction piece.
CN201810298388.6A 2018-03-30 2018-03-30 Steel construction piece mounting device and steel construction piece installation method Pending CN108678394A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810298388.6A CN108678394A (en) 2018-03-30 2018-03-30 Steel construction piece mounting device and steel construction piece installation method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810298388.6A CN108678394A (en) 2018-03-30 2018-03-30 Steel construction piece mounting device and steel construction piece installation method

Publications (1)

Publication Number Publication Date
CN108678394A true CN108678394A (en) 2018-10-19

Family

ID=63799797

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810298388.6A Pending CN108678394A (en) 2018-03-30 2018-03-30 Steel construction piece mounting device and steel construction piece installation method

Country Status (1)

Country Link
CN (1) CN108678394A (en)

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2002227419A (en) * 2001-02-06 2002-08-14 Kayaba Ind Co Ltd Plumbing adjusting device
JP2003027748A (en) * 2001-07-12 2003-01-29 Maeda Corp Method for correcting distortion in jointing of heavyweight member
CN2825586Y (en) * 2005-09-19 2006-10-11 江阴法尔胜住电新材料有限公司 Inner-clamping type single-hole top-pressing jack
EP2148014A2 (en) * 2008-07-24 2010-01-27 Liebherr-Hydraulikbagger GmbH Work device
CN102216627A (en) * 2008-11-18 2011-10-12 阿尔斯通水电设备法国公司 Ring for a hydrostatic and hydrodynamic bearing, hydraulic machine provided with such a ring and method for mounting such a ring on a shaft
CN103306498A (en) * 2013-07-09 2013-09-18 中建八局第一建设有限公司青岛分公司 Folding telescopic template supporting device for building construction
CN104135108A (en) * 2014-08-01 2014-11-05 北京航空航天大学 Electric cylinder with buffer
CN204385944U (en) * 2015-01-05 2015-06-10 昆明天矫力加固技术工程有限公司 A kind of damping device of civil engineering structure

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2002227419A (en) * 2001-02-06 2002-08-14 Kayaba Ind Co Ltd Plumbing adjusting device
JP2003027748A (en) * 2001-07-12 2003-01-29 Maeda Corp Method for correcting distortion in jointing of heavyweight member
CN2825586Y (en) * 2005-09-19 2006-10-11 江阴法尔胜住电新材料有限公司 Inner-clamping type single-hole top-pressing jack
EP2148014A2 (en) * 2008-07-24 2010-01-27 Liebherr-Hydraulikbagger GmbH Work device
CN102216627A (en) * 2008-11-18 2011-10-12 阿尔斯通水电设备法国公司 Ring for a hydrostatic and hydrodynamic bearing, hydraulic machine provided with such a ring and method for mounting such a ring on a shaft
CN103306498A (en) * 2013-07-09 2013-09-18 中建八局第一建设有限公司青岛分公司 Folding telescopic template supporting device for building construction
CN104135108A (en) * 2014-08-01 2014-11-05 北京航空航天大学 Electric cylinder with buffer
CN204385944U (en) * 2015-01-05 2015-06-10 昆明天矫力加固技术工程有限公司 A kind of damping device of civil engineering structure

Similar Documents

Publication Publication Date Title
US20190055838A1 (en) Apparatus for physical simulation experiment for fracturing in horizontal well layer by layer by spiral perforation and method thereof
CN108413152A (en) A kind of axial seal component
CN105604521A (en) Multifunctional compression packer rubber sleeve unit experiment device
CN108678394A (en) Steel construction piece mounting device and steel construction piece installation method
CN102691692B (en) Multi-stage pressure composite cylinder
CN203114573U (en) Scale type barometer air pump
CN206617386U (en) One kind three acts on telescopic oil cylinder
CN108223492A (en) A kind of hydraulic linear motor element seal friction force and viscosity friction coefficient test system and method
CN107893470A (en) A kind of anti-settling plastic conduit intelligent monitor system
CN207064384U (en) A kind of capacitance type detector of guidance tape wear extent
CN208169761U (en) A kind of axial seal component
CN108518334B (en) A kind of variable speed compressor self-regulation wideband gas attenuator and its control method
CN108414199A (en) Visualize the performance testing device of packing element
CN104358736A (en) Pneumatic mechanism for rotary output
CN105020403B (en) A kind of valve
CN204186365U (en) A kind of sealing system of adjustable concentric roater regulator
CN107940122A (en) Anti-settling plastic duct system
CN207539117U (en) High frequency sound servo-cylinder
CN208153739U (en) A kind of adjustable axial sealer of sealed pressure
CN105179357A (en) Hydraulic annular joint oil cylinder
CN108006012A (en) A kind of hydraulic cylinder
CN107178538B (en) A kind of capacitance type detector of guidance tape abrasion loss
CN108162476A (en) Ultra-high pressure high flow telescopic oil tube is servo-actuated oil transportation method
CN108843637B (en) Hydraulic power device and method
CN205898441U (en) Mechanical type pulse generator

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20181019