CN108678337A - A kind of steel guardrail washboard installation bearing calibration - Google Patents

A kind of steel guardrail washboard installation bearing calibration Download PDF

Info

Publication number
CN108678337A
CN108678337A CN201810569201.1A CN201810569201A CN108678337A CN 108678337 A CN108678337 A CN 108678337A CN 201810569201 A CN201810569201 A CN 201810569201A CN 108678337 A CN108678337 A CN 108678337A
Authority
CN
China
Prior art keywords
clamp
working plate
bearing calibration
washboard
tablet
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201810569201.1A
Other languages
Chinese (zh)
Inventor
邱战武
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
MCC5 Group Shanghai Corp Ltd
Original Assignee
MCC5 Group Shanghai Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by MCC5 Group Shanghai Corp Ltd filed Critical MCC5 Group Shanghai Corp Ltd
Priority to CN201810569201.1A priority Critical patent/CN108678337A/en
Publication of CN108678337A publication Critical patent/CN108678337A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04FFINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
    • E04F21/00Implements for finishing work on buildings

Abstract

The present invention provides a kind of steel guardrail washboards to install bearing calibration, includes the following steps:A:Make the first clamp;B:Make the second clamp;C:Second clamp is set in the first installation tablet and the first working plate institute clip space, and, plate stack is installed by described second to install on tablet and be secured to together in described first, one cavity of sandwiched between second working plate and first working plate, the cavity is made to be used for clip skirting board;D:Handle is made, it is rod-shaped to make its shape, after the handle completes, it is fixedly connected with the first installation tablet or the second installation tablet, obtains aligning tool;E:The flatness of the handle adjustment skirting board on the aligning tool buckle to skirting board, will be pulled by the cavity.Steel guardrail washboard provided by the invention installs bearing calibration, reliably ensure that Fast Installation and the beautiful needs of installation.

Description

A kind of steel guardrail washboard installation bearing calibration
Technical field
The present invention relates to civil engineering structure installation tool technical field, especially a kind of steel guardrail washboard installs correction side Method.
Background technology
In the construction of industrial building steel-structure factory building, there is a large amount of platform railing, wherein skirting board installation is big, because of skirt Plate it is relatively thin it is relatively narrow easily deformed in transport and during preliminary in place, correcting value is big when formal installation, uses conventional methods not The straight beauty of skirting board can be ensured completely.
Invention content
The technical problem to be solved in the present invention is to provide a kind of steel guardrail washboards to install bearing calibration, facilitates correction skirt Plate, it is ensured that its straight beauty.
The present invention provides a kind of steel guardrail washboards to install bearing calibration, includes the following steps:
A:Make the first clamp, first clamp includes in the first default angle and the first installation tablet being connected with each other and the One working plate, the first installation tablet and first working plate are tabular;
B:Make the second clamp, second clamp includes in the second default angle and the second installation tablet being connected with each other and the Two working plates, the second installation tablet and second working plate are tabular;
C:Second clamp is set in the first installation tablet and the first working plate institute clip space, also, Plate stack is installed by described second to install on tablet and be secured to together in described first so that second working plate and institute One cavity of sandwiched between the first working plate is stated, the cavity is used for clip skirting board;
D:Handle is made, it is rod-shaped to make its shape, after the handle completes, by itself and the first installation tablet or described Second installation tablet is fixedly connected, and obtains aligning tool;
E:By the cavity the smooth of skirting board is adjusted by the handle on the aligning tool buckle to skirting board, is pulled Degree.
Further, the described first default angle and the second default angle are right angle.
Further, the cavity is in the gap of second working plate or the first working plate thickness direction 8~10mm。
Further, the cavity is in the gap of second working plate or the first working plate thickness direction 9mm。
Further, first clamp and second clamp are angle steel, and size is identical.
Further, first clamp and the second clamp length are 100mm, length of side 75mm, side thickness are 8mm's Angle steel.
Further, the handle is the coating steel pipe of 600mm long, diameter 25mm.
Further, the described second default angle is less than the described first default angle.
Further, the described second default angle it is 5 ° smaller than the described first default angle ~ 20 °.
Further, the described second default angle is 15 ° smaller than the described first default angle.
Steel guardrail washboard provided by the invention installs bearing calibration, reliably ensure that Fast Installation and installation beauty need It wants.Advantage specific manifestation is as follows:
Aligning tool fabrication and installation method is simple and convenient, and operability is strong.
It is controlled conducive to adjustment, meets quality appearance requirement.
It is strong that making, the economy such as discarded steel can be selected in aligning tool.
Aligning tool is repeatable to be utilized, and construction cost is saved.
Description of the drawings
Fig. 1 is the dimensional structure diagram of one use state of steel guardrail washboard installation bearing calibration embodiment of the present invention;
Fig. 2 is the front view that device embodiment one is corrected in the present invention;
Fig. 3 is the upward view of Fig. 2;
Fig. 4 is the front view that device embodiment two is corrected in the present invention.
In figure, 1. first clamps, 101. first installation tablets, 102. first working plates, 2. second clamps, 201. second Tablet, 202. second working plates, 3. handles, 4. skirting boards, 5. railing posts are installed.
Specific implementation mode
The invention will be further described in the following with reference to the drawings and specific embodiments, so that those skilled in the art can be with It more fully understands the present invention and can be practiced, but illustrated embodiment is not as a limitation of the invention.
Embodiment one:
The present invention provides a kind of steel guardrail washboards to install bearing calibration, as shown in Figure 1, need to corrected tool card is corrected On skirting board 4, which is fixed on railing post 5, and operating personnel holds aligning tool handle, can according to orientation Up and down adjust power.
Specifically, as shown in Figures 2 and 3, include the following steps:
A:The first clamp 1 is made, first clamp 1 includes the first installation tablet in the first default angle and interconnection 101 and first working plate 102, the first installation tablet 101 and first working plate 102 are tabular;
B:The second clamp 2 is made, second clamp 2 includes the second installation tablet in the second default angle and interconnection 201 and second working plate 202, the second installation tablet 201 and second working plate 202 are tabular;
C:Second clamp 2 is set to described first installation, 102 clip spaces of tablet 101 and first working plate It is interior, also, the second installation tablet 201 is superimposed on the first installation tablet 101 and is secured to, fixed form can Think welding so that one cavity of sandwiched, the cavity between second working plate 202 and first working plate 102 For clip skirting board 4;
D:Handle 3 is made, it is rod-shaped to make its shape, after the handle 3 completes, by itself and the first installation tablet 101 Or the second installation tablet 201 is fixedly connected, and obtains aligning tool;
E:By the cavity the flat of skirting board 4 is adjusted by the handle 3 on the aligning tool buckle to skirting board 4, is pulled Whole degree.
In one optional embodiment of the present embodiment, the default angle is right angle.
In one optional embodiment of the present embodiment, as shown in Fig. 2, the cavity in second working plate 202 or The clearance D of first working plate, 102 thickness direction is 8 ~ 10mm, it is preferable that the cavity is in second working plate The gap of 202 or described first working plate, 102 thickness direction is 9mm.
In one optional embodiment of the present embodiment, first clamp 1 and second clamp 2 are angle steel, and Size is identical.Specifically, first clamp 1 and second clamp, 2 length A is 100mm, length of side B is 75mm, side thickness C is The angle steel of 8mm.
In one optional embodiment of the present embodiment, the handle 3 is the coating steel pipe of 600mm long, diameter 25mm.
This method has mainly made a kind of aligning tool facilitating skirting board mounting and adjusting.It reliably ensure that fast Speed installation and the beautiful needs of installation.Advantage specific manifestation is as follows:
Aligning tool fabrication and installation method is simple and convenient, and operability is strong.
It is controlled conducive to adjustment, meets quality appearance requirement.
It is strong that making, the economy such as discarded steel can be selected in aligning tool.
Aligning tool is repeatable to be utilized, and construction cost is saved.
In Baosteel oriented silicon steel structure optimization engineering, steel-structure factory building construction area reaches 30000m2, platform railing kicks Sole installation about 3000m.It is all corrected in this way when live platform railing skirting board installation, meets quality Beautiful and rapid construction requirement.
Embodiment two:
The present embodiment and embodiment one the difference is that, the second default angle is less than the described first default angle.Such as Fig. 4 It is shown, D ° of angle is formed between the second working plate 202 and the first working plate 102, the presence of the angle facilitates correction work Tool card sets skirting board 4.
In one optional embodiment of the present embodiment, the second default angle is 5 ° smaller than the described first default angle ~ 20 °, it is preferable that the second default angle is 15 ° smaller than the described first default angle, i.e. D sizes in Fig. 4 are 15.
Protection scope of the present invention is without being limited thereto.Those skilled in the art on the basis of the present invention made by it is equivalent It substitutes or converts, within protection scope of the present invention.Protection scope of the present invention is subject to claims.

Claims (10)

1. a kind of steel guardrail washboard installs bearing calibration, which is characterized in that include the following steps:A:Make the first clamp, institute It includes in the first default angle and the first installation tablet being connected with each other and the first working plate, first peace to state the first clamp It is tabular to fill tablet and first working plate;B:The second clamp is made, second clamp includes default in second Angle and the second installation tablet being connected with each other and the second working plate, the second installation tablet and second working plate It is tabular;C:Second clamp is set to the first installation tablet and the first working plate institute clip space It is interior, also, plate stack is installed by described second and installs on tablet and is secured to together in described first so that second work One cavity of sandwiched between tablet and first working plate, the cavity are used for clip skirting board;D:Handle is made, its shape is made Shape is rod-shaped, and after the handle completes, it is fixedly connected with the first installation tablet or the second installation tablet, Obtain aligning tool;E:The handle on the aligning tool buckle to skirting board, will be pulled by the cavity and adjust skirt The flatness of plate.
2. steel guardrail washboard as described in claim 1 installs bearing calibration, which is characterized in that the first default angle and The second default angle is right angle.
3. steel guardrail washboard as claimed in claim 2 installs bearing calibration, which is characterized in that the cavity is described second The gap of working plate or the first working plate thickness direction is 8 ~ 10mm.
4. steel guardrail washboard as claimed in claim 3 installs bearing calibration, which is characterized in that the cavity is described second The gap of working plate or the first working plate thickness direction is 9mm.
5. steel guardrail washboard as claimed in claim 3 installs bearing calibration, which is characterized in that first clamp and described Second clamp is angle steel, and size is identical.
6. steel guardrail washboard as claimed in claim 5 installs bearing calibration, which is characterized in that first clamp and described The angle steel that second clamp length is 100mm, length of side 75mm, side thickness are 8mm.
7. steel guardrail washboard as described in claim 1 installs bearing calibration, which is characterized in that the handle be 600mm long, The coating steel pipe of diameter 25mm.
8. steel guardrail washboard as described in claim 1 installs bearing calibration, which is characterized in that the second default angle is small In the described first default angle.
9. steel guardrail washboard as claimed in claim 8 installs bearing calibration, which is characterized in that the second default angle ratio The first default angle is 5 ° small ~ and 20 °.
10. steel guardrail washboard as claimed in claim 9 installs bearing calibration, which is characterized in that the second default angle It is 15 ° smaller than the described first default angle.
CN201810569201.1A 2018-06-05 2018-06-05 A kind of steel guardrail washboard installation bearing calibration Pending CN108678337A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810569201.1A CN108678337A (en) 2018-06-05 2018-06-05 A kind of steel guardrail washboard installation bearing calibration

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810569201.1A CN108678337A (en) 2018-06-05 2018-06-05 A kind of steel guardrail washboard installation bearing calibration

Publications (1)

Publication Number Publication Date
CN108678337A true CN108678337A (en) 2018-10-19

Family

ID=63809808

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810569201.1A Pending CN108678337A (en) 2018-06-05 2018-06-05 A kind of steel guardrail washboard installation bearing calibration

Country Status (1)

Country Link
CN (1) CN108678337A (en)

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN202021304U (en) * 2011-03-28 2011-11-02 河南省电力公司驻马店供电公司 Bending tool for reinforcing steel bars
CN202202570U (en) * 2011-08-25 2012-04-25 安徽华力建设集团有限公司 Reinforcement bar strengthener
CN102632474A (en) * 2011-02-15 2012-08-15 黄旭东 Fast spanner
CN202725874U (en) * 2012-06-08 2013-02-13 海盐三马标准件有限公司 Reinforcing steel bar bending wrench
CN203003712U (en) * 2012-12-24 2013-06-19 君宇企业股份有限公司 Clamp mechanism with positioning function
CN103603498A (en) * 2013-11-11 2014-02-26 浙江置华建设有限公司 Rebar bending tool
CN205074991U (en) * 2015-10-20 2016-03-09 陕煤集团神木柠条塔矿业有限公司 Pipeline removal tool
CN206859603U (en) * 2017-05-31 2018-01-09 席邦实业(苏州)有限公司 Ceramic tile develops tool tong

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102632474A (en) * 2011-02-15 2012-08-15 黄旭东 Fast spanner
CN202021304U (en) * 2011-03-28 2011-11-02 河南省电力公司驻马店供电公司 Bending tool for reinforcing steel bars
CN202202570U (en) * 2011-08-25 2012-04-25 安徽华力建设集团有限公司 Reinforcement bar strengthener
CN202725874U (en) * 2012-06-08 2013-02-13 海盐三马标准件有限公司 Reinforcing steel bar bending wrench
CN203003712U (en) * 2012-12-24 2013-06-19 君宇企业股份有限公司 Clamp mechanism with positioning function
CN103603498A (en) * 2013-11-11 2014-02-26 浙江置华建设有限公司 Rebar bending tool
CN205074991U (en) * 2015-10-20 2016-03-09 陕煤集团神木柠条塔矿业有限公司 Pipeline removal tool
CN206859603U (en) * 2017-05-31 2018-01-09 席邦实业(苏州)有限公司 Ceramic tile develops tool tong

Similar Documents

Publication Publication Date Title
US20180355623A1 (en) Tile Leveling System
KR101592905B1 (en) Stone Fastening Device for Apartment House
KR20150003622A (en) Fixing unit for exterior stone material and a fixing structure of exterior stone material using thereof
CN108678337A (en) A kind of steel guardrail washboard installation bearing calibration
KR101580642B1 (en) A fixing device for a out side panel of building
CN108678336A (en) A kind of steel guardrail washboard installation aligning tool
KR102050791B1 (en) Scaffold supporting apparatus
MX2020008646A (en) Apparatus and method for correcting misalignment of a strip.
CN210732273U (en) Structure is assembled fast to panel
CN208844945U (en) Integrated scale
CN208391336U (en) A kind of diagonal fixture
CN211396397U (en) Pre-buried composite board
CN211873731U (en) Installation levelling device of wall ground ceramic tile
CN204126260U (en) Masonry structure external corner part joint pin support mould tool
CN207934380U (en) A kind of corner brace fastener of fixed decorative panel
CN211369537U (en) Adjustable clamp structure of ground beam template
CN220705235U (en) L shaped steel board wall butt joint installation correction adjusting device
CN108339869A (en) A kind of device for correcting steel member
CN215631268U (en) Multi-tooth ceramic tile wallboard hook
JP3233176U (en) Temporary member auxiliary support
CN210025021U (en) Tool for processing weighing sensor of electronic scale
US20160333596A1 (en) Tile spacing device and method of use
JP2011219934A (en) Mold height adjustment member
CN218069656U (en) Adjusting device for pre-buried switch box
JP2009215798A (en) Panel mounting tool and method of forming fire resistant covering structure

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20181019