CN108677763A - A kind of high efficiency road bridge quickly repairs gluing equipment - Google Patents

A kind of high efficiency road bridge quickly repairs gluing equipment Download PDF

Info

Publication number
CN108677763A
CN108677763A CN201810635801.3A CN201810635801A CN108677763A CN 108677763 A CN108677763 A CN 108677763A CN 201810635801 A CN201810635801 A CN 201810635801A CN 108677763 A CN108677763 A CN 108677763A
Authority
CN
China
Prior art keywords
cavity
sliding
fuselage
sliding shoe
roof
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn
Application number
CN201810635801.3A
Other languages
Chinese (zh)
Inventor
朱林祥
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
PUJIANG COUNTY JIEHAO IMPORT AND EXPORT Co Ltd
Original Assignee
PUJIANG COUNTY JIEHAO IMPORT AND EXPORT Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by PUJIANG COUNTY JIEHAO IMPORT AND EXPORT Co Ltd filed Critical PUJIANG COUNTY JIEHAO IMPORT AND EXPORT Co Ltd
Priority to CN201810635801.3A priority Critical patent/CN108677763A/en
Publication of CN108677763A publication Critical patent/CN108677763A/en
Withdrawn legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01CCONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
    • E01C23/00Auxiliary devices or arrangements for constructing, repairing, reconditioning, or taking-up road or like surfaces
    • E01C23/06Devices or arrangements for working the finished surface; Devices for repairing or reconditioning the surface of damaged paving; Recycling in place or on the road
    • E01C23/09Devices or arrangements for working the finished surface; Devices for repairing or reconditioning the surface of damaged paving; Recycling in place or on the road for forming cuts, grooves, or recesses, e.g. for making joints or channels for markings, for cutting-out sections to be removed; for cleaning, treating, or filling cuts, grooves, recesses, or fissures; for trimming paving edges
    • E01C23/0966Devices or arrangements for working the finished surface; Devices for repairing or reconditioning the surface of damaged paving; Recycling in place or on the road for forming cuts, grooves, or recesses, e.g. for making joints or channels for markings, for cutting-out sections to be removed; for cleaning, treating, or filling cuts, grooves, recesses, or fissures; for trimming paving edges for filling or priming, with or without working the surface of the filling or applying particulate material thereto, e.g. for filling the joints of stone-sett paving
    • E01C23/0973Devices or arrangements for working the finished surface; Devices for repairing or reconditioning the surface of damaged paving; Recycling in place or on the road for forming cuts, grooves, or recesses, e.g. for making joints or channels for markings, for cutting-out sections to be removed; for cleaning, treating, or filling cuts, grooves, recesses, or fissures; for trimming paving edges for filling or priming, with or without working the surface of the filling or applying particulate material thereto, e.g. for filling the joints of stone-sett paving with liquid or semi-liquid materials, e.g. crack sealants
    • E01C23/098Devices or arrangements for working the finished surface; Devices for repairing or reconditioning the surface of damaged paving; Recycling in place or on the road for forming cuts, grooves, or recesses, e.g. for making joints or channels for markings, for cutting-out sections to be removed; for cleaning, treating, or filling cuts, grooves, recesses, or fissures; for trimming paving edges for filling or priming, with or without working the surface of the filling or applying particulate material thereto, e.g. for filling the joints of stone-sett paving with liquid or semi-liquid materials, e.g. crack sealants and working the surface of the filling or applying particulate material thereto, e.g. smoothing, gritting
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D22/00Methods or apparatus for repairing or strengthening existing bridges ; Methods or apparatus for dismantling bridges

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Mining & Mineral Resources (AREA)
  • Road Repair (AREA)

Abstract

The invention discloses a kind of high efficiency road bridges quickly to repair gluing equipment, including fuselage, first cavity upward in the fuselage inner opening is set, the first sliding cavity being arranged in the fuselage and the first drive cavity being arranged in the fuselage, the second cavity being provided in the first sliding cavity bottom wall outside connection, the front and back rack extended is installed in the first sliding cavity roof, it is capable of sliding back and forth in first sliding cavity to be provided with the first sliding shoe, second cavity is stretched into first sliding shoe bottom, the third cavity of opening upwards is provided in the first sliding shoe roof;The configuration of the present invention is simple, it is easy to operate, it is crushed by using reasonable mechanical structure road pavement, then using the same power source gradually carry out repair glue mixing and road surface it is smooth, automatic feed mechanism is set in use again, it cooperates and does not influence between each process, not only increase pavement preservation efficiency, and improve device practical performance.

Description

A kind of high efficiency road bridge quickly repairs gluing equipment
Technical field
The present invention relates to road upkeep field, specifically a kind of high efficiency road bridge quickly repairs gluing equipment.
Background technology
With the development of society, automobile quantity gradually increases, the increase of automobile quantity is to the requirement of road and bridge pavement quality It is higher and higher, but with the aging on road surface, road surface breakage happens occasionally, thus a kind of pavement maintenance equipment of active demand to its into Row is repaired, and traditional pavement maintenance equipment volume is huge, has a single function, and can not efficiently be completed road surface reparation alone, be generally required The a whole set of maintained equipment ability road pavement that gathers together enough repairs, and so not only efficiency is low but also mass effect is general, this device is effective It solves this problem in that.
Invention content
Technical problem to be solved by the invention is to provide a kind of high efficiency road bridges quickly to repair gluing equipment, can solve The problems in certainly above-mentioned present technology.
The present invention is achieved through the following technical solutions:A kind of high efficiency road bridge of the present invention is quickly repaired glue and is set It is standby, including fuselage, be arranged the first upward cavity of the fuselage inner opening, the first sliding cavity being arranged in the fuselage with And the first drive cavity being arranged in the fuselage, the second cavity being provided in the first sliding cavity bottom wall outside connection, It is installed with the front and back rack extended in the first sliding cavity roof, setting capable of sliding back and forth in first sliding cavity There are the first sliding shoe, first sliding shoe bottom to stretch into second cavity, be provided with out in the first sliding shoe roof Mouthful upward third cavity, is rotatably provided with cam in the third cavity, the cam outer face be installed with The internal spline of rack cooperation, is installed with the first rotating shaft that left and right extends in the cam, on the left of the first rotating shaft End is rotatably dispose on the left of the third cavity in end wall, the first rotating shaft right end and is fixedly installed on the third First motor be connected by power on the right side of cavity in end wall, is provided with that connection is external second to be slided in the third cavity roof Chamber can slide up and down in second sliding cavity and be provided with impact head, the impact head top end and the cam engagement, The third sliding cavity of opening to the right is provided on the left of first drive cavity in end wall, is set in the end wall of the first drive cavity right side It is equipped with the 4th cavity, the second drive cavity extended to the right, the third sliding are provided with and communicated in the first drive cavity bottom wall Intracavitary, which can slide up and down, is provided with the second sliding shoe, and the second motor is fixedly installed in end wall on the right side of the second sliding shoe, Extending end is installed with first bevel gear to second electric machine main shaft to the right, is provided in the second sliding shoe and passes through up and down The first logical threaded hole, the first threaded hole screw-internal thread fit are connected with the first threaded rod extended up and down, first spiral shell Rasp bar bottom end is rotatably dispose in the third sliding cavity bottom wall, the first threaded rod top end be fixedly installed on Third motor power connection in the third sliding cavity roof, it is rotatable between first cavity and first drive cavity The second shaft for being provided with left and right and extending, the second shaft left distal end in first cavity is rotatably dispose in described In first cavity left end face, second shaft outer surface in first cavity is installed with blade, and described first Second shaft outer surface in drive cavity is installed with the second bevel gear that cooperation is detached from the first bevel gear, institute Rotatable screw conveyor shaft in the 4th cavity is stated, the screw conveyor shaft top end is rotatably dispose in the 4th cavity top In portion's end wall, second drive cavity is stretched into the screw conveyor shaft bottom through the 4th cavity bottom wall, and described second passes The screw conveyor shaft outer surface of dynamic intracavitary is installed with the third hand tap gear engaged with the first bevel gear, the machine It is installed with solar energy equipment with it, the solar energy equipment includes solar panels and accumulator.
Preferably technical solution is provided with the 5th cavity that Open Side Down in the fuselage bottom wall, and the described 5th is empty Intracavitary, which can slide up and down, is provided with third sliding shoe, and the second screw thread of opening upwards is provided in the third sliding shoe roof Hole, the second threaded hole screw-internal thread fit are connected with the second threaded rod upwardly extended, the second threaded rod top End is fixedly connected with first threaded rod bottom, and the 6th sky that Open Side Down is provided in the third sliding shoe bottom wall Chamber is rotatably provided with roller in the 6th cavity.
Preferably technical solution, it is front and back symmetrical in the first sliding shoe bottom wall and be symmetrically set with opening to Under third cavity, be rotatably provided with idler wheel in the third cavity, slid back and forth convenient for first sliding shoe.
Preferably technical solution is installed with loading hopper, the loading hopper on the right side of the fuselage on end wall It is provided with and communicated with feed inlet between left side end wall and the 4th cavity, is connected between the 4th cavity and first cavity It was provided with for the first communicating pipe, is provided through the second communicating pipe of the fuselage bottom wall in the first cavity bottom wall, described It is provided with solenoid valve at the top of two communicating pipes.
Preferably technical solution, it is symmetrical before and after the fuselage bottom and be symmetrically set with wheel.
Preferably technical solution is symmetrically arranged with the inside limit that is open in the second sliding cavity left hand end wall Slot, is slidably fitted with the limited block being fixedly connected with the impact head in the limiting slot, fixed peace on the limiting slot roof Equipped with the top pressure spring to offset with the limited block.
Preferably technical solution, is installed with solar panels on the fuselage upper surface, in the fuselage roof The accumulator of the promising solar panels electric power storage is fixedly installed.
The beneficial effects of the invention are as follows:When being worked with the equipment of the present invention, the mobile setting needs repairing to described Upper pavement surface starts the first motor at this time, and the first motor rotation drives the first rotating shaft to rotate, described first turn Shaft rotation is dynamic to drive the cam rotation, is crushed when cam rotation pushes the impact head to move down to that need to repair road surface, When the cam turns to top, the internal spline in the cam is engaged with the rack, at this time first sliding Block moves, and when the cam abuts again with the impact head, the impact head is again crushed the road surface, works as road Broken rear road surface substance is removed, then adds metaling into the loading hopper by the mobile equipment after the completion of face is broken And glue is repaired, and starting second motor at this time, the second motor rotation drives the first bevel gear rotation, and described the The rotation of one bevel gear drives the third hand tap gear rotation, the third hand tap gear rotation to drive the screw conveyor shaft rotation, The screw conveyor shaft rotation, which drives the metaling and repairs glue, rises to the 4th cavity top from first company Siphunculus is fallen into first cavity, when falling into appropriate metaling in first cavity and repairing glue, starts the third Motor rotation drives the first threaded rod rotation, and the first threaded rod rotation drives the second sliding shoe to move up, described The second sliding shoe, which moves up, drives the first bevel gear to be engaged with the second bevel gear, and the second motor rotation at this time drives The first bevel gear rotation, the first bevel gear rotation drive the second bevel gear rotation, the second bevel gear to turn It is dynamic that the blade rotation, the blade rotation is driven to drive material mixing in first cavity, at the same time, the third electricity Machine rotation drives first threaded rod rotation, and the first threaded rod rotation drives the second threaded rod rotation, and described the The rotation of two threaded rods drives the third sliding shoe to move down, and the third sliding shoe, which moves down, drives the roller to move down, mobile institute Equipment is stated to the repair upper pavement surface, starts the solenoid valve and the reparation glue mixed is put on the repair road surface, this Equipment described in Shi Qidong moves, and the reparation glue is pressed smooth under Kun wheels effect at this time.
The configuration of the present invention is simple, it is easy to operate, it is crushed, is then utilized same by using reasonable mechanical structure road pavement One power source gradually carries out repairing the smooth of glue mixing and road surface, and automatic feed mechanism is arranged in use, each It cooperates and does not influence between process, not only increase pavement preservation efficiency, and improve device practical performance.
Description of the drawings
The present invention is described in detail by following specific embodiment and attached drawing for ease of explanation,.
Fig. 1 is that a kind of high efficiency road bridge of the present invention quickly repairs gluing equipment overall structure diagram.
Specific implementation mode
As shown in Figure 1, a kind of high efficiency road bridge of the present invention quickly repairs gluing equipment, including fuselage 100, setting in institute The first upward cavity 101 of 100 inner opening of fuselage, the first sliding cavity 140 being arranged in the fuselage 100 and setting is stated to exist The first drive cavity 107 in the fuselage 100, the second cavity being provided in 140 bottom wall of the first sliding cavity outside connection 127, the front and back rack 141 extended is installed in 140 roof of the first sliding cavity, it can in first sliding cavity 140 What is slid back and forth is provided with the first sliding shoe 138, and second cavity 127 is stretched into 138 bottom of the first sliding shoe, and described It is provided with the third cavity 143 of opening upwards in one sliding shoe, 138 roof, is rotatably provided in the third cavity 143 Cam 136,136 outer surface of the cam are installed with the internal spline 135 coordinated with the rack 141, in the cam 136 It is installed with the first rotating shaft 137 that left and right extends, 137 left distal end of the first rotating shaft is rotatably dispose in the third cavity In 143 left side end walls, 137 right end of the first rotating shaft and it is fixedly installed in 143 right side end wall of the third cavity 126 be connected by power of first motor, the second sliding cavity 144 being provided in 143 roof of third cavity outside connection, described the It can slide up and down in two sliding cavities 144 and be provided with impact head 134,134 top end of the impact head is matched with the cam 136 It closes, the third sliding cavity 108 of opening to the right, first drive cavity 107 is provided in first drive cavity, 107 left side end wall It is provided with the 4th cavity 112 in the end wall of right side, second extended to the right is provided with and communicated in 107 bottom wall of the first drive cavity and is passed Chamber 118 is moved, can slide up and down in the third sliding cavity 108 and be provided with the second sliding shoe 111, the second sliding shoe 111 The second motor 115 is fixedly installed in the end wall of right side, extending end is installed with first to 115 main shaft of the second motor to the right Bevel gear 119 is provided with the first threaded hole 111 up and down, first threaded hole 111 in the second sliding shoe 111 Screw-internal thread fit is connected with the first threaded rod 109 extended up and down, and 111 bottom end of the first threaded rod is rotatably dispose in institute It states in 108 bottom wall of third sliding cavity, 109 top end of the first threaded rod and is fixedly installed on the third sliding cavity 108 106 be connected by power of third motor in roof, rotatably sets between first cavity 101 and first drive cavity 107 It is equipped with the second shaft 102 that left and right extends, 102 left distal end of the second shaft rotation setting in first cavity 101 In in 101 left end face of the first cavity, 102 outer surface of the second shaft in first cavity 101 is fixedly mounted There is blade 103,102 outer surface of the second shaft in first drive cavity 107 is installed with and the first cone tooth Wheel 119 is detached from the second bevel gears 105 of cooperation, rotatable screw conveyor shaft 113, the spiral in the 4th cavity 112 113 top end of conveying axis is rotatably dispose in 112 top end wall of the 4th cavity, and 113 bottom of the screw conveyor shaft is passed through It wears 112 bottom wall of the 4th cavity and stretches into second drive cavity 118, the helical feed in second drive cavity 118 113 outer surface of axis is installed with the third hand tap gear 117 engaged with the first bevel gear 119, is fixed on the fuselage 100 Solar energy equipment is installed, the solar energy equipment includes solar panels 201 and accumulator 200.
Valuably, the 5th cavity 122 that Open Side Down is provided in 100 bottom wall of the fuselage, in the 5th cavity 122 It can slide up and down and be provided with third sliding shoe 125, the second spiral shell of opening upwards is provided in 125 roof of third sliding shoe Pit 121,121 screw-internal thread fit of the second threaded hole are connected with the second threaded rod 121 upwardly extended, and described second 121 top end of threaded rod is fixedly connected with 109 bottom of the first threaded rod, setting in 125 bottom wall of third sliding shoe There is the 6th cavity 123 that Open Side Down, roller 124 is rotatably provided in the 6th cavity 123.
Valuably, front and back symmetrical in 138 bottom wall of the first sliding shoe and be symmetrically set with the third that Open Side Down Cavity 133 is rotatably provided with idler wheel 132 in the third cavity 133, is slid back and forth convenient for first sliding shoe 138.
Valuably, loading hopper 114,114 left side of the loading hopper are installed on 100 right side end wall of the fuselage Feed inlet 145, the 4th cavity 112 and first cavity 101 are provided with and communicated between end wall and the 4th cavity 112 Between be provided with and communicated with for the first communicating pipe 104, be provided through the second of the fuselage bottom wall in 101 bottom wall of the first cavity Communicating pipe 139, second communicating pipe, 139 top was provided with solenoid valve 142.
Valuably, symmetrical before and after 100 bottom of the fuselage and be symmetrically set with wheel 128, it is moved convenient for the equipment It is dynamic.
Valuably, the inside limiting slot 129 that is open is symmetrically arranged in 144 left hand end wall of the second sliding cavity, it is described It is slidably fitted with the limited block 131 being fixedly connected with the impact head 134 in limiting slot 129, consolidates on 129 roof of the limiting slot Dingan County is equipped with the top pressure spring 130 to offset with the limited block 131.
Valuably, it is installed with solar panels 201 on 100 upper surface of the fuselage, fixes and sets in the fuselage roof Be equipped with the accumulator 200 for 201 electric power storage of the solar panels, the solar panels 201 receive illumination after be the accumulator 200 Charging, the accumulator 200 can provide electricity for equipment.
In the initial state, the first motor 126, the second motor 115 and third motor 106 are equal for the equipment of the present invention It remains static, first sliding shoe 138 is located at any position, and the second sliding shoe 111 is located at third sliding 108 bottom of chamber, the first bevel gear 119 are engaged with the third hand tap gear 117, and the third sliding shoe 125 is located at this time 5th cavity, 122 top.
When being worked with the equipment of the present invention, the mobile setting starts institute at this time to the upper pavement surface that needs repairing First motor 126 is stated, the rotation of the first motor 126 drives the first rotating shaft 137 to rotate, and the first rotating shaft 137 rotates It drives the cam 136 to rotate, is broken when the rotation of the cam 136 pushes the impact head 134 to move down to road surface need to be repaired Broken, when the cam 136 turns to top, the internal spline 135 in the cam 136 is engaged with the rack 141, this The first sliding shoes of Shi Suoshu 138 move, when the cam 136 abuts again with the impact head 134, the impact head 134 The road surface is crushed again, the mobile equipment after the completion of pavement breaking, broken rear road surface substance is removed, then Metaling is added into the loading hopper 114 and repairs glue, starts second motor 115, second motor at this time 115 rotations drive the first bevel gear 119 to rotate, and the rotation of the first bevel gear 119 drives 117 turns of the third hand tap gear Dynamic, the rotation of the third hand tap gear 117 drives the screw conveyor shaft 113 to rotate, and the rotation of the screw conveyor shaft 113 drives institute It states metaling and repairs glue to rise to the top of the 4th cavity 112 empty from falling into described first first communicating pipe 104 In chamber 101, when falling into appropriate metaling in first cavity 101 and repairing glue, starts the third motor 106 and rotate band Dynamic first threaded rod 109 rotates, and the rotation of the first threaded rod 109 drives the second sliding shoe 111 to move up, and described the Two sliding shoes 111, which move up, drives the first bevel gear 119 to be engaged with the second bevel gear 105, at this time second motor 115 rotations drive the first bevel gear 119 to rotate, and the rotation of the first bevel gear 119 drives 105 turns of the second bevel gear Dynamic, the rotation of the second bevel gear 105 drives the blade 103 to rotate, and the rotation of the blade 103 drives first cavity Material mixing in 101, at the same time, the rotation of third motor 106 drive first threaded rod 109 to rotate, and described first The rotation of threaded rod 109 drives second threaded rod 120 to rotate, and the rotation of the second threaded rod 120 drives the third sliding Block 125 moves down, and the third sliding shoe 125, which moves down, drives the roller 124 to move down, the mobile equipment to the repair road surface Top starts the solenoid valve 142 and the reparation glue mixed is put on the repair road surface, starts the equipment at this time and moves Dynamic, the reparation glue is pressed smooth under 124 effect of Kun wheels at this time.
The beneficial effects of the invention are as follows:When being worked with the equipment of the present invention, the mobile setting needs repairing to described Upper pavement surface starts the first motor at this time, and the first motor rotation drives the first rotating shaft to rotate, described first turn Shaft rotation is dynamic to drive the cam rotation, is crushed when cam rotation pushes the impact head to move down to that need to repair road surface, When the cam turns to top, the internal spline in the cam is engaged with the rack, at this time first sliding Block moves, and when the cam abuts again with the impact head, the impact head is again crushed the road surface, works as road Broken rear road surface substance is removed, then adds metaling into the loading hopper by the mobile equipment after the completion of face is broken And glue is repaired, and starting second motor at this time, the second motor rotation drives the first bevel gear rotation, and described the The rotation of one bevel gear drives the third hand tap gear rotation, the third hand tap gear rotation to drive the screw conveyor shaft rotation, The screw conveyor shaft rotation, which drives the metaling and repairs glue, rises to the 4th cavity top from first company Siphunculus is fallen into first cavity, when falling into appropriate metaling in first cavity and repairing glue, starts the third Motor rotation drives the first threaded rod rotation, and the first threaded rod rotation drives the second sliding shoe to move up, described The second sliding shoe, which moves up, drives the first bevel gear to be engaged with the second bevel gear, and the second motor rotation at this time drives The first bevel gear rotation, the first bevel gear rotation drive the second bevel gear rotation, the second bevel gear to turn It is dynamic that the blade rotation, the blade rotation is driven to drive material mixing in first cavity, at the same time, the third electricity Machine rotation drives first threaded rod rotation, and the first threaded rod rotation drives the second threaded rod rotation, and described the The rotation of two threaded rods drives the third sliding shoe to move down, and the third sliding shoe, which moves down, drives the roller to move down, mobile institute Equipment is stated to the repair upper pavement surface, starts the solenoid valve and the reparation glue mixed is put on the repair road surface, this Equipment described in Shi Qidong moves, and the reparation glue is pressed smooth under Kun wheels effect at this time.
The configuration of the present invention is simple, it is easy to operate, it is crushed, is then utilized same by using reasonable mechanical structure road pavement One power source gradually carries out repairing the smooth of glue mixing and road surface, and automatic feed mechanism is arranged in use, each It cooperates and does not influence between process, not only increase pavement preservation efficiency, and improve device practical performance.
The above description is merely a specific embodiment, but scope of protection of the present invention is not limited thereto, any The change or replacement expected without creative work, should be covered by the protection scope of the present invention.Therefore, of the invention Protection domain should be determined by the scope of protection defined in the claims.

Claims (7)

1. a kind of high efficiency road bridge of the present invention quickly repairs gluing equipment, including fuselage, setting the fuselage inner opening to On the first cavity, the first sliding cavity being arranged in the fuselage and the first drive cavity being arranged in the fuselage, It is characterized in that:It is provided with the second external cavity of connection in the first sliding cavity bottom wall, consolidates in the first sliding cavity roof Dingan County is equipped with the rack of front and back extension, capable of sliding back and forth in first sliding cavity to be provided with the first sliding shoe, and described first Second cavity is stretched into sliding shoe bottom, and the third cavity of opening upwards is provided in the first sliding shoe roof, described Cam is rotatably provided in third cavity, the cam outer face is installed with the internal spline coordinated with the rack, The first rotating shaft that left and right extends is installed in the cam, the first rotating shaft left distal end is rotatably dispose in the third On the left of cavity in end wall, the first rotating shaft right end and the first electricity being fixedly installed on the right side of the third cavity in end wall Mechanomotive force connects, the second sliding cavity being provided in the third cavity roof outside connection, in second sliding cavity can on Lower slider is provided with impact head, the impact head top end and the cam engagement, the first drive cavity left side end wall It is inside provided with opening third sliding cavity to the right, is provided with the 4th cavity on the right side of first drive cavity in end wall, described first It is provided with and communicated with the second drive cavity extended to the right in drive cavity bottom wall, can slide up and down and be provided in the third sliding cavity The second sliding shoe is fixedly installed the second motor on the right side of the second sliding shoe in end wall, and second electric machine main shaft prolongs to the right It stretches end and is installed with first bevel gear, be provided with the first threaded hole up and down in the second sliding shoe, described One threaded hole screw-internal thread fit is connected with the first threaded rod extended up and down, and the first threaded rod bottom end is rotatably dispose in In the third sliding cavity bottom wall, the first threaded rod top end and it is fixedly installed in the third sliding cavity roof Third motor power connects, and left and right extends second is rotatably provided between first cavity and first drive cavity Shaft, the second shaft left distal end in first cavity are rotatably dispose in the first cavity left end face, institute It states second shaft outer surface in the first cavity and is installed with blade, second shaft in first drive cavity Outer surface is installed with the second bevel gear that cooperation is detached from the first bevel gear, rotatable spiral shell in the 4th cavity Conveying axis is revolved, the screw conveyor shaft top end is rotatably dispose in the 4th cavity top end wall, the helical feed Second drive cavity, the screw conveyor shaft in second drive cavity are stretched into axis bottom through the 4th cavity bottom wall Outer surface is installed with the third hand tap gear engaged with the first bevel gear, and solar energy dress is installed on the fuselage It sets, the solar energy equipment includes solar panels and accumulator.
2. a kind of high efficiency road bridge according to claim 1 quickly repairs gluing equipment, it is characterised in that:The fuselage bottom It is provided with the 5th cavity that Open Side Down in wall, can slide up and down in the 5th cavity and be provided with third sliding shoe, it is described The second threaded hole of opening upwards is provided in third sliding shoe roof, the second threaded hole screw-internal thread fit is connected with The second threaded rod upwardly extended, the second threaded rod top end is fixedly connected with first threaded rod bottom, described It is provided with the 6th cavity that Open Side Down in third sliding shoe bottom wall, roller is rotatably provided in the 6th cavity.
3. a kind of high efficiency road bridge according to claim 1 quickly repairs gluing equipment, it is characterised in that:Described first slides It is front and back symmetrical and be symmetrically set with the third cavity that Open Side Down in motion block bottom wall, it is rotatably set in the third cavity It is equipped with idler wheel, is slid back and forth convenient for first sliding shoe.
4. a kind of high efficiency road bridge according to claim 1 quickly repairs gluing equipment, it is characterised in that:The fuselage is right Be installed with loading hopper on the wall of side, be provided with and communicated between end wall and the 4th cavity on the left of the loading hopper into Material mouth was provided with and communicated with for the first communicating pipe, is set in the first cavity bottom wall between the 4th cavity and first cavity It is equipped with the second communicating pipe through the fuselage bottom wall, solenoid valve is provided at the top of second communicating pipe.
5. a kind of high efficiency road bridge according to claim 1 quickly repairs gluing equipment, it is characterised in that:The fuselage bottom It is symmetrical and be symmetrically set with wheel before and after portion.
6. a kind of high efficiency road bridge according to claim 1 quickly repairs gluing equipment, it is characterised in that:Described second slides It is symmetrically arranged with the inside limiting slot that is open in dynamic chamber left hand end wall, is slidably fitted in the limiting slot solid with the impact head Surely the limited block connected is installed with the top pressure spring to offset with the limited block on the limiting slot roof.
7. a kind of high efficiency road bridge according to claim 1 quickly repairs gluing equipment, it is characterised in that:On the fuselage It is installed with solar panels on end face, the accumulator of the promising solar panels electric power storage is fixedly installed in the fuselage roof.
CN201810635801.3A 2018-06-20 2018-06-20 A kind of high efficiency road bridge quickly repairs gluing equipment Withdrawn CN108677763A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810635801.3A CN108677763A (en) 2018-06-20 2018-06-20 A kind of high efficiency road bridge quickly repairs gluing equipment

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810635801.3A CN108677763A (en) 2018-06-20 2018-06-20 A kind of high efficiency road bridge quickly repairs gluing equipment

Publications (1)

Publication Number Publication Date
CN108677763A true CN108677763A (en) 2018-10-19

Family

ID=63811632

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810635801.3A Withdrawn CN108677763A (en) 2018-06-20 2018-06-20 A kind of high efficiency road bridge quickly repairs gluing equipment

Country Status (1)

Country Link
CN (1) CN108677763A (en)

Similar Documents

Publication Publication Date Title
CN201529572U (en) Horizontal screw unloading settling centrifuge
CN109909021B (en) A high-efficient type ball mill that grinds evenly for coal chemical industry
CN108677763A (en) A kind of high efficiency road bridge quickly repairs gluing equipment
CN107226303A (en) A kind of block-resistant type run coal bin
CN112196236B (en) Decoration construction is with beating mucilage binding and is put convenient to automatic frictioning
CN108677764A (en) A kind of road and bridge quickly repairs glue
CN205660957U (en) Portable plastic crusher
CN108995418A (en) A kind of integrated Multipurpose power-driven binding machine
CN112197547B (en) Novel material drying machine
CN108787056A (en) A kind of multifunctional bio medicine milling apparatus
CN210479172U (en) Quantitative material distributing mechanism
CN211662401U (en) Semiconductor wafer cutting backup pad unloading equipment
CN209061139U (en) A kind of reaction unit of converted starch
CN108442721B (en) A kind of informationization metope dismounting device
CN208972646U (en) A kind of quality-adjusting device
CN202829810U (en) Spherical bead processing unit
CN220969411U (en) Plastic steel raw and other materials reducing mechanism
CN108952210A (en) A kind of metope dismounting device
CN107511210A (en) A kind of broken fertilizer apparatus of hardened fertilizer
CN108665988A (en) A kind of advanced spentnuclear fuel after-treatment device
CN219578213U (en) Tea processing and twisting assembly
CN108177517A (en) A kind of novel hybrid driving equipment
CN108300634A (en) A kind of novel vinasse filter plant
CN219273152U (en) Environment-friendly crusher
CN203943059U (en) Novel tobacco material drying device

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
WW01 Invention patent application withdrawn after publication

Application publication date: 20181019