CN108673144A - A kind of energy conservation and environmental protection pipe fitting process equipment for building - Google Patents
A kind of energy conservation and environmental protection pipe fitting process equipment for building Download PDFInfo
- Publication number
- CN108673144A CN108673144A CN201810595221.6A CN201810595221A CN108673144A CN 108673144 A CN108673144 A CN 108673144A CN 201810595221 A CN201810595221 A CN 201810595221A CN 108673144 A CN108673144 A CN 108673144A
- Authority
- CN
- China
- Prior art keywords
- rack
- block
- sliding
- sliding block
- pipe fitting
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Withdrawn
Links
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B23—MACHINE TOOLS; METAL-WORKING NOT OTHERWISE PROVIDED FOR
- B23P—METAL-WORKING NOT OTHERWISE PROVIDED FOR; COMBINED OPERATIONS; UNIVERSAL MACHINE TOOLS
- B23P23/00—Machines or arrangements of machines for performing specified combinations of different metal-working operations not covered by a single other subclass
- B23P23/02—Machine tools for performing different machining operations
Landscapes
- Physics & Mathematics (AREA)
- Optics & Photonics (AREA)
- Engineering & Computer Science (AREA)
- Mechanical Engineering (AREA)
- Sawing (AREA)
Abstract
The invention discloses a kind of energy conservation and environmental protection pipe fitting process equipments for building, including rack and main motor, the rack is equipped with conveying device, cutter device and length control device, the conveying device includes the driving roller and driven roller being correspondingly arranged up and down, the driven roller is set to above driving roller, the driving roller is rotatably dispose in by transmission shaft in rack, the main motor drives the transmission shaft rotation, the driven roller is rotatably dispose on the first sliding block, in the first sliding groove of the first sliding block vertical sliding being set in rack, the top surface of the first sliding groove is equipped with adjusting screw, the lower part of the adjusting screw is equipped with the first compression spring, the lower face of first compression spring is resisted against the upper surface of the first sliding block.Fixed length cutting and drilling operation can be achieved at the same time in the pipe fitting process equipment clever structure of the present invention, reasonable design, and mechanical structure is simplified, and has practicability.
Description
Technical field
The present invention relates to technical field of buildings, particularly relate to a kind of energy conservation and environmental protection pipe fitting process equipment for building.
Background technology
The pipe fitting process equipment complex structural designs for building of the prior art, the degree of automation is low, needs to improve;Existing skill
The workbench of art adjusts dumb, adjustment structure design complexity, inconvenient for operation.
Invention content
Technical problem to be solved by the invention is to provide a kind of energy conservation and environmental protection pipe fitting process equipments for building, existing to solve
There are pipe fitting process equipment complex structural designs for building in technology, the degree of automation is low and workbench adjusts dumb, adjusting
Complex structural designs, technical problem inconvenient for operation.
In order to solve the above technical problems, the embodiment of the present invention provides a kind of energy conservation and environmental protection pipe fitting process equipment for building,
Including rack and main motor, the rack is equipped with conveying device, cutter device and length control device, and the conveying device includes upper
Under the driving roller and driven roller that are correspondingly arranged, the driven roller is set to above driving roller, and the driving roller is logical
It crosses transmission shaft to be rotatably dispose in rack, the main motor drives the transmission shaft rotation, the driven roller to be rotatably dispose in
On first sliding block, in the first sliding groove of the first sliding block vertical sliding being set in rack, the top surface of the first sliding groove
It is equipped with adjusting screw, the lower part of the adjusting screw is equipped with the first compression spring, and the lower face of first compression spring is resisted against first
The upper surface of sliding block, first compression spring mutually compress driven roller with driving roller, so that the driven roller and actively rolling
A pipe fitting is transmitted by frictional force between wheel, the side wall of the driven roller and driving roller is equipped with for transmitting pipe fitting
Annular groove;The cutter device includes upper cutter block and lower cutter block, and the lower cutter block is fixed in rack, the upper cutter block and second
Sliding block is mutually fixed, and second sliding block both sides are equipped with slide guide axis, second be set in rack of the slide guide axis vertical sliding
In sliding slot, slide guide axis outer end is fixed with the second compression spring, and the lower end of second compression spring is resisted against in rack, the slide guide axis
The top of second sliding slot is in by the active force of the second compression spring, under this state the upper circular arc edge of a knife on upper cutter block and lower cutter block
On the lower circular arc edge of a knife one channel that passes tubulars through of composition just;The length control device includes being fixed on level by screw to determine
Mounting blocks on elongated slot, rotation are set to the first guide rod on mounting blocks, and block is fixedly provided on the mounting blocks for limiting the
The upper end of the rotational angle of one guide rod, first guide rod is rotatablely connected a mandril, and the mandril is horizontal to be set up in rack,
The first column is additionally provided in the rack, rotation is equipped with briquetting on first column, equipped with water between the briquetting and rack
Horizontal drawing spring, the briquetting are made the side of briquetting be resisted against the end of mandril by the active force of horizontal tension spring;On second sliding block
Side is equipped with the taping block that vertical direction moves back and forth, and the lower surface of taping block is not touched just when the taping block moves to minimum point
The upper surface of the second sliding block is touched, the briquetting is turned to after by the forward active force of mandril above the second sliding block;Described second slides
Block is equipped with the third sliding slot of vertically communicated setting, and perforating device is equipped in the third sliding slot, and the perforating device includes perpendicular
To the guide sleeve of setting, the guide sleeve side wall is connected to by the first rotation axis on third sliding slot, the upper side wall of the guide sleeve and
It is equipped with the 4th compression spring between three sliding slots, jacking block, the bottom of the guide sleeve are equipped between the lower wall and third sliding slot of the guide sleeve
Equipped with bottom plate, the bottom plate center is equipped with first through hole, and perforating cutting tool is equipped in the guide sleeve, is set on the perforating cutting tool side wall
There is slider guide, the first spring is equipped between the slider guide and bottom plate, the top of the perforating cutting tool is higher by the top surface of guide sleeve, institute
The bottom end for stating perforating cutting tool is located above bottom plate, and the upper back position of the guide sleeve is equipped with driving lever, and the driving lever is set to second
Between sliding block and briquetting;
It is additionally provided with workbench in the rack, the workbench includes the second column being fixed in rack, and described second
Upper limit plate and lower limiting board are equipped at intervals on column, the second column is separated out installation by the upper limit plate and lower limiting board
Portion, on the mounting portion rotation be equipped with mounting bracket, the mounting bracket is equipped with anchor ear portion, the installation that the anchor ear portion horizontally rotates
In on mounting portion, the side in the anchor ear portion is equipped with clamping screw and is used to anchor ear portion being positioned at mounting portion, the anchor ear portion
The other side set there are two vertical gear mounting plate disposed in parallel, pass through rotary gear shaft rotation peace between two gear mounting plates
Equipped with first gear, there is in the anchor ear portion between two gear mounting plates short slot, be vertically equipped on the short slot
First rack, first rack are limited in vertical direction between upper limit plate and lower limiting board, the length of first rack
Degree is equal to the height of mounting portion, and first rack is engaged in first gear, is also rotated between described two gear mounting plates
Equipped with worm screw, the worm screw is horizontally disposed, and the outer end of the worm screw is equipped with the runner with handle, and the worm screw is engaged in the
The top of one gear, the gear mounting plate is equipped with worktable panel;
Dust-extraction unit is additionally provided in the rack, the dust-extraction unit includes babinet, and the babinet is equipped with air inlet, goes out
Air port, connects exhaust fan on the air inlet, and the babinet lower end connects purifier by connecting tube, under the purifier
End connects water storage box, and upper end is equipped with spray tube in the babinet, and the spray tube is connect by feed pipe with water storage box, described to give
Water pipe is equipped with water-supply valve, and dust concentration sensor and controller, the exhaust fan, water-supply valve, ash are equipped on the outside of the babinet
Dust concentration sensor is respectively connect with controller, and the water storage box is arranged in rack.
The first gear is helical gear, and first rack is diagonal-cut rack.
When the driving roller transmits pipe fitting so that the end of pipe fitting is resisted against the lower end of the first guide rod with driven roller,
Drive the horizontal forward movement of mandril, the mandril that briquetting is driven to turn to the second sliding block upper surface after the first guide rod rotation,
Block is suppressed on the taping block top so that upper cutter block completes cutting operation.
The above-mentioned technical proposal of the present invention has the beneficial effect that:
Fixed length cutting and drilling operation, machine can be achieved at the same time in the pipe fitting process equipment clever structure of the present invention, reasonable design
Tool structure is simplified, and has practicability.The workbench of the present invention it is easy to adjust, it can be achieved that horizontal direction rotation and vertical direction
Height is adjusted, and self-locking structure designs the convenience for bringing operation.
Description of the drawings
Fig. 1 is the structural diagram of the present invention.
Fig. 2 is the part isometric structure chart one of the present invention.
Fig. 3 is the part isometric structure chart two of the present invention.
Fig. 4 is the exploded view of the cutter device of the present invention.
Fig. 5 is the structure chart of the taping block of the present invention.
Fig. 6 is the structure chart of the second sliding block of the present invention.
Fig. 7 is the sectional view of the perforating cutting tool of the present invention.
Fig. 8 is the stereogram of the workbench of the present invention.
Fig. 9 is the exploded view of the workbench of the present invention.
Figure 10 is the structure chart of the dust-extraction unit of the present invention.
Specific implementation mode
To keep the technical problem to be solved in the present invention, technical solution and advantage clearer, below in conjunction with attached drawing and tool
Body embodiment is described in detail.
For convenience of description, before right direction is in Fig. 1, front end, front, direction of advance, left direction be after, rear end, after
Portion, direction of retreat.
As shown in Figures 1 to 7, the embodiment of the present invention provides a kind of energy conservation and environmental protection pipe fitting process equipment for building, including machine
Frame 100 and main motor (not shown) are equipped with conveying device, cutter device and fixed length dress in the rack 100 successively from front to back
It sets, the conveying device includes the driving roller 11 being correspondingly arranged up and down and driven roller 12, and the driven roller 12 is set to
11 top of driving roller, the driving roller 11 are rotatably dispose in by transmission shaft 13 in rack 100, and the main motor drives institute
The rotation of transmission shaft 13 is stated, the driven roller 12 is rotatably dispose on the first sliding block 14,14 vertical sliding of the first sliding block
It is set in the first sliding groove 15 in rack 100, the top surface of the first sliding groove 15 is equipped with adjusting screw 16, the adjusting spiral shell
The lower part of nail 16 is equipped with the first compression spring 17, and the lower face of first compression spring 17 is resisted against the upper surface of the first sliding block 14, described
First compression spring 17 compresses driven roller 12 and 11 phase of driving roller, so as to lead between the driven roller 12 and driving roller 11
Frictional force is crossed to transmit rearward a pipe fitting 18, the driven roller 12 and the side wall of driving roller 11 are equipped with for transmitting pipe fitting
18 annular groove 19;The cutter device includes upper cutter block 20 and lower cutter block 21, and the lower cutter block 21 is fixed in rack 100,
The upper cutter block 20 is fixed with 22 phase of the second sliding block, and 22 both sides of the second sliding block are equipped with slide guide axis 23, and the slide guide axis 23 is perpendicular
In the second sliding slot 24 being set in rack 100 directly slided, 23 outer end of slide guide axis is fixed with the second compression spring 25, and described
The lower end of two compression springs 25 is resisted against in rack 100, and the slide guide axis 23 is in second sliding slot by the active force of the second compression spring 25
24 the top, under this state 211 lucky groups of the lower circular arc edge of a knife on the upper circular arc edge of a knife 201 and lower cutter block 21 on upper cutter block 20
At one make pipe fitting 18 by channel;The length control device includes the mounting blocks being fixed on by screw in horizontal fixed length slot 26
27, rotation is set to the first guide rod 28 on mounting blocks 27, and block 29 is fixedly provided on the mounting blocks 27 and is led for limiting first
The upper end of the rotational angle of bar 28, first guide rod 28 is rotatablely connected a mandril 30, first guide rod 28 and mandril 30
Link position can be adjusted by screw, and the mandril 30 is horizontal to be set up in rack 100, and the is additionally provided in the rack 100
One column 31, on first column 31 rotation be equipped with briquetting 32, horizontal tension spring is equipped between the briquetting 32 and rack 100
33, the briquetting 32 is made the side of briquetting 32 be resisted against the front end of mandril 30 by the active force of horizontal tension spring 33;Described second
22 top of sliding block is equipped with the taping block 34 that vertical direction moves back and forth, taping block 34 when the taping block 34 moves to minimum point
Lower surface does not touch the upper surface of the second sliding block 22 just, and the driving roller 11 transmits pipe fitting 18 so that pipe with driven roller 12
When the end of part 18 is resisted against the lower end of the first guide rod 28, first guide rod 28 drives 30 horizontal forward fortune of mandril after rotating
Dynamic, the mandril 30 drives briquetting 32 to turn to 22 upper surface of the second sliding block, and block 32 is suppressed so that upper slitter in the top of the taping block 34
Block 20 completes cutting operation;The taping block 34 can vertical sliding be set in rack 100, taping block 34 and rack 100 it
Between be equipped with that third compression spring is (not shown) so that there is taping block 34 stress uptrend, the top of the taping block 34 to be equipped with driving
Wheel 35 is set in rack 100 by the rotation of first rotating shaft 36 at the eccentric position of the driving wheel 35, and the driving wheel 35 is by the
The driving (not shown) of two motors, the driving wheel 35 drive taping block 34 to do the reciprocating motion on vertical direction;Described second slides
Block 22 is equipped with the third sliding slot 36 of vertically communicated setting, and perforating device, the perforating device are equipped in the third sliding slot 36
Including vertically arranged guide sleeve 37,37 side wall of the guide sleeve is connected to by the first rotation axis 38 on third sliding slot 36, first turn
The setting direction of moving axis 38 is identical as the setting direction of slide guide axis 23, is set between the upper side wall and third sliding slot 36 of the guide sleeve 37
There is the 4th compression spring 39, jacking block 40 is equipped between the lower wall and third sliding slot 36 of the guide sleeve 37, not by other external force states
Under, the active force of the 4th compression spring 39 drive the lower wall of guide sleeve 37 to be resisted against on jacking block 40 so that guide sleeve 37 keep vertical state,
4th compression spring 39 and jacking block 40 are set to the front side of guide sleeve 37, and the bottom of the guide sleeve 37 is equipped with bottom plate 41, the bottom plate
41 centers are equipped with first through hole 42, and perforating cutting tool 43 is equipped in the guide sleeve 37, and 43 side wall of the perforating cutting tool is equipped with slide guide
Block 44 is equipped with the first spring 45 between the slider guide 44 and bottom plate 41, the top of the perforating cutting tool 43 is higher by guide sleeve 37
The bottom end of top surface, the perforating cutting tool 43 is located at 41 top of bottom plate, when the taping block 34 acts on perforating cutting tool 43, beats
The first through hole 42 of bottom plate 41 is stretched out in the bottom end of spot facing cutter 43, and the upper back position of the guide sleeve 37 is equipped with driving lever 46, described
Driving lever 46 is set between the second sliding block 22 and briquetting 32.
The working process and principle of the pipe fitting process equipment are as follows:One long straight pipe fitting 18 by driving roller 11 and from
The driving of dynamic idler wheel 12, conveys, from the front to the back by the lower circular arc knife of the upper circular arc edge of a knife 201 and lower cutter block 21 by upper cutter block 20
Behind the channels of mouthfuls 211 compositions, since perforating cutting tool catches a packet the impact of block period, punching work can be carried out to the surface of pipe fitting
Industry, when the end of pipe fitting touches the lower end of the first guide rod 28, first guide rod 28 drives mandril 30 horizontal after rotating
It travels forward, the mandril 30 drives briquetting 32 to turn to 22 upper surface of the second sliding block, and briquetting drives driving lever to force guide sleeve
Rotation, makes perforating cutting tool be temporarily lost with effect, and be not subject to crushing, and block 32 is suppressed on the top of the taping block 34 so that upper cutter block 20 is completed
Cutting operation.By adjusting position of first guide rod in horizontal fixed length slot and mandril, the Cutting Length of pipe fitting is adjusted.
As shown in Fig. 1, Fig. 8 and Fig. 9, workbench 50 is additionally provided in the rack 100, the workbench 50 includes being fixed on
The second column 51 in rack 100 is equipped at intervals with upper limit plate 52 and lower limiting board 53, the upper limit on second column 51
Second column 51 is separated out mounting portion 511 by position plate 52 and lower limiting board 53, and rotation is equipped with mounting bracket on the mounting portion 511
54, the mounting bracket 54 is equipped with anchor ear portion 541, and what the anchor ear portion 541 horizontally rotated is installed on mounting portion 511, described
The side in anchor ear portion 541 is equipped with clamping screw 55 and is used to anchor ear portion 541 being positioned at mounting portion 511, the anchor ear portion 541
The other side is set there are two vertical gear mounting plate 542 disposed in parallel, passes through rotary gear shaft 56 between two gear mounting plates 542
It is rotatablely equipped with first gear 57, is located in the anchor ear portion 541 between two gear mounting plates 542 with short slot 543, it is described
First rack 58 is vertically installed, the short slot 543 and the first rack 58 opposite can slide, first rack on short slot 543
58 are limited in vertical direction between upper limit plate 52 and lower limiting board 53, and the length of first rack 58 is equal to mounting portion
511 height, first rack 58 are engaged in first gear 57, also rotate and be equipped between described two gear mounting plates 542
Worm screw 59, the worm screw 59 are horizontally disposed, and the outer end of the worm screw 59 is equipped with the runner 61 with handle 60, the worm screw 59
It is engaged in first gear 57, the top of the gear mounting plate 542 is equipped with worktable panel 62;The first gear 57 is helical teeth
Wheel, first rack 58 are diagonal-cut rack.Worktable panel can be made to lift by rotational handle, by the locking screw in anchor ear portion
After bolt unclamps, anchor ear portion can be made to rotate, rotated to drive worktable panel to synchronize, turn to suitable position lock
Tight bolt locking, since the engaging structure of worm screw, first gear can make worktable panel self-locking.
As shown in Fig. 1 and Figure 10, dust-extraction unit 7 is additionally provided in the rack 100, the dust-extraction unit 7 includes babinet 71,
The babinet 71 is equipped with air inlet 72, air outlet 73, and exhaust fan 74 is connected on the air inlet 72, and 71 lower end of the babinet is logical
It crosses connecting tube 75 and connects purifier 76,76 lower end of the purifier connects water storage box 77, and upper end is equipped in the babinet 71
Spray tube 78, the spray tube 78 are connect by feed pipe 79 with water storage box 77, and the feed pipe 79 is equipped with water-supply valve 80, institute
It states 71 outside of babinet and is equipped with dust concentration sensor 81 and controller 82, the exhaust fan 74, water-supply valve 80, dust concentration sensing
Device 81 is respectively connect with controller 82, and the water storage box 77 is arranged in rack 100.Made by dust concentration Sensor monitoring
The dust concentration of industry environment, when dust concentration is more than certain value, signal is transmitted to controller, controller by dust concentration sensor
It signals to open exhaust fan, water-supply valve, air is pumped into babinet by exhaust fan, and spray tube, which sprays water, carries out the dust in air
It settles, then air goes out discharge from air outlet, and the water after ejection is flowed back by filtering, sterilization in water storage box, and carrying out repetition makes
With.
The above is the preferred embodiment of the present invention, it is noted that for those skilled in the art
For, without departing from the principles of the present invention, several improvements and modifications can also be made, these improvements and modifications
It should be regarded as protection scope of the present invention.
Claims (3)
1. a kind of energy conservation and environmental protection pipe fitting process equipment for building, including rack and main motor, which is characterized in that set in the rack
It includes the driving roller being correspondingly arranged up and down and driven rolling to have conveying device, cutter device and length control device, the conveying device
Wheel, the driven roller are set to above driving roller, and the driving roller is rotatably dispose in by transmission shaft in rack, described
Main motor drives the transmission shaft rotation, the driven roller to be rotatably dispose on the first sliding block, and first sliding block is slided vertically
In the dynamic the first sliding groove being set in rack, the top surface of the first sliding groove is equipped with adjusting screw, the adjusting screw
Lower part is equipped with the first compression spring, and the lower face of first compression spring is resisted against the upper surface of the first sliding block, and first compression spring will be from
Dynamic idler wheel is mutually compressed with driving roller, so as to a pipe fitting is transmitted by frictional force between the driven roller and driving roller,
The side wall of the driven roller and driving roller is equipped with the annular groove for transmitting pipe fitting;The cutter device includes upper cutter block
With lower cutter block, the lower cutter block is fixed in rack, and the upper cutter block is mutually fixed with the second sliding block, and second sliding block both sides are set
There is a slide guide axis, in the second sliding slot of the slide guide axis vertical sliding being set in rack, slide guide axis outer end is fixed with
The lower end of two compression springs, second compression spring is resisted against in rack, and the slide guide axis is in second by the active force of the second compression spring
The top of sliding slot, composition one makes pipe to the lower circular arc edge of a knife on the upper circular arc edge of a knife and lower cutter block on upper cutter block just under this state
Part by channel;The length control device includes the mounting blocks being fixed on by screw in horizontal fixed length slot, rotation set on installation
The first guide rod on block is fixedly provided with rotational angle of the block for limiting the first guide rod on the mounting blocks, and described first leads
The upper end of bar is rotatablely connected a mandril, and the mandril is horizontal to be set up in rack, and the first column, institute are additionally provided in the rack
It states rotation on the first column and is equipped with briquetting, horizontal tension spring is equipped between the briquetting and rack, the briquetting is by horizontal tension spring
Active force makes the side of briquetting be resisted against the end of mandril;The strike that vertical direction moves back and forth is equipped with above second sliding block
Block, the lower surface of taping block does not touch the upper surface of the second sliding block, the briquetting just when the taping block moves to minimum point
It is turned to after by the forward active force of mandril above the second sliding block;The third that second sliding block is equipped with vertically communicated setting is slided
Slot, is equipped with perforating device in the third sliding slot, and the perforating device includes vertically arranged guide sleeve, and the guide sleeve side wall passes through
First rotation axis is connected on third sliding slot, and the 4th compression spring is equipped between the upper side wall and third sliding slot of the guide sleeve, described to lead
Jacking block is equipped between the lower wall and third sliding slot of set, the bottom of the guide sleeve is equipped with bottom plate, and the bottom plate center is equipped with first
Through-hole, the guide sleeve is interior to be equipped with perforating cutting tool, and the perforating cutting tool side wall is equipped with slider guide, between the slider guide and bottom plate
Equipped with the first spring, the top of the perforating cutting tool is higher by the top surface of guide sleeve, and the bottom end of the perforating cutting tool is located above bottom plate,
The upper back position of the guide sleeve is equipped with driving lever, and the driving lever is set between the second sliding block and briquetting;
Workbench is additionally provided in the rack, the workbench includes the second column being fixed in rack, second column
On be equipped at intervals with upper limit plate and lower limiting board, the second column is separated out mounting portion by the upper limit plate and lower limiting board, institute
It states rotation on mounting portion and is equipped with mounting bracket, the mounting bracket is equipped with anchor ear portion, and what the anchor ear portion horizontally rotated is installed on peace
In dress portion, the side in the anchor ear portion is equipped with clamping screw and is used to anchor ear portion being positioned at mounting portion, the anchor ear portion it is another
Side is set there are two vertical gear mounting plate disposed in parallel, is rotatablely equipped with by rotary gear shaft between two gear mounting plates
First gear, being located in the anchor ear portion between two gear mounting plates has short slot, and first is vertically equipped on the short slot
Rack, first rack are limited in vertical direction between upper limit plate and lower limiting board, the length etc. of first rack
It is same as the height of mounting portion, first rack is engaged in first gear, also rotates and be equipped between described two gear mounting plates
Worm screw, the worm screw are horizontally disposed, and the outer end of the worm screw is equipped with the runner with handle, and the worm screw is engaged in the first tooth
The top of wheel, the gear mounting plate is equipped with worktable panel;
Dust-extraction unit is additionally provided in the rack, the dust-extraction unit includes babinet, and the babinet is equipped with air inlet, outlet air
Mouthful, exhaust fan is connected on the air inlet, the babinet lower end connects purifier, the purifier lower end by connecting tube
Water storage box is connected, upper end is equipped with spray tube in the babinet, and the spray tube is connect by feed pipe with water storage box, the water supply
Pipe is equipped with water-supply valve, and dust concentration sensor and controller, the exhaust fan, water-supply valve, dust are equipped on the outside of the babinet
Concentration sensor is respectively connect with controller, and the water storage box is arranged in rack.
2. energy conservation and environmental protection pipe fitting process equipment for building according to claim 1, which is characterized in that the first gear is
Helical gear, first rack are diagonal-cut rack.
3. energy conservation and environmental protection pipe fitting process equipment for building according to claim 1, which is characterized in that the driving roller with
When driven roller transmits pipe fitting so that the end of pipe fitting is resisted against the lower end of the first guide rod, driven after the first guide rod rotation
The horizontal forward movement of mandril, the mandril drive briquetting to turn to the second sliding block upper surface, the taping block top suppress block so that
Upper cutter block completes cutting operation.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810595221.6A CN108673144A (en) | 2018-06-11 | 2018-06-11 | A kind of energy conservation and environmental protection pipe fitting process equipment for building |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810595221.6A CN108673144A (en) | 2018-06-11 | 2018-06-11 | A kind of energy conservation and environmental protection pipe fitting process equipment for building |
Publications (1)
Publication Number | Publication Date |
---|---|
CN108673144A true CN108673144A (en) | 2018-10-19 |
Family
ID=63810847
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201810595221.6A Withdrawn CN108673144A (en) | 2018-06-11 | 2018-06-11 | A kind of energy conservation and environmental protection pipe fitting process equipment for building |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN108673144A (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110474237A (en) * | 2019-08-29 | 2019-11-19 | 国网山东省电力公司济南市长清区供电公司 | Rainproof distribution box |
-
2018
- 2018-06-11 CN CN201810595221.6A patent/CN108673144A/en not_active Withdrawn
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110474237A (en) * | 2019-08-29 | 2019-11-19 | 国网山东省电力公司济南市长清区供电公司 | Rainproof distribution box |
CN110474237B (en) * | 2019-08-29 | 2021-02-19 | 国网山东省电力公司济南市长清区供电公司 | Rainproof distribution box |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN108480993A (en) | A kind of environment protection architecture construction pipe fitting process equipment | |
CN108436484A (en) | A kind of process equipment that environment protection architecture finishing is monitored with pipe fitting band | |
CN107414194A (en) | A kind of interior decoration decorative panel cutter device | |
CN108723779A (en) | A kind of pipe fitting process equipment of the construction and decoration with illumination | |
CN108673144A (en) | A kind of energy conservation and environmental protection pipe fitting process equipment for building | |
CN108747379A (en) | A kind of pipe fitting process equipment of energy conservation and environmental protection dust removal for building | |
CN108723778A (en) | A kind of environment protection architecture finishing pipe fitting multifunctional process equipment | |
CN108747380A (en) | A kind of construction and decoration environment-friendly type pipe fitting multifunctional process equipment | |
CN108747375A (en) | A kind of energy conservation and environmental protection construction and decoration pipe fitting process equipment | |
CN218745268U (en) | Fire hydrant reaming device | |
CN108788745A (en) | A kind of architectural engineering environment-friendly type pipe fitting multifunctional process equipment | |
CN216095369U (en) | Coal conveying system dredging robot | |
CN111496319B (en) | Cutting equipment for machining cold storage plate | |
CN209006740U (en) | A kind of machining metal drilling equipment with collection iron filings | |
CN209035585U (en) | A kind of horizontal saw mill | |
CN108747376A (en) | A kind of energy saving and environment friendly pipe fitting process equipment of construction | |
CN108747378A (en) | A kind of construction environment-friendly type pipe fitting process equipment | |
CN108705315A (en) | A kind of construction and decoration environment-friendly type pipe fitting process equipment | |
CN108788744A (en) | A kind of process equipment of energy conservation and environmental protection construction and decoration pipe fitting | |
CN108705314A (en) | A kind of architectural engineering environment-friendly type pipe fitting process equipment | |
CN210996601U (en) | Drilling equipment is used in processing of illumination integrated protection device | |
CN209614454U (en) | A kind of slug collection device of machining | |
CN208945334U (en) | A kind of wire cutting fixed device to be cut | |
CN112974906A (en) | A precision finishing drilling machine for producing hardware fitting | |
CN207736444U (en) | A kind of single-shaft vertical wood-milling machine |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
WW01 | Invention patent application withdrawn after publication |
Application publication date: 20181019 |
|
WW01 | Invention patent application withdrawn after publication | ||
DD01 | Delivery of document by public notice |
Addressee: Wu Hongshuai Document name: Notification of Approving Refund |
|
DD01 | Delivery of document by public notice |