CN108672838B - Gear shaft roll flute tooling and assembly method - Google Patents
Gear shaft roll flute tooling and assembly method Download PDFInfo
- Publication number
- CN108672838B CN108672838B CN201810249864.5A CN201810249864A CN108672838B CN 108672838 B CN108672838 B CN 108672838B CN 201810249864 A CN201810249864 A CN 201810249864A CN 108672838 B CN108672838 B CN 108672838B
- Authority
- CN
- China
- Prior art keywords
- gear shaft
- hole
- strap
- roll flute
- positioning
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B23—MACHINE TOOLS; METAL-WORKING NOT OTHERWISE PROVIDED FOR
- B23F—MAKING GEARS OR TOOTHED RACKS
- B23F23/00—Accessories or equipment combined with or arranged in, or specially designed to form part of, gear-cutting machines
- B23F23/02—Loading, unloading or chucking arrangements for workpieces
- B23F23/06—Chucking arrangements
Landscapes
- Engineering & Computer Science (AREA)
- Mechanical Engineering (AREA)
- Gears, Cams (AREA)
Abstract
The invention discloses a kind of gear shaft roll flute tooling and assembly methods.Positioning of the gear shaft roll flute with tooling for gear shaft clamps, including top, pedestal and square pillar, it further include strap, strap is provided with positioning through hole, the top positioning through hole that passes through withstands gear shaft, positioning for gear shaft, it is provided on the outside of the positioning through hole of strap along the circumferentially equally distributed installation through-hole of positioning through hole, gear shaft is removably attached on strap upper surface by installation through-hole, strap is provided with polar connecting structure, and square pillar is connected under strap upper surface by polar connecting structure.The invention also discloses the assembly methods for the gear shaft roll flute tooling.Gear shaft roll flute tooling of the invention and assembly method can remove the technique lengthening section of gear shaft, reduce production cost and improve production efficiency, while can guarantee that the positioning datum of gear shaft processing front and back is consistent, improve the service life of gear shaft.
Description
Technical field
The present invention relates to mining reducer technology field more particularly to a kind of gear shaft roll flute toolings and assembly method.
Background technique
Coalcutter sun gear and speed reducer sun gear, it is toothed member that structure is identical, alternatively referred to as gear shaft, wherein adopting
Coal machine sun gear and JS series reduction sun gear are the gear shaft that axial length is less than 280mm.When gear shaft axial length is less than 280mm
When, such gear shaft is when carrying out roll flute processing using conventional roll flute processing method, due to the limitation of grinding wheel size, Wu Fabao
Demonstrate,prove grinding wheel smooth withdrawing after roll flute.
Fig. 5 is the assembling schematic diagram of the conventional roll flute processing method of the prior art.As shown in figure 5, gear shaft 1 to be processed is logical
It crosses radial clamping tooling 5 and is fixed on 3 top of workbench, wherein radial clamping tooling 5 includes top, square pillar, pedestal and diameter
To clamping clamping plate, processing gear shaft 1 is treated by grinding wheel 4 and carries out roll flute processing, due to the size of grinding wheel 4 and gear shaft to be processed 1
It influences, treats processing gear shaft 1 in grinding wheel 4 and carry out in roll flute process, may cause grinding wheel 4 and radial clamping device 5 is sent out
Raw interference, so as to cause the damage of radially loading clip tool 5 and grinding wheel 4.Therefore, it is small not to be suitable for axial length for conventional roll flute processing method
In the roll flute processing of the gear shaft of 280mm.In order to overcome gear shaft to lead to not carry out asking for roll flute processing since axial length is shorter
Topic, the prior art process secondary segment using the technique for increasing a length of 50mm-70mm in gear shaft spline one end to realize such tooth
The roll flute of wheel shaft is processed.
Fig. 6 is that the technique of the prior art lengthens the assembling schematic diagram of roll flute processing method.As shown in fig. 6, work gear to be added
The technique that spline one end of axis 1 increases by a Duan Changwei 50mm-70mm processes secondary segment 101, passes through work using radial clamping device 5
Skill processes secondary segment 101 and gear shaft 1 to be processed is fixed on the top of workbench 3, at this time by grinding wheel 4 treat processing gear shaft 1 into
When row roll flute is processed, grinding wheel 4 will not interfere with radial clamping device 5.After gear shaft 1 to be processed completes all roll flute processes,
Technique processing secondary segment 101 is cut off again.Thus it will lead to material cost and increase by 15%~20%, and due to the increase of process,
Production efficiency is caused to reduce.In addition, when carrying out the damage of the gear shaft after roll flute processing using the roll flute processing method need to repair,
Since the technique processing secondary segment for stationary positioned has been removed, the stationary positioned benchmark of the gear shaft changes, may
Repositioning position is caused deviation occur.
Therefore, the roll flute processing for how realizing gear shaft of the axial length less than 280mm, guarantees the positioning of gear shaft processing front and back
Benchmark is consistent, while reducing cost and improving production efficiency, becomes those skilled in the art's technical problem urgently to be resolved.
Summary of the invention
To solve above-mentioned the technical problems existing in the prior art, the present invention, which provides one kind and can be realized axial length, to be less than
The gear shaft roll flute tooling and assembly method of the roll flute processing of the gear shaft of 280mm.
The invention discloses a kind of gear shaft roll flute toolings thus.The gear shaft roll flute tooling is determined for gear shaft
Position clamps, including top, pedestal and square pillar, further includes strap.Wherein, it is logical to be provided with positioning for the strap
Hole, it is described it is top pass through the positioning through hole withstand the gear shaft, for being positioned to the gear shaft;The fixing clamp
It is provided on the outside of the positioning through hole of plate along the circumferentially equally distributed installation through-hole of the positioning through hole, the gear shaft passes through
The installation through-hole is removably attached on the strap upper surface;The strap is provided with pillar connection knot
Structure, described square pillar one end is connected under the strap upper surface by the polar connecting structure, the other end is fixed
In the pedestal.
Further, in the gear shaft roll flute tooling, the polar connecting structure includes being arranged in the fixation
The connection boss of clamping plate lower end, the connection boss are provided with compatible with the square pillar along the axial direction of the strap
Matching hole, the connection boss are provided with the bolt hole perpendicular to the matching hole axial direction, the bolt hole and the cooperation
Hole is mutually communicated, and the bolt hole is equipped with connection bolt.
Further, in the gear shaft roll flute tooling, the matching hole runs through the strap.
Further, in the gear shaft roll flute tooling kind, the matching hole is square through hole or U-shaped through slot.
Further, in the gear shaft roll flute tooling kind, the positioning through hole is round or polygon.
Further, in the gear shaft roll flute tooling kind, the installation through-hole is two or more.
Furthermore the invention also discloses a kind of assembly methods for gear shaft roll flute tooling, this method comprises:
According to the center of installation through-hole on strap away from the corresponding ground auger on one side end face of gear shaft spline to be processed
Tapping female bore;
Using connection bolt, it is connected and fixed by the threaded hole of gear shaft to be processed and the installation through-hole of strap to be added
Work gear axis and strap;
Strap is fixed on by polar connecting structure in square pillar one end, the square pillar other end is fixed on bottom
Seat;
It is fixed on the worktable top;
Mobile gear shaft to be processed makes top to withstand gear shaft to be processed;
After gear shaft to be processed is by top positioning, pedestal is fixed on the worktable.
Gear shaft roll flute tooling of the invention and assembly method can remove the technique lengthening section of gear shaft, reduce production
Cost and raising production efficiency, while can guarantee that the positioning datum of gear shaft processing front and back is consistent, improve the use of gear shaft
Service life.
Gear shaft roll flute tooling and assembly method provided by the invention by strap be arranged positioning through hole and
Installation through-hole can remove the technique lengthening section of gear shaft, optimization gear shaft processing using axial installation way fixed gear shaft
Technique reduces production cost, improves production efficiency;Meanwhile the technique lengthening section of gear shaft is removed, it can guarantee that gear shaft is processed
The consistency of front and back benchmark is convenient for subsequent maintenance, improves the service life of gear shaft.
Detailed description of the invention
Attached drawing described herein is used to provide to further understand the embodiment of the present invention, constitutes of the invention one
Point, the illustrative embodiments of the present invention and their descriptions are used to explain the present invention, does not constitute improper limitations of the present invention.Attached
In figure:
Fig. 1 is the assembling schematic diagram of gear shaft roll flute tooling provided by one embodiment of the present invention, wherein also showing
The gear shaft and grinding wheel to be processed being used cooperatively are filled with gear shaft roll flute recruitment;
Fig. 2 is the structural schematic diagram of strap in gear shaft roll flute tooling shown in FIG. 1;
Fig. 3 is the A of Fig. 2 to cross-sectional view;
Fig. 4 is the flow chart of the assembly method of gear shaft roll flute tooling shown in FIG. 1;
Fig. 5 is the assembling schematic diagram of the conventional roll flute processing method of the prior art;
Fig. 6 is that the technique of the prior art lengthens the assembling schematic diagram of roll flute processing method.
Specific embodiment
To make the object, technical solutions and advantages of the present invention clearer, below in conjunction with the specific embodiment of the invention and
Technical solution of the present invention is clearly and completely described in corresponding attached drawing.Obviously, described embodiment is only of the invention
A part of the embodiment, instead of all the embodiments.Based on the embodiment of the present invention, those of ordinary skill in the art are not doing
Every other embodiment obtained under the premise of creative work out, shall fall within the protection scope of the present invention.
Below in conjunction with attached drawing, the technical solution of embodiment that the present invention will be described in detail offer.
Fig. 1 is the assembling schematic diagram of gear shaft roll flute tooling provided by one embodiment of the present invention, wherein also showing
The gear shaft and grinding wheel being used cooperatively are filled with gear shaft roll flute recruitment.Fig. 2 is fixed in gear shaft roll flute tooling shown in FIG. 1
The structural schematic diagram of clamping plate.As depicted in figs. 1 and 2, the gear shaft roll flute of the embodiment is used for gear shaft 1 to be processed with tooling 2
Positioning clamp, including top 201, pedestal 202 and square pillar 203 further include strap 204.Wherein, strap
204 are provided with positioning through hole 2041, and in actual use, top 201, which can pass through positioning through hole 2041, withstands work gear to be added
Axis 1, the positioning for gear shaft 1 to be processed;It is provided on the outside of the positioning through hole 2041 of strap 204 along positioning through hole 2041
Circumferential equally distributed installation through-hole 2042, gear shaft 1 to be processed are removably attached to fixing clamp by installation through-hole 2042
On 204 upper surface of plate;Strap 204 is provided with polar connecting structure, and 203 one end of square pillar is connected by polar connecting structure
It connects under 204 upper surface of strap, the other end is fixed on pedestal 202.
Specifically, positioning through hole 2041 can be round or polygon, installation through-hole 2042 can for two or two with
On, it is connected firmly in order to facilitate processing with guarantee strap 204 with gear shaft 1 to be processed, positioning through hole 2041 is preferably justified
Shape, installation through-hole 2042 are preferably three.
Fig. 3 is the A of Fig. 2 to cross-sectional view.As shown in Figures 2 and 3, polar connecting structure includes being arranged in strap 204
The connection boss 2043 of lower end connects boss 2043 along the axial direction of strap 204 and is provided with match compatible with square pillar 203
Close hole 2044, connection boss 2043 is provided with the bolt hole 2045 axial perpendicular to matching hole 2044, bolt hole 2045 with match
It closes hole 2044 to be mutually communicated, bolt hole 2045 is also equipped with connection bolt, and connection bolt is for square pillar 203 to be fixed on
On strap 204.
Specifically, connection through-hole can be offered in the one end of square pillar 203 connecting with strap 204, it is rectangular
Pillar 203 can be positioned by matching hole 2044, while can pass through bolt hole 2045, connection through-hole and connection bolt
Mutual cooperation realization square pillar 203 is fixedly connected with strap 204.
Further, strap 204 occurs in 1 roll flute process of gear shaft to be processed with grinding wheel 4 in order to prevent
Interference, while the scope of application of gear shaft roll flute tooling 2 is improved, bolt hole 2045 is arranged in 204 upper surface of strap
Under, and meet the connection bolt being coupled and be located under 204 upper surface of strap.
Further, strap 204 occurs in 1 roll flute process of gear shaft to be processed with grinding wheel 4 in order to prevent
Interference, while improving the scope of application of gear shaft roll flute tooling 2, it is preferable that the face size of strap 204 is less than or waits
Face size in the connecting pin of gear shaft 1 to be processed being connect with strap 204.
Wherein, 204 end profile of strap can be round, ellipse or polygon, be also possible to above-mentioned three kinds of shapes
Shape is combined with each other.
As described above, matching hole 2044 is set to connection boss 2043, connection boss 2043 is set to strap 204,
In order to facilitate the processing of matching hole 2044, matching hole 2044 can run through strap 204.Wherein, matching hole 2044 can be
Square through hole compatible with square pillar 203 or U-shaped through slot, in order to guarantee that square pillar 203 connect jail with strap 204
Gu matching hole 2044 is preferably U-type groove.
The assembly method of the gear shaft roll flute tooling of the embodiment is introduced in detail below.
Fig. 4 is the flow chart of the assembly method of gear shaft roll flute tooling shown in FIG. 1.As shown in figure 4, above-described embodiment
The assembly method of gear shaft roll flute tooling include the following steps:
Step S11, according to the center of installation through-hole 2042 on strap 204 away from 1 spline side of gear shaft to be processed
Corresponding ground auger tapping female bore on end face;
Step S12 passes through the threaded hole of gear shaft 1 to be processed and the installation through-hole of strap 204 using connection bolt
2042 are connected and fixed gear shaft 1 and strap 204 to be processed;
203 one end of square pillar is fixed on strap 204 by polar connecting structure, the other end is consolidated by step S13
Due to pedestal 202;
Step S14 is fixed on top 201 on workbench 3;
Step S15, mobile gear shaft 1 to be processed, makes top 201 to withstand gear shaft 1 to be processed;
Pedestal 202 is fixed on workbench 3 by step S16 after gear shaft 1 to be processed is by top 201 positioning.
When gear shaft to be processed 1 and gear shaft roll flute with tooling 2 after the assembly is completed, gear shaft 1 and gear shaft mill to be processed
Tooth tooling 2 is both secured on workbench 3, at this point, grinding wheel 4 can be used to treat processing gear shaft 1 carries out roll flute processing.
Gear shaft roll flute tooling of the invention and assembly method can remove the technique lengthening section of gear shaft, reduce production
Cost and raising production efficiency, while can guarantee that the positioning datum of gear shaft processing front and back is consistent, improve the use of gear shaft
Service life.
Gear shaft roll flute tooling and assembly method provided by the invention by strap be arranged positioning through hole and
Installation through-hole can remove the technique lengthening section of gear shaft, optimization gear shaft processing using axial installation way fixed gear shaft
Technique reduces production cost, improves production efficiency;Meanwhile the technique lengthening section of gear shaft is removed, it can guarantee that gear shaft is processed
The consistency of front and back benchmark is convenient for subsequent maintenance, improves the service life of gear shaft.
It should be noted that, in this document, the relational terms of such as " first " and " second " or the like are used merely to one
A entity or operation with another entity or operate distinguish, without necessarily requiring or implying these entities or operation it
Between there are any actual relationship or orders.Moreover, the terms "include", "comprise" or its any other variant are intended to
Cover non-exclusive inclusion, so that the process, method, article or equipment for including a series of elements not only includes those
Element, but also including other elements that are not explicitly listed, or further include for this process, method, article or setting
Standby intrinsic element.In addition, placement shape of "front", "rear", "left", "right", "upper", the "lower" herein to be indicated in attached drawing
State is reference.
Finally, it should be noted that the above examples are only used to illustrate the technical scheme of the present invention, rather than its limitations;Although
Present invention has been described in detail with reference to the aforementioned embodiments, those skilled in the art should understand that: it still may be used
To modify the technical solutions described in the foregoing embodiments or equivalent replacement of some of the technical features;
And these are modified or replaceed, technical solution of various embodiments of the present invention that it does not separate the essence of the corresponding technical solution spirit and
Range.
Claims (7)
1. a kind of gear shaft roll flute tooling, the positioning for gear shaft is clamped, including top, pedestal and square pillar, special
Sign is, further includes strap, in which:
The strap is provided with positioning through hole, it is described it is top pass through the positioning through hole and withstand the gear shaft, for pair
The gear shaft is positioned;
It is provided on the outside of the positioning through hole of the strap along the circumferentially equally distributed installation through-hole of the positioning through hole,
The gear shaft is removably attached on the strap upper surface by the installation through-hole;
The strap is provided with polar connecting structure, and described square pillar one end is connected to by the polar connecting structure
Under the strap upper surface, the other end is fixed on the pedestal.
2. gear shaft roll flute tooling according to claim 1, which is characterized in that the polar connecting structure includes setting
Connection boss in the strap lower end, the connection boss are provided with and the rectangular branch along the axial direction of the strap
The compatible matching hole of column, the connection boss are provided with the bolt hole perpendicular to the matching hole axial direction, the bolt hole
It is mutually communicated with the matching hole, the bolt hole is equipped with connection bolt.
3. gear shaft roll flute tooling according to claim 2, which is characterized in that the matching hole runs through the fixing clamp
Plate.
4. gear shaft roll flute tooling according to claim 3, which is characterized in that the matching hole is square through hole or U
Type through slot.
5. gear shaft roll flute tooling according to any one of claim 1 to 4, which is characterized in that the positioning through hole
For round or polygon.
6. gear shaft roll flute tooling according to any one of claim 1 to 4, which is characterized in that the installation through-hole
For two or more.
7. a kind of assembly method for gear shaft roll flute tooling such as described in any one of claims 1 to 6, feature exist
In, which comprises
According to the center of installation through-hole on strap away from corresponding ground auger attacks spiral shell on one side end face of gear shaft spline to be processed
Pit;
Using connection bolt, tooth to be processed is connected and fixed by the threaded hole of gear shaft to be processed and the installation through-hole of strap
Wheel shaft and strap;
Strap is fixed on by polar connecting structure in square pillar one end, the square pillar other end is fixed on pedestal;
It is fixed on the worktable top;
Mobile gear shaft to be processed makes top to withstand gear shaft to be processed;
After gear shaft to be processed is by top positioning, pedestal is fixed on the worktable.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810249864.5A CN108672838B (en) | 2018-03-26 | 2018-03-26 | Gear shaft roll flute tooling and assembly method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810249864.5A CN108672838B (en) | 2018-03-26 | 2018-03-26 | Gear shaft roll flute tooling and assembly method |
Publications (2)
Publication Number | Publication Date |
---|---|
CN108672838A CN108672838A (en) | 2018-10-19 |
CN108672838B true CN108672838B (en) | 2019-09-27 |
Family
ID=63800020
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201810249864.5A Active CN108672838B (en) | 2018-03-26 | 2018-03-26 | Gear shaft roll flute tooling and assembly method |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN108672838B (en) |
Families Citing this family (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN117754057B (en) * | 2024-02-17 | 2024-05-28 | 江苏环欧智能传动设备有限公司 | Gear grinding tool based on gear shaft general type |
Family Cites Families (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US5135810A (en) * | 1991-03-11 | 1992-08-04 | Dana Corporation | Method of machining and structure of machined pinion gear |
CN202428216U (en) * | 2011-06-18 | 2012-09-12 | 大连洁能重工机械有限公司 | Positioning jacket specialized for grinding pitch gear shaft of wind power equipment |
CN202367288U (en) * | 2011-12-16 | 2012-08-08 | 贵州詹阳动力重工有限公司 | Special fixture for machining milled spline of cam shaft |
CN203495349U (en) * | 2013-09-11 | 2014-03-26 | 上海运良转向节有限公司 | Component processing and locking device for vehicle loader |
CN104227148A (en) * | 2014-08-20 | 2014-12-24 | 衡山齿轮有限责任公司 | Hobbing assembly clamp for gear shaft |
CN204524441U (en) * | 2014-12-25 | 2015-08-05 | 重庆机床(集团)有限责任公司 | Solid stub clamping apparatus for gear wheel processing |
CN207104017U (en) * | 2017-08-28 | 2018-03-16 | 华星传动科技无锡有限公司 | Axle tooth processing self-locking clamp |
-
2018
- 2018-03-26 CN CN201810249864.5A patent/CN108672838B/en active Active
Also Published As
Publication number | Publication date |
---|---|
CN108672838A (en) | 2018-10-19 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN208961525U (en) | A kind of wheel hub clamping and positioning device | |
CN108672838B (en) | Gear shaft roll flute tooling and assembly method | |
CN109551265A (en) | A kind of adaptive universal fixturing for clamping blade tip or integral shroud process area | |
CN106640995A (en) | Clamping mechanism and equipment provided with same | |
CN208542894U (en) | Spring coiling machine | |
CN103867687B (en) | Built-up type segmentation people's word ring gear | |
CN202845959U (en) | Automobile transmission input shaft hobbing tool | |
CN205660530U (en) | Split type screw tap side tail anchor clamps | |
CN104401895B (en) | Integrated parallel fold line reel and manufacturing technique thereof | |
CN217121895U (en) | Two-way clamp for inner milling cutter | |
CN210623514U (en) | Compound big V many wedges system belt pulley | |
CN102672288A (en) | Tooth shaping work fixture | |
CN205270967U (en) | A automatic milling machine for processing plum blossom lamella | |
CN202123431U (en) | Fast connecting device for grinding head | |
CN206286386U (en) | Strip grooves process tool and lathe on a kind of axle | |
CN207982328U (en) | For top before replacement heart carrier | |
CN204700609U (en) | A kind of Automatic-clamping hydraulic pressure finish turning mandrel | |
CN106425722B (en) | The mill of fixed spring is used in spring grinding machine | |
CN205184347U (en) | A anchor clamps that is used for clamping automobile to shift gears pendulum rod carrying out wave form face processing | |
CN109940228A (en) | Gear-shaping clamp | |
CN108380911A (en) | For top before replacement heart carrier | |
CN203804632U (en) | Light and narrow tapered roller bearing ring machining device | |
CN205415298U (en) | Grind anchor clamps of cam | |
CN210232255U (en) | Square-round conversion thin flange plate milling surface clamp | |
CN205184346U (en) | Car pendulum rod wavy surface processing clamping device that shifts |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |