CN108662432A - A kind of high pressure gas packaging process - Google Patents

A kind of high pressure gas packaging process Download PDF

Info

Publication number
CN108662432A
CN108662432A CN201810405027.7A CN201810405027A CN108662432A CN 108662432 A CN108662432 A CN 108662432A CN 201810405027 A CN201810405027 A CN 201810405027A CN 108662432 A CN108662432 A CN 108662432A
Authority
CN
China
Prior art keywords
tank body
lid
gas
high pressure
packaging process
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201810405027.7A
Other languages
Chinese (zh)
Inventor
钟光岚
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guizhou Wangjiang Gas Co Ltd
Original Assignee
Guizhou Wangjiang Gas Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guizhou Wangjiang Gas Co Ltd filed Critical Guizhou Wangjiang Gas Co Ltd
Priority to CN201810405027.7A priority Critical patent/CN108662432A/en
Publication of CN108662432A publication Critical patent/CN108662432A/en
Pending legal-status Critical Current

Links

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F17STORING OR DISTRIBUTING GASES OR LIQUIDS
    • F17CVESSELS FOR CONTAINING OR STORING COMPRESSED, LIQUEFIED OR SOLIDIFIED GASES; FIXED-CAPACITY GAS-HOLDERS; FILLING VESSELS WITH, OR DISCHARGING FROM VESSELS, COMPRESSED, LIQUEFIED, OR SOLIDIFIED GASES
    • F17C5/00Methods or apparatus for filling containers with liquefied, solidified, or compressed gases under pressures
    • F17C5/06Methods or apparatus for filling containers with liquefied, solidified, or compressed gases under pressures for filling with compressed gases
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F17STORING OR DISTRIBUTING GASES OR LIQUIDS
    • F17CVESSELS FOR CONTAINING OR STORING COMPRESSED, LIQUEFIED OR SOLIDIFIED GASES; FIXED-CAPACITY GAS-HOLDERS; FILLING VESSELS WITH, OR DISCHARGING FROM VESSELS, COMPRESSED, LIQUEFIED, OR SOLIDIFIED GASES
    • F17C13/00Details of vessels or of the filling or discharging of vessels
    • F17C13/002Details of vessels or of the filling or discharging of vessels for vessels under pressure
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F17STORING OR DISTRIBUTING GASES OR LIQUIDS
    • F17CVESSELS FOR CONTAINING OR STORING COMPRESSED, LIQUEFIED OR SOLIDIFIED GASES; FIXED-CAPACITY GAS-HOLDERS; FILLING VESSELS WITH, OR DISCHARGING FROM VESSELS, COMPRESSED, LIQUEFIED, OR SOLIDIFIED GASES
    • F17C13/00Details of vessels or of the filling or discharging of vessels
    • F17C13/02Special adaptations of indicating, measuring, or monitoring equipment
    • F17C13/025Special adaptations of indicating, measuring, or monitoring equipment having the pressure as the parameter
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F17STORING OR DISTRIBUTING GASES OR LIQUIDS
    • F17CVESSELS FOR CONTAINING OR STORING COMPRESSED, LIQUEFIED OR SOLIDIFIED GASES; FIXED-CAPACITY GAS-HOLDERS; FILLING VESSELS WITH, OR DISCHARGING FROM VESSELS, COMPRESSED, LIQUEFIED, OR SOLIDIFIED GASES
    • F17C13/00Details of vessels or of the filling or discharging of vessels
    • F17C13/08Mounting arrangements for vessels
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F17STORING OR DISTRIBUTING GASES OR LIQUIDS
    • F17CVESSELS FOR CONTAINING OR STORING COMPRESSED, LIQUEFIED OR SOLIDIFIED GASES; FIXED-CAPACITY GAS-HOLDERS; FILLING VESSELS WITH, OR DISCHARGING FROM VESSELS, COMPRESSED, LIQUEFIED, OR SOLIDIFIED GASES
    • F17C2201/00Vessel construction, in particular geometry, arrangement or size
    • F17C2201/03Orientation
    • F17C2201/032Orientation with substantially vertical main axis
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F17STORING OR DISTRIBUTING GASES OR LIQUIDS
    • F17CVESSELS FOR CONTAINING OR STORING COMPRESSED, LIQUEFIED OR SOLIDIFIED GASES; FIXED-CAPACITY GAS-HOLDERS; FILLING VESSELS WITH, OR DISCHARGING FROM VESSELS, COMPRESSED, LIQUEFIED, OR SOLIDIFIED GASES
    • F17C2205/00Vessel construction, in particular mounting arrangements, attachments or identifications means
    • F17C2205/01Mounting arrangements
    • F17C2205/0103Exterior arrangements
    • F17C2205/0107Frames
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F17STORING OR DISTRIBUTING GASES OR LIQUIDS
    • F17CVESSELS FOR CONTAINING OR STORING COMPRESSED, LIQUEFIED OR SOLIDIFIED GASES; FIXED-CAPACITY GAS-HOLDERS; FILLING VESSELS WITH, OR DISCHARGING FROM VESSELS, COMPRESSED, LIQUEFIED, OR SOLIDIFIED GASES
    • F17C2223/00Handled fluid before transfer, i.e. state of fluid when stored in the vessel or before transfer from the vessel
    • F17C2223/03Handled fluid before transfer, i.e. state of fluid when stored in the vessel or before transfer from the vessel characterised by the pressure level
    • F17C2223/035High pressure (>10 bar)
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F17STORING OR DISTRIBUTING GASES OR LIQUIDS
    • F17CVESSELS FOR CONTAINING OR STORING COMPRESSED, LIQUEFIED OR SOLIDIFIED GASES; FIXED-CAPACITY GAS-HOLDERS; FILLING VESSELS WITH, OR DISCHARGING FROM VESSELS, COMPRESSED, LIQUEFIED, OR SOLIDIFIED GASES
    • F17C2227/00Transfer of fluids, i.e. method or means for transferring the fluid; Heat exchange with the fluid
    • F17C2227/04Methods for emptying or filling
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F17STORING OR DISTRIBUTING GASES OR LIQUIDS
    • F17CVESSELS FOR CONTAINING OR STORING COMPRESSED, LIQUEFIED OR SOLIDIFIED GASES; FIXED-CAPACITY GAS-HOLDERS; FILLING VESSELS WITH, OR DISCHARGING FROM VESSELS, COMPRESSED, LIQUEFIED, OR SOLIDIFIED GASES
    • F17C2250/00Accessories; Control means; Indicating, measuring or monitoring of parameters
    • F17C2250/04Indicating or measuring of parameters as input values
    • F17C2250/0404Parameters indicated or measured
    • F17C2250/043Pressure

Abstract

The present invention relates to the technical field of memory of gas, specially a kind of high pressure gas packaging process includes the following steps:The maintenance of S1, tank body;S2, gas it is filling:The intake valve on the lid of gas storage device is opened, gas is passed through into tank body by intake valve, observes the pressure gauge on lid, when the pointer of pressure gauge reaches specified atmospheric pressure value, closes intake valve;The fastening of S3, tank body:One end of safety belt declines, the safety belt other end is connected to the sliding shoe above lid around fixed pulley and rises, the lead screw shaft being connected on sliding shoe rises, it is rotated with the feed screw nut of lead screw shaft cooperation, the nut seat rotation being connect with feed screw nut drives link rotation, the circle ring disk rotation of link lower end connection, the nut rotation engaged with the screw thread of circle ring disk periphery on the buckling parts of cover edge is tightened on tank body and stretches out on the half of screw of lid buckling parts.

Description

A kind of high pressure gas packaging process
Technical field
The present invention relates to the technical field of memory of gas, specially a kind of high pressure gas packaging process.
Background technology
Currently, in terms of gas storage, when especially storing high pressure gas, generally use is that large-scale high pressure is stored up Gas tank, structure are all relatively simple tank bodies, in actual use, probably since pressure is excessive when injecting gas every time And cause the tank body of air accumulator that small deformation occurs, and it is permanent previous, holding vessel will be caused to scrap.Therefore, make in air accumulator After long, usually it is required for that air accumulator is detected and is repaired, to find that the crackle occurred on tank body is gone forward side by side in time Row repair, to ensure that gas will not escape.
Further, since high pressure tank is during use, it sometimes can be by extraneous impact, so that storage Gas tank shakes, and the bolt shaken for a long time between the tank body and lid that may can realize connection high pressure tank goes out It now loosens, once loosening occurs in bolt, gap is just will appear between tank body and lid, the gas in tank body is easy for effusion tank Body also just reduces the preservation effect of gas, so, after the canned gas into high pressure tank, usually also need to cover Nut on body is tightened again, ensures the close fastening between tank body and lid.However for large-scale high pressure tank, Three groups or more of bolt usually can be all arranged in bolt on lid, and in this case, operating personnel just need to repeat at least three Secondary tightens operation, moreover, because also having a certain distance, operating personnel often to complete once to tighten operation between each group bolt Afterwards, it is also necessary to be moved at next group of bolt and be operated, entire rundown process elapsed time is also just long, entire gas Pouring process is also just longer, and the filling efficiency of gas is also just relatively low, and how to improve the filling efficiency of high pressure gas also just becomes One the technical issues of being badly in need of solving.
Invention content
The invention is intended to provide a kind of filling efficient high pressure gas packaging process.
The present invention provides base case:A kind of high pressure gas packaging process, includes the following steps;
The maintenance of S1, tank body:The entire outer wall of tank body is detected using the maintenance ladder being arranged on tank body;It is detecting When intact to outer wall, carry out S2 and carry out S2 after being repaired to crackle at this when there is crackle on detecting outer wall;
S2, gas it is filling:The intake valve on the lid of gas storage device is opened, is passed through into tank body by intake valve Gas observes the pressure gauge on lid, when the pointer of pressure gauge reaches specified atmospheric pressure value, closes intake valve;
The fastening of S3, tank body:One end of safety belt declines, and the safety belt other end is connected to around fixed pulley above lid Sliding shoe rises, and the lead screw shaft being connected on sliding shoe rises, and rotates with the feed screw nut of lead screw shaft cooperation, connects with feed screw nut The nut seat rotation connect, drives link rotation, the circle ring disk rotation of link lower end connection, on the buckling parts of cover edge with The nut rotation of the screw thread engagement of circle ring disk periphery, is tightened on tank body and stretches out on the half of screw of lid buckling parts.
The operation principle of base case:When filling, tank body is overhauled first, testing staff is first to the lower part of tank body It is detected, then when being overhauled to tank body top, it is contemplated that the height of tank body, service personnel can be by tank body at this time On maintenance ladder can climb eminence, complete the detection to tank body top, can also complete to the entire outer wall of tank body Detection, when having detected crackle, service personnel repairs crackle at this, ensures the intact of outer wall, and is detecting During, with one end bandage service personnel of safety belt, play the role of a security protection.
After having detected, service personnel has been also at the top of tank body and has been detected at this time that is, at the lid of tank body upper end at this time Personnel first open the intake valve on lid, and gas is passed through into tank body, and specified atmospheric pressure value is then reached in the pointer of pressure gauge When, i.e., after the air pressure at this time in tank body has reached specified numerical value, intake valve is closed, the fill operations of gas are completed.
In view of gas storage device will appear shaking during use, therefore, complete gas it is filling after, need The bolt of connection tank body and lid is carried out tightening reinforcing, testing staff gets off by maintenance ladder from lid at this time, due to One end of safety belt is connected on testing staff, so during testing staff gets off from lid, safety belt One end declines, and since the other end of safety belt is to bypass what fixed pulley was connect with sliding shoe, safety belt is another at this time One end rises, and drives sliding shoe to rise, then by the cooperation of lead screw shaft and feed screw nut on sliding shoe, realize feed screw nut and The rotation of nut seat, to drive circle ring disk to rotate, the nut rotation engaged with circle ring disk has also just been tightened on screw rod, real Now to the tightening operation of bolt.
The advantageous effect of base case is:Compared with prior art, tank body is overhauled before gas filling, is avoided Gas escapes the problem of tank body caused by tank body is cracked.And complete gas it is filling after, testing staff borrows When helping maintenance ladder to get off from lid, sliding shoe is driven to rise, coordinate lead screw shaft and feed screw nut, realizes turning for circle ring disk Dynamic, to which multiple nuts that driving is engaged with circle ring disk rotate simultaneously, that realizes bolt tightens reinforcing, ensure that tank body and lid Between air-tightness, it is no longer necessary to testing staff tightens one by one, greatly shorten tighten bolt consumption time, to improve Filling efficiency.
Preferred embodiment one:As the preferred of basic scheme, in S1, maintenance ladder can be along the annular being arranged in tank body circumferential direction Slot slides.Advantageous effect:Sliding of the maintenance ladder in tank body circumferential direction is realized using the annular groove in tank body circumferential direction, you can realizes inspection Repair personnel to outside tank body week to detection.
Preferred embodiment two:Preferably one it is preferred, in S3, circle ring disk is detachably connected on link.It is beneficial Effect:In view of to the gas storage device of different size carry out gas it is filling when, the specification of lid would also vary from, In order to ensure that circle ring disk is engaged with the nut on lid buckling parts, also just need circle ring disk that equally there is different specifications, therefore, During gas filling, the circle ring disk that appropriate size is replaced according to the specification of lid is also just needed, so, by detachable The mode of connection realizes that connection of the circle ring disk on link also ensures that circle ring disk can be replaced, and increases circle ring disk Applicability.
Preferred embodiment three:Preferably two it is preferred, in S3, circle ring disk is bolted on link.Have Beneficial effect:Bolted mode is selected to facilitate the dismounting of circle ring disk, stable connection.
Preferred embodiment four:As the preferred of basic scheme, in S3, fixed pulley is fixed on height-adjustable by locating rod The top of supporting rack.Advantageous effect:In view of the height of the gas storage device of different size is different, therefore by fixed pulley It is fixed on height-adjustable supporting rack, the height by adjusting supporting rack makes fixed pulley be adapted to the gas of different size Body holding vessel, it is easy to operate.
Preferred embodiment five:Preferably four it is preferred, in S3, the supporting rods of supporting rack lower part both sides carries out tank body Support.Advantageous effect:Supporting rod is supported tank body, avoids gas storage device and topples over.
Description of the drawings
Fig. 1 is the structural representation of the gas storage device used in a kind of high pressure gas packaging process embodiment of the present invention Figure;
Fig. 2 is the connection diagram of maintenance ladder and tank body in Fig. 1;
Fig. 3 is the vertical view of cap portion in Fig. 1;
Fig. 4 is the structural schematic diagram of supporting rack lower end in Fig. 1.
Specific implementation mode
Below by the further details of explanation of specific implementation mode:
Reference numeral in Figure of description includes:Tank body 10, annular groove 13, screw rod 15, maintenance ladder 17, stabilizer blade 171, button Conjunction portion 21, circle ring disk 22, lid 23, nut 25, link 27, nut seat 29, supporting rack 30, location hole 301, positioning pin 303, Supporting rod 31, support leg 33, fixed pulley 343, sliding shoe 344, lead screw shaft 35.
A kind of high pressure gas packaging process, the gas storage device of use are as shown in Figure 1, including tank body 10, lid 23 With adjustable for height supporting rack 30, maintenance ladder 17 is slidably connected on 10 outer wall of tank body, as shown in Fig. 2, the stabilizer blade of maintenance ladder 17 171 is T-shaped, and annular groove 13 is provided in 10 outer wall circumferential direction of tank body, and stabilizer blade 171 and the annular groove 13 of maintenance ladder 17 are slidably connected; The upper end circumferential direction uniform intervals of tank body 10 are provided with multigroup screw rod 15, are 12 groups of screw rods 15 in the present embodiment;
23 edge of lid is provided with buckling parts 21, and 12 and 15 position phase of screw rod on tank body 10 are provided on buckling parts 21 The upper end of corresponding connecting hole, screw rod 15 is pierced by connecting hole, and the partial threads that threaded hole is pierced by connecting hole are connected with nut 25;Lid Circle ring disk 22 is additionally provided on body 23, the periphery of circle ring disk 22 is provided with the screw thread engaged with nut 25, as shown in Figure 3;
The upper end of supporting rack 30 is connected with fixed pulley 343 by locating rod, and being bypassed on fixed pulley 343 has a safety belt, The free end of safety belt is used for tying up with service personnel, and the fixing end of safety belt is connected with sliding shoe 344, sliding shoe 344 Lower part is connected with lead screw shaft 35, and lead screw shaft 35 is connected with feed screw nut 25, and feed screw nut 25 is located at the lower end of lead screw shaft 35, Feed screw nut 25 is connected with link 27 by nut seat 29, and the lower end of link 27 is connect by bolt with circle ring disk 22;Branch The both sides of 30 lower end of support are provided with the supporting rod 31 to offset with tank body 10;In order to realize the height-adjustable of supporting rack 30, this 30 lower end of supporting rack in embodiment slidably connects support leg 33, specifically, as shown in figure 4, being set inside 30 lower end of supporting rack It is equipped with sliding slot, support leg 33 is slidably connected with sliding slot, seven location holes 301 is arranged in support leg 33, wherein a location hole Positioning pin 303 is inserted into 301, you can complete the adjusting to 30 height of supporting rack.
A kind of high pressure gas packaging process, includes the following steps:
The maintenance of S1, tank body 10:Testing staff is first detected the lower part of tank body 10, then to 10 top of tank body into When row maintenance, service personnel can climb upper eminence by the maintenance ladder 17 on tank body 10, complete the detection to 10 top of tank body, Also the detection to the entire outer wall of tank body 10 can be completed, when having detected crackle, service personnel is to crackle at this It is repaired, ensures the intact of outer wall, and during detection, with one end bandage service personnel of safety belt, play one The effect of a security protection;
S2, gas it is filling:After having detected, the intake valve on lid 23 is opened, gas is passed through into tank body 10, then When the pointer of pressure gauge reaches specified atmospheric pressure value, intake valve is closed, the fill operations of gas are completed;
The fastening of S3, tank body 10:Testing staff walks downwards along maintenance ladder 17, drives the one end for tying up the safety belt with Decline, the sliding shoe 344 of the other end connection of safety belt rises, and lead screw shaft 35 rises, and feed screw nut 25 rotates, 29 turns of nut seat It is dynamic, drive link 27 to rotate, the rotation of link 27 can drive circle ring disk 22 to rotate again, be nibbled with circle ring disk 22 on buckling parts 21 The nut 25 of conjunction rotates, and is tightened on screw rod 15, realizes the tightening operation to bolt.
In order to facilitate the opening of lid, it is additionally provided with electric telescopic rod in the present embodiment, mounting plate is provided in rack, Electric telescopic rod is installed, the buckling parts 21 of the upper end face lid of electric telescopic rod is arranged, electric telescopic rod on mounting plate Power supply circuit is connected to by conducting wire in the conductor block of 29 both sides of nut seat connection, and two pieces of magnet pieces are provided in rack, When needing to open lid, conducting wire is connected in conductor block, during nut seat 29 rotates, conductor block septum magnet block Magnetic induction line powers to electric telescopic rod by power supply circuit, realizes the automatic elongation of electric telescopic rod to generate electric current, from And lid is pushed up upwards.
Above-described is only the embodiment of the present invention, and the common sense such as well known concrete structure and characteristic are not made herein in scheme Excessive description, technical field that the present invention belongs to is all before one skilled in the art know the applying date or priority date Ordinary technical knowledge can know the prior art all in the field, and with using routine experiment hand before the date The ability of section, one skilled in the art can improve in conjunction with self-ability and implement under the enlightenment that the application provides This programme, some typical known features or known method should not implement the application as one skilled in the art Obstacle.It should be pointed out that for those skilled in the art, without departing from the structure of the invention, can also make Go out several modifications and improvements, these should also be considered as protection scope of the present invention, these all do not interfere with the effect that the present invention is implemented Fruit and patent practicability.The scope of protection required by this application should be based on the content of the claims, the tool in specification The records such as body embodiment can be used for explaining the content of claim.

Claims (6)

1. a kind of high pressure gas packaging process, includes the following steps, it is characterised in that:
The maintenance of S1, tank body:The entire outer wall of tank body is detected using the maintenance ladder being arranged on tank body;It is outer detecting When wall is intact, carries out S2 and carry out S2 after being repaired to crackle at this when there is crackle on detecting outer wall;
S2, gas it is filling:The intake valve on the lid of gas storage device is opened, gas is passed through into tank body by intake valve Body observes the pressure gauge on lid, when the pointer of pressure gauge reaches specified atmospheric pressure value, closes intake valve;
The fastening of S3, tank body:One end of safety belt declines, and the safety belt other end is connected to the sliding above lid around fixed pulley Block rises, and the lead screw shaft being connected on sliding shoe rises, and rotates with the feed screw nut of lead screw shaft cooperation, is connect with feed screw nut Nut seat rotates, and drives link rotation, the circle ring disk rotation of link lower end connection, on the buckling parts of cover edge with annulus The nut rotation of the screw thread engagement of disk periphery, is tightened on tank body and stretches out on the half of screw of lid buckling parts.
2. high pressure gas packaging process according to claim 1, it is characterised in that:In S1, maintenance ladder can exist along setting Annular groove sliding in tank body circumferential direction.
3. high pressure gas packaging process according to claim 2, it is characterised in that:In S3, circle ring disk is detachably connected on On link.
4. high pressure gas packaging process according to claim 3, it is characterised in that:In S3, circle ring disk is bolted On link.
5. high pressure gas packaging process according to claim 1, it is characterised in that:In S3, fixed pulley is solid by locating rod It is scheduled on the top of height-adjustable supporting rack.
6. high pressure gas packaging process according to claim 5, it is characterised in that:In S3, the branch of supporting rack lower part both sides Strut is supported tank body.
CN201810405027.7A 2018-04-28 2018-04-28 A kind of high pressure gas packaging process Pending CN108662432A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810405027.7A CN108662432A (en) 2018-04-28 2018-04-28 A kind of high pressure gas packaging process

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810405027.7A CN108662432A (en) 2018-04-28 2018-04-28 A kind of high pressure gas packaging process

Publications (1)

Publication Number Publication Date
CN108662432A true CN108662432A (en) 2018-10-16

Family

ID=63781597

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810405027.7A Pending CN108662432A (en) 2018-04-28 2018-04-28 A kind of high pressure gas packaging process

Country Status (1)

Country Link
CN (1) CN108662432A (en)

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102537344A (en) * 2011-11-28 2012-07-04 楚天科技股份有限公司 Pressure container with quick-open door
KR20150120733A (en) * 2014-04-18 2015-10-28 삼성중공업 주식회사 Apparatus and method for leak detection of liquified gas
CN206050575U (en) * 2016-08-02 2017-03-29 浙江特塑龙化工设备有限公司 A kind of steel lining PE storage tanks for being provided with guardrail cat ladder
CN206159825U (en) * 2016-11-14 2017-05-10 鹰潭市远大气体有限公司 Novel explosion -proof jar of body of gas filling
CN207094178U (en) * 2017-06-15 2018-03-13 江西和明制药有限公司 A kind of vertical gas storage tank for ease of maintenaince
US9919867B1 (en) * 2016-02-17 2018-03-20 Shawn Poncsak Automatic bin lid opener system

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102537344A (en) * 2011-11-28 2012-07-04 楚天科技股份有限公司 Pressure container with quick-open door
KR20150120733A (en) * 2014-04-18 2015-10-28 삼성중공업 주식회사 Apparatus and method for leak detection of liquified gas
US9919867B1 (en) * 2016-02-17 2018-03-20 Shawn Poncsak Automatic bin lid opener system
CN206050575U (en) * 2016-08-02 2017-03-29 浙江特塑龙化工设备有限公司 A kind of steel lining PE storage tanks for being provided with guardrail cat ladder
CN206159825U (en) * 2016-11-14 2017-05-10 鹰潭市远大气体有限公司 Novel explosion -proof jar of body of gas filling
CN207094178U (en) * 2017-06-15 2018-03-13 江西和明制药有限公司 A kind of vertical gas storage tank for ease of maintenaince

Similar Documents

Publication Publication Date Title
US10823137B2 (en) Methods and systems for disassembling a pitch bearing from a wind turbine hub
CN105058037B (en) A kind of method of electric motor with vane wheel split nut machine and its split nut
CA2857258A1 (en) Bolt tightening robot for wind turbines
CN105155571A (en) Replaceable prestressed anchor bolt device and mounting and replacement construction method thereof
CN108662432A (en) A kind of high pressure gas packaging process
CN203869860U (en) Supper rotation speed test device
CN106441996A (en) Coal sample collecting device
CN104942558B (en) Automobile door lock stay rope oil injecting, adhesive dispensing and shell clamping all-in-one machine
JP2018503776A (en) Wind turbine tower access panel and fixing method thereof
CN204235096U (en) A kind of seat nut automatic setup system
CN209402380U (en) Sealing bearing bush support adjusts tool
CN106736486B (en) Duct piece assembling machine segment bolt automatic tightening system
CN104907812B (en) A kind of automatic rapid disassembling device of air spring
CN203738295U (en) Liftable welding fixture device
CN204843459U (en) Automatic quick detaching device of air spring
KR101020113B1 (en) Disjointing and jointing system of stud nut for nuclear reactor
CN109193454A (en) Replace the operational method and its closed fixture yoke plate device of 500kV aerodynamic type insulator
CN205520330U (en) Automatic cover sealing washer device
CN106078136B (en) Blanking, detection and screening installation after the assembling of water meter bushing
CN209125270U (en) A kind of screw automatic positioning device for screwing up of automatic locking screw machine
KR100971542B1 (en) Centering device of tentioner
CN208385912U (en) For installing the mounting device of breaker in power distribution cabinet
CN207223883U (en) A kind of installation of engineering machinery planetary reduction box and provision for disengagement
CN108202906A (en) A kind of deicing of high-voltage wires tool apparatus for placing
CN205870373U (en) A anchor clamps for automatic spiral cover of water gauge

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20181016