CN108662270A - Crystallizer discharges to the gas control dredge valve on trap pipeline in melamine industrial equipment - Google Patents

Crystallizer discharges to the gas control dredge valve on trap pipeline in melamine industrial equipment Download PDF

Info

Publication number
CN108662270A
CN108662270A CN201710197536.0A CN201710197536A CN108662270A CN 108662270 A CN108662270 A CN 108662270A CN 201710197536 A CN201710197536 A CN 201710197536A CN 108662270 A CN108662270 A CN 108662270A
Authority
CN
China
Prior art keywords
lead screw
air seal
break
crystallizer
industrial equipment
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201710197536.0A
Other languages
Chinese (zh)
Inventor
常怀春
秦杏尧
纪振海
史洪泉
潘国胜
盛文广
何冰冰
李富银
居晓
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
SHANDONG HUALU-HENGSHENG CHEMICAL Co Ltd
Original Assignee
SHANDONG HUALU-HENGSHENG CHEMICAL Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by SHANDONG HUALU-HENGSHENG CHEMICAL Co Ltd filed Critical SHANDONG HUALU-HENGSHENG CHEMICAL Co Ltd
Priority to CN201710197536.0A priority Critical patent/CN108662270A/en
Publication of CN108662270A publication Critical patent/CN108662270A/en
Pending legal-status Critical Current

Links

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F16ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
    • F16KVALVES; TAPS; COCKS; ACTUATING-FLOATS; DEVICES FOR VENTING OR AERATING
    • F16K31/00Actuating devices; Operating means; Releasing devices
    • F16K31/44Mechanical actuating means
    • F16K31/60Handles
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B01PHYSICAL OR CHEMICAL PROCESSES OR APPARATUS IN GENERAL
    • B01DSEPARATION
    • B01D9/00Crystallisation
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F16ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
    • F16KVALVES; TAPS; COCKS; ACTUATING-FLOATS; DEVICES FOR VENTING OR AERATING
    • F16K1/00Lift valves or globe valves, i.e. cut-off apparatus with closure members having at least a component of their opening and closing motion perpendicular to the closing faces
    • F16K1/32Details
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F16ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
    • F16KVALVES; TAPS; COCKS; ACTUATING-FLOATS; DEVICES FOR VENTING OR AERATING
    • F16K1/00Lift valves or globe valves, i.e. cut-off apparatus with closure members having at least a component of their opening and closing motion perpendicular to the closing faces
    • F16K1/32Details
    • F16K1/34Cutting-off parts, e.g. valve members, seats
    • F16K1/36Valve members
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F16ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
    • F16KVALVES; TAPS; COCKS; ACTUATING-FLOATS; DEVICES FOR VENTING OR AERATING
    • F16K27/00Construction of housing; Use of materials therefor
    • F16K27/02Construction of housing; Use of materials therefor of lift valves

Abstract

Crystallizer discharges to the gas control dredge valve on trap pipeline in melamine industrial equipment of the present invention, including air seal chamber, supporting rack, adjust lead screw and lead screw regulating device, further include gas source pipe and break dredger, the gas source pipe is arranged on the side wall for the air seal chamber being connected with air seal intracavitary, it is provided centrally with fumarole in air seal bottom of chamber portion, adjusting screw lower end passes through the fumarole of air seal chamber to extend downwardly, and break dredger is hinged on the lower end for adjusting lead screw;Pass through this programme, gas source pipe adds inflated with nitrogen to air seal intracavitary, nitrogen is ejected into through fumarole on rotating disc simultaneously, rotation is generated under guide vane effect, rotates adjusting handle, rotating disc moves forward, fixation particle at the easily blocking of crystallizer discharge pipe can be carried out break processing by break dredger, it is blocked to reach effective control pipeline, the production cycle greatly shortens, and really realizes the stabilization of equipment, efficient, long-term operation.

Description

Crystallizer discharges to the gas control on trap pipeline and dredges in melamine industrial equipment Port valve
Technical field
The present invention relates to a kind of melamine industrial equipment, more particularly to being tied in a kind of melamine industrial equipment Brilliant device discharges to the gas control dredge valve on trap pipeline.
Background technology
The quality of the crystallizer discharging operating condition of production melamine plant directly influences the operation feelings of whole equipment Condition, it is necessary to the continuous operation for ensureing crystallizer discharging, since temperature of charge is high when crystallizer discharges in melamine plant, and Contain the gases such as ammonia, carbon dioxide while containing fine particle, these gases form ammonium bicarbonate in the duct, often result in Material bonds on crystallizer discharge pipe, to block pipeline.
In the prior art, melamine plant is primarily due to crystallizer discharge blockage problem and seriously affects the continuous of production Property, wherein there are two types of chief reasons, 1 traditional crystallizer discharging is transported to trap through bottom discharge by pipe string, by To the cold in melamine and tube wall, it is bonded in inner wall of the pipe, causes duct wall ecto-entad to block, in trap conduit entrance Horizontal segment easily blocks, and causes melamine plant can only parking process;It is designed on the outside of crystallizer pipeline in the design of 2 prior arts Steam jacket, under high temperature and high pressure environment, since external environment is colder, the factors such as chuck is longer influence, and cause melamine stifled Fill in pipeline.
Invention content
In view of this, the main purpose of the present invention is to provide crystallizer in a kind of melamine industrial equipment discharge to Gas control dredge valve on trap pipeline solves melamine plant crystallization by the technical program using gas control dredging mode Device discharge pipe frequent jams problem, control containing solid particle, high temperature, high pressure gas medium one-way flow, to reach It is blocked to effective control pipeline, the production cycle greatly shortens, and really realizes the stabilization of equipment, efficient, long-term operation.
In order to achieve the above object, the technical proposal of the invention is realized in this way:
Crystallizer discharges to the gas control dredge valve on trap pipeline, including air seal in a kind of melamine industrial equipment Chamber, supporting rack adjust lead screw and lead screw regulating device, and support frame as described above is fixed above air seal chamber, and lead screw is adjusted Device is hinged on above supporting rack, is adjusted lead screw and is arranged in supporting rack, is adjusted lead screw top and is connected with lead screw regulating device, also Including gas source pipe and break dredger, the gas source pipe is arranged in the side for the air seal chamber being connected with air seal intracavitary On wall, it is provided centrally with fumarole in air seal bottom of chamber portion, screw lower end is adjusted and passes through the fumarole of air seal chamber downward It stretches out, break dredger is hinged on the lower end for adjusting lead screw.
As further technical solution, the break dredger is made of rotating disc, guide vane and break tool, described Guide vane setting above the rotating disc on, the setting of break tool below the rotating disc on.
As further technical solution, the guide vane is formed using spiral of Archimedes planar development.
As further technical solution, the lead screw regulating device is made of adjusting handle and feed screw nut, adjusts hand Wheel is hinged on above supporting rack, is fixed on adjusting handle on the outside of feed screw nut, and feed screw nut's inside thread spinning is adjusting silk On bar.
As further technical solution, the list between the fumarole and adjusting lead screw of air seal chamber bottom centre Side clearance is 0.6-0.8mm.
It is using the advantageous effect after above-mentioned technical proposal:Crystallizer discharges to catching in a kind of melamine industrial equipment Gas control dredge valve on storage pipeline solves melamine plant crystallizer by the technical program using gas control dredging mode Discharge pipe frequent jams problem adds inflated with nitrogen, nitrogen to enter crystallization through fumarole air seal intracavitary by gas source pipe The one-way flow control pipeline of gas medium of the device discharge pipe control containing solid particle, high temperature, high pressure blocks, while nitrogen It being ejected into through fumarole on the rotating disc of break dredger, rotating disc generates rotation under guide vane effect, rotates adjusting handle, Rotating disc moves forward, and the fixation particle at the easily blocking of crystallizer discharge pipe can be carried out break by the break tool on rotating disc Processing blocks to reach effective control pipeline, and the production cycle greatly shortens, and really realizes the stabilization of equipment, efficient, long period Operation.
Description of the drawings
Fig. 1 is the overall structure diagram of the present invention.
Fig. 2 is the vertical view of rotating disc in the present invention.
Fig. 3 is the use state diagram of the present invention.
In figure, 1 air seal chamber, 2 supporting racks, 3 adjusting lead screws, 4 gas source pipes, 5 fumaroles, 6 rotating discs, 7 guide vanes, 8 are broken Slag tool, 9 adjusting handles, 10 feed screw nuts, 11 crystallizers, 12 traps, 13 vertical components, 14 horizontal components.
Specific implementation mode
Specific embodiment in the present invention is described in further detail below in conjunction with attached drawing.
As Figure 1-Figure 2, crystallizer discharges to trap pipeline in melamine industrial equipment of the present invention On gas control dredge valve, including air seal chamber 1, supporting rack 2, adjust lead screw 3 and lead screw regulating device, support frame as described above 2 is solid Fixed to be arranged above air seal chamber 1, lead screw regulating device is hinged on 2 top of supporting rack, adjusts lead screw 3 and is arranged in supporting rack 2 In, it adjusts 3 top of lead screw and is connected with lead screw regulating device, further include gas source pipe 4 and break dredger, the gas source pipe 4 is set It sets on the side wall for the air seal chamber 1 being connected in air seal chamber 1, in air seal chamber, 1 bottom centre is provided with spray Stomata 5 adjusts 3 lower end of lead screw and the fumarole 5 of air seal chamber 1 is passed through to extend downwardly, and break dredger is hinged on adjusting silk On the lower end of bar 3.
As further embodiment, the break dredger is made of rotating disc 6, guide vane 7 and break tool 8, institute State the setting of guide vane 7 rotating disc 6 above on, the setting of break tool 8 rotating disc 6 below on, the break tool 8 is several equal The blade of even distribution.
As further embodiment, the guide vane 7 is formed using spiral of Archimedes planar development.
As further embodiment, the lead screw regulating device is made of adjusting handle 9 and feed screw nut 10, adjusts hand Wheel 9 is hinged on 2 top of supporting rack, and 10 outside of feed screw nut is fixed on adjusting handle 9, and 10 inside thread spinning of feed screw nut exists It adjusts on lead screw 3.
As further embodiment, between the fumarole 5 and adjusting lead screw 3 of 1 bottom centre of air seal chamber Unilateral gap is 0.6-0.8mm.
As shown in figure 3, when the present invention, needs to clear up 11 discharge pipe of crystallizer in actual operation, Wu Xuting Machine, by gas source pipe 4 to adding inflated with nitrogen, nitrogen to enter in 11 discharge pipe of crystallizer and control through fumarole 5 in air seal chamber 1 It makes the one-way flow control pipeline of gas medium containing solid particle, high temperature, high pressure to block, nitrogen is ejected into through fumarole 5 On the rotating disc 6 of break dredger, guide vane 7 drives rotating disc 6 to rotate, and rotation adjusting handle 9 makes rotating disc 6 move forward, Fixation particle at the easily blocking of 11 discharge pipe of crystallizer is carried out break processing by the break tool 8 on rotating disc 6.
Sealing mechanism, the sealer are provided with to the adjusting lead screw 3 being arranged on supporting rack 2 in technical solution of the present invention Structure is the prior art, and in this not go into detail.
The dredge valve of the present invention is applied in the discharging to the connecting pipeline of trap 12 of crystallizer 11, the connecting pipeline It is made of vertical component 13 and horizontal component 14, technical solution used by dredge valve of the invention is provided in vertical component 13 At the inflection point of horizontal component 14.
The above, only preferable possible embodiments of the invention, are not limited to the scope of the present invention.

Claims (5)

1. crystallizer discharges close to the gas control dredge valve on trap pipeline, including gas in a kind of melamine industrial equipment It seals chamber, supporting rack, adjust lead screw and lead screw regulating device, support frame as described above is fixed above air seal chamber, lead screw tune Regulating device is hinged on above supporting rack, is adjusted lead screw and is arranged in supporting rack, is adjusted lead screw top and is connected with lead screw regulating device, It is characterised in that it includes gas source pipe and break dredger, the gas source pipe are arranged in the gas being connected with air seal intracavitary On the side wall of body seal chamber, it is provided centrally with fumarole in air seal bottom of chamber portion, screw lower end is adjusted and passes through air seal chamber Fumarole extend downwardly, break dredger be hinged on adjust lead screw lower end on.
2. crystallizer discharges to the gas control on trap pipeline and dredges in melamine industrial equipment according to claim 1 Port valve, which is characterized in that the break dredger is made of rotating disc, guide vane and break tool, and the guide vane setting is turning On above Moving plate, the setting of break tool below the rotating disc on.
3. crystallizer discharges to the gas control on trap pipeline and dredges in melamine industrial equipment according to claim 2 Port valve, which is characterized in that the guide vane is formed using spiral of Archimedes planar development.
4. crystallizer discharges to the gas control on trap pipeline and dredges in melamine industrial equipment according to claim 1 Port valve, which is characterized in that the lead screw regulating device is made of adjusting handle and feed screw nut, and adjusting handle is hinged on supporting rack Top, feed screw nut outside are fixed on adjusting handle, and feed screw nut's inside thread spinning is on adjusting lead screw.
5. crystallizer discharges to the gas control on trap pipeline and dredges in melamine industrial equipment according to claim 1 Port valve, which is characterized in that the unilateral gap between the fumarole and adjusting lead screw of air seal chamber bottom centre is 0.6- 0.8mm。
CN201710197536.0A 2017-03-29 2017-03-29 Crystallizer discharges to the gas control dredge valve on trap pipeline in melamine industrial equipment Pending CN108662270A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710197536.0A CN108662270A (en) 2017-03-29 2017-03-29 Crystallizer discharges to the gas control dredge valve on trap pipeline in melamine industrial equipment

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710197536.0A CN108662270A (en) 2017-03-29 2017-03-29 Crystallizer discharges to the gas control dredge valve on trap pipeline in melamine industrial equipment

Publications (1)

Publication Number Publication Date
CN108662270A true CN108662270A (en) 2018-10-16

Family

ID=63786266

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710197536.0A Pending CN108662270A (en) 2017-03-29 2017-03-29 Crystallizer discharges to the gas control dredge valve on trap pipeline in melamine industrial equipment

Country Status (1)

Country Link
CN (1) CN108662270A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114028850A (en) * 2021-11-22 2022-02-11 山东华鲁恒升化工股份有限公司 Chemical production safety relief device

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4063317A (en) * 1975-11-13 1977-12-20 Michael Santore Hydro-pneumatic pipe, tube and drain cleaner
CN2584678Y (en) * 2002-12-20 2003-11-05 扬子石油化工股份有限公司 Pipe dredger with pressure
CN2858799Y (en) * 2005-12-09 2007-01-17 李宇龙 Airpowered rotary pipeline dredging apparatus
US20150165360A1 (en) * 2012-11-22 2015-06-18 China University Of Petroleum-Beijing (Cupb) Self-Oscillating Nozzle and Pulse-Aided Back-Flushing Ash Cleaning Apparatus of Filter Equipped with Self-Oscillating Nozzle
CN204437714U (en) * 2014-12-30 2015-07-01 中石化华北分公司第一采油厂 Do not stop production pipeline corrosion monitoring device
CN206608605U (en) * 2017-03-29 2017-11-03 山东华鲁恒升化工股份有限公司 Crystallizer discharges to the gas control dredge valve on trap pipeline in melamine industrial equipment

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4063317A (en) * 1975-11-13 1977-12-20 Michael Santore Hydro-pneumatic pipe, tube and drain cleaner
CN2584678Y (en) * 2002-12-20 2003-11-05 扬子石油化工股份有限公司 Pipe dredger with pressure
CN2858799Y (en) * 2005-12-09 2007-01-17 李宇龙 Airpowered rotary pipeline dredging apparatus
US20150165360A1 (en) * 2012-11-22 2015-06-18 China University Of Petroleum-Beijing (Cupb) Self-Oscillating Nozzle and Pulse-Aided Back-Flushing Ash Cleaning Apparatus of Filter Equipped with Self-Oscillating Nozzle
CN204437714U (en) * 2014-12-30 2015-07-01 中石化华北分公司第一采油厂 Do not stop production pipeline corrosion monitoring device
CN206608605U (en) * 2017-03-29 2017-11-03 山东华鲁恒升化工股份有限公司 Crystallizer discharges to the gas control dredge valve on trap pipeline in melamine industrial equipment

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114028850A (en) * 2021-11-22 2022-02-11 山东华鲁恒升化工股份有限公司 Chemical production safety relief device

Similar Documents

Publication Publication Date Title
JP4523973B2 (en) An apparatus for filling an extruder with a pre-processed thermoplastic synthetic resin material
KR20120040130A (en) Continuous pelletizing, drying and bagging systems with improved throughput
CN108662270A (en) Crystallizer discharges to the gas control dredge valve on trap pipeline in melamine industrial equipment
RU2010137001A (en) METHOD AND DEVICE FOR RECEIVING AND TRANSMISSION FROM SMALL TO LARGE-GRAIN SOLIDS FROM THE BUNKER TO THE PRESSURIZED SYSTEM
TW201446325A (en) High-throughput particle production using a plasma system
CN206608605U (en) Crystallizer discharges to the gas control dredge valve on trap pipeline in melamine industrial equipment
CN107876401A (en) A kind of crop seeds processing unit
JP2005132528A (en) Hopper device
CN203737132U (en) Vibration-type spiral dust generator
CN109592332A (en) A kind of hoisting mechanism for fine materials
DE602004013826D1 (en) DEVICE FOR FILLING A CONTAINER WITH SOLID PARTICLES
US3751214A (en) Method of and apparatus for conveying granular masses in tubular treating chambers
CN208026533U (en) Environment measuring pedotheque processing unit
JP2016198764A (en) Crystallization device and crystallization method
JP2014136181A (en) Cleaning device having compressed-air-gun jetting function
CN107514894B (en) No sieve stream washes formula battery material drier
CN207232107U (en) A kind of gas chromatograph carrier gas device
CN205701156U (en) A kind of regulatable foam gun of foam density
JP5171802B2 (en) Granulator
JP6449403B1 (en) Gas supply device
CN209576204U (en) A kind of activated carbon adsorption desorption equipment
EP2651794B1 (en) Apparatus for discharging bulk material
CN207236065U (en) A kind of new limitation drawing mechanism for carbon dioxide expanded cut tobacco linearly coupled cabinet
JP2010094675A5 (en)
CN205327868U (en) A jar pull throughs is retrieved to catalyst

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination