CN108661645A - 端部薄矿体回采的方法 - Google Patents
端部薄矿体回采的方法 Download PDFInfo
- Publication number
- CN108661645A CN108661645A CN201810271712.5A CN201810271712A CN108661645A CN 108661645 A CN108661645 A CN 108661645A CN 201810271712 A CN201810271712 A CN 201810271712A CN 108661645 A CN108661645 A CN 108661645A
- Authority
- CN
- China
- Prior art keywords
- ore body
- back production
- panel
- mineral building
- arrangement
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21C—MINING OR QUARRYING
- E21C41/00—Methods of underground or surface mining; Layouts therefor
- E21C41/16—Methods of underground mining; Layouts therefor
- E21C41/22—Methods of underground mining; Layouts therefor for ores, e.g. mining placers
Landscapes
- Engineering & Computer Science (AREA)
- Life Sciences & Earth Sciences (AREA)
- Geochemistry & Mineralogy (AREA)
- Geology (AREA)
- Mining & Mineral Resources (AREA)
- Environmental & Geological Engineering (AREA)
- Remote Sensing (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Lining And Supports For Tunnels (AREA)
Abstract
端部薄矿体回采的方法,涉及矿石采集技术领域,其特征在于:包括以下操作步骤,确定矿体形式、优化采场布置、确定回采布置、确定另一盘区布置。本发明方法合理、操作方便、实施便捷。
Description
技术领域
本发明涉及矿石采集技术领域,具体涉及端部薄矿体回采的方法。
背景技术
马钢张庄矿铁矿石地质储量2.25亿吨,建设规模为采、选综合生产能力550万t/a。首采中段-390~-450m中段,开拓矿量2000万吨,6~12勘探线之间矿体肥厚,地质条件单一,占-390~-450m中段矿体90%以上,开采条件优越,而12线以南6线以北的端部矿体,赋存条件差、工业品位低、不适合集中大规模回采,在市场行情低迷的情况下,张庄矿为了奋力求生存,前期主要回采中部厚大矿体的一步回采部位,二步回采需充填结束后4个月方可进行,端部薄矿体未进行开采,导致三级矿量严重失衡。
而首采区-390--450m中段,预计2018年厚大部位矿体一步采矿房基本回采结束,二步采矿房可回采矿量急剧较少,且回采难度较一步采矿房复杂。新水平开拓准备需要两年以上的时间,不能及时提供采准备采矿量,为弥补后期回采矿量须适当准备端部薄矿体开采,端部矿体赋存条件差,工业品位低,不适合集中大规模回采。
发明内容
本发明所要解决的技术问题在于克服现有的技术缺陷提供一种方法合理、操作方便、实施便捷的端部薄矿体回采的方法。
本发明所要解决的技术问题采用以下的技术方案来实现:
端部薄矿体回采的方法,其特征在于:包括以下操作步骤,
步骤一、确定矿体形式:
对井下-390m和-450m水平南北端部矿体进行勘探,为了精确南北端部矿体的整体走向,勘探是采用垂直断面法布置钻孔,使-390m~-450m中段勘探程度由原来的200*100m达到50*36m网度;
步骤二、优化采场布置:
设计勘探线以北和12-18勘探线之间矿体,矿体水平厚度20m-100m,沿矿体走向每108m划分为一个盘区,盘区间垂直走向留设18m厚连续间柱,盘区内垂直走向划分采场,即采场长轴方向垂直走向布置,采场长为矿体厚度,宽18m,高60m,每个盘区内划分为5个采场;
步骤三、确定回采布置:
因盘区矿体平均厚度为31.8m,具有上部厚大下部狭小的特点,考虑一步回采顶板暴露面积超过1500m2,设计矿房沿矿体走向布置,分二步回采;
其中下盘一间矿房为一步回采矿房,矿房宽度为20m,长最大为62m;
另一间为二步回采矿房,分两区长条区宽13m,长62m,方块区为33*40m;
步骤四、确定另一盘区布置:
另一盘区矿体下部平均厚28m,上部24m,设计采用沿矿体走向布置矿房,为了满足Mathews稳定图结论宽度为28m时,矿房长度仅为55m的要求,仍然采用上下盘二步回采的矿房布置形式;
且一步矿房宽度设置为18m,二步采矿房为17m,均可满足岩体暴露面积及充填体自立要求。
本发明的有益效果为:本发明最先适用于安徽地区小张庄地区的矿区,已开始回采的端部矿体均转变垂直走向的矿房布置形式,减少了整体的采准工程量及采准废石量,为减少资金投入,缩短矿房准备时间加快增加三级矿量及促进采充平衡起到了积极的作用。
具体实施方式
为了使本发明实现的技术手段、创作特征、达成目的与功效易于明白了解,下面进一步阐述本发明。
端部薄矿体回采的方法,其特征在于:包括以下操作步骤,
步骤一、确定矿体形式:
对井下-390m和-450m水平南北端部矿体进行勘探,为了精确南北端部矿体的整体走向,勘探是采用垂直断面法布置钻孔,使-390m~-450m中段勘探程度由原来的200*100m达到50*36m网度;
步骤二、优化采场布置:
设计勘探线以北和12-18勘探线之间矿体,矿体水平厚度20m-100m,沿矿体走向每108m划分为一个盘区,盘区间垂直走向留设18m厚连续间柱,盘区内垂直走向划分采场,即采场长轴方向垂直走向布置,采场长为矿体厚度,宽18m,高60m,每个盘区内划分为5个采场;
步骤三、确定回采布置:
因一号盘区的矿体平均厚度为31.8m,具有上部厚大下部狭小的特点,考虑一步回采顶板暴露面积超过1500m2,设计矿房沿矿体走向布置,分二步回采;
其中下盘一间矿房为一步回采矿房,矿房宽度为20m,长最大为62m;
另一间为二步回采矿房,分两区长条区宽13m,长62m,方块区为33*40m;
步骤四、确定另一盘区布置:
二号盘区的矿体下部平均厚28m,上部24m,设计采用沿矿体走向布置矿房,为了满足Mathews稳定图结论宽度为28m时,矿房长度仅为55m的要求,仍然采用上下盘二步回采的矿房布置形式;
且一步矿房宽度设置为18m,二步采矿房为17m,均可满足岩体暴露面积及充填体自立要求。
Mathews稳定图结论如下表所示:
L | 20 | 21 | 22 | 23 | 24 | 25 | 26 | 27 | 28 | 29 | 30 |
L1(S=9.30m) | 266.6 | 163.1 | 120.5 | 97.3 | 82.8 | 72.7 | 65.4 | 59.8 | 55.4 | 51.9 | 49.0 |
L1(S=9.97m) | 6927.1 | 396.0 | 213.2 | 150.0 | 118.0 | 98.6 | 85.6 | 76.3 | 69.3 | 63.9 | 59.5 |
根据《马钢张庄铁矿建设关键技术研究与实践》中的Mathews稳定图结论:“当矿房跨度在20m时,最不利情况下矿房长度也能达到266m”,计算可知一号盘区的矿房沿走向布置符合稳定性要求,“当充填体的宽度从16m至24m,充填的长度达到200m是,充填体自立的稳定性安全系数均超过1.5”,可知长条区也符合安全回收要求,通过对二步采矿房回采情况也可证实二步长条状矿体回采过程中的可靠性。为了安全回采二号盘区的矿体的方块区域优先回采,同时预留矿石对暴露围岩支撑护壁,因矿体倾角较大,此方案仅对矿房布置方式进行了优化,继续使用大直径深孔阶段空场法进行爆破回采。
本申请现用于张庄矿的探矿采集。
以上显示和描述了本发明的基本原理和主要特征和本发明的优点。本行业的技术人员应该了解,本发明不受上述实施例的限制,上述实施例和说明书中描述的只是说明本发明的原理,在不脱离本发明精神和范围的前提下,本发明还会有各种变化和改进,这些变化和改进都落入要求保护的本发明范围内。本发明要求保护范围由所附的权利要求书及其等效物界定。
Claims (1)
1.端部薄矿体回采的方法,其特征在于:包括以下操作步骤,
步骤一、确定矿体形式:
对井下-390m和-450m水平南北端部矿体进行勘探,为了精确南北端部矿体的整体走向,勘探是采用垂直断面法布置钻孔,使-390m~-450m中段勘探程度由原来的200*100m达到50*36m网度;
步骤二、优化采场布置:
设计勘探线以北和12-18勘探线之间矿体,矿体水平厚度20m-100m,沿矿体走向每108m划分为一个盘区,盘区间垂直走向留设18m厚连续间柱,盘区内垂直走向划分采场,即采场长轴方向垂直走向布置,采场长为矿体厚度,宽18m,高60m,每个盘区内划分为5个采场;
步骤三、确定回采布置:
因盘区矿体平均厚度为31.8m,具有上部厚大下部狭小的特点,考虑一步回采顶板暴露面积超过1500m2,设计矿房沿矿体走向布置,分二步回采;
其中下盘一间矿房为一步回采矿房,矿房宽度为20m,长最大为62m;
另一间为二步回采矿房,分两区长条区宽13m,长62m,方块区为33*40m;
步骤四、确定另一盘区布置:
另一盘区矿体下部平均厚28m,上部24m,设计采用沿矿体走向布置矿房,为了满足Mathews稳定图结论宽度为28m时,矿房长度仅为55m的要求,仍然采用上下盘二步回采的矿房布置形式;
且一步矿房宽度设置为18m,二步采矿房为17m,均可满足岩体暴露面积及充填体自立要求。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810271712.5A CN108661645A (zh) | 2018-03-29 | 2018-03-29 | 端部薄矿体回采的方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810271712.5A CN108661645A (zh) | 2018-03-29 | 2018-03-29 | 端部薄矿体回采的方法 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN108661645A true CN108661645A (zh) | 2018-10-16 |
Family
ID=63782148
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201810271712.5A Pending CN108661645A (zh) | 2018-03-29 | 2018-03-29 | 端部薄矿体回采的方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN108661645A (zh) |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
RU2418167C1 (ru) * | 2010-01-14 | 2011-05-10 | Учреждение Российской академии наук Институт проблем комплексного освоения недр Российской академии наук (УРАН ИПКОН РАН) | Способ подземной разработки маломощных жил |
CN102953733A (zh) * | 2011-08-19 | 2013-03-06 | 彭康 | 中央脉外房柱式联合横巷两端脉内连续分段充填采矿法 |
CN103726848A (zh) * | 2014-01-17 | 2014-04-16 | 长沙有色冶金设计研究院有限公司 | 适用于缓倾斜/倾斜薄矿体回采的采矿方法 |
CN104265297A (zh) * | 2014-08-06 | 2015-01-07 | 中钢集团马鞍山矿山研究院有限公司 | 一种多层易碎缓倾斜极薄矿脉的开采方法 |
CN105952454A (zh) * | 2016-05-10 | 2016-09-21 | 中国恩菲工程技术有限公司 | 深井矿山空场嗣后充填采矿法 |
CN107829741A (zh) * | 2017-11-27 | 2018-03-23 | 西北矿冶研究院 | 一种缓倾斜薄矿体开采方法 |
-
2018
- 2018-03-29 CN CN201810271712.5A patent/CN108661645A/zh active Pending
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
RU2418167C1 (ru) * | 2010-01-14 | 2011-05-10 | Учреждение Российской академии наук Институт проблем комплексного освоения недр Российской академии наук (УРАН ИПКОН РАН) | Способ подземной разработки маломощных жил |
CN102953733A (zh) * | 2011-08-19 | 2013-03-06 | 彭康 | 中央脉外房柱式联合横巷两端脉内连续分段充填采矿法 |
CN103726848A (zh) * | 2014-01-17 | 2014-04-16 | 长沙有色冶金设计研究院有限公司 | 适用于缓倾斜/倾斜薄矿体回采的采矿方法 |
CN104265297A (zh) * | 2014-08-06 | 2015-01-07 | 中钢集团马鞍山矿山研究院有限公司 | 一种多层易碎缓倾斜极薄矿脉的开采方法 |
CN105952454A (zh) * | 2016-05-10 | 2016-09-21 | 中国恩菲工程技术有限公司 | 深井矿山空场嗣后充填采矿法 |
CN107829741A (zh) * | 2017-11-27 | 2018-03-23 | 西北矿冶研究院 | 一种缓倾斜薄矿体开采方法 |
Non-Patent Citations (1)
Title |
---|
刘新云: "张庄铁矿南翼急倾斜薄矿体采矿方法探究", 《工业》 * |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
AU2017405652B2 (en) | Method for stepwise construction of preferential gas migration pathway at stope in coal seam | |
CN103899352B (zh) | 煤炭开采中固体充填充实率设计及控制方法 | |
CN100554642C (zh) | 一种长壁综采回收房式开采煤柱的方法 | |
CN105422099B (zh) | 一种柱旁双侧全部充填复采残采区遗留煤柱的方法 | |
CN102505963A (zh) | 回采工作面顶板水预疏放施工方法 | |
CN104763466B (zh) | 一种覆岩隔离注浆充填浆体有效扩散半径的检测方法 | |
CN109854297A (zh) | 一种基于定向钻探工艺的小煤窑采空区注浆方法 | |
CN102979526B (zh) | 中深孔分段采矿出矿堑沟充填法构筑工艺 | |
CN105673014A (zh) | 坚硬顶板跳采工作面冲击地压控制方法 | |
CN1828017A (zh) | 一种w堑沟型有底部结构受矿巷道以及形成工艺 | |
CN103557001B (zh) | 一种低段高无底柱留矿嗣后充填采矿法 | |
CN201474347U (zh) | 一种分段矿房 | |
CN102155227B (zh) | 垂直方向上连续开采方法及在全矿体连续开采中的应用 | |
CN104453900A (zh) | 一种近水平矿体充填采矿方法 | |
CN109162713A (zh) | 一种不改变覆岩水文地质条件的煤水双资源矿井开采模式 | |
CN108222940A (zh) | 一种锰矿的开采方法 | |
Fan et al. | Opencast to underground iron ore mining method | |
CN105422100A (zh) | 一种急倾斜煤层水平分段高采出率巷道布置与放煤方式 | |
CN108661645A (zh) | 端部薄矿体回采的方法 | |
CN103362541A (zh) | 高瓦斯低透气性煤层区域性增加煤层透气性的方法 | |
CN106593444A (zh) | 一种坚硬岩层下降低采动震动能量的方法 | |
CN110886612A (zh) | 一种适合缓倾斜中厚矿体连续开采的采矿方法 | |
CN103742144B (zh) | 一种矿石损失贫化的控制方法及其用途 | |
Chang et al. | Key parameters of surrounding rock roof cutting and pressure relief control in soft rock roof roadway of deep mine stope and its engineering application | |
CN104929639A (zh) | 一种柔性条带充填保水开采方法 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20181016 |