CN108661588A - A kind of Multi-pipe crossing high temperature test wellhead assembly - Google Patents

A kind of Multi-pipe crossing high temperature test wellhead assembly Download PDF

Info

Publication number
CN108661588A
CN108661588A CN201810655794.3A CN201810655794A CN108661588A CN 108661588 A CN108661588 A CN 108661588A CN 201810655794 A CN201810655794 A CN 201810655794A CN 108661588 A CN108661588 A CN 108661588A
Authority
CN
China
Prior art keywords
tubing string
side wall
reducing joint
passage lanes
hanger
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201810655794.3A
Other languages
Chinese (zh)
Inventor
刘福东
国聪
马锐
姜超
刘文科
李雪野
雷月鑫
杜志勇
石江明
王东升
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
CNPC Bohai Equipment Manufacturing Co Ltd
Original Assignee
CNPC Bohai Equipment Manufacturing Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CNPC Bohai Equipment Manufacturing Co Ltd filed Critical CNPC Bohai Equipment Manufacturing Co Ltd
Priority to CN201810655794.3A priority Critical patent/CN108661588A/en
Publication of CN108661588A publication Critical patent/CN108661588A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B33/00Sealing or packing boreholes or wells
    • E21B33/02Surface sealing or packing
    • E21B33/03Well heads; Setting-up thereof
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B17/00Drilling rods or pipes; Flexible drill strings; Kellies; Drill collars; Sucker rods; Cables; Casings; Tubings
    • E21B17/02Couplings; joints
    • E21B17/04Couplings; joints between rod or the like and bit or between rod and rod or the like
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B33/00Sealing or packing boreholes or wells
    • E21B33/02Surface sealing or packing
    • E21B33/03Well heads; Setting-up thereof
    • E21B33/04Casing heads; Suspending casings or tubings in well heads
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B47/00Survey of boreholes or wells

Landscapes

  • Engineering & Computer Science (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Geology (AREA)
  • Mining & Mineral Resources (AREA)
  • Physics & Mathematics (AREA)
  • Environmental & Geological Engineering (AREA)
  • Fluid Mechanics (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Mechanical Engineering (AREA)
  • Testing Resistance To Weather, Investigating Materials By Mechanical Methods (AREA)

Abstract

The present invention relates to gasifying underground coal production technique field, more particularly to a kind of Multi-pipe crossing high temperature test wellhead assembly.The hanger of the device is seated inside tubing head four-way and is sealed between tubing head four-way inner wall, hanger lower end connected pipes, tubing head four-way upper end connects reducing joint, reducing joint upper end connects production tree component, a plurality of passage lanes are set on reducing joint side wall, a plurality of passage lanes corresponding with a plurality of passage lanes of reducing joint are provided on hanger side wall.The present invention realizes and can complete multi-pipeline and pass through and effectively seal, and sealing is safe and reliable, can be used under high temperature, high pressure, deep-etching operating mode, have while noting oxygen, water filling, steam injection, gas production and test function.

Description

A kind of Multi-pipe crossing high temperature test wellhead assembly
Technical field:
The present invention relates to gasifying underground coal production technique field, more particularly to a kind of Multi-pipe crossing high temperature test well head dress It sets.
Background technology:
Gasifying underground coal (In-situ coal conversion) production practice is the coal by underground preservation in coal seam It burns, be gasificated into coal gas, be transported to ground, as the energy or industrial chemicals.Technique injection, output medium composition are complicated, rotten Corrosion is strong, while needing the completion of ISC technique wellhead assemblies is mostly logical to pass through and reliably seal, however existing ISC techniques wellhead assembly It cannot be satisfied this demand.
Invention content:
The technical problem to be solved in the present invention is to provide a kind of Multi-pipe crossing high temperature test wellhead assembly, the arrangement achieves It can complete multi-pipeline to pass through and effectively seal, sealing is safe and reliable, can use under high temperature, high pressure, deep-etching operating mode, has It is standby to note oxygen, water filling, steam injection, gas production and test function simultaneously.Mostly logical pass through can not be completed by overcoming existing ISC techniques wellhead assembly And the deficiency reliably sealed.
The technical solution used in the present invention is:A kind of Multi-pipe crossing high temperature test wellhead assembly, including tubing head four-way; Hanger is seated inside tubing head four-way and is sealed between tubing head four-way inner wall, hanger lower end connected pipes, oil pipe Head four-way upper end connects reducing joint, and reducing joint upper end connects production tree component, a plurality of pass through is arranged on reducing joint side wall Channel is provided with a plurality of passage lanes corresponding with a plurality of passage lanes of reducing joint, reducing joint on hanger side wall Every passage lanes inlet be arranged at the outer wall step of reducing joint, every passage lanes of reducing joint penetrate A piece tubing string, side wall passage lanes of the tubing string Jing Guo reducing joint, hanger side wall passage lanes be crossing to oil pipe and set Between pipe inside annular space, every tubing string is sealed with reducing joint side wall passage lanes inlet, every tubing string and suspension It is sealed between device side wall passage lanes.
A passage lanes are arranged in reducing joint side side wall, which penetrates tubing string I;Reducing joint other side side Wall is provided with three passage lanes, which respectively penetrates tubing string II, tubing string III and tubing string IV.
Tubing string I is located in reducing joint side wall passage lanes inlet by hanging positioning component suspension, hangs positioning group Part, which includes fan-shaped flange and positioning component, positioning component, can be such that tubing string I is centered in reducing joint side wall passage lanes, tubing string I is sealed with reducing joint side wall passage lanes inlet by nonmetallic seal assembly, tubing string I and hanger side wall passage lanes Between sealed by nonmetallic sealing mechanism.
Tubing string II, tubing string III, tubing string IV and reducing joint side wall passage lanes inlet pass through metal sealing component respectively Sealing, is sealed by metal sealing mechanism respectively between tubing string II, tubing string III, tubing string IV and hanger side wall passage lanes.
Every side wall passage lanes of reducing joint are angularly disposed, and each side wall passage lanes of hanger are axially set It sets.
The beneficial effects of the invention are as follows:The present invention realizes and can complete multi-pipeline and pass through and effectively seal, sealing safety Reliably, it can be used under high temperature, high pressure, deep-etching operating mode, have while noting oxygen, water filling, steam injection, gas production and test function.
Description of the drawings:
The present invention will be further described in detail with reference to the accompanying drawings and detailed description.
Fig. 1 is the structural diagram of the present invention.
Specific implementation mode:
As shown in Figure 1, a kind of Multi-pipe crossing high temperature test wellhead assembly, including tubing head four-way 1;Hanger 2 is seated 1 inside of tubing head four-way simultaneously seals, 2 lower end connected pipes 8 of hanger between 1 inner wall of tubing head four-way, on tubing head four-way 1 End connection reducing joint 4,4 upper end of reducing joint connect production tree component 5, a plurality of passage lanes are arranged on 4 side wall of reducing joint, A plurality of passage lanes corresponding with a plurality of passage lanes of reducing joint 4 are provided on 2 side wall of hanger, reducing joint 4 Every passage lanes inlet is arranged at the outer wall step of reducing joint 4, and every passage lanes of reducing joint 4 penetrate A piece tubing string, side wall passage lanes of the tubing string Jing Guo reducing joint 4, hanger 2 side wall passage lanes be crossing to 8 and of oil pipe Between casing inside annular space, every tubing string is sealed with 4 side wall passage lanes inlet of reducing joint, every tubing string with it is outstanding It is sealed between 2 side wall passage lanes of hanging device.
A passage lanes are arranged in 4 side side wall of reducing joint, which penetrates tubing string I 9;Reducing joint 4 is another Side side wall is provided with three passage lanes, which respectively penetrates tubing string II 10, tubing string III 11 and tubing string IV 12.
Tubing string I 9 is located in 4 side wall passage lanes inlet of reducing joint, suspension positioning by hanging the suspension of positioning component 6 Component 6, which includes fan-shaped flange and positioning component 7, positioning component 7, can make tubing string I 9 be centered in 4 side wall passage lanes of reducing joint Interior, tubing string I 9 is sealed with 4 side wall passage lanes inlet of reducing joint by nonmetallic seal assembly, tubing string I 9 and hanger 2 It is sealed by nonmetallic sealing mechanism between side wall passage lanes.
Tubing string II 10, tubing string III 11, tubing string IV 12 and 4 side wall passage lanes inlet of reducing joint are close by metal respectively Sealing assembly 3 seals, close by metal respectively between tubing string II 10,2 side wall passage lanes of tubing string III 11, tubing string IV 12 and hanger Sealing mechanism seals.
Every side wall passage lanes of reducing joint 4 are angularly disposed, and each side wall passage lanes of hanger 2 are axial Setting.
It is understood that above with respect to the specific descriptions of the present invention, it is merely to illustrate the present invention and is not limited to this Technical solution described in inventive embodiments, it will be understood by those of ordinary skill in the art that, still the present invention can be carried out Modification or equivalent replacement, to reach identical technique effect;As long as meet use needs, all protection scope of the present invention it It is interior.

Claims (5)

1. a kind of Multi-pipe crossing high temperature test wellhead assembly, including tubing head four-way (1);It is characterized in that:Hanger (2) is located It seals in tubing head four-way (1) inside and between tubing head four-way (1) inner wall, hanger (2) lower end connected pipes (8), oil Tube head four-way (1) upper end connects reducing joint (4), and reducing joint (4) upper end connects production tree component (5), reducing joint (4) side A plurality of passage lanes are set on wall, are provided on hanger (2) side wall corresponding with a plurality of passage lanes of reducing joint (4) Every passage lanes inlet of a plurality of passage lanes, reducing joint (4) is arranged at the outer wall step of reducing joint (4), Every passage lanes of reducing joint (4) penetrate a tubing string, side wall passage lanes of the tubing string Jing Guo reducing joint (4), The side wall passage lanes of hanger (2) are crossing to oil pipe (8) between casing inside annular space, every tubing string and reducing joint (4) Side wall passage lanes inlet is sealed, and is sealed between every tubing string and hanger (2) side wall passage lanes.
2. Multi-pipe crossing high temperature test wellhead assembly described in accordance with the claim 1, it is characterised in that:The reducing joint (4) A passage lanes are arranged in side side wall, which penetrates tubing string I (9);Reducing joint (4) other side side wall is provided with three Passage lanes, three passage lanes respectively penetrate tubing string II (10), tubing string III (11) and tubing string IV (12).
3. Multi-pipe crossing high temperature test wellhead assembly according to claim 2, it is characterised in that:The tubing string I (9) passes through Suspension positioning component (6), which is hung, is located in reducing joint (4) side wall passage lanes inlet, and suspension positioning component (6) includes fan Shape flange and positioning component (7), positioning component (7) can be such that tubing string I (9) is centered in reducing joint (4) side wall passage lanes, Tubing string I (9) is sealed with reducing joint (4) side wall passage lanes inlet by nonmetallic seal assembly, tubing string I (9) and suspension It is sealed by nonmetallic sealing mechanism between device (2) side wall passage lanes.
4. Multi-pipe crossing high temperature test wellhead assembly according to claim 2, it is characterised in that:The tubing string II (10), Tubing string III (11), tubing string IV (12) and reducing joint (4) side wall passage lanes inlet are close by metal sealing component (3) respectively Envelope, it is close by metal respectively between tubing string II (10), tubing string III (11), tubing string IV (12) and hanger (2) side wall passage lanes Sealing mechanism seals.
5. Multi-pipe crossing high temperature test wellhead assembly described in accordance with the claim 1, it is characterised in that:The reducing joint (4) Every side wall passage lanes it is angularly disposed, each side wall passage lanes of hanger (2) are axially arranged.
CN201810655794.3A 2018-06-23 2018-06-23 A kind of Multi-pipe crossing high temperature test wellhead assembly Pending CN108661588A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810655794.3A CN108661588A (en) 2018-06-23 2018-06-23 A kind of Multi-pipe crossing high temperature test wellhead assembly

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810655794.3A CN108661588A (en) 2018-06-23 2018-06-23 A kind of Multi-pipe crossing high temperature test wellhead assembly

Publications (1)

Publication Number Publication Date
CN108661588A true CN108661588A (en) 2018-10-16

Family

ID=63772774

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810655794.3A Pending CN108661588A (en) 2018-06-23 2018-06-23 A kind of Multi-pipe crossing high temperature test wellhead assembly

Country Status (1)

Country Link
CN (1) CN108661588A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109653700A (en) * 2019-02-15 2019-04-19 中为(上海)能源技术有限公司 For its operating method of the Modular high-temperature well head well control system of coal underground gasifying technology
CN111734337A (en) * 2020-06-21 2020-10-02 中国石油天然气集团有限公司 High-temperature electric pump oil production testing wellhead device
CN113464090A (en) * 2021-08-10 2021-10-01 江苏益马机械有限公司 Combined production tree for production well

Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2846718Y (en) * 2005-04-15 2006-12-13 鲍洪玉 High temperature high pressure double pipe pole wellhead device
CN201087713Y (en) * 2007-10-15 2008-07-16 辽河石油勘探局 Injection-production integrated double tube thermal production well mouth device
CN101560878A (en) * 2009-05-20 2009-10-21 辽河石油勘探局 Horizontal well even steam injection and test wellhead device
CN102287156A (en) * 2011-08-05 2011-12-21 中国石油天然气股份有限公司 Concentric pipe wellhead device for exploiting thickened oil through steam assisted gravity drainage
CN103790541A (en) * 2013-03-28 2014-05-14 中国石油天然气股份有限公司 Three-position multifunctional three-tube wellhead device
WO2015077954A1 (en) * 2013-11-28 2015-06-04 中国石油天然气股份有限公司 Method for isothermal differential forced steam cyclic pre-heating for twin horizontal wells of mid-depth layer of oil reservoir
CN205805482U (en) * 2016-06-15 2016-12-14 中海油能源发展股份有限公司 A kind of thermal production well mouth liquid controling pipe line passes through sealing device
CN106812493A (en) * 2015-12-02 2017-06-09 中国石油天然气股份有限公司 Multitube thermal recovery well head device
US20180148989A1 (en) * 2016-11-29 2018-05-31 Jerry D. Ross Tubing Hanger Assembly With Wellbore Access, and Method of Accessing a Wellbore
CN208534444U (en) * 2018-06-23 2019-02-22 中国石油集团渤海石油装备制造有限公司 A kind of Multi-pipe crossing high temperature test wellhead assembly

Patent Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2846718Y (en) * 2005-04-15 2006-12-13 鲍洪玉 High temperature high pressure double pipe pole wellhead device
CN201087713Y (en) * 2007-10-15 2008-07-16 辽河石油勘探局 Injection-production integrated double tube thermal production well mouth device
CN101560878A (en) * 2009-05-20 2009-10-21 辽河石油勘探局 Horizontal well even steam injection and test wellhead device
CN102287156A (en) * 2011-08-05 2011-12-21 中国石油天然气股份有限公司 Concentric pipe wellhead device for exploiting thickened oil through steam assisted gravity drainage
CN103790541A (en) * 2013-03-28 2014-05-14 中国石油天然气股份有限公司 Three-position multifunctional three-tube wellhead device
WO2015077954A1 (en) * 2013-11-28 2015-06-04 中国石油天然气股份有限公司 Method for isothermal differential forced steam cyclic pre-heating for twin horizontal wells of mid-depth layer of oil reservoir
CN106812493A (en) * 2015-12-02 2017-06-09 中国石油天然气股份有限公司 Multitube thermal recovery well head device
CN205805482U (en) * 2016-06-15 2016-12-14 中海油能源发展股份有限公司 A kind of thermal production well mouth liquid controling pipe line passes through sealing device
US20180148989A1 (en) * 2016-11-29 2018-05-31 Jerry D. Ross Tubing Hanger Assembly With Wellbore Access, and Method of Accessing a Wellbore
CN208534444U (en) * 2018-06-23 2019-02-22 中国石油集团渤海石油装备制造有限公司 A kind of Multi-pipe crossing high temperature test wellhead assembly

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109653700A (en) * 2019-02-15 2019-04-19 中为(上海)能源技术有限公司 For its operating method of the Modular high-temperature well head well control system of coal underground gasifying technology
CN109653700B (en) * 2019-02-15 2023-06-23 中为(上海)能源技术有限公司 Operation method of modularized high-temperature wellhead well control system for underground coal gasification process
CN111734337A (en) * 2020-06-21 2020-10-02 中国石油天然气集团有限公司 High-temperature electric pump oil production testing wellhead device
CN113464090A (en) * 2021-08-10 2021-10-01 江苏益马机械有限公司 Combined production tree for production well

Similar Documents

Publication Publication Date Title
CN108661588A (en) A kind of Multi-pipe crossing high temperature test wellhead assembly
CN105756599A (en) Coal mine two-end gas plug and middle water seal layer penetrating drill hole sealing device and method
CN208311716U (en) A kind of natural gas line of preservative treatment
AU2011200012A1 (en) Gas-Blanketed Piping Connections
CN103195470B (en) Drilling construction Gas gathering-device
CN207686653U (en) All-metal sealing mandrel type casing hanger
CN208534444U (en) A kind of Multi-pipe crossing high temperature test wellhead assembly
CN201214997Y (en) Metal seal double tube christmas tree wellhead device
CN108049836A (en) Replacement SAGD wellhead assemblies and its replacing options with pressure
CN108019179A (en) A kind of metal sealing component and boll-weevil hanger
CN107345610A (en) Anti-corrosion direct-burried external-compression type expansion bellow
CN205276318U (en) Inspection shaft interface seal structure
CN107218455A (en) A kind of attachment structure of cracking furnace tube
CN105507866B (en) A kind of device for fracturing wellhead
CN207863906U (en) A kind of inserted metal sealing mandrel type hanger of step
CN207905757U (en) Replacement SAGD wellhead assemblies with pressure
CN209179719U (en) A kind of closed type wellhead for production
CN206205821U (en) A kind of antitorque sealed fitting
CN110469284A (en) Dual tubing wellhead
CN205330588U (en) Sealed expansion pipe cluster assembly of long distance for oil drilling
CN108644501A (en) A kind of flange assembled heavy caliber high pressure assembling pipe joint
CN103452529B (en) A kind of co-well oil-pumping and water-injecting technique oil-extraction electric pump assembly
CN207863917U (en) A kind of suspension calker
CN210977330U (en) Stratum test sealing joint
CN204372415U (en) Centre revolving joint

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20181016

RJ01 Rejection of invention patent application after publication