CN108661296A - A kind of tile work adjustment eyelid retractor - Google Patents
A kind of tile work adjustment eyelid retractor Download PDFInfo
- Publication number
- CN108661296A CN108661296A CN201810598275.8A CN201810598275A CN108661296A CN 108661296 A CN108661296 A CN 108661296A CN 201810598275 A CN201810598275 A CN 201810598275A CN 108661296 A CN108661296 A CN 108661296A
- Authority
- CN
- China
- Prior art keywords
- connecting plate
- plate
- upper junction
- lower connecting
- junction plate
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
- 210000000744 eyelid Anatomy 0.000 title claims abstract description 18
- 230000001105 regulatory effect Effects 0.000 claims description 29
- 238000010276 construction Methods 0.000 abstract description 10
- 238000010586 diagram Methods 0.000 description 10
- 239000011449 brick Substances 0.000 description 7
- 230000000694 effects Effects 0.000 description 4
- 239000000919 ceramic Substances 0.000 description 3
- 238000005516 engineering process Methods 0.000 description 3
- 238000000034 method Methods 0.000 description 3
- XEEYBQQBJWHFJM-UHFFFAOYSA-N Iron Chemical compound [Fe] XEEYBQQBJWHFJM-UHFFFAOYSA-N 0.000 description 2
- 239000000203 mixture Substances 0.000 description 2
- TVEXGJYMHHTVKP-UHFFFAOYSA-N 6-oxabicyclo[3.2.1]oct-3-en-7-one Chemical compound C1C2C(=O)OC1C=CC2 TVEXGJYMHHTVKP-UHFFFAOYSA-N 0.000 description 1
- 239000004927 clay Substances 0.000 description 1
- 238000007796 conventional method Methods 0.000 description 1
- 230000008878 coupling Effects 0.000 description 1
- 238000010168 coupling process Methods 0.000 description 1
- 238000005859 coupling reaction Methods 0.000 description 1
- 229910052742 iron Inorganic materials 0.000 description 1
- 238000003754 machining Methods 0.000 description 1
- 239000004570 mortar (masonry) Substances 0.000 description 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04F—FINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
- E04F21/00—Implements for finishing work on buildings
- E04F21/18—Implements for finishing work on buildings for setting wall or ceiling slabs or plates
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04F—FINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
- E04F21/00—Implements for finishing work on buildings
- E04F21/18—Implements for finishing work on buildings for setting wall or ceiling slabs or plates
- E04F21/1838—Implements for finishing work on buildings for setting wall or ceiling slabs or plates for setting a plurality of similar elements
- E04F21/1877—Leveling devices
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Conveying And Assembling Of Building Elements In Situ (AREA)
Abstract
The invention belongs to wall tile laying construction appurtenances, eyelid retractor is adjusted more particularly to a kind of tile work, the upper junction plate hinged including passing sequentially through connecting shaft, first connecting plate, second connecting plate, lower connecting plate, third connecting plate and the 4th connecting plate, upper junction plate is opposite with lower connecting plate after hinged, the upper junction plate is equipped with adjusting screw rod, adjusting screw rod and upper junction plate thread connection, one end of adjusting screw rod and lower connecting plate contact connection, it can change the distance between upper junction plate and lower connecting plate by rotating adjusting screw rod, after the distance between upper junction plate and lower connecting plate reach lower limit, the connecting shaft at upper junction plate both ends and the connecting shaft at lower connecting plate both ends are staggered, rather than it is opposite, minimum range is less than the sum of two connection shaft diameters i.e. between upper junction plate and lower connecting plate.To reduce the thickness after the device closes, increase adjusting range.
Description
Technical field
The invention belongs to wall tile laying construction appurtenances, and in particular to a kind of tile work adjustment eyelid retractor.
Background technology
At present wall, there are two types of floor tile construction methods.Wherein optimal method be floor tile construction after maximum height and
In the same horizontal line, wall brick coincides with floor tile horizontal plane into 90 degree of angles to the minimum altitude that wall brick construction finishes.Another
Method is the level of subsistence of setting walltile construction first, and floor ceramic tile withstands wall brick vertical plane after furring tile is pasted
At 90 degree of angles.Two methods in order to the angle of effective protection floor ceramic tile finished product engineering set out be all made of first wall after ground construction
Sequentially.No matter use any one of which construction method, primary key task be find out and be determined for compliance with wall, floor tile construction want
The highest level benchmark of the top-down floor level datum line of entire floor space asked or entire floor space from bottom to top
Line.
Conventional method is with artificial experience and individual skill, and with horizontal messenger wire, unwrapping wire, the ambiguity object such as clay mortar carries out
Wall brick, artificial lift brick is supported to adjust back and forth.The entitled a kind of novel wall bottom benchmark brick that applicant declares before
It is laid with the utility model patent of adjustment eyelid retractor(Number of patent application is:ZL 201620736888.X), well solved the skill
Art problem.The patent makes two pieces of symmetrical plate opening and closing of hexagonal polygon body by adjusting longitudinally adjust screw rod, is adjusted to play
The effect of distance between upper junction plate and lower connecting plate.Reach most narrow spacing but after closing, between upper junction plate and lower connecting plate
From(Thickness)When lower limit, the connecting shaft at upper junction plate both ends is opposite with the connecting shaft at lower connecting plate both ends(It offsets), i.e., upper connection
Minimum range is the sum of two connection shaft diameters between plate and lower connecting plate.
Therefore, the device adjustable range is limited, cannot meet actually required.In addition, the lower connecting plate of the device is positioned over
When ground, on ground there are in the case of the gradient, also accordingly there is certain angle in upper junction plate, can not ensure floor ceramic tile with
Wall brick it is vertical.
Invention content
The present invention is directed at least solve one of the technical problems existing in the prior art, for this purpose, the present invention provides one kind
Tile work adjusts eyelid retractor, which can reduce the thickness after the device closes, and increase adjusting range.
In order to solve the above-mentioned technical problem, the technical solution adopted by the present invention is:
A kind of tile work adjustment eyelid retractor, it is characterised in that:Including passing sequentially through the hinged upper junction plate of connecting shaft, the first connection
Plate, the second connecting plate, lower connecting plate, third connecting plate and the 4th connecting plate, hinged rear upper junction plate is opposite with lower connecting plate, institute
It states upper junction plate and is equipped with adjusting screw rod, adjusting screw rod is threaded with upper junction plate, one end of adjusting screw rod and lower company
Fishplate bar contacts, and can change the distance between upper junction plate and lower connecting plate, upper junction plate and lower company by rotating adjusting screw rod
When the distance between fishplate bar reaches lower limit, the connecting shaft and the connecting shaft at lower connecting plate both ends at upper junction plate both ends are staggered.
The width of the upper junction plate is less than the width of lower connecting plate, when the distance between upper junction plate and lower connecting plate reach
To after lower limit, the connecting shaft at upper junction plate both ends is located between the connecting shaft at lower connecting plate both ends.
The width of the upper junction plate is more than the width of lower connecting plate, when the distance between upper junction plate and lower connecting plate reach
To after lower limit, the connecting shaft at lower connecting plate both ends is located between the connecting shaft at upper junction plate both ends.
First connecting plate and third connecting plate are of same size, and the second connecting plate and the 4th connecting plate are of same size, when
After the distance between upper junction plate and lower connecting plate reach lower limit, the connecting shaft of upper junction plate one end is located at lower connecting plate both ends
Between connecting shaft.
The lower connecting plate is equipped with the groove coordinated with adjusting screw rod.
It is fixedly installed fixing axle, the adjusting screw rod inner hollow on the lower connecting plate, and is set in the fixing axle
On.
The lower connecting plate is equipped with regulating part, and lower connecting plate, and the extension elongation of regulating part are stretched out in one end of regulating part
It is adjustable.
The regulating part is coupled by screw thread with lower connecting plate, and lower connecting plate is equipped with corresponding tapped through hole.
The upper junction plate is equipped with through-hole, and regulating part may pass through the through-hole.
The upper junction plate is equipped with connecting through hole, and adjusting screw rod passes through the connecting through hole, spiral shell is equipped at the connecting through hole
Female or T-nut or rivet nut or the connecting through hole are tapped through hole.
The connecting plate that the connecting shaft at upper junction plate both ends and the connecting shaft at lower connecting plate both ends are contacted is equipped with corresponding
Groove.
Compared with prior art, the present invention having an advantageous effect in that:
When can reduce the distance between upper junction plate and lower connecting plate by rotating adjusting screw rod, due to upper junction plate both ends
Connecting shaft and the connecting shaft at lower connecting plate both ends are staggered, rather than opposite, i.e., minimum range between upper junction plate and lower connecting plate
Less than the sum of two connection shaft diameters.To reduce the thickness after the device closes, increase adjusting range.
By being equipped with regulating part on lower connecting plate, one end of regulating part can stretch out lower connecting plate, the stretching of regulating part
End is contacted with ground, plays the role of supporting leveling.According to the gradient on ground, adjust regulating part extension elongation can ensure on connect
Fishplate bar and wall body vertical, to ensure the precision of construction.
Description of the drawings
Fig. 1 is the structural schematic diagram of one embodiment of the invention;
Fig. 2 is the usage state diagram of Fig. 1;
Fig. 3 is the structural schematic diagram of another embodiment of the present invention;
Fig. 4 is the usage state diagram of Fig. 3;
Fig. 5 is the structural schematic diagram of one embodiment of the invention through-hole;
Fig. 6 is the structural schematic diagram of another embodiment of the present invention through-hole;
Fig. 7 is the structural schematic diagram of one embodiment of the invention groove;
Fig. 8 is the structural schematic diagram of another embodiment of the present invention groove
Fig. 9 is the structural schematic diagram of T-nut of the present invention;
Figure 10 is the structural schematic diagram of fixing axle of the present invention;
Wherein:1 is upper junction plate, and 2 be the first connecting plate, and 3 be the second connecting plate, and 4 be lower connecting plate, and 5 be third connecting plate, 6
For the 4th connecting plate, 7 be the first connecting shaft, and 8 be the second connecting shaft, and 9 be third connecting shaft, and 10 be the fourth connecting shaft, and 11 be the
Five connecting shafts, 12 be the 6th connecting shaft, and 13 be groove, and 14 be regulating part, and 15 be through-hole, and 16 be adjusting screw rod, and 17 be fixing axle,
18 be connecting through hole, and 19 be T-nut.
Specific implementation mode
The following is a clear and complete description of the technical scheme in the embodiments of the invention, it is clear that described embodiment
Only a part of the embodiment of the present invention, instead of all the embodiments.Based on the embodiments of the present invention, the common skill in this field
The every other embodiment that art personnel are obtained without making creative work belongs to the model that the present invention protects
It encloses.
A kind of tile work adjustment eyelid retractor, including pass sequentially through the hinged upper junction plate 1 of connecting shaft, the first connecting plate 2, second
Connecting plate 3, lower connecting plate 4, third connecting plate 5 and the 4th connecting plate 6, can form hexahedron after connection.Connecting shaft is equipped with six
It is a, specifically include the first connecting shaft 7, the second connecting shaft 8, third connecting shaft 9, the fourth connecting shaft 10, the 5th connecting shaft the 11, the 6th
Connecting shaft 12.
Specific connecting relation between each connecting shaft and each connecting plate is:One end of upper junction plate 1 passes through the first connecting shaft 7
One end hinged with one end of the first connecting plate 2, that the other end of the first connecting plate 2 passes through the second connecting shaft 8 and the second connecting plate 3
Hinged, the other end of the second connecting plate 3 is hinged by one end of third connecting shaft 9 and lower connecting plate 4, lower connecting plate 4 it is another
End is hinged by the fourth connecting shaft 10 and one end of third connecting plate 5, and the other end of third connecting plate 5 passes through the 5th connecting shaft 11
Hinged with one end of the 4th connecting plate 6, the other end of the 4th connecting plate 6 is another by the 6th connecting shaft 12 and upper junction plate 1
End is hinged.
After hinged, upper junction plate 1 is opposite with lower connecting plate 4, and longitudinally adjust screw rod 16 is equipped on upper junction plate 1.Due to
Adjusting screw rod 16 and 1 thread connection of upper junction plate, and one end of adjusting screw rod 16 and 4 contact connection of lower connecting plate;Pass through rotation
Adjusting screw rod 16 can change its extension elongation, so as to adjust the distance between upper junction plate 1 and lower connecting plate 4.When upper connection
After the distance between plate 1 and lower connecting plate 4 reach lower limit, the connecting shaft at 1 both ends of upper junction plate(First connecting shaft 7 and the 6th connects
Spindle 12)With the connecting shaft at 4 both ends of lower connecting plate(Third connecting shaft 9 and the fourth connecting shaft 10)It is staggered.So that upper junction plate 1
Minimum range is less than two connecting shafts between lower connecting plate 4(First connecting shaft 7 and third connecting shaft 9)The sum of diameter.
As shown in FIG. 8 and 9, the thread connection that various structures realize adjusting screw rod 16 and upper junction plate 1 may be used, specifically
It is as follows:Connecting through hole 18 can be equipped on upper junction plate 1, and the connecting through hole 18 is tapped through hole, adjusting screw rod 16 passes through
The tapped through hole and 1 thread connection of upper junction plate;Or nut is welded at the connecting through hole 18, adjusting screw rod 16 and the spiral shell
Box thread couples, and adjusting screw rod 16 can be contacted across the connecting through hole 18 with lower connecting plate 4;Or in the connecting through hole 18
Place is equipped with rivet nut, adjusting screw rod 16 and the rivet nut thread connection;Or T-nut is equipped at the connecting through hole 18
19(Iron plate nut), T-nut 19 is equipped with internal thread and external screw thread(Tapped through hole), it is logical which may pass through connection
Its coupling with upper junction plate 1 is realized by the tightening nuts on its external screw thread after passing through in hole 18(It clamps), adjusting screw rod 16
Couple with its internal thread.
Those skilled in the art is learning the above, it is easy to expect that multiple technologies scheme realizes 1 liang of upper junction plate
The connecting shaft at end and the connecting shaft at 4 both ends of lower connecting plate are staggered.Such as:It can be by adjusting upper junction plate 1, the first connecting plate 2,
The width realization of two connecting plates 3, lower connecting plate 4, third connecting plate 5 and the 4th connecting plate 6.
As shown in Fig. 1~2, the width of upper junction plate 1 can be made to be less than the width of lower connecting plate 4.
When the width of upper junction plate 1 is less than the width of lower connecting plate 4, i.e. 7 He of the first connecting shaft at 1 both ends of upper junction plate
The distance between 6th connecting shaft 12 also accordingly less than 4 both ends of lower connecting plate third connecting shaft 9 and the fourth connecting shaft 10 it
Between distance.Remaining first connecting plate 2, the second connecting plate 3, third connecting plate 5 and the 4th connecting plate 6 width make to be adapted
Adjustment, such as:First connecting plate 2 and the 4th connecting plate 6 are wide, and the second connecting plate 3 and third connecting plate 5 are wide, and the first connection
2 to the second connecting plate 3 of plate is wide.
After the distance between upper junction plate 1 and lower connecting plate 4 reach lower limit, under the connecting shaft at 1 both ends of upper junction plate is located at
Between the connecting shaft at 4 both ends of connecting plate.
Vice versa, and the width of upper junction plate 1 is made to be more than the width of lower connecting plate 4, remaining first connecting plate 2, second connects
Fishplate bar 3, third connecting plate 5 and the 4th connecting plate 6 make adaptable adjustment, such as:First connecting plate 2 and the 4th connecting plate 6 are wide,
Second connecting plate 3 and third connecting plate 5 are wide, and 2 to the second connecting plate 3 of the first connecting plate is short.
After the distance between upper junction plate 1 and lower connecting plate 4 reach lower limit, the connecting shaft at 4 both ends of lower connecting plate is located at
Between the connecting shaft at 1 both ends of upper junction plate.
The specific width of upper junction plate 1 and lower connecting plate 4 in said program can be adjusted according to actual conditions, such as
Pin diameter etc..Remaining first connecting plate 2, the second connecting plate 3, third connecting plate 5 and the 4th connecting plate 6 specific size according to
The length of upper junction plate 1 and lower connecting plate 4 carries out adaptable adjustment, and the adjustment is for a person skilled in the art
It is it will be apparent that therefore not elaborating specifically herein.
Meanwhile above-mentioned upper junction plate 1, the first connecting plate 2, the second connecting plate 3, lower connecting plate 4, third connecting plate 5 and
The width of four connecting plates 6 is the length of side of hexahedron after its composition.It is named only to facilitate description, upper junction plate 1 is under
Connecting plate 4 refers to after composition two opposite connecting plates after hexahedron.
As shown in FIG. 7 and 8, on the basis of said program:Lower connecting plate 4 is equipped with the groove coordinated with adjusting screw rod 16
13.Circular groove may be used in groove 13, and one end of adjusting screw rod 16 is located in the groove 13, and rotates and join with the groove 13
It connects.Whole stability can be improved by the way that groove 13 is arranged.Certainly, which can also be square groove, concrete shape root
It is adjusted according to actual conditions.
It as shown in Figure 10, can also be by lower connecting plate 4 other than can be by the way that the raising overall stability of groove 13 is arranged
Upper setting fixing axle 17 is realized, specific as follows:It is fixedly installed fixing axle 17 on lower connecting plate 4,16 inner hollow of adjusting screw rod,
And be set in the fixing axle 17, i.e., fixing axle 17 can stretch into the hollow structure of adjusting screw rod 16, and exist between the two
Gap does not interfere with the rotation of adjusting screw rod 16.
As shown in figs. 34, certainly, the width of upper junction plate 1 also can be equal with the width of lower connecting plate 4, and passes through change
The connection at 1 both ends of width realization upper junction plate of the first connecting plate 2, the second connecting plate 3, third connecting plate 5 and the 4th connecting plate 6
Axis and the connecting shaft at 4 both ends of lower connecting plate are staggered.
Specially:The width of first connecting plate 2 is equal with the width of third connecting plate 5, the second connecting plate 3 width and
The width of four connecting plates 6 is equal, and the width of the first connecting plate 2 is less than or greater than the width of the second connecting plate 3.Work as upper junction plate
After the distance between 1 and lower connecting plate 4 reach lower limit, the connecting shaft of 1 one end of upper junction plate(6th connecting shaft 12 or first connects
Axis 7, depending on closing mode)Connecting shaft positioned at 4 both ends of lower connecting plate(The fourth connecting shaft 10 and third connecting shaft 9)Between,
Realization interlocks.
In above-mentioned whole technical solution, in order to which the thickness after making the device close reaches minimum(As lower limit), can make
The connecting plate 3+ lower connecting plate 4+ thirds connecting plate 5 of 6 width of the 4th connecting plates of upper junction plate 1+ the first connecting plate 2+=second.
Due to hingedly coordinating machining accuracy and connecting shaft, it is impossible to ruler between above-mentioned each connecting plate be completely secured
Very little is absolute equal, and above-mentioned only theory can specifically have certain error in practice.Answer reduction error appropriate.Error is deposited
It is parastate that can lead to upper junction plate 1 and lower connecting plate 4 not, but there are certain angles, only want that error is excessive
.
In order to preferably reduce thickness, when the distance between upper junction plate 1 and lower connecting plate 4 reach lower limit, upper junction plate 1
The connecting plate that the connecting shaft at 2 both ends of connecting shaft and lower connecting plate at both ends is contacted is equipped with corresponding groove, and connecting shaft can
It has been embedded in corresponding groove.The shape of groove can be arc, and be more than connecting shaft outer diameter, and groove is straight slot, i.e. its length
With connecting plate equal length.For groove is arranged on which specific connecting plate, it is not provided with groove on which connecting plate, it can be according to upper
Technical solution determination is stated, therefore is not elaborated herein.
In conclusion the device is by adjusting upper junction plate 1, the first connecting plate 2, the second connecting plate 3, lower connecting plate 4,
The width of three connecting plates 5 and the 4th connecting plate 6 realizes the connecting shaft of the connecting shaft and 4 both ends of lower connecting plate at 1 both ends of upper junction plate
It is staggered.Specific width adjustment mode would be obvious to one skilled in the art, it can be according to reality
Situation is adjusted and designs.Above scheme is merely illustrative.Meanwhile may exist certain error for specific size,
It is not absolute.Certainly, those skilled in the art also can be used other technologies means realize the connecting shaft at upper junction plate 1 both ends with
The connecting shaft at 4 both ends of lower connecting plate is staggered, to reduce integral thickness.
Further, levelling there are when the gradient, needing to carry out device when ground, therefore can be equipped on lower connecting plate 4
One end of regulating part 14, regulating part 14 can stretch out lower connecting plate 4, and the external part of regulating part 14 can be contacted with ground, from
And so that lower connecting plate 4 forms an angle with ground shape, ensure upper junction plate 1 and wall body vertical.When the gradient is not present in ground,
One end of regulating part 14 does not stretch out lower connecting plate 4.
The specific location and quantity of regulating part 14 can be adjusted according to actual conditions, can be arranged the one of lower connecting plate 4
End or side or other suitable locations, regulating part 14 may also set up two or more there are one setting, and increase regulating part 14
Quantity can improve stability.
Regulating part 14 primarily serves the effect of supporting pad, therefore various structures realization may be used, such as:
Regulating part 14 can be coupled by screw thread with lower connecting plate 4, and lower connecting plate 4 is equipped with corresponding tapped through hole.By turning
Dynamic regulating part 14, changes the extension elongation of regulating part 14 so that upper junction plate 1 and wall body vertical.Spiral shell may be used in regulating part 14
Nail.
Upper junction plate 1 is equipped with through-hole 15, and regulating part 14 may pass through the through-hole 15.The effect of through-hole 15 is connected on ensureing
After the distance between plate 1 and lower connecting plate 4 reach lower limit, regulating part 14 is not contacted with upper junction plate 1(Support), avoid influencing to be somebody's turn to do
The minimum support thickness of device(Lower limit).
As it can be seen in figures 5 and 6, the concrete shape of through-hole 15 can be adjusted according to actual conditions, can be circular hole, rectangular
Hole, waist-shaped hole etc..
Said program can be according to required arbitrary combination.Only presently preferred embodiments of the present invention is explained in detail above,
But the present invention is not limited to above-described embodiments, it within the knowledge of a person skilled in the art, can also be
Do not depart under the premise of present inventive concept that various changes can be made, various change should all be included in the protection scope of the present invention.
Claims (10)
1. a kind of tile work adjusts eyelid retractor, it is characterised in that:The upper junction plate hinged including passing sequentially through connecting shaft(1), first
Connecting plate(2), the second connecting plate(3), lower connecting plate(4), third connecting plate(5)With the 4th connecting plate(6), upper connection after hinged
Plate(1)With lower connecting plate(4)Relatively, the upper junction plate(1)It is equipped with adjusting screw rod(16), adjusting screw rod(16)With upper connection
Plate(1)It is threaded, adjusting screw rod(16)One end and lower connecting plate(4)Contact, by rotating adjusting screw rod(16)It can
To change upper junction plate(1)With lower connecting plate(4)The distance between, upper junction plate(1)With lower connecting plate(4)The distance between reach
When to lower limit, upper junction plate(1)The connecting shaft and lower connecting plate at both ends(4)The connecting shaft at both ends is staggered.
2. a kind of tile work according to claim 1 adjusts eyelid retractor, it is characterised in that:The upper junction plate(1)Width
Less than lower connecting plate(4)Width, work as upper junction plate(1)With lower connecting plate(4)The distance between reach lower limit after, upper junction plate
(1)The connecting shaft at both ends is located at lower connecting plate(4)Between the connecting shaft at both ends.
3. a kind of tile work according to claim 1 adjusts eyelid retractor, it is characterised in that:The upper junction plate(1)Width
More than lower connecting plate(4)Width, work as upper junction plate(1)With lower connecting plate(4)The distance between reach lower limit after, lower connecting plate
(4)The connecting shaft at both ends is located at upper junction plate(1)Between the connecting shaft at both ends.
4. a kind of tile work according to claim 1 adjusts eyelid retractor, it is characterised in that:First connecting plate(2)With
Three connecting plates(5)It is of same size, the second connecting plate(3)With the 4th connecting plate(6)It is of same size, work as upper junction plate(1)With lower company
Fishplate bar(4)The distance between reach lower limit after, upper junction plate(1)The connecting shaft of one end is located at lower connecting plate(4)The connection at both ends
Between axis.
5. a kind of tile work according to claim 1 adjusts eyelid retractor, it is characterised in that:The lower connecting plate(4)It is equipped with
With adjusting screw rod(16)The groove of cooperation(13).
6. a kind of tile work according to claim 1 adjusts eyelid retractor, it is characterised in that:The lower connecting plate(4)Upper fixation
It is provided with fixing axle(17), the adjusting screw rod(16)Inner hollow, and it is set in the fixing axle(17)On.
7. a kind of tile work according to claim 1 adjusts eyelid retractor, it is characterised in that:The lower connecting plate(4)It is equipped with
Regulating part(14), regulating part(14)One end stretch out lower connecting plate(4), and regulating part(14)Extension elongation it is adjustable.
8. a kind of tile work according to claim 7 adjusts eyelid retractor, it is characterised in that:The regulating part(14)Pass through screw thread
With lower connecting plate(4)Connection, lower connecting plate(4)It is equipped with corresponding tapped through hole.
9. a kind of tile work according to claim 7 or 8 adjusts eyelid retractor, it is characterised in that:The upper junction plate(1)On set
There is through-hole(15), regulating part(14)It may pass through the through-hole(15).
10. a kind of tile work according to claim 1 adjusts eyelid retractor, it is characterised in that:The upper junction plate(1)It is equipped with
Connecting through hole(18), adjusting screw rod(16)Across the connecting through hole(18), the connecting through hole(18)Place is equipped with nut or T-nut
Or rivet nut or the connecting through hole(18)For tapped through hole.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810598275.8A CN108661296B (en) | 2018-06-12 | Brick laying adjustment support |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810598275.8A CN108661296B (en) | 2018-06-12 | Brick laying adjustment support |
Publications (2)
Publication Number | Publication Date |
---|---|
CN108661296A true CN108661296A (en) | 2018-10-16 |
CN108661296B CN108661296B (en) | 2024-05-28 |
Family
ID=
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112157570A (en) * | 2020-09-28 | 2021-01-01 | 中国科学院光电技术研究所 | Longitudinal telescopic polishing tool |
Citations (12)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH0567358U (en) * | 1992-02-20 | 1993-09-07 | 清水建設株式会社 | Tile pack joint release agent spraying machine |
CN201062103Y (en) * | 2007-06-19 | 2008-05-21 | 莫仕钧 | Combined type storing barrel |
CN101434307A (en) * | 2007-11-14 | 2009-05-20 | 盈太企业股份有限公司 | Foldable containing apparatus |
CN203740273U (en) * | 2014-03-25 | 2014-07-30 | 金双英 | Large and small connection automobile-shaped foldable storage box |
CN104512834A (en) * | 2013-09-28 | 2015-04-15 | 沈阳新松机器人自动化股份有限公司 | Connecting rod type lifting device |
CN105857357A (en) * | 2016-04-18 | 2016-08-17 | 中国宣纸股份有限公司 | Transfer trolley for large-size Chinese art paper |
CA2887533A1 (en) * | 2015-04-13 | 2016-10-13 | Garry E. Moon | Methods and apparatuses for aligning tiles |
CN205822734U (en) * | 2016-07-01 | 2016-12-21 | 刘所明 | A kind of novel wall bottom benchmark brick is laid and is adjusted eyelid retractor |
EP3147423A1 (en) * | 2015-09-25 | 2017-03-29 | Profilitec S.p.A. Socio Unico | A device for the laying of tiles or the like |
CN106740453A (en) * | 2016-12-21 | 2017-05-31 | 重庆广际实业有限公司 | It is a kind of to be easy to vehicle-mounted automotive alarm board with cover |
CN207211647U (en) * | 2017-08-17 | 2018-04-10 | 珠海维迪装饰设计工程有限公司 | A kind of interior wall leveling unit for construction and decoration |
CN208329532U (en) * | 2018-06-12 | 2019-01-04 | 阳泉森宝建材有限公司 | A kind of tile work adjustment eyelid retractor |
Patent Citations (12)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH0567358U (en) * | 1992-02-20 | 1993-09-07 | 清水建設株式会社 | Tile pack joint release agent spraying machine |
CN201062103Y (en) * | 2007-06-19 | 2008-05-21 | 莫仕钧 | Combined type storing barrel |
CN101434307A (en) * | 2007-11-14 | 2009-05-20 | 盈太企业股份有限公司 | Foldable containing apparatus |
CN104512834A (en) * | 2013-09-28 | 2015-04-15 | 沈阳新松机器人自动化股份有限公司 | Connecting rod type lifting device |
CN203740273U (en) * | 2014-03-25 | 2014-07-30 | 金双英 | Large and small connection automobile-shaped foldable storage box |
CA2887533A1 (en) * | 2015-04-13 | 2016-10-13 | Garry E. Moon | Methods and apparatuses for aligning tiles |
EP3147423A1 (en) * | 2015-09-25 | 2017-03-29 | Profilitec S.p.A. Socio Unico | A device for the laying of tiles or the like |
CN105857357A (en) * | 2016-04-18 | 2016-08-17 | 中国宣纸股份有限公司 | Transfer trolley for large-size Chinese art paper |
CN205822734U (en) * | 2016-07-01 | 2016-12-21 | 刘所明 | A kind of novel wall bottom benchmark brick is laid and is adjusted eyelid retractor |
CN106740453A (en) * | 2016-12-21 | 2017-05-31 | 重庆广际实业有限公司 | It is a kind of to be easy to vehicle-mounted automotive alarm board with cover |
CN207211647U (en) * | 2017-08-17 | 2018-04-10 | 珠海维迪装饰设计工程有限公司 | A kind of interior wall leveling unit for construction and decoration |
CN208329532U (en) * | 2018-06-12 | 2019-01-04 | 阳泉森宝建材有限公司 | A kind of tile work adjustment eyelid retractor |
Non-Patent Citations (2)
Title |
---|
周超超;张志富;张昊;孙科;陈定方;: "一种六边形铺砖装置的凸轮补偿机构设计及优化", 机械传动, no. 09, 15 September 2013 (2013-09-15) * |
张艳丽;蔡轲;王广;鲁鹏;陈文鹏;郭旭;周威: "基于图像处理的自动铺砖机设计", 西安文理学院学报(自然科学版), no. 004, 31 December 2018 (2018-12-31) * |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112157570A (en) * | 2020-09-28 | 2021-01-01 | 中国科学院光电技术研究所 | Longitudinal telescopic polishing tool |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN206942036U (en) | The cladding fixture of Dali stone ceramic tile | |
CN208329532U (en) | A kind of tile work adjustment eyelid retractor | |
CN108661296A (en) | A kind of tile work adjustment eyelid retractor | |
ITMI20001371A1 (en) | SUPPORT FOR REMOVABLE FLOORS AND FLOORS USING THE SAID SUPPORT. | |
CN106368234B (en) | A kind of new rim of a cup basis box steel column construction technique | |
CN205713158U (en) | A kind of stagewise marked rod | |
CN111197400A (en) | Device and method for installing and leveling wall and floor tiles | |
CN108661296B (en) | Brick laying adjustment support | |
CN214995569U (en) | Assembled raised floor supports leveling component | |
CN208748945U (en) | A kind of hyperboloid installation of ceiling component | |
CN211229058U (en) | Bottom permanent supporting seat for preventing light partition plate from self-weight settlement | |
CN207376391U (en) | A kind of concave-convex ground building panel in construction site | |
CN209723342U (en) | Control device for plane plate flatness | |
CN206957203U (en) | Full working scope adaptive type socket joint type disk button steel pipe support system | |
CN112361913A (en) | Guiding rule for building coke oven head and using method thereof | |
CN206878409U (en) | Cable testing bridge mounting bracket | |
CN208518153U (en) | A kind of type unitized curtain wall suspension mounting structure | |
CN206308961U (en) | A kind of floor tile Level tune part | |
CN106193424A (en) | One is exempted to plaster and is laid bricks and body of wall | |
CN205637499U (en) | Gap and roughness adjusting device are laid to ceramic tile | |
CN211873731U (en) | Installation levelling device of wall ground ceramic tile | |
CN206891436U (en) | A kind of metope laser beam projectoscope | |
CN205399414U (en) | Adjustable width's building pile | |
CN207079734U (en) | A kind of connector of construction steel structure | |
CN108824689A (en) | A kind of hyperboloid installation of ceiling component |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||