CN108648544A - Electric field simulation training method, user terminal and computer storage media - Google Patents

Electric field simulation training method, user terminal and computer storage media Download PDF

Info

Publication number
CN108648544A
CN108648544A CN201810432354.1A CN201810432354A CN108648544A CN 108648544 A CN108648544 A CN 108648544A CN 201810432354 A CN201810432354 A CN 201810432354A CN 108648544 A CN108648544 A CN 108648544A
Authority
CN
China
Prior art keywords
electric power
training
answer
scene picture
power scene
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201810432354.1A
Other languages
Chinese (zh)
Inventor
李映君
徐敏
曾阳发
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangdong Power Grid Co Ltd
Huizhou Power Supply Bureau of Guangdong Power Grid Co Ltd
Original Assignee
Guangdong Power Grid Co Ltd
Huizhou Power Supply Bureau of Guangdong Power Grid Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guangdong Power Grid Co Ltd, Huizhou Power Supply Bureau of Guangdong Power Grid Co Ltd filed Critical Guangdong Power Grid Co Ltd
Priority to CN201810432354.1A priority Critical patent/CN108648544A/en
Publication of CN108648544A publication Critical patent/CN108648544A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G09EDUCATION; CRYPTOGRAPHY; DISPLAY; ADVERTISING; SEALS
    • G09BEDUCATIONAL OR DEMONSTRATION APPLIANCES; APPLIANCES FOR TEACHING, OR COMMUNICATING WITH, THE BLIND, DEAF OR MUTE; MODELS; PLANETARIA; GLOBES; MAPS; DIAGRAMS
    • G09B7/00Electrically-operated teaching apparatus or devices working with questions and answers
    • G09B7/02Electrically-operated teaching apparatus or devices working with questions and answers of the type wherein the student is expected to construct an answer to the question which is presented or wherein the machine gives an answer to the question presented by a student

Landscapes

  • Engineering & Computer Science (AREA)
  • Theoretical Computer Science (AREA)
  • Business, Economics & Management (AREA)
  • Physics & Mathematics (AREA)
  • Educational Administration (AREA)
  • Educational Technology (AREA)
  • General Physics & Mathematics (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

A kind of electric field simulation training method of present invention offer, user terminal and computer storage media, the electric field simulation training method include:Multiple electric power scene picture groups are provided;A picture is provided from an electric power scene picture group, the picture includes at least two answer choices so that user answers;Examination result is carried out after user answers and shows that next picture continues to answer for user;Achievement is submitted after all pictures of the electric power scene picture group are all answered.The Training Methodology of the present invention, the electric power scene picture of multiple at least two answer choices is provided, the employee giveed training may determine that the region for having hidden danger, defect and failure in picture and click selection, to improve the efficiency of the judgement training for the hidden danger of electric power facility, defect and the surface phenomenon of mal-function, and reduce the cost of training.

Description

Electric field simulation training method, user terminal and computer storage media
Technical field
The present invention relates to power grid training technique fields, in particular to a kind of electric field simulation training method, user Terminal and computer storage media.
Background technology
With the continuous development of national grid, the power equipment of power grid is more and more, and transmission line of electricity also becomes increasingly complex, and is Prevention power grid in power generation and power Transmission, various equipment and circuit it is reliable and secure, power grid enterprises are to regular Allow employee to carry out the tour of various power equipments and transmission line of electricity, investigation have hidden danger, defect and failure power equipment and Transmission line of electricity.Therefore, the tour ability of power grid enterprises' meeting emphasis training employee, improves employee's onsite lookup hidden danger or failure electric power The ability of facility.
Existing Training Methodology is more traditional, and the judgement training of hidden danger and the surface phenomenon of mal-function for electric power facility is all It is carried out by word in on-the-spot guidance, books and picture description.Come using the mode that books word and picture are recorded The training of hidden danger, defect and breakdown judge power is carried out, it is dull uninteresting, the learning interest of employee can not have really been transferred, has been caused Employee remembers not deeply after learning, and there may be difference with live electric power facility for books record, make entire result of training pole Difference.
The mode of on-the-spot guidance must be led new employee to carry out patrolling for electric power facility by the abundant employee of judgement field experience Depending on and instruct, but electric power facility hidden danger occurs or the probability of failure is relatively low, and is easy to be influenced by weather and environment, Cause the process of whole scene training can be veryer long, new employee needs just can independently to make an inspection tour by the very long training period Work, cause the cost of corporate training relatively high.
Generally speaking, the existing judgement training for the hidden danger of electric power facility, defect and the surface phenomenon of mal-function, efficiency ratio It is relatively low, and training cost is relatively high.
Invention content
In view of the above problems, the present invention provides a kind of electric field simulation training method, user terminal and computers Storage medium to improve the efficiency of the judgement training for the hidden danger of electric power facility, defect and the surface phenomenon of mal-function, and reduces training The cost of instruction.
To achieve the goals above, the present invention adopts the following technical scheme that:
A kind of electric field simulation training method, including:
Multiple electric power scene picture groups are provided;
One picture is provided from an electric power scene picture group, the picture include at least two answer choices with It answers for user;
Examination result is carried out after user answers and shows that next picture continues to answer for user;
Achievement is submitted after all pictures of the electric power scene picture group are all answered.
Preferably, the Training Methodology further includes:
After all pictures of the electric power scene picture group are all answered, other electric power scene picture groups are provided It is selected for user.
Preferably, the Training Methodology further includes:
There is provided after all pictures of the electric power scene picture group are all answered includes submitting achievement and inspection The option of answer.
Preferably, the Training Methodology further includes:
When answering correct, correct prompt is shown;Or
When answer mistake when, show miscue.
Preferably, described " providing multiple electric power scene picture groups " includes:
The multiple electric power scene picture group is provided according to from simple to complicated sequence.
Preferably, prespecified answer is prescribed a time limit, when more than the answer prescribe a time limit answer not yet, then judge answer fail.
Preferably, whether it is more than predetermined value according to the achievement, it is determined whether award.
Preferably, the achievement of the achievement and other users is subjected to ranking, determines whether to award according to ranking.
The present invention also provides a kind of user terminal, including memory and processor, the memory is calculated for storing Machine program, the processor runs the computer program so that the user terminal executes the electric field simulation training Method.
The present invention also provides a kind of computer storage media, the computer that is stored with used in the user terminal Program.
A kind of electric field simulation training method provided by the invention, the Training Methodology include:Multiple electric power scenes are provided Picture group;One picture is provided from an electric power scene picture group, the picture include at least two answer choices with It answers for user;Examination result is carried out after user answers and shows that next picture continues to answer for user;In the electric power All pictures of scene picture group submit achievement after all being answered.The Training Methodology of the present invention, provides multiple at least two The electric power scene picture of a answer choice, the employee giveed training may determine that the region for having hidden danger, defect or failure in picture And selection is clicked, to improve the efficiency of the judgement training for the hidden danger of electric power facility, defect and the surface phenomenon of mal-function, and drop The cost of low training.
To enable the above objects, features and advantages of the present invention to be clearer and more comprehensible, preferred embodiment cited below particularly, and coordinate Appended attached drawing, is described in detail below.
Description of the drawings
In order to illustrate the technical solution of the embodiments of the present invention more clearly, below will be to needed in the embodiment attached Figure is briefly described, it should be understood that the following drawings illustrates only certain embodiments of the present invention, therefore is not construed as pair The restriction of the scope of the invention.
Fig. 1 is a kind of structure diagram of user terminal provided by the invention;
Fig. 2 is a kind of flow chart for electric field simulation training method that the embodiment of the present invention 1 provides;
Fig. 3 is a kind of flow chart for electric field simulation training method that the embodiment of the present invention 2 provides;
Fig. 4 is a kind of flow chart for electric field simulation training method that the embodiment of the present invention 3 provides.
Specific implementation mode
Below in conjunction with attached drawing in the embodiment of the present invention, technical solution in the embodiment of the present invention carries out clear, complete Ground describes, it is clear that described embodiments are only a part of the embodiments of the present invention, instead of all the embodiments.Usually exist The component of the embodiment of the present invention described and illustrated in attached drawing can be arranged and be designed with a variety of different configurations herein.Cause This, the detailed description of the embodiment of the present invention to providing in the accompanying drawings is not intended to limit claimed invention below Range, but it is merely representative of the selected embodiment of the present invention.Based on the embodiment of the present invention, those skilled in the art are not doing The every other embodiment obtained under the premise of going out creative work, shall fall within the protection scope of the present invention.
Following each embodiments can be applied in user terminal as shown in Figure 1, and Fig. 1 shows the structure of the user terminal Block diagram, the user terminal 100 include:Radio frequency (Radio Frequency, RF) circuit 110, memory 120, input unit 130, Display unit 140, sensor 150, voicefrequency circuit 160, Wireless Fidelity (wireless fidelity, WiFi) module 170, place Manage the components such as device 180 and power supply 190.Input unit 130 may include touch panel and other input equipments, display unit 140 may include display panel 140.It will be understood by those skilled in the art that 100 structure of user terminal shown in Fig. 1 is not The restriction to user terminal is constituted, may include either combining certain components or difference than illustrating more or fewer components Component arrangement.
Embodiment 1
Fig. 2 is a kind of flow chart for electric field simulation training method that the embodiment of the present invention 1 provides, and this method includes such as Lower step:
Step S21:Multiple electric power scene picture groups are provided.
In the embodiment of the present invention, the electric power facility for having hidden danger, defect and trouble location is shown in electric power scene picture, this A little electric power scene pictures are all the photo site of electric power facility, such as can be the tour personnels of power grid, are found in tour Failure or there are the electric power facility of hidden danger carry out shooting record.
Wherein it is possible to provide multiple electric power scene picture groups according to from simple to complicated sequence.Simple electric power scene Picture group refers to the picture of some electric power facilities simple in structure, and the hidden danger of the electric power facility, defect and failure compare Few, usually only one or two, the judgement of the presentation of the hidden danger of these pictures, defect and failure is easier, and is relatively suitble to just connect Touch the employee of training.On the contrary, the presentation of the hidden danger of complicated electric power scene picture group, defect and failure judges just relatively to be stranded Difficulty is some pictures with labyrinth electric power facility, and its existing hidden danger, defect and failure ratio are more.It is this to follow The progressive electric power scene picture acquisition modes of sequence are conducive to the efficiency that employee improves study, deepen the various of various electric power facilities The memory of the presentation of hidden danger, defect and failure, avoids employee from being weary of too early in training.
Step S22:A picture is provided from an electric power scene picture group, which includes at least two answer choices So that user answers.
Above-mentioned answer choice, hidden danger, defect and the fault zone of electric power facility, trained member mainly in electric power scene picture Work carries out the judgment training of the hidden danger, defect and the surface phenomenon of mal-function of electric power facility by the electric power scene picture.Wherein, an electricity It at least can be there are one hidden danger, defect and failure in the electric power scene picture of power facility so that the electric power scene picture is at least Two or more answer choices.
In the embodiment of the present invention, the region of hidden danger, defect and failure can be marked off in electric power scene picture, to answer Case option area.Wherein it is possible to carry out the division in answer choice region in electric power scene picture using algorithm, for example, can be with Plane coordinate system is generated on electric power scene picture by algorithm, is fastened in the plane coordinates according to hidden danger, defect and failure Point divides a panel region, which is then the correct option option area in electric power scene picture, and remaining area is then answered for mistake Case option area.The hidden danger, defect and failure coordinate points of electric power facility can use picture recognition in above-mentioned electric power scene picture Method obtain, for example, image recognition can be carried out to the electric power scene picture of power transmission line column, identify power transmission line column Upper wirerope it is stranded, and generate plane coordinates.
Step S23:Examination result is carried out after user answers and shows that next picture continues to answer for user.
In the embodiment of the present invention, electric power facility at least one hidden danger, defect on electric power scene picture and failure, training Employee needs to identify these hidden danger, defect and failure, and corresponding region is answered on picture.For example, electric power scene picture On electric power facility there are three hidden danger regions, training employee can correspondingly select corresponding region on picture to click, Examination result is carried out after the completion of clicking and obtains next electric power scene picture.Meanwhile the achievement after answering can be by trained The user terminal that employee uses counts, and the user terminal giveed training using the above method can be the meters such as computer or mobile phone Machine equipment is calculated, is not limited here.
Step S24:Achievement is submitted after all pictures of electric power scene picture group are all answered.
In the embodiment of the present invention, each training of employee under training needs the picture number judged can be fixed, i.e., and one Group electric power scene picture, for example, training needs to judge the hidden danger, defect of electric power facility and fault zone in 10 pictures every time. The picture number of the electric power scene picture group can also be deepened according to the degree of training and be changed, such as centainly skilled is arrived in training Degree, can increase picture number in electric power scene picture group.When obtaining the picture in last electric power scene picture group, by Instruction employee, which answers to the picture, to be finished, then training finishes, and user terminal stops obtaining electric power scene picture.
When above-mentioned stopping obtains electric power scene picture group, user terminal can count all correct and wrong letters answered Breath, and the statistical information is sent to Training Server.The statistical information is sent in Training Server, server can basis The statistical information generates the achievement of this time training, and stores.The Training Server can also to the achievement of several employee under trainings into Row management, and ranking list and other services are generated, it does not limit here.
In the embodiment of the present invention, which can be real using games in training process Now, for example, carrying out power specialty knowledge discrimination using using mobile phone trivial games form, judge that there are circuit hidden danger, defect and events The equipment and attachment of barrier, including conducting wire are set with ground wire, insulator, gold utensil, shaft tower, basis, lightning protection facility and earthing or grounding means, protection It applies, channel and environment etc..In games, every group of picture is equivalent to the different outpost of the tax office of complexity, and every group of outpost of the tax office is because of degree Difference provides the electric power scene picture group of one or more correct option option, and the employee for participating in training may determine that in picture There is the region of hidden danger, defect and failure and click selection, realizes lookup training and the training to transmission line of electricity hidden danger, defect and failure Instruction.To promote the tour technical ability of employee and create atmosphere of working hard to employee, the cost of training is greatly reduced.
Embodiment 2
Fig. 3 is a kind of flow chart for electric field simulation training method that the embodiment of the present invention 2 provides, and this method includes such as Lower step:
Step S31:Multiple electric power scene picture groups are provided.
This step is identical as above-mentioned steps S21, and details are not described herein.
Step S32:A picture is provided from an electric power scene picture group, which includes at least two answer choices So that user answers.
This step is identical as above-mentioned steps S22, and details are not described herein.
Step S33:Examination result is carried out after user answers and shows that next picture continues to answer for user.
This step is identical as above-mentioned steps S23, and details are not described herein.
Step S34:Achievement is submitted after all pictures of electric power scene picture group are all answered.
This step is identical as above-mentioned steps S24, and details are not described herein.
Step S35:After all pictures of electric power scene picture group are all answered, other electric power scene graph are provided Piece group is selected for user.
In the embodiment of the present invention, after answering to current power scene picture group, employee under training is also an option that it His electric power scene picture group gives training.Wherein, the difficulty of each electric power scene picture group is inconsistent, and employee under training can be with It selects as desired.
Wherein, when answering correct, correct prompt is shown.When employee under training selects at least two answer of electric power scene picture Item is when answering, and the user terminal correctness that can answer to this judges.Wherein, the electricity can have been prestored in user terminal Field of force scape picture is correctly answered information, and when employee under training clicks the answer choice region on picture, user terminal can obtain a little The information of answering for hitting region then can determine whether this is answered correct finally by the comparison of two information of answering.The above process can Realized in a manner of using algorithm or software, for example, algorithm can be utilized to obtain the coordinate in region of answering, using the coordinate with Pre-stored correct coordinates carry out algorithm comparison.
Carried out in employee under training picture each answer choice region answer before, can also show to answer on the subscriber terminal and carry Show, to prompt employee under training to need the selection for carrying out how many a answer choice regions that can just obtain next pictures, which can To be text prompt.
When answering for employee under training is correct, correct prompt can be shown in the user terminal.This is correctly prompted, such as Correct mark can be shown in correct option option area, such as beaten hook mark, can also be shown correct prompt text.Use shifting The employee under training of dynamic user terminal, such as the employee that is giveed training using mobile phone, answer correctly can also using mobile phone vibration come Prompt, can also export prompt tone.Certainly, when answering mistake, miscue can also be shown.The miscue can also be Error identification, the prompt text of display, the vibration of mobile subscriber terminal and prompt tone on picture.
Embodiment 3
Fig. 4 is a kind of flow chart for electric field simulation training method that the embodiment of the present invention 3 provides, and this method includes such as Lower step:
Step S41:Multiple electric power scene picture groups are provided.
This step is identical as above-mentioned steps S21, and details are not described herein.
Step S42:A picture is provided from an electric power scene picture group, which includes at least two answer choices So that user answers.
This step is identical as above-mentioned steps S22, and details are not described herein.
Step S43:Examination result is carried out after user answers and shows that next picture continues to answer for user.
This step is identical as above-mentioned steps S23, and details are not described herein.
Step S44:Achievement is submitted after all pictures of electric power scene picture group are all answered.
This step is identical as above-mentioned steps S24, and details are not described herein.
Step S45:After all pictures of electric power scene picture group are all answered provide include submit achievement with Check the option of answer.
In the embodiment of the present invention, after answering to current power scene picture group, employee under training can select will be at Achievement is submitted in Training Server and is stored, which can be managed the achievement of several employee under trainings, and Generate ranking list.Employee under training can also check the correct option option of each picture, correct the mistake of oneself in time.
Wherein it is possible to prespecified answer is prescribed a time limit, prescribes a time limit answer not yet when more than the answer, then judge that answer fails.This Can be that every electric power scene picture sets a Reaction time, employee under training must be in the Reaction time in inventive embodiments The interior judgement for completing the presentation to the hidden danger, defect and failure of electric power facility in picture, and complete to answer.The mistake that the time judges Journey is realized by algorithm or application program, for example, the Reaction time of the electric power scene picture is prestored in the user terminal, when When obtaining the electric power scene picture, then start timing using algorithm, and judges whether answer duration is more than preset answer Time.Prespecified answer field of electric force can also be completely organized, it is specified that must be answered in the time in limited time in every group of electric power scene picture Scape picture.
Wherein, countdown can also be provided in the user terminal and show Reaction time, to prompt employee under training's field of electric force The Reaction time of scape picture.When employee under training is more than the preset time not complete to answer, then judge that answer fails, and can Display reminding, this unsuccessfully prompts be that text prompt is shown in the user terminal, if employee under training passes through mobile subscriber's end It holds to give training, such as using mobile phone training, this unsuccessfully prompts the vibration that can also be mobile phone.
In the embodiment of the present invention, after answering to current power scene picture group, can whether be more than on merit Predetermined value, it is determined whether award, and by the achievement of achievement and other users carry out ranking, according to ranking determine whether to Give reward.The predetermined value can be stored in advance in the user terminal of employee under training, can be therewith when answering and finishing and achieve the result Carry out algorithm comparison.Marks sequencing can be generated algorithmically by by the Training Server profit of management performance, can in the Training Server To be stored with the achievement that each employee under training trains every time.
In addition, the present invention also provides a kind of user terminal, the user terminal may include smart phone, tablet computer, Vehicle-mounted computer, intelligent wearable device etc..The user terminal includes memory and processor, and memory can be used for storing computer journey Sequence, processor by running the computer program, thereby using family terminal execute above-mentioned electric field simulation training method or The function of modules in the above-mentioned electric field analog training device of person.
Memory may include storing program area and storage data field, wherein storing program area can storage program area, at least Application program (such as sound-playing function, image player function etc.) needed for one function etc.;Storage data field can store root Created data (such as audio data, phone directory etc.) etc. are used according to user terminal.In addition, memory may include high speed Random access memory, can also include nonvolatile memory, a for example, at least disk memory, flush memory device or Other volatile solid-state parts.
The present embodiment additionally provides a kind of computer storage media, for storing the computer used in above-mentioned user terminal Program.
In several embodiments provided herein, it should be understood that disclosed device and method can also pass through Other modes are realized.The apparatus embodiments described above are merely exemplary, for example, the flow chart in attached drawing and structure Figure show the device of multiple embodiments according to the present invention, method and computer program product system frame in the cards Structure, function and operation.In this regard, each box in flowchart or block diagram can represent a module, section or code A part, the part of the module, section or code includes one or more for implementing the specified logical function Executable instruction.It should also be noted that in the realization method as replacement, the function of being marked in box can also be to be different from The sequence marked in attached drawing occurs.For example, two continuous boxes can essentially be basically executed in parallel, they are sometimes It can execute in the opposite order, this is depended on the functions involved.It is also noted that in structure chart and/or flow chart The combination of each box and the box in structure chart and/or flow chart can use the special of function or action as defined in executing Hardware based system realize, or can realize using a combination of dedicated hardware and computer instructions.
In addition, each function module or unit in each embodiment of the present invention can integrate and to form an independence Part, can also be modules individualism, can also two or more modules be integrated to form an independent part.
It, can be with if the function is realized and when sold or used as an independent product in the form of software function module It is stored in a computer read/write memory medium.Based on this understanding, technical scheme of the present invention is substantially in other words The part of the part that contributes to existing technology or the technical solution can be expressed in the form of software products, the meter Calculation machine software product is stored in a storage medium, including some instructions are used so that a computer equipment (can be intelligence Can mobile phone, personal computer, server or network equipment etc.) execute each embodiment the method for the present invention whole or Part steps.And storage medium above-mentioned includes:USB flash disk, mobile hard disk, read-only memory (ROM, Read-Only Memory), Random access memory (RAM, Random Access Memory), magnetic disc or CD etc. are various can to store program code Medium.
The above description is merely a specific embodiment, but scope of protection of the present invention is not limited thereto, any Those familiar with the art in the technical scope disclosed by the present invention, can easily think of the change or the replacement, and should all contain Lid is within protection scope of the present invention.Therefore, the protection scope of the present invention shall be subject to the protection scope of the claims.

Claims (10)

1. a kind of electric field simulation training method, which is characterized in that including:
Multiple electric power scene picture groups are provided;
One picture is provided from an electric power scene picture group, the picture include at least two answer choices for It answers at family;
Examination result is carried out after user answers and shows that next picture continues to answer for user;
Achievement is submitted after all pictures of the electric power scene picture group are all answered.
2. Training Methodology according to claim 1, which is characterized in that further include:
After all pictures of the electric power scene picture group are all answered, provide other electric power scene picture groups for Family selects.
3. Training Methodology according to claim 1, which is characterized in that further include:
There is provided after all pictures of the electric power scene picture group are all answered includes submitting achievement and inspection answer Option.
4. Training Methodology according to claim 1, which is characterized in that further include:
When answering correct, correct prompt is shown;Or
When answer mistake when, show miscue.
5. Training Methodology according to claim 1, which is characterized in that described " providing multiple electric power scene picture groups " wraps It includes:
The multiple electric power scene picture group is provided according to from simple to complicated sequence.
6. Training Methodology according to claim 1, it is characterised in that:
Prespecified answer is prescribed a time limit, when more than the answer prescribe a time limit answer not yet, then judge answer fail.
7. Training Methodology according to claim 1, it is characterised in that:
Whether it is more than predetermined value according to the achievement, it is determined whether award.
8. Training Methodology according to claim 1, it is characterised in that:
The achievement of the achievement and other users is subjected to ranking, determines whether to award according to ranking.
9. a kind of user terminal, which is characterized in that including memory and processor, the memory is for storing computer journey Sequence, the processor runs the computer program so that the user terminal is executed according to any one of claim 1 to 8 institute The Training Methodology stated.
10. a kind of computer storage media, which is characterized in that it is stored with used in the user terminal described in claim 9 Computer program.
CN201810432354.1A 2018-05-08 2018-05-08 Electric field simulation training method, user terminal and computer storage media Pending CN108648544A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810432354.1A CN108648544A (en) 2018-05-08 2018-05-08 Electric field simulation training method, user terminal and computer storage media

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810432354.1A CN108648544A (en) 2018-05-08 2018-05-08 Electric field simulation training method, user terminal and computer storage media

Publications (1)

Publication Number Publication Date
CN108648544A true CN108648544A (en) 2018-10-12

Family

ID=63749516

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810432354.1A Pending CN108648544A (en) 2018-05-08 2018-05-08 Electric field simulation training method, user terminal and computer storage media

Country Status (1)

Country Link
CN (1) CN108648544A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112365763A (en) * 2020-11-18 2021-02-12 国网智能科技股份有限公司 Unmanned aerial vehicle inspection training method and system for power equipment

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102063811A (en) * 2011-01-07 2011-05-18 广东电网公司电力科学研究院 Multimedia training examining system of digitalized transformer substation
CN104318483A (en) * 2014-09-22 2015-01-28 国家电网公司 Virtual electric power urgent repair plan training system
CN104916180A (en) * 2015-06-03 2015-09-16 武汉市腾亚科技有限公司 Terminal device and method for simulation welding and thermal cutter operation performance test
CN105741634A (en) * 2014-12-09 2016-07-06 国家电网公司 Microcomputer protection secondary press plate and abnormity simulation system for intelligent substation

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102063811A (en) * 2011-01-07 2011-05-18 广东电网公司电力科学研究院 Multimedia training examining system of digitalized transformer substation
CN104318483A (en) * 2014-09-22 2015-01-28 国家电网公司 Virtual electric power urgent repair plan training system
CN105741634A (en) * 2014-12-09 2016-07-06 国家电网公司 Microcomputer protection secondary press plate and abnormity simulation system for intelligent substation
CN104916180A (en) * 2015-06-03 2015-09-16 武汉市腾亚科技有限公司 Terminal device and method for simulation welding and thermal cutter operation performance test

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112365763A (en) * 2020-11-18 2021-02-12 国网智能科技股份有限公司 Unmanned aerial vehicle inspection training method and system for power equipment

Similar Documents

Publication Publication Date Title
US10152897B2 (en) Systems and methods for computerized interactive skill training
US20140220535A1 (en) Methods, systems, and computer readable media for tagging atomic learning units of instructional content with standards and levels of rigor and for using the tagged atomic learning units for dynamically generating a curriculum for individualized academic instruction
CN108664649B (en) Knowledge content pushing method and device and pushing server
CN105679122A (en) Multifunctional college English teaching management system
US20150317757A1 (en) Methods and systems for representing usage of an electronic learning system
US9792826B2 (en) Group formation and notification in an on-line course system
CN110833693B (en) Game running method and device, storage medium and electronic device
CN109389492A (en) Method, system, equipment and the storage medium of probability of cheating are calculated based on micro- expression
CN110619772A (en) Data processing method, device, equipment and medium
CN107358554B (en) Multidimensional learning ability improving system and method
CN112507679A (en) Method and device for automatically generating curriculum schedule, electronic equipment and storage medium
CN108648544A (en) Electric field simulation training method, user terminal and computer storage media
US20140272906A1 (en) Mastery-based online learning system
CN109672694A (en) A kind of method, apparatus and associated component of information collection
CN113257060A (en) Question answering solving method, device, equipment and storage medium
US20140178848A1 (en) Method and apparatus for administering learning contents
CN111079020A (en) Output method and device and electronic equipment
JP6121433B2 (en) Method and system for determining acceptability by verifying unverified questionnaire items
US20140303760A1 (en) Sport performance development and analytics
KR101245824B1 (en) Method, system and computer-readable recording medium for providing study information
CN112328894A (en) Behavior guiding method and device, computer equipment and storage medium
EP3928844A1 (en) Memory augmentation apparatus, memory augmentation method, and computer-readable recording medium
US20180322796A1 (en) A/b testing for massive open online courses
CN107992956A (en) Reserving method and device after class
US20130203035A1 (en) Learning support system and method

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20181012