CN108648544A - Electric field simulation training method, user terminal and computer storage media - Google Patents
Electric field simulation training method, user terminal and computer storage media Download PDFInfo
- Publication number
- CN108648544A CN108648544A CN201810432354.1A CN201810432354A CN108648544A CN 108648544 A CN108648544 A CN 108648544A CN 201810432354 A CN201810432354 A CN 201810432354A CN 108648544 A CN108648544 A CN 108648544A
- Authority
- CN
- China
- Prior art keywords
- electric power
- training
- answer
- scene picture
- power scene
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- G—PHYSICS
- G09—EDUCATION; CRYPTOGRAPHY; DISPLAY; ADVERTISING; SEALS
- G09B—EDUCATIONAL OR DEMONSTRATION APPLIANCES; APPLIANCES FOR TEACHING, OR COMMUNICATING WITH, THE BLIND, DEAF OR MUTE; MODELS; PLANETARIA; GLOBES; MAPS; DIAGRAMS
- G09B7/00—Electrically-operated teaching apparatus or devices working with questions and answers
- G09B7/02—Electrically-operated teaching apparatus or devices working with questions and answers of the type wherein the student is expected to construct an answer to the question which is presented or wherein the machine gives an answer to the question presented by a student
Landscapes
- Engineering & Computer Science (AREA)
- Theoretical Computer Science (AREA)
- Business, Economics & Management (AREA)
- Physics & Mathematics (AREA)
- Educational Administration (AREA)
- Educational Technology (AREA)
- General Physics & Mathematics (AREA)
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
Abstract
A kind of electric field simulation training method of present invention offer, user terminal and computer storage media, the electric field simulation training method include:Multiple electric power scene picture groups are provided;A picture is provided from an electric power scene picture group, the picture includes at least two answer choices so that user answers;Examination result is carried out after user answers and shows that next picture continues to answer for user;Achievement is submitted after all pictures of the electric power scene picture group are all answered.The Training Methodology of the present invention, the electric power scene picture of multiple at least two answer choices is provided, the employee giveed training may determine that the region for having hidden danger, defect and failure in picture and click selection, to improve the efficiency of the judgement training for the hidden danger of electric power facility, defect and the surface phenomenon of mal-function, and reduce the cost of training.
Description
Technical field
The present invention relates to power grid training technique fields, in particular to a kind of electric field simulation training method, user
Terminal and computer storage media.
Background technology
With the continuous development of national grid, the power equipment of power grid is more and more, and transmission line of electricity also becomes increasingly complex, and is
Prevention power grid in power generation and power Transmission, various equipment and circuit it is reliable and secure, power grid enterprises are to regular
Allow employee to carry out the tour of various power equipments and transmission line of electricity, investigation have hidden danger, defect and failure power equipment and
Transmission line of electricity.Therefore, the tour ability of power grid enterprises' meeting emphasis training employee, improves employee's onsite lookup hidden danger or failure electric power
The ability of facility.
Existing Training Methodology is more traditional, and the judgement training of hidden danger and the surface phenomenon of mal-function for electric power facility is all
It is carried out by word in on-the-spot guidance, books and picture description.Come using the mode that books word and picture are recorded
The training of hidden danger, defect and breakdown judge power is carried out, it is dull uninteresting, the learning interest of employee can not have really been transferred, has been caused
Employee remembers not deeply after learning, and there may be difference with live electric power facility for books record, make entire result of training pole
Difference.
The mode of on-the-spot guidance must be led new employee to carry out patrolling for electric power facility by the abundant employee of judgement field experience
Depending on and instruct, but electric power facility hidden danger occurs or the probability of failure is relatively low, and is easy to be influenced by weather and environment,
Cause the process of whole scene training can be veryer long, new employee needs just can independently to make an inspection tour by the very long training period
Work, cause the cost of corporate training relatively high.
Generally speaking, the existing judgement training for the hidden danger of electric power facility, defect and the surface phenomenon of mal-function, efficiency ratio
It is relatively low, and training cost is relatively high.
Invention content
In view of the above problems, the present invention provides a kind of electric field simulation training method, user terminal and computers
Storage medium to improve the efficiency of the judgement training for the hidden danger of electric power facility, defect and the surface phenomenon of mal-function, and reduces training
The cost of instruction.
To achieve the goals above, the present invention adopts the following technical scheme that:
A kind of electric field simulation training method, including:
Multiple electric power scene picture groups are provided;
One picture is provided from an electric power scene picture group, the picture include at least two answer choices with
It answers for user;
Examination result is carried out after user answers and shows that next picture continues to answer for user;
Achievement is submitted after all pictures of the electric power scene picture group are all answered.
Preferably, the Training Methodology further includes:
After all pictures of the electric power scene picture group are all answered, other electric power scene picture groups are provided
It is selected for user.
Preferably, the Training Methodology further includes:
There is provided after all pictures of the electric power scene picture group are all answered includes submitting achievement and inspection
The option of answer.
Preferably, the Training Methodology further includes:
When answering correct, correct prompt is shown;Or
When answer mistake when, show miscue.
Preferably, described " providing multiple electric power scene picture groups " includes:
The multiple electric power scene picture group is provided according to from simple to complicated sequence.
Preferably, prespecified answer is prescribed a time limit, when more than the answer prescribe a time limit answer not yet, then judge answer fail.
Preferably, whether it is more than predetermined value according to the achievement, it is determined whether award.
Preferably, the achievement of the achievement and other users is subjected to ranking, determines whether to award according to ranking.
The present invention also provides a kind of user terminal, including memory and processor, the memory is calculated for storing
Machine program, the processor runs the computer program so that the user terminal executes the electric field simulation training
Method.
The present invention also provides a kind of computer storage media, the computer that is stored with used in the user terminal
Program.
A kind of electric field simulation training method provided by the invention, the Training Methodology include:Multiple electric power scenes are provided
Picture group;One picture is provided from an electric power scene picture group, the picture include at least two answer choices with
It answers for user;Examination result is carried out after user answers and shows that next picture continues to answer for user;In the electric power
All pictures of scene picture group submit achievement after all being answered.The Training Methodology of the present invention, provides multiple at least two
The electric power scene picture of a answer choice, the employee giveed training may determine that the region for having hidden danger, defect or failure in picture
And selection is clicked, to improve the efficiency of the judgement training for the hidden danger of electric power facility, defect and the surface phenomenon of mal-function, and drop
The cost of low training.
To enable the above objects, features and advantages of the present invention to be clearer and more comprehensible, preferred embodiment cited below particularly, and coordinate
Appended attached drawing, is described in detail below.
Description of the drawings
In order to illustrate the technical solution of the embodiments of the present invention more clearly, below will be to needed in the embodiment attached
Figure is briefly described, it should be understood that the following drawings illustrates only certain embodiments of the present invention, therefore is not construed as pair
The restriction of the scope of the invention.
Fig. 1 is a kind of structure diagram of user terminal provided by the invention;
Fig. 2 is a kind of flow chart for electric field simulation training method that the embodiment of the present invention 1 provides;
Fig. 3 is a kind of flow chart for electric field simulation training method that the embodiment of the present invention 2 provides;
Fig. 4 is a kind of flow chart for electric field simulation training method that the embodiment of the present invention 3 provides.
Specific implementation mode
Below in conjunction with attached drawing in the embodiment of the present invention, technical solution in the embodiment of the present invention carries out clear, complete
Ground describes, it is clear that described embodiments are only a part of the embodiments of the present invention, instead of all the embodiments.Usually exist
The component of the embodiment of the present invention described and illustrated in attached drawing can be arranged and be designed with a variety of different configurations herein.Cause
This, the detailed description of the embodiment of the present invention to providing in the accompanying drawings is not intended to limit claimed invention below
Range, but it is merely representative of the selected embodiment of the present invention.Based on the embodiment of the present invention, those skilled in the art are not doing
The every other embodiment obtained under the premise of going out creative work, shall fall within the protection scope of the present invention.
Following each embodiments can be applied in user terminal as shown in Figure 1, and Fig. 1 shows the structure of the user terminal
Block diagram, the user terminal 100 include:Radio frequency (Radio Frequency, RF) circuit 110, memory 120, input unit 130,
Display unit 140, sensor 150, voicefrequency circuit 160, Wireless Fidelity (wireless fidelity, WiFi) module 170, place
Manage the components such as device 180 and power supply 190.Input unit 130 may include touch panel and other input equipments, display unit
140 may include display panel 140.It will be understood by those skilled in the art that 100 structure of user terminal shown in Fig. 1 is not
The restriction to user terminal is constituted, may include either combining certain components or difference than illustrating more or fewer components
Component arrangement.
Embodiment 1
Fig. 2 is a kind of flow chart for electric field simulation training method that the embodiment of the present invention 1 provides, and this method includes such as
Lower step:
Step S21:Multiple electric power scene picture groups are provided.
In the embodiment of the present invention, the electric power facility for having hidden danger, defect and trouble location is shown in electric power scene picture, this
A little electric power scene pictures are all the photo site of electric power facility, such as can be the tour personnels of power grid, are found in tour
Failure or there are the electric power facility of hidden danger carry out shooting record.
Wherein it is possible to provide multiple electric power scene picture groups according to from simple to complicated sequence.Simple electric power scene
Picture group refers to the picture of some electric power facilities simple in structure, and the hidden danger of the electric power facility, defect and failure compare
Few, usually only one or two, the judgement of the presentation of the hidden danger of these pictures, defect and failure is easier, and is relatively suitble to just connect
Touch the employee of training.On the contrary, the presentation of the hidden danger of complicated electric power scene picture group, defect and failure judges just relatively to be stranded
Difficulty is some pictures with labyrinth electric power facility, and its existing hidden danger, defect and failure ratio are more.It is this to follow
The progressive electric power scene picture acquisition modes of sequence are conducive to the efficiency that employee improves study, deepen the various of various electric power facilities
The memory of the presentation of hidden danger, defect and failure, avoids employee from being weary of too early in training.
Step S22:A picture is provided from an electric power scene picture group, which includes at least two answer choices
So that user answers.
Above-mentioned answer choice, hidden danger, defect and the fault zone of electric power facility, trained member mainly in electric power scene picture
Work carries out the judgment training of the hidden danger, defect and the surface phenomenon of mal-function of electric power facility by the electric power scene picture.Wherein, an electricity
It at least can be there are one hidden danger, defect and failure in the electric power scene picture of power facility so that the electric power scene picture is at least
Two or more answer choices.
In the embodiment of the present invention, the region of hidden danger, defect and failure can be marked off in electric power scene picture, to answer
Case option area.Wherein it is possible to carry out the division in answer choice region in electric power scene picture using algorithm, for example, can be with
Plane coordinate system is generated on electric power scene picture by algorithm, is fastened in the plane coordinates according to hidden danger, defect and failure
Point divides a panel region, which is then the correct option option area in electric power scene picture, and remaining area is then answered for mistake
Case option area.The hidden danger, defect and failure coordinate points of electric power facility can use picture recognition in above-mentioned electric power scene picture
Method obtain, for example, image recognition can be carried out to the electric power scene picture of power transmission line column, identify power transmission line column
Upper wirerope it is stranded, and generate plane coordinates.
Step S23:Examination result is carried out after user answers and shows that next picture continues to answer for user.
In the embodiment of the present invention, electric power facility at least one hidden danger, defect on electric power scene picture and failure, training
Employee needs to identify these hidden danger, defect and failure, and corresponding region is answered on picture.For example, electric power scene picture
On electric power facility there are three hidden danger regions, training employee can correspondingly select corresponding region on picture to click,
Examination result is carried out after the completion of clicking and obtains next electric power scene picture.Meanwhile the achievement after answering can be by trained
The user terminal that employee uses counts, and the user terminal giveed training using the above method can be the meters such as computer or mobile phone
Machine equipment is calculated, is not limited here.
Step S24:Achievement is submitted after all pictures of electric power scene picture group are all answered.
In the embodiment of the present invention, each training of employee under training needs the picture number judged can be fixed, i.e., and one
Group electric power scene picture, for example, training needs to judge the hidden danger, defect of electric power facility and fault zone in 10 pictures every time.
The picture number of the electric power scene picture group can also be deepened according to the degree of training and be changed, such as centainly skilled is arrived in training
Degree, can increase picture number in electric power scene picture group.When obtaining the picture in last electric power scene picture group, by
Instruction employee, which answers to the picture, to be finished, then training finishes, and user terminal stops obtaining electric power scene picture.
When above-mentioned stopping obtains electric power scene picture group, user terminal can count all correct and wrong letters answered
Breath, and the statistical information is sent to Training Server.The statistical information is sent in Training Server, server can basis
The statistical information generates the achievement of this time training, and stores.The Training Server can also to the achievement of several employee under trainings into
Row management, and ranking list and other services are generated, it does not limit here.
In the embodiment of the present invention, which can be real using games in training process
Now, for example, carrying out power specialty knowledge discrimination using using mobile phone trivial games form, judge that there are circuit hidden danger, defect and events
The equipment and attachment of barrier, including conducting wire are set with ground wire, insulator, gold utensil, shaft tower, basis, lightning protection facility and earthing or grounding means, protection
It applies, channel and environment etc..In games, every group of picture is equivalent to the different outpost of the tax office of complexity, and every group of outpost of the tax office is because of degree
Difference provides the electric power scene picture group of one or more correct option option, and the employee for participating in training may determine that in picture
There is the region of hidden danger, defect and failure and click selection, realizes lookup training and the training to transmission line of electricity hidden danger, defect and failure
Instruction.To promote the tour technical ability of employee and create atmosphere of working hard to employee, the cost of training is greatly reduced.
Embodiment 2
Fig. 3 is a kind of flow chart for electric field simulation training method that the embodiment of the present invention 2 provides, and this method includes such as
Lower step:
Step S31:Multiple electric power scene picture groups are provided.
This step is identical as above-mentioned steps S21, and details are not described herein.
Step S32:A picture is provided from an electric power scene picture group, which includes at least two answer choices
So that user answers.
This step is identical as above-mentioned steps S22, and details are not described herein.
Step S33:Examination result is carried out after user answers and shows that next picture continues to answer for user.
This step is identical as above-mentioned steps S23, and details are not described herein.
Step S34:Achievement is submitted after all pictures of electric power scene picture group are all answered.
This step is identical as above-mentioned steps S24, and details are not described herein.
Step S35:After all pictures of electric power scene picture group are all answered, other electric power scene graph are provided
Piece group is selected for user.
In the embodiment of the present invention, after answering to current power scene picture group, employee under training is also an option that it
His electric power scene picture group gives training.Wherein, the difficulty of each electric power scene picture group is inconsistent, and employee under training can be with
It selects as desired.
Wherein, when answering correct, correct prompt is shown.When employee under training selects at least two answer of electric power scene picture
Item is when answering, and the user terminal correctness that can answer to this judges.Wherein, the electricity can have been prestored in user terminal
Field of force scape picture is correctly answered information, and when employee under training clicks the answer choice region on picture, user terminal can obtain a little
The information of answering for hitting region then can determine whether this is answered correct finally by the comparison of two information of answering.The above process can
Realized in a manner of using algorithm or software, for example, algorithm can be utilized to obtain the coordinate in region of answering, using the coordinate with
Pre-stored correct coordinates carry out algorithm comparison.
Carried out in employee under training picture each answer choice region answer before, can also show to answer on the subscriber terminal and carry
Show, to prompt employee under training to need the selection for carrying out how many a answer choice regions that can just obtain next pictures, which can
To be text prompt.
When answering for employee under training is correct, correct prompt can be shown in the user terminal.This is correctly prompted, such as
Correct mark can be shown in correct option option area, such as beaten hook mark, can also be shown correct prompt text.Use shifting
The employee under training of dynamic user terminal, such as the employee that is giveed training using mobile phone, answer correctly can also using mobile phone vibration come
Prompt, can also export prompt tone.Certainly, when answering mistake, miscue can also be shown.The miscue can also be
Error identification, the prompt text of display, the vibration of mobile subscriber terminal and prompt tone on picture.
Embodiment 3
Fig. 4 is a kind of flow chart for electric field simulation training method that the embodiment of the present invention 3 provides, and this method includes such as
Lower step:
Step S41:Multiple electric power scene picture groups are provided.
This step is identical as above-mentioned steps S21, and details are not described herein.
Step S42:A picture is provided from an electric power scene picture group, which includes at least two answer choices
So that user answers.
This step is identical as above-mentioned steps S22, and details are not described herein.
Step S43:Examination result is carried out after user answers and shows that next picture continues to answer for user.
This step is identical as above-mentioned steps S23, and details are not described herein.
Step S44:Achievement is submitted after all pictures of electric power scene picture group are all answered.
This step is identical as above-mentioned steps S24, and details are not described herein.
Step S45:After all pictures of electric power scene picture group are all answered provide include submit achievement with
Check the option of answer.
In the embodiment of the present invention, after answering to current power scene picture group, employee under training can select will be at
Achievement is submitted in Training Server and is stored, which can be managed the achievement of several employee under trainings, and
Generate ranking list.Employee under training can also check the correct option option of each picture, correct the mistake of oneself in time.
Wherein it is possible to prespecified answer is prescribed a time limit, prescribes a time limit answer not yet when more than the answer, then judge that answer fails.This
Can be that every electric power scene picture sets a Reaction time, employee under training must be in the Reaction time in inventive embodiments
The interior judgement for completing the presentation to the hidden danger, defect and failure of electric power facility in picture, and complete to answer.The mistake that the time judges
Journey is realized by algorithm or application program, for example, the Reaction time of the electric power scene picture is prestored in the user terminal, when
When obtaining the electric power scene picture, then start timing using algorithm, and judges whether answer duration is more than preset answer
Time.Prespecified answer field of electric force can also be completely organized, it is specified that must be answered in the time in limited time in every group of electric power scene picture
Scape picture.
Wherein, countdown can also be provided in the user terminal and show Reaction time, to prompt employee under training's field of electric force
The Reaction time of scape picture.When employee under training is more than the preset time not complete to answer, then judge that answer fails, and can
Display reminding, this unsuccessfully prompts be that text prompt is shown in the user terminal, if employee under training passes through mobile subscriber's end
It holds to give training, such as using mobile phone training, this unsuccessfully prompts the vibration that can also be mobile phone.
In the embodiment of the present invention, after answering to current power scene picture group, can whether be more than on merit
Predetermined value, it is determined whether award, and by the achievement of achievement and other users carry out ranking, according to ranking determine whether to
Give reward.The predetermined value can be stored in advance in the user terminal of employee under training, can be therewith when answering and finishing and achieve the result
Carry out algorithm comparison.Marks sequencing can be generated algorithmically by by the Training Server profit of management performance, can in the Training Server
To be stored with the achievement that each employee under training trains every time.
In addition, the present invention also provides a kind of user terminal, the user terminal may include smart phone, tablet computer,
Vehicle-mounted computer, intelligent wearable device etc..The user terminal includes memory and processor, and memory can be used for storing computer journey
Sequence, processor by running the computer program, thereby using family terminal execute above-mentioned electric field simulation training method or
The function of modules in the above-mentioned electric field analog training device of person.
Memory may include storing program area and storage data field, wherein storing program area can storage program area, at least
Application program (such as sound-playing function, image player function etc.) needed for one function etc.;Storage data field can store root
Created data (such as audio data, phone directory etc.) etc. are used according to user terminal.In addition, memory may include high speed
Random access memory, can also include nonvolatile memory, a for example, at least disk memory, flush memory device or
Other volatile solid-state parts.
The present embodiment additionally provides a kind of computer storage media, for storing the computer used in above-mentioned user terminal
Program.
In several embodiments provided herein, it should be understood that disclosed device and method can also pass through
Other modes are realized.The apparatus embodiments described above are merely exemplary, for example, the flow chart in attached drawing and structure
Figure show the device of multiple embodiments according to the present invention, method and computer program product system frame in the cards
Structure, function and operation.In this regard, each box in flowchart or block diagram can represent a module, section or code
A part, the part of the module, section or code includes one or more for implementing the specified logical function
Executable instruction.It should also be noted that in the realization method as replacement, the function of being marked in box can also be to be different from
The sequence marked in attached drawing occurs.For example, two continuous boxes can essentially be basically executed in parallel, they are sometimes
It can execute in the opposite order, this is depended on the functions involved.It is also noted that in structure chart and/or flow chart
The combination of each box and the box in structure chart and/or flow chart can use the special of function or action as defined in executing
Hardware based system realize, or can realize using a combination of dedicated hardware and computer instructions.
In addition, each function module or unit in each embodiment of the present invention can integrate and to form an independence
Part, can also be modules individualism, can also two or more modules be integrated to form an independent part.
It, can be with if the function is realized and when sold or used as an independent product in the form of software function module
It is stored in a computer read/write memory medium.Based on this understanding, technical scheme of the present invention is substantially in other words
The part of the part that contributes to existing technology or the technical solution can be expressed in the form of software products, the meter
Calculation machine software product is stored in a storage medium, including some instructions are used so that a computer equipment (can be intelligence
Can mobile phone, personal computer, server or network equipment etc.) execute each embodiment the method for the present invention whole or
Part steps.And storage medium above-mentioned includes:USB flash disk, mobile hard disk, read-only memory (ROM, Read-Only Memory),
Random access memory (RAM, Random Access Memory), magnetic disc or CD etc. are various can to store program code
Medium.
The above description is merely a specific embodiment, but scope of protection of the present invention is not limited thereto, any
Those familiar with the art in the technical scope disclosed by the present invention, can easily think of the change or the replacement, and should all contain
Lid is within protection scope of the present invention.Therefore, the protection scope of the present invention shall be subject to the protection scope of the claims.
Claims (10)
1. a kind of electric field simulation training method, which is characterized in that including:
Multiple electric power scene picture groups are provided;
One picture is provided from an electric power scene picture group, the picture include at least two answer choices for
It answers at family;
Examination result is carried out after user answers and shows that next picture continues to answer for user;
Achievement is submitted after all pictures of the electric power scene picture group are all answered.
2. Training Methodology according to claim 1, which is characterized in that further include:
After all pictures of the electric power scene picture group are all answered, provide other electric power scene picture groups for
Family selects.
3. Training Methodology according to claim 1, which is characterized in that further include:
There is provided after all pictures of the electric power scene picture group are all answered includes submitting achievement and inspection answer
Option.
4. Training Methodology according to claim 1, which is characterized in that further include:
When answering correct, correct prompt is shown;Or
When answer mistake when, show miscue.
5. Training Methodology according to claim 1, which is characterized in that described " providing multiple electric power scene picture groups " wraps
It includes:
The multiple electric power scene picture group is provided according to from simple to complicated sequence.
6. Training Methodology according to claim 1, it is characterised in that:
Prespecified answer is prescribed a time limit, when more than the answer prescribe a time limit answer not yet, then judge answer fail.
7. Training Methodology according to claim 1, it is characterised in that:
Whether it is more than predetermined value according to the achievement, it is determined whether award.
8. Training Methodology according to claim 1, it is characterised in that:
The achievement of the achievement and other users is subjected to ranking, determines whether to award according to ranking.
9. a kind of user terminal, which is characterized in that including memory and processor, the memory is for storing computer journey
Sequence, the processor runs the computer program so that the user terminal is executed according to any one of claim 1 to 8 institute
The Training Methodology stated.
10. a kind of computer storage media, which is characterized in that it is stored with used in the user terminal described in claim 9
Computer program.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810432354.1A CN108648544A (en) | 2018-05-08 | 2018-05-08 | Electric field simulation training method, user terminal and computer storage media |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810432354.1A CN108648544A (en) | 2018-05-08 | 2018-05-08 | Electric field simulation training method, user terminal and computer storage media |
Publications (1)
Publication Number | Publication Date |
---|---|
CN108648544A true CN108648544A (en) | 2018-10-12 |
Family
ID=63749516
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201810432354.1A Pending CN108648544A (en) | 2018-05-08 | 2018-05-08 | Electric field simulation training method, user terminal and computer storage media |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN108648544A (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112365763A (en) * | 2020-11-18 | 2021-02-12 | 国网智能科技股份有限公司 | Unmanned aerial vehicle inspection training method and system for power equipment |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102063811A (en) * | 2011-01-07 | 2011-05-18 | 广东电网公司电力科学研究院 | Multimedia training examining system of digitalized transformer substation |
CN104318483A (en) * | 2014-09-22 | 2015-01-28 | 国家电网公司 | Virtual electric power urgent repair plan training system |
CN104916180A (en) * | 2015-06-03 | 2015-09-16 | 武汉市腾亚科技有限公司 | Terminal device and method for simulation welding and thermal cutter operation performance test |
CN105741634A (en) * | 2014-12-09 | 2016-07-06 | 国家电网公司 | Microcomputer protection secondary press plate and abnormity simulation system for intelligent substation |
-
2018
- 2018-05-08 CN CN201810432354.1A patent/CN108648544A/en active Pending
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102063811A (en) * | 2011-01-07 | 2011-05-18 | 广东电网公司电力科学研究院 | Multimedia training examining system of digitalized transformer substation |
CN104318483A (en) * | 2014-09-22 | 2015-01-28 | 国家电网公司 | Virtual electric power urgent repair plan training system |
CN105741634A (en) * | 2014-12-09 | 2016-07-06 | 国家电网公司 | Microcomputer protection secondary press plate and abnormity simulation system for intelligent substation |
CN104916180A (en) * | 2015-06-03 | 2015-09-16 | 武汉市腾亚科技有限公司 | Terminal device and method for simulation welding and thermal cutter operation performance test |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112365763A (en) * | 2020-11-18 | 2021-02-12 | 国网智能科技股份有限公司 | Unmanned aerial vehicle inspection training method and system for power equipment |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US10152897B2 (en) | Systems and methods for computerized interactive skill training | |
US20140220535A1 (en) | Methods, systems, and computer readable media for tagging atomic learning units of instructional content with standards and levels of rigor and for using the tagged atomic learning units for dynamically generating a curriculum for individualized academic instruction | |
CN108664649B (en) | Knowledge content pushing method and device and pushing server | |
CN105679122A (en) | Multifunctional college English teaching management system | |
US20150317757A1 (en) | Methods and systems for representing usage of an electronic learning system | |
US9792826B2 (en) | Group formation and notification in an on-line course system | |
CN110833693B (en) | Game running method and device, storage medium and electronic device | |
CN109389492A (en) | Method, system, equipment and the storage medium of probability of cheating are calculated based on micro- expression | |
CN110619772A (en) | Data processing method, device, equipment and medium | |
CN107358554B (en) | Multidimensional learning ability improving system and method | |
CN112507679A (en) | Method and device for automatically generating curriculum schedule, electronic equipment and storage medium | |
CN108648544A (en) | Electric field simulation training method, user terminal and computer storage media | |
US20140272906A1 (en) | Mastery-based online learning system | |
CN109672694A (en) | A kind of method, apparatus and associated component of information collection | |
CN113257060A (en) | Question answering solving method, device, equipment and storage medium | |
US20140178848A1 (en) | Method and apparatus for administering learning contents | |
CN111079020A (en) | Output method and device and electronic equipment | |
JP6121433B2 (en) | Method and system for determining acceptability by verifying unverified questionnaire items | |
US20140303760A1 (en) | Sport performance development and analytics | |
KR101245824B1 (en) | Method, system and computer-readable recording medium for providing study information | |
CN112328894A (en) | Behavior guiding method and device, computer equipment and storage medium | |
EP3928844A1 (en) | Memory augmentation apparatus, memory augmentation method, and computer-readable recording medium | |
US20180322796A1 (en) | A/b testing for massive open online courses | |
CN107992956A (en) | Reserving method and device after class | |
US20130203035A1 (en) | Learning support system and method |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20181012 |