CN108647913A - A kind of data analysis deep foundation pit construction error method - Google Patents

A kind of data analysis deep foundation pit construction error method Download PDF

Info

Publication number
CN108647913A
CN108647913A CN201810712733.6A CN201810712733A CN108647913A CN 108647913 A CN108647913 A CN 108647913A CN 201810712733 A CN201810712733 A CN 201810712733A CN 108647913 A CN108647913 A CN 108647913A
Authority
CN
China
Prior art keywords
data
construction
feedback
foundation pit
collecting
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201810712733.6A
Other languages
Chinese (zh)
Inventor
陈春杰
徐换平
李红洁
仇保华
王占东
马心悦
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Beijing Mining Bureau Integrated Geological Engineering Co
Original Assignee
Beijing Mining Bureau Integrated Geological Engineering Co
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Beijing Mining Bureau Integrated Geological Engineering Co filed Critical Beijing Mining Bureau Integrated Geological Engineering Co
Priority to CN201810712733.6A priority Critical patent/CN108647913A/en
Publication of CN108647913A publication Critical patent/CN108647913A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0639Performance analysis of employees; Performance analysis of enterprise or organisation operations
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
    • G06Q50/08Construction

Landscapes

  • Business, Economics & Management (AREA)
  • Human Resources & Organizations (AREA)
  • Engineering & Computer Science (AREA)
  • Economics (AREA)
  • Strategic Management (AREA)
  • General Physics & Mathematics (AREA)
  • Tourism & Hospitality (AREA)
  • Theoretical Computer Science (AREA)
  • Educational Administration (AREA)
  • Marketing (AREA)
  • Development Economics (AREA)
  • General Business, Economics & Management (AREA)
  • Entrepreneurship & Innovation (AREA)
  • Physics & Mathematics (AREA)
  • Quality & Reliability (AREA)
  • Operations Research (AREA)
  • Game Theory and Decision Science (AREA)
  • Health & Medical Sciences (AREA)
  • General Health & Medical Sciences (AREA)
  • Primary Health Care (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The invention discloses a kind of data analysis deep foundation pit construction error methods, its key points of the technical solution are that:Include the following steps:S1:Collect data:The data for collecting measuring instrument measurement, the data for collecting designing unit's feedback, the data for collecting construction unit's feedback, the data of collection mechanism for monitoring feedback, the data for collecting safety supervision mechanism feedback, the data for collecting data and supervisor's feedback that unit in charge of construction feeds back.S2:Store data:The output collected in step S1 is stored into central server;S3:Analyze data:The data stored in central server are analyzed, multigroup construction data is compared, finding out construction error data has the data of bigger difference with normal data of constructing, and avoids the problem in work progress, ensures the Stability and veracity of construction.

Description

A kind of data analysis deep foundation pit construction error method
Technical field
The present invention relates to deep foundation pit construction field, more particularly to a kind of data analysis deep foundation pit construction error method.
Background technology
Authorization Notice No. is that the Chinese patent of CN103061322A discloses a kind of deep basal pit stability remote intelligent monitoring And 3-dimensional digital comprehensive pre-warning method, include the following steps:(1)Select a deep basal pit as studied object;Investigate the depth Foundation pit regional stratum hydrogeological engineering geological conditions obtains the deep basal pit region Rock And Soil physical and mechanical parameter;(2)Long-range prison It surveys and data processing host is based on deep basal pit regional stratum hydrogeological engineering geological conditions, the deep basal pit region Rock And Soil physics Mechanics parameter and continuous media fast Lagrangian analysis program FLAC3D establish deep pit digging stability three-dimensional comprehensive number It is worth model;Deep basal pit three-dimensional visualization safe early warning is established based on VTK (Visualization Toolkit) business software system Platform;(3)While going along with sb. to guard him pile driving construction:To the several surveys of setting synchronous with the comparable position of Guan Liang depth below deep basal pit top of the slope Oblique instrument and several interstitial hydraulic pressure meters;Multiple inclinometers, bottom are set with stake axis parallel synchronous along fender post surface or fender post The inclinometer in portion gos deep into pile top hereinafter, the inclinometer at top is concordant with Guan Liang top;Multiple pressure cells are installed along fender post surface And multiple pore pressure gauges;Several hydrostatic levels are installed in deep basal pit top of the slope upper surface, are installed in Guan Liang upper surface more A hydrostatic level;Each I-shaped bracing members both ends are installed by axle power meter;The synchronous installation audible-visual annunciator in scene;Acquire deep basal pit slope Sedimentation, horizontal displacement, fender post week lateral earth pressure, I-steel axial force of the supports, foundation pit top of the slope and the fender post on top and fender post All soil pore water pressure force datas, and it is transferred to long-range monitoring and data processing host, database file is generated, deep pit digging is steady These data of qualitative three-dimensional comprehensive numerical model real-time calling;(4)Deep pit digging stability three-dimensional comprehensive numerical model utilizes Obtained initial array data completes self parameters revision and provides each parameter model threshold value, the follow-up reality that model will obtain later It surveys series data and carries out comprehensive stress, deformation analysis, and be compared with model parameter threshold value, pass through deep basal pit three-dimensional visualization Safe early warning platform is showed and carries out classification safety early warning to super Vigilance parameter;Warning information is by connecting with computer SMS module is sent to the mobile phone of site operation and floor control related personnel with mobile phone short messages, realizes that deep basal pit is stablized Property distant early warning;Meanwhile warning information also passes back to installation work surface at the construction field (site) by visualizing safe early warning platform Audible-visual annunciator carry out sound, light alarm, realize live early warning.Above-mentioned this deep basal pit method for early warning realizes and can connect in real time Sedimentation, the horizontal displacement of continuous monitoring deep basal pit top of the slope and fender post, and real-time continuous monitoring fender post week lateral earth pressure, I-steel Axial force of the supports, while the situation of change of continuous detection foundation pit top of the slope and fender post week soil pore water pressure power etc., and by measured data It is real-time continuous to be transferred to long-range monitoring and data processing host, according to Real-time Monitoring Data, complete to deep basal pit Stability Classification Early warning.However in actual work progress, deep basal pit is even constructed because the uncertainty of data can frequently result in construction error The thing of reconstruction occurs.
Invention content
The object of the present invention is to provide a kind of data analysis deep foundation pit construction error methods, its advantage is that number can be collected According to by data progress case study, help construction personnel evades falling these problems.
The present invention above-mentioned technical purpose technical scheme is that:A kind of data analysis deep basal pit is applied Work error method, it is characterized in that:Include the following steps:
S1:Collect data:The data for collecting measuring instrument measurement, the data for collecting designing unit's feedback, collection construction unit are anti- The data of feedback, the data for collecting safety supervision mechanism feedback, collect unit in charge of construction's feedback at the data for collecting mechanism for monitoring feedback The data of data and supervisor's feedback;
S2:Store data:The output collected in step S1 is stored into central server;
S3:Analyze data:The data stored in central server are analyzed, multigroup construction data is compared, construction is found out and loses Accidentally data have the data of bigger difference with normal data of constructing.
Through the above technical solutions, the larger data of data differences are found by above-mentioned method, it can be largely Analyze leads to construction accident and the construction error problem in Deep foundation Pit excavation, to reduce the mistake constructed again Construction accident occurs caused by error in journey before, by collecting data, the collection designing unit that measuring instrument measures The data of feedback, the data for collecting mechanism for monitoring feedback, collect safety supervision mechanism feedback at the data for collecting construction unit's feedback Data, collect unit in charge of construction feedback data and supervisor feedback data, can realize that various aspects are collected number According to, and in central server complete paired data analysis, while data are stored, before being extracted at any time in order to construction personnel Construction data is analyzed, and is largely reduced deep foundation pit construction error in this way, is prevented from constructing and bringing huge again Loss, reduce unnecessary loss, while construction data is grasped at any time convenient for construction personnel, ensure the accuracy of construction and steady It is qualitative.
The present invention is further arranged to:The S3 further includes the general value found out by multi-group data, and the general value is used Staff compares as with reference to data in work progress.
Through the above technical solutions, each item data of the setting of general value for staff and construction compares, protect The accuracy of card control construction data, reduces the error of construction.
The present invention is further arranged to:The algorithm of the general value is
Numerical value maximum 20 percent and numerical value are minimum in data 20 percent is removed, being averaged for remaining numerical value is found out Value.
Through the above technical solutions, removal maximum 20 percent and numerical value it is minimum 20 percent can ensure number According to Stability and veracity, prevent the inaccuracy because of data from leading to the error of integral construction, ensure that the stability of construction.
The present invention is further arranged to:Several storage elements, each storage element are provided in the central server For storing the same class data in multi-group data.
Through the above technical solutions, several storage elements are arranged in central server in order to arrive purpose data classifying Together, it is convenient for staff's transferring and analyzing to data first, secondly collecting and arranging convenient for data.
The present invention is further arranged to:Further include S4:The data constructed every time later are stored in corresponding in central server Storage element in.
Through the above technical solutions, setting can ensure the continuous supplementary data of database in central server in this way, And then general value is caused increasingly to level off to a stationary value, while can be diversified in data, it makes more accurate True judgement, and then a greater degree of safety and stability that ensure that construction.
The present invention is further arranged to:It calculates all construction errors and differs more data, by these construction error differences More data are compared with general value, take the numerical value with general value difference minimum, and the numerical value is set as construction error value.
Through the above technical solutions, the setting of construction error value plays the role of warning construction personnel, the i.e. data aobvious Show to be to be the case of construction failure under construction error value, and then ensure that the personnel such as construction or design is supervised to avoid applying The case where work fails occurs.
In conclusion the invention has the advantages that:The larger data of data differences are found by above-mentioned method, Can largely analyze leads to construction accident and the construction error problem in Deep foundation Pit excavation, to subtract Construction accident occurs caused by error during few construction again before, passes through and collects the number that measuring instrument measures According to, collect designing unit feedback data, collect construction unit feedback data, collect mechanism for monitoring feedback data, collect The data of the data of safety supervision mechanism feedback, the data for collecting unit in charge of construction's feedback and supervisor's feedback, can realize Various aspects are collected data, and in central server complete paired data analysis, while data are stored, in order to constructor Construction data before member extracts at any time is analyzed, and is largely reduced deep foundation pit construction error in this way, is prevented again The huge loss constructed and brought reduces unnecessary loss, while grasping construction data at any time convenient for construction personnel, ensures The Stability and veracity of construction, the continuous data that increase ensure that the data of construction are more and more accurate, further increase construction Stability and veracity.
Specific implementation mode
Embodiment:A kind of data analysis deep foundation pit construction error method, including collect data, statistical data and analysis data Process, the methods of above-mentioned collection data includes the collection of measuring instrument data, the collection of designing unit's feedback information, it is single to build The position collection of feedback information, the collection of mechanism for monitoring feedback information, the collection of safety supervision mechanism feedback information, unit in charge of construction are anti- The collection of feedforward information and the collection of supervisor's feedback information, above-mentioned measuring instrument include inclinometer, total powerstation, level The measuring apparatus such as instrument, slope instrument, frequency recorder, limnimeter and micrometer, and above equipment is respectively connected with central server, in this hair In bright, the data that these measuring apparatus are measured are wirelessly transmitted to central server.
Designing unit provides actual design data towards central server in the design process, such as size, ratio and calculating Formula etc.;Construction unit constantly provides the construction data of work progress towards central server in the construction process,;Testing agency It is constantly provided in work progress towards central server and detects the data obtained, specific to all detection datas in each stage; Release mechanism constantly provides the data of safety towards central server, specific to safety index;The continuous direction of unit in charge of construction Central server provides construction data, such as materials, construction problem, construction effect;Supervisor is responsible for continuous towards center Server provides the problem of having in work progress.
Several storage elements are preset in central server, each storage element corresponds to a kind of data, for storing Such data is individually stored per class data, convenient for reading and analyzing data.
The process of statistical data includes uniformly being summarized to multi-group data caused by multigroup deep foundation pit construction, i.e., will The data of multigroup deep foundation pit construction are distributed unitedly in different storage elements.
The process of analysis data analyzes the multipacket message stored in central server, is set in central server It sets there are one analytic unit, analytic unit compares the project data that construction is made a fault with normal project data, and The data for differing more are taken out after comparison, this data is particularly likely that the reason of causing engineering to be slipped up, then by artificially dividing The reason of analysis construction error.
The analytic unit extracts the data that measuring instrument detects, and calculates data in wherein each storage element General value, the algorithm of general value are that remove data in 20 percent and each storage element minimum in every group of data highest 20 percent, then calculate the average value of intermediate 60 percent data, as usual numerical value, when detection data is more and more When, this is often referred to level off to stable value, and analytic unit calculates the domain of walker in data, the calculating of domain of walker simultaneously Method is the data with 20 highest percent after removing minimum 20 percent, and after removing data, is taken therein Maximum value and minimum value difference divided by general value, then two percentages obtained at this time are then the domain of walker that data allow.With The more and more of data, general value is just increasingly stablized, and the data obtained are also just more accurate, and more fitting is practical.
It calculates multiple construction errors and differs more data, these data are compared with general value, take and general value The numerical value of difference minimum, and by the numerical value propose for construct error value, i.e., every time construction there is not allowed that less than or equal to construction lose Accidentally the case where value, occurs.
Therefore later construction can be analyzed according to general value, and corresponding in domain of walker, Neng Goushi Now when the following construction, above-mentioned general value can be applied to as a standard value in work progress.Above-mentioned construction error The minimum of data, can prevent operating personnel because being less than the numerical value on a certain item data when value can reflect construction error And construction is caused to be slipped up.And then general value and construction error value can reduce the generation for error of constructing when construction.
This specific embodiment is only explanation of the invention, is not limitation of the present invention, people in the art Member can as needed make the present embodiment the modification of not creative contribution after reading this specification, but as long as at this It is all protected by Patent Law in the right of invention.

Claims (6)

  1. A kind of method 1. data analysis deep foundation pit construction is slipped up, it is characterized in that:Include the following steps:
    S1:Collect data:The data for collecting measuring instrument measurement, the data for collecting designing unit's feedback, collection construction unit are anti- The data of feedback, the data for collecting safety supervision mechanism feedback, collect unit in charge of construction's feedback at the data for collecting mechanism for monitoring feedback The data of data and supervisor's feedback;
    S2:Store data:The output collected in step S1 is stored into central server;
    S3:Analyze data:The data stored in central server are analyzed, multigroup construction data is compared, construction is found out and loses Accidentally data have the data of bigger difference with normal data of constructing.
  2. The method 2. a kind of data analysis deep foundation pit construction according to claim 1 is slipped up, it is characterized in that:The S3 further includes The general value found out by multi-group data, the general value are used for staff in work progress and are carried out pair as with reference to data Than.
  3. The method 3. a kind of data analysis deep foundation pit construction according to claim 2 is slipped up, it is characterized in that:The general value Algorithm is
    Numerical value maximum 20 percent and numerical value are minimum in data 20 percent is removed, being averaged for remaining numerical value is found out Value.
  4. The method 4. a kind of data analysis deep foundation pit construction according to claim 3 is slipped up, it is characterized in that:The central service Several storage elements are provided in device, each storage element is used to store the same class data in multi-group data.
  5. The method 5. a kind of data analysis deep foundation pit construction according to claim 4 is slipped up, it is characterized in that:Further include S4:It will In the data deposit central server constructed every time later in corresponding storage element.
  6. The method 6. a kind of data analysis deep foundation pit construction according to claim 5 is slipped up, it is characterized in that:Calculate all constructions Error differs more data, these construction errors are differed more data to be compared with general value, is taken and usual value difference It is worth minimum numerical value, and the numerical value is set as construction error value.
CN201810712733.6A 2018-06-29 2018-06-29 A kind of data analysis deep foundation pit construction error method Pending CN108647913A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810712733.6A CN108647913A (en) 2018-06-29 2018-06-29 A kind of data analysis deep foundation pit construction error method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810712733.6A CN108647913A (en) 2018-06-29 2018-06-29 A kind of data analysis deep foundation pit construction error method

Publications (1)

Publication Number Publication Date
CN108647913A true CN108647913A (en) 2018-10-12

Family

ID=63750834

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810712733.6A Pending CN108647913A (en) 2018-06-29 2018-06-29 A kind of data analysis deep foundation pit construction error method

Country Status (1)

Country Link
CN (1) CN108647913A (en)

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN202694126U (en) * 2012-07-25 2013-01-23 南京工业大学 Foundation pit engineering safety construction informationized monitoring system
CN104088306A (en) * 2014-07-04 2014-10-08 苏州科技学院 Wireless monitoring and early warning system for deep foundation pit comprehensive parameters
WO2016180127A1 (en) * 2015-09-16 2016-11-17 中兴通讯股份有限公司 Network performance evaluation method and system
CN107450426A (en) * 2017-08-01 2017-12-08 中国建筑第八工程局有限公司 Foundation pit construction deformable statistical analysis method and system

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN202694126U (en) * 2012-07-25 2013-01-23 南京工业大学 Foundation pit engineering safety construction informationized monitoring system
CN104088306A (en) * 2014-07-04 2014-10-08 苏州科技学院 Wireless monitoring and early warning system for deep foundation pit comprehensive parameters
WO2016180127A1 (en) * 2015-09-16 2016-11-17 中兴通讯股份有限公司 Network performance evaluation method and system
CN107450426A (en) * 2017-08-01 2017-12-08 中国建筑第八工程局有限公司 Foundation pit construction deformable statistical analysis method and system

Similar Documents

Publication Publication Date Title
CN111042143B (en) Foundation pit engineering early warning method and system based on analysis of large amount of monitoring data
CN113611085B (en) Monitoring and early warning method and system for geological disasters in geotechnical engineering
CN110264672A (en) A kind of early warning system of geological disaster
CN114021487B (en) Early warning method, device and equipment for landslide collapse and readable storage medium
CN107829452A (en) It is a kind of to merge multisensor and ground SAR deep foundation pit construction monitoring and warning technology
CN108180885B (en) Automatic monitoring system and method for tunnel deformation
CN105091951A (en) Deformation monitoring and state early-warning method for hydraulic structure of sluice station
CN109931109A (en) A kind of constructing tunnel dynamic landslide safety comprehensive method for early warning based on multivariate data
CN110517453A (en) A kind of geological disaster website and managing and control system based on big-dipper satellite high precision monitor
CN108280969A (en) A kind of high slope surface deformation monitoring and warning system and its method for early warning
CN110310021A (en) A kind of space enrironment for pit retaining monitoring early warning and monitoring point matching systems
CN110336983A (en) A kind of Excavation Monitoring system based on virtual reality technology
CN109405880A (en) A kind of superficial part goaf earth's surface combines monitoring and pre-warning system and method with underground
CN108205874A (en) Geo-hazard early-warning method based on multi-parameter linkage, live master station and system
CN103852025A (en) Method for monitoring vertical deformation in rail way underlying substratum by applying 3D laser scanning technology
CN108680808A (en) Fault diagnosis method and device
CN206959776U (en) High-rise building safe monitoring system based on big-dipper satellite
CN114297756A (en) BIM (building information modeling) scene construction method for security risk of earthquake occurring in extremely rare water conservancy project reservoir area
CN114937133A (en) Point cloud data-based visual monitoring method and system for embankment
CN117150632B (en) Airport runway health situation sensing system and method based on digital twin technology
CN108647913A (en) A kind of data analysis deep foundation pit construction error method
CN113591347A (en) Dynamic monitoring method and early warning system in high slope construction process
CN115775092B (en) Construction process safety risk management and control system based on digital twin technology
CN114493295B (en) Method for determining tunnel monitoring project under salt rock geology and monitoring system
CN110309490A (en) A kind of experience curve fitting system for pit retaining monitoring early warning

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20181012