CN108643123A - Double collapsible three plugs triangular pyramid cage body components of frame - Google Patents

Double collapsible three plugs triangular pyramid cage body components of frame Download PDF

Info

Publication number
CN108643123A
CN108643123A CN201810464509.XA CN201810464509A CN108643123A CN 108643123 A CN108643123 A CN 108643123A CN 201810464509 A CN201810464509 A CN 201810464509A CN 108643123 A CN108643123 A CN 108643123A
Authority
CN
China
Prior art keywords
moulding
triangular pyramid
cage body
points
plug
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201810464509.XA
Other languages
Chinese (zh)
Inventor
李志英
彭文华
李志平
石永军
李志春
张光力
张小桥
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Chongqing Wangate Flood Control Equipment Co Ltd
Original Assignee
Chongqing Wangate Flood Control Equipment Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Chongqing Wangate Flood Control Equipment Co Ltd filed Critical Chongqing Wangate Flood Control Equipment Co Ltd
Priority to CN201810464509.XA priority Critical patent/CN108643123A/en
Publication of CN108643123A publication Critical patent/CN108643123A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02BHYDRAULIC ENGINEERING
    • E02B3/00Engineering works in connection with control or use of streams, rivers, coasts, or other marine sites; Sealings or joints for engineering works in general
    • E02B3/04Structures or apparatus for, or methods of, protecting banks, coasts, or harbours
    • E02B3/10Dams; Dykes; Sluice ways or other structures for dykes, dams, or the like
    • E02B3/106Temporary dykes
    • E02B3/108Temporary dykes with a filling, e.g. filled by water or sand

Landscapes

  • Engineering & Computer Science (AREA)
  • General Engineering & Computer Science (AREA)
  • Environmental & Geological Engineering (AREA)
  • Ocean & Marine Engineering (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Revetment (AREA)

Abstract

Double collapsible three plugs triangular pyramid cage body components of frame, belong to flood-fighting equipment technical field, the three plugs triangular pyramid cage body is made of six roots of sensation moulding and four Zhang San's hexagonal lattices;It is respectively provided with two crosspoints on every moulding, and the first moulding, the second moulding, third moulding and first Zhang San's hexagonal lattice are constituted into the first Atria plug rack;First moulding, the 4th moulding, the 5th moulding and second Zhang San's hexagonal lattice are constituted into the second Atria plug rack;Then attaching third is thrown the net lattice on the second moulding, on the 5th moulding attaching the 4th throw the net lattice, the movable intersection of the 6th moulding is finally installed in D interface points, makees the collapsible three plugs triangular pyramid cage body component of frame in pairs;Advantage is can to close up into triangle projective planum structure, saves occupied space;Also three plug triangular pyramid cage bodies fast can be assembled at flood fighting scene, filled up after sandstone when being thrown into torrent, realization Cut-off and sealing water;Three plugs carry out lift to move but also as handle.

Description

Double collapsible three plugs triangular pyramid cage body components of frame
Technical field
It is especially a kind of for building dykes and dams or shutting off the present invention relates to dykes and dams or flood-fighting equipment technical field is built The collapsible three plugs triangular pyramid cage body component of double frames blocked up.
Background technology
In build dykes and dams, flood-fighting, river closure or dykes and dams block up work, need to clog sandstone, soil or other Weight.Currently, generally directly being crammed using stone, when stone is inadequate, sandstone or soil is fitted into insert in water in sand pocket and blocked up Plug.But since flood is larger, The turbulent river crashes its way through, stone or sandbag will soon be washed away by flood, because dykes and dams are inherently in danger Dangerous state, it is also difficult to a large amount of stones or weight be transported by vehicle or crane, it is difficult to implement effectively to block to notch.
For this purpose, patent No. 201610656081X disclose it is a kind of for building dykes and dams or the double jaw rack blocked up that shuts off, Its content is that several frames join two-by-two becomes frame, and the side end of every two adjacent bezels extends outward at interface point For cross one another double jaw;Attaching twine becomes double jaw rack in frame;The frame of several double jaw racks is two-by-two Connected with each other to become cage body, cage body vertex becomes trident crown point, and cage body becomes three plug cage bodies;The patent is by double jaw net Frame makes semifinished part, in the quick assembling three plug steel reinforcement cage of positive tetrahedron in flood-fighting scene, assembling in steel reinforcement cage It is put into stone, soil or sandbag, becomes effective flood-fighting goods and materials;There are three forks in each direction of three plug steel reinforcement cages Head, it is easy to be inserted under the bottom or in dykes and dams, then other plugs can hook other steel reinforcement cage again or water blockoff shuts off weight, carry Height is speedily carried out rescue work effect;There is plug at each interface point of rack, handle can be used as, it is easy to carry;Simultaneously in transport and storage Not wasting space.
The patented product has good practicability, and easy to operate, the effect of flood-fighting is also fine.But its technique On be to make double jaw frame or double jaw rack first, then double jaw frame or double jaw rack are assembled into three plug frameworks Or three plug cage bodies, although being convenient for stacking to save transport and memory space in this way, there are three defects, 1. in contrast its It stacks inconvenient with assemble method, also more easily stacks and assemble method;2. frame bar has repetition after it is assembled, make trident Head becomes thick, and will increase the resistance being inserted into water-bed mud, or reduce and catch in three plug frameworks being preceding thrown into or three plugs The chance of cage body;3. its frame bar repeats after assembled, more wasteful material.
Number of patent application 2016106560862 disclose it is a kind of for building dykes and dams or the single tine head rack blocked up that shuts off, Its place different from double jaw rack be a line frame in every two frames mutually joined side end at interface point to Outer extension becomes single tine head, and attaching twine becomes single tine head rack in frame;Two two-phase of frame of several single tine head racks It mutually and is connected into as cage body, cage body vertex becomes trident crown point;The forked end lever of this three plug does not repeat, but its framework or cage The moulding of body has repetition or more wasteful material;More importantly its assembling mode is as hereinbefore, still inconvenient, nothing Method, which reaches, preferably stacks and struts effect.
Invention content
It is a kind of more convenient for folding harvesting the technical problem to be solved by the present invention is to provide in view of the above technical problems, It is more convenient for quickly assembling, is equally easy to be inserted into water-bed or dykes and dams the flood-fightings with high intensity stability for being not easy to be flushed away Tool.
Another technical problem to be solved by this invention is to provide a kind of frame bar and does not repeat, it is easier to be inserted into it is water-bed or It is easier to catch on the flood-fighting tool that material is saved in the comparison for the three plug frameworks or three plug cage bodies being preceding thrown into.
In order to solve the above technical problems, the technical solution adopted in the present invention is a kind of collapsible three plugs trigone of double frames Cage body component is bored, the three plugs triangular pyramid cage body refers to the hollow form triangular pyramid for only having on moulding and moulding triangular mesh The both ends of cage body, every moulding extend outwardly from the vertex of triangular pyramid cage body so that constitute three outside four vertex of triangular pyramid Plug becomes three plug triangular pyramid cage bodies, sandstone, soil block or sandbag can be contained inside this cage body, is used for Cut-off and sealing water, It is characterized in that the three plugs triangular pyramid cage body is made of six roots of sensation moulding and four Zhang San's hexagonal lattices;Two close end is leaned on every moulding Position on be respectively provided with one for intersecting the crosspoint of attaching, referred to as M points and N points;The N points of wherein the first moulding and the second frame The M points of item intersect attaching in rotary movable formula, become A interface points;The M points of first moulding are in that can revolve with the M points of third moulding It turns a work dynamic formula and intersects attaching, become B interface points;The N points of second moulding are fixedly attached with the N points of third moulding, become C handing-over Point;Such first moulding, the second moulding, third moulding collectively form the first triangle double jaw frame, then in the first triangle First Zhang San's hexagonal lattice of fixed installing, becomes the first Atria plug rack on three plug frame of shape;Then by the 4th frame The N points of item intersect attaching with the N points of the first moulding in rotary movable formula, and A interface points is made to become A trident interface points;By the 5th The N points of moulding intersect attaching with the M points of the first moulding in rotary movable formula, and B interface points is made to become B trident interface points;Again will The M points and the M points of the 5th moulding of 4th moulding are fixedly attached, and become D interface points;Such first moulding, the 4th moulding, the 5th frame Item collectively forms the second triangle double jaw frame, then the second Zhang San angle of fixed installing on the second Atria plug frame Shape grid becomes the second Atria plug rack;Then in rotary moveable formula attaching the on the second moulding or the 4th moulding Three throw the net lattice, throw the net lattice in rotary moveable formula attaching the 4th on third moulding or the 5th moulding, finally by the N points of the 6th moulding Intersect attaching in rotary movable formula with D interface points, D interface points is made to become d-trio interface point;Since this structure is with first Two triangle double jaw racks are constituted centered on moulding, finally can be assembled into grid cage body, therefore this structure are known as double The collapsible three plugs triangular pyramid cage body component of frame.
This collapsible three plugs triangular pyramid cage body component of double frames can be collapsed when usually storing and transporting and is folded into Triangle projective planum structure shape, can save occupied space;It can be rapidly by two triangle double jaws when speedily carrying out rescue work application Rack frame struts, then two movable grids are fixedly attached on moulding, can be assembled into three plug triangular pyramid cage bodies, convenient for containing Then sand loading stone or sandbag put into mighty torrent and carry out Cut-off and sealing water.
When needing the collapsible three plugs triangular pyramid cage body component of double frames carrying out pile storage, or need to transport When, the collapsible three plugs triangular pyramid cage body component of double frames can be closed up, method is closed up in folding is:Due to the second moulding, Three mouldings intersect attaching with the first moulding in rotary movable formula, and the 4th moulding, the 5th moulding are also in rotatable with the first moulding Third lattice of throwing the net can be stacked tiling by movable intersection attaching to the first Atria plug rack first when closing up in this way, 4th lattice of throwing the net are stacked into tiling to the second Atria plug rack, then by the first triangle double jaw rack and the two or three Angular double jaw rack closes up, and finally closes up the 6th moulding to the second triangle double jaw rack, in this way by two triangles Double jaw rack and grid close up into triangle projective planum structure shape, and triangle plane body component is more convenient in one Pile, storage and transport layer by layer, can save occupied space.
When needing the collapsible three plugs triangular pyramid cage body component of double frames being assembled into three plug triangular pyramid cage bodies, assembling It is at the method for cage body:First by two triangle double jaw racks in the collapsible three plugs triangular pyramid cage body component of double frames It separates, the M points of the 6th moulding is then intersected into attaching with C interface points, become C trident interface points, in conjunction with A, B, D tri- above-mentioned Trident interface point, four trident interface points respectively become a vertex, have outwardly directed three plugs on each vertex, i.e., Three plugs;Then third lattice of throwing the net are stretched out, is fixedly attached on the 4th moulding and the 6th moulding, then the 4th lattice of throwing the net are stretched It opens, is fixedly attached on third moulding and the 6th moulding, be thus assembled into three plug triangular pyramid cage bodies;It is very square when assembling Just quick.
At flood-fighting scene, the 4th it can throw the net being fixedly attached and will fill up sandstone or sandbag before lattice in cage body, then by the Four throw the net lattice fixation be encapsulated on third moulding and the 6th moulding, be thus assembled into three plug triangular pyramid solid core cage bodies.
In practical applications, the plug on three plugs on the vertex of three plug triangular pyramid cage bodies can be subtracted as needed It is few, become single tine head or double jaw, the three plugs triangular pyramid cage body becomes single tine head triangular pyramid cage body or double jaw trigone Bore cage body;Or increase the plug on cage body vertex, make four plugs, five plugs or more plug, the three plugs trigone Cone cage body becomes four plug triangular pyramid cage bodies, five plug triangular pyramid cage bodies or more plug triangular pyramid cage body, or mixing plug Triangular pyramid cage body.
Further, the six roots of sensation moulding of three plug triangular pyramid cage bodies can be made equal length, the friendship on every moulding Length of the crunode apart from side end is also equal, can make three plug cage body of positive tetrahedron according to the method described above.
Above-mentioned each moulding cross one another attaching mode it is unlimited, can be bind, snapping, screw hole screw attaching etc..
The moulding is also referred to as skeleton item or main reinforcement, can be made by metal material, can also be by other hard material systems Make, such as steel, alloy copper material, hard alloy, PVC material etc., the larger metal material of most handy density ratio makes.
Double collapsible three plugs triangular pyramid cage body components of frame are built for dykes and dams, river closure, dykes and dams are blocked up, flood fighting is robbed Danger, reclaim land from a lake, base is beaten in the islands Wei Haizao, bridging.
The beneficial effects of the invention are as follows needing to deposit the collapsible three plugs triangular pyramid cage body component progress pile of double frames When storage or transport, two triangle double jaw frames can be closed up into triangle projective planum structure, can significantly save and account for Use space;At the scene of flood-fighting, when needing for flood fighting, two triangle double jaw racks can be separated, then bridge joint the Three throw the net lattice, the 4th throw the net lattice and the 6th moulding, be rapidly assembled into three plug triangular pyramid cage bodies immediately, may be used also in assembling First sandstone or sandbag will be filled up in cage body, make three plug triangular pyramid solid core cage bodies, when being thrown into torrent, can sink to water rapidly Bottom, and three plugs is made to be inserted into water-bed or link on the three plug framework truss that leading input is constituted, realize Cut-off and sealing water;It is this Cage body light and flexible, three plugs carry out lift to move but also as handle, and very convenient in the situation is critical, the moment is manually speedily carried out rescue work.
Description of the drawings
Fig. 1 is the deployed configuration schematic diagram of the collapsible three plugs triangular pyramid cage body component of double frames in the present invention.
Fig. 2 is the structural schematic diagram of central framing strip of the present invention.
Fig. 3 is the structural schematic diagram of intermediate cam shape grid of the present invention.
Fig. 4 is that double collapsible three plugs triangular pyramid cage body components of frame become triangle projective planum body structure after closing up in the present invention The structural schematic diagram of part.
Fig. 5 is when double collapsible three plugs triangular pyramid cage body components of frame of the invention are assembled into three plug triangular pyramid cage bodies Assembling process schematic diagram.
Fig. 6 is after double collapsible three plugs triangular pyramid cage body components of frame of the invention are assembled into three plug triangular pyramid cage bodies Structural schematic diagram.
In figure:1. three plug triangular pyramid cage bodies, 2. mouldings, 3. triangular mesh, 4. 3 plugs, 5. crosspoints, 6.M points, 7.N points, 8. first mouldings, 9. second mouldings, 10.A interface points, that is, A tridents interface point, 11. third mouldings, 12.B interface points, that is, B Trident interface point, 13.C interface points, that is, C tridents interface point, 14. first Atria plug racks, 15. the 4th mouldings, 16. Five mouldings, 17.D interface points, that is, d-trio interface point, 18. second Atria plug racks, 19. the 6th mouldings, 20. triangles Plane body component, 21. thirds throw the net lattice, 22. the 4th throw the net lattice.
Specific implementation mode
With reference to embodiment, the invention will be further described, and following embodiment is intended to illustrate invention rather than to this Further limiting for invention, should not be limited the scope of the invention with this.
Embodiment 1.
As shown in Fig. 1,2,3,6, a kind of double collapsible three plugs triangular pyramid cage body components of frame, three plug three are made Pyramid cage body 1 refers to the hollow form triangular pyramid cage body for only having on moulding 2 and moulding triangular mesh 3, the both ends of every moulding 2 Extend outwardly from the vertex of triangular pyramid cage body so that constitute three plugs 4 outside four vertex of triangular pyramid, become three plug trigones Cage body 1 is bored, sandstone, soil block or sandbag can be contained inside this cage body, is used for Cut-off and sealing water, the present embodiment is by three plug Triangular pyramid cage body 1 is made to be made of six roots of sensation moulding 2 and four Zhang San's hexagonal lattices 3;It is each on the position of two close end on every moulding 2 If there are one the crosspoint 5 for intersecting attaching, referred to as M points 6 and N points 7;The M of the N points and the second moulding 9 of wherein the first moulding 8 Point intersects attaching in rotary movable formula, becomes A interface points 10;The M points of first moulding 8 are in that can revolve with the M points of third moulding 11 It turns a work dynamic formula and intersects attaching, become B interface points 12;The N points of second moulding 9 are fixedly attached with the N points of third moulding 11, become C Interface point 13;Such first moulding 8, the second moulding 9, third moulding 11 collectively form the first triangle double jaw frame, then First Zhang San's hexagonal lattice of fixed installing, becomes the first Atria plug rack 14 on the first Atria plug frame; Then the N points of the 4th moulding 15 and the N points of the first moulding 8 are intersected into attaching in rotary movable formula, A interface points 10 is made to become A Trident interface point 10;The N points of 5th moulding 16 and the M points of the first moulding 8 are intersected into attaching in rotary movable formula, B is made to join Point 12 becomes B tridents interface point 12;The M points of the 4th moulding 15 and the M points of the 5th moulding 16 are fixedly attached again, become D handing-over Point 17;Such first moulding 8, the 4th moulding 15, the 5th moulding 16 collectively form the second triangle double jaw frame, then Second Zhang San's hexagonal lattice of fixed installing, becomes the second Atria plug rack 18 on two Atria plug frames;Then It throws the net lattice 21 in rotary moveable formula attaching third on the second moulding 9(Also it can be mounted on the 4th moulding 15), in third moulding It throws the net lattice 22 in rotary moveable formula attaching the 4th on 11(Also it can be mounted on the 5th moulding 16), finally by the N of the 6th moulding 19 Point intersects attaching with D interface points 17 in rotary movable formula, and D interface points 17 is made to become d-trio interface point 17;Due to this structure Body constitutes two triangle double jaw racks centered on the first moulding 8, last purpose be constitute cage body and foldable, therefore This structure is known as the collapsible three plugs triangular pyramid cage body component of double frames.
This collapsible three plugs triangular pyramid cage body component of double frames can be collapsed when usually storing and transporting and is folded into Triangle projective planum structure shape, can save occupied space;It can be rapidly by two triangle double jaws when speedily carrying out rescue work application Rack frame struts, then two movable grids are fixedly attached on other two mouldings, can be assembled into three plug triangular pyramid cages Then body puts into mighty torrent convenient for containing sandstone or sandbag and carries out Cut-off and sealing water.
Embodiment 2.
On the basis of embodiment 1, moulding 2 is made of the round bar of a diameter of 15mm, the length of every moulding 2 is equal It is 30cm from crosspoint 5 to the distance of moulding side end, with steel wire bind at crosspoint 5 between each moulding 2 for 150cm; Triangular mesh 3 is made of the steel wire of a diameter of 3mm, and is made the equilateral triangle that the length of side is 90cm;In this way by six Root moulding 2 makes equal length, and length of the crosspoint 5 apart from side end on every moulding 2 is also equal;Four Zhang San's hexagonal lattices 3 Also identical, and its length of side with match at a distance from two crosspoints on moulding, thus made three plug triangular pyramid cage bodies Particular configuration, i.e. three plug cage body of positive tetrahedron.
Embodiment 3.
As shown in figure 4, when needing the collapsible three plugs triangular pyramid cage body component of double frames carrying out pile storage, or When needing transport, the collapsible three plugs triangular pyramid cage body component of double frames can be closed up, method is closed up in folding is:Due to second Moulding 9, third moulding 11 intersect attaching, the 4th moulding 15, the 5th moulding 16 and first with the first moulding 8 in rotary movable formula Moulding 8 is also in that rotary movable formula intersects attaching, can third be thrown the net lattice 21 to the first Atria first when closing up in this way Plug rack 14 stacks tiling, the 4th lattice 22 of throwing the net is stacked tiling to the second Atria plug rack 18, then by first Triangle double jaw rack 14 and the second triangle double jaw rack 18 close up, finally that the 6th moulding 19 is double to the second triangle Plug rack 18 closes up, and has thus closed up two triangle double jaw racks and grid at the triangle projective planum structure bodily form Shape, triangle plane body component 20 is more convenient in pile, storage and transport from level to level, can save occupied space.
Embodiment 4.
As shown in Figure 5,6, it needs the collapsible three plugs triangular pyramid cage body component of double frames being assembled into three plug triangular pyramids When cage body, the method for being assembled into cage body is:First by two three in the collapsible three plugs triangular pyramid cage body component of double frames Angular double jaw rack separates, and the M points of the 6th moulding 19 are then intersected attaching with C interface points 13, become C trident interface points 13, in conjunction with tri- trident interface points of A, B, D above-mentioned, four trident interface points respectively become a vertex, on each vertex There are outwardly directed three plugs, i.e. three plugs 4;Then third lattice 21 of throwing the net are stretched out, is fixedly attached in 15 He of the 4th moulding On 6th moulding 19, then the 4th lattice 22 of throwing the net are stretched out, is fixedly attached on third moulding 11 and the 6th moulding 19, thus group Three plug triangular pyramid cage bodies 1 are dressed up;It is very convenient quick when assembling.
Embodiment 5.
At flood-fighting scene, the 4th it can throw the net and will be filled out in cage body before lattice 22 being fixedly attached on the basis of embodiment 4 Sand filling stone or sandbag, then by the 4th throw the net lattice 22 fixation be encapsulated on third moulding 11 and the 6th moulding 19, be thus assembled into Three plug triangular pyramid solid core cage bodies.
In practical applications, the plug on three plugs on the vertex of three plug triangular pyramid cage bodies can be subtracted as needed It is few, become single tine head or double jaw, the three plugs triangular pyramid cage body becomes single tine head triangular pyramid cage body or double jaw trigone Bore cage body;Or increase the plug on cage body vertex, make four plugs, five plugs or more plug, the three plugs trigone Cone cage body becomes four plug triangular pyramid cage bodies, five plug triangular pyramid cage bodies or more plug triangular pyramid cage body, or mixing plug Triangular pyramid cage body.
Above-mentioned each moulding cross one another attaching mode it is unlimited, can be bind, snapping, screw hole screw attaching etc..
The moulding is also referred to as skeleton item or main reinforcement, can be made by metal material, can also be by other hard material systems Make, such as steel, alloy copper material, hard alloy, PVC material etc., the larger metal material of most handy density ratio makes.
Double collapsible three plugs triangular pyramid cage body components of frame are built for dykes and dams, river closure, dykes and dams are blocked up, flood fighting is robbed Danger, reclaim land from a lake, base is beaten in the islands Wei Haizao, bridging.

Claims (9)

1. the collapsible three plugs triangular pyramid cage body component of pair frame, including three plug triangular pyramid cage bodies, it is characterised in that described three Plug triangular pyramid cage body is made of six roots of sensation moulding and four Zhang San's hexagonal lattices;It is respectively provided on the position of two close end on every moulding One crosspoint for intersecting attaching, referred to as M points and N points;The N points of wherein the first moulding are in that can revolve with the M points of the second moulding It turns a work dynamic formula and intersects attaching, become A interface points;The M points of first moulding are in rotary movable formula cross mounting with the M points of third moulding It connects, becomes B interface points;The N points of second moulding are fixedly attached with the N points of third moulding, become C interface points;Such first moulding, Second moulding, third moulding collectively form the first triangle double jaw frame, then solid on the first Atria plug frame Surely first Zhang San's hexagonal lattice is installed, the first Atria plug rack is become;Then by the N points of the 4th moulding and the first moulding N points in rotary movable formula intersect attaching, make A interface points become A trident interface points;By the N points of the 5th moulding and the first frame The M points of item intersect attaching in rotary movable formula, and B interface points is made to become B trident interface points;Again by the M points of the 4th moulding and The M points of five mouldings are fixedly attached, and become D interface points;Such first moulding, the 4th moulding, the 5th moulding collectively form the two or three Angular double jaw frame, then second Zhang San's hexagonal lattice of fixed installing on the second Atria plug frame, becomes second Atria plug rack;Then it throws the net lattice in rotary moveable formula attaching third on the second moulding or the 4th moulding, the 5th It throws the net lattice in rotary moveable formula attaching the 4th on moulding or third moulding, finally by the N points of the 6th moulding and D interface points in can revolve It turns a work dynamic formula and intersects attaching, D interface points is made to become d-trio interface point.
2. the collapsible three plugs triangular pyramid cage body component of double frames according to claim 1, it is characterised in that the cage body Method is closed up in the folding of component:Third lattice of throwing the net are stacked into tiling to the first Atria plug rack first, by the 4th Grid stacks tiling to the second Atria plug rack, then by the first triangle double jaw rack and the double forks of the second triangle Head rack closes up, and finally closes up the 6th moulding to the second triangle double jaw rack, triangle plane body component.
3. the collapsible three plugs triangular pyramid cage body component of double frames according to claim 1, it is characterised in that the component The method for being assembled into cage body is:First by two triangle double jaws in the collapsible three plugs triangular pyramid cage body component of double frames Rack separates, and the M points of the 6th moulding are then intersected attaching with C interface points, become C trident interface points;Then third is thrown the net Lattice are stretched out, and are fixedly attached on the 4th moulding and the 6th moulding;The 4th lattice of throwing the net are stretched out again, be fixedly attached in third moulding and On 6th moulding, three plug triangular pyramid cage bodies are constituted.
4. the collapsible three plugs triangular pyramid cage body component of double frames according to claim 3, it is characterised in that in fixation Attaching the 4th, which is thrown the net, will fill up sandstone or sandbag before lattice in cage body, then the 4th lattice fixation of throwing the net is encapsulated in third moulding and the 6th On moulding, three plug triangular pyramid solid core cage bodies are constituted.
5. the collapsible three plugs triangular pyramid cage body component of double frames according to claim 4, it is characterised in that can basis It needs to reduce the plug on three plugs on the vertex of three plug triangular pyramid cage bodies, becomes single tine head or double jaw, it is described Three plug triangular pyramid cage bodies become single tine head triangular pyramid cage body or double jaw triangular pyramid cage body;Or by the plug on cage body vertex Increase, makes four plugs, five plugs or more plug, the three plugs triangular pyramid cage body becomes four plug triangular pyramid cage bodies, five Plug triangular pyramid cage body or more plug triangular pyramid cage body, or mixing plug triangular pyramid cage body.
6. the collapsible three plugs triangular pyramid cage body component of double frames according to claim 5, it is characterised in that the trident The six roots of sensation moulding equal length of head triangular pyramid cage body, the length of the intersection side end on every moulding is also equal, constitutes just Three plug cage body of tetrahedron.
7. the collapsible three plugs triangular pyramid cage body component of double frames according to claim 6, it is characterised in that the moulding Cross one another attaching mode it is unlimited, can be bind, snapping, screw hole screw attaching etc..
8. the collapsible three plugs triangular pyramid cage body component of double frames according to claim 7, it is characterised in that the moulding It is made, can also be made by other hard materials by metal material.
9. the collapsible three plugs triangular pyramid cage body component of double frames according to claim 1-8, it is characterised in that described double The collapsible three plugs triangular pyramid cage body component of frame is built for dykes and dams, river closure, dykes and dams are blocked up, flood-fighting, is enclosed lake and is made Base is beaten in field, the islands Wei Haizao, bridging.
CN201810464509.XA 2018-05-16 2018-05-16 Double collapsible three plugs triangular pyramid cage body components of frame Pending CN108643123A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810464509.XA CN108643123A (en) 2018-05-16 2018-05-16 Double collapsible three plugs triangular pyramid cage body components of frame

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810464509.XA CN108643123A (en) 2018-05-16 2018-05-16 Double collapsible three plugs triangular pyramid cage body components of frame

Publications (1)

Publication Number Publication Date
CN108643123A true CN108643123A (en) 2018-10-12

Family

ID=63755835

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810464509.XA Pending CN108643123A (en) 2018-05-16 2018-05-16 Double collapsible three plugs triangular pyramid cage body components of frame

Country Status (1)

Country Link
CN (1) CN108643123A (en)

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2892946Y (en) * 2005-12-05 2007-04-25 沈昌生 Telescopic traffic warning panel
CN201928781U (en) * 2010-11-26 2011-08-17 广州新新日用制品有限公司 Folding type pet cage
CN204000754U (en) * 2014-06-19 2014-12-10 长江航道规划设计研究院 A kind of snap close installing type water-permeable frame
CN205268963U (en) * 2015-12-31 2016-06-01 重庆文理学院 Foldable simple and easy small -size football door frame
CN106245584A (en) * 2016-08-12 2016-12-21 李志英 A kind of for building dykes and dams or the double jaw rack blocked up that dams
CN205894019U (en) * 2016-08-12 2017-01-18 李志英 A two jaw racks of regular triangle for building dykes and dams or dam are blocked up
US9562335B1 (en) * 2009-05-20 2017-02-07 Abron J. Arrington Flood control devices and methods

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2892946Y (en) * 2005-12-05 2007-04-25 沈昌生 Telescopic traffic warning panel
US9562335B1 (en) * 2009-05-20 2017-02-07 Abron J. Arrington Flood control devices and methods
CN201928781U (en) * 2010-11-26 2011-08-17 广州新新日用制品有限公司 Folding type pet cage
CN204000754U (en) * 2014-06-19 2014-12-10 长江航道规划设计研究院 A kind of snap close installing type water-permeable frame
CN205268963U (en) * 2015-12-31 2016-06-01 重庆文理学院 Foldable simple and easy small -size football door frame
CN106245584A (en) * 2016-08-12 2016-12-21 李志英 A kind of for building dykes and dams or the double jaw rack blocked up that dams
CN205894019U (en) * 2016-08-12 2017-01-18 李志英 A two jaw racks of regular triangle for building dykes and dams or dam are blocked up

Similar Documents

Publication Publication Date Title
CN106245584B (en) It is a kind of for building dykes and dams or the double jaw rack blocked up that shuts off
CN108625341A (en) The collapsible three plugs triangular prism frame assembly of three frames
CN108487187B (en) Double collapsible three plugs triangular pyramid frame assemblies of frame
CN205894019U (en) A two jaw racks of regular triangle for building dykes and dams or dam are blocked up
CN109338996A (en) A kind of plugging device for throwing hanging dike breach
CN108532542A (en) The collapsible three plugs triangular pyramid frame assembly of single frame
CN107190706A (en) A kind of dike breach plugging device for being easy to quickly transport
CN107034850B (en) A kind of plugging device suitable for the small-sized breach of dykes and dams
CN108612045A (en) The collapsible three plugs triangular prism cage body component of three frames
CN108487188A (en) Double collapsible three plugs triangular prism cage body components of frame
CN108643123A (en) Double collapsible three plugs triangular pyramid cage body components of frame
CN106087870B (en) A kind of flood-fighting special reinforcing steel cage
CN108612038A (en) The collapsible three plugs triangular pyramid cage body component of single frame
EP0007342A1 (en) Method and means for beach restoration
CN108589647A (en) The collapsible three plugs triangular pyramid frame assembly of center moulding frame
CN107142899B (en) A kind of plugging device for the dike breach facilitating dispensing
CN108612044A (en) The collapsible three plugs triangular pyramid frame assembly of side moulding frame
CN108589648A (en) The collapsible three plugs quadrangular cage body component of three frames
CN108589646A (en) Double collapsible three plugs triangular prism frame assemblies of frame
CN108612039A (en) The collapsible three plugs quadrangular frame assembly of three frames
KR101758111B1 (en) The traction means having gaebion and its construction methods
CN107724329A (en) It is a kind of to be used to build dykes and dams or the single tine head rack blocked up that dams
CN204780765U (en) Adopt energy dissipation checking motion of geotechnique's package
CN106164378A (en) Wrap from filling flood control
CN207419497U (en) A kind of greening slope protecting device

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20181012