Invention content
For overcome the deficiencies in the prior art, the flocculation for providing the good sewage of effluent quality after a kind of processing is heavy by the present invention
Shallow lake pond.
To achieve the goals above, the present invention uses following technical scheme:A kind of flocculation sedimentation tank of sewage, including pond
Body, mixing component and charging component;The charging component includes feed compartment and is switched with the matched blowing of the feed compartment,
A rabbling mechanism is equipped in the pond body, the mixing component is opened the blowing by the transmission mechanism and switched;The pond body
It is interior to be equipped with sedimentation device, correspond in the pond body and be equipped with water outlet above sedimentation device, is equipped with corresponding to sedimentation device lower section
Water inlet;The water inlet connects water inlet pipe, and the water outlet connects outlet pipe.Sedimentation device is provided in the present invention, in turn
In water outlet, sedimentation device can again be sunk to carrying the flocculate in water body into water outlet flowing water body
Drop carries flocculate when water body being avoided to be discharged, ensure that effluent quality is good;And water inlet is arranged in sedimentation device lower part, in turn
The flow of water inlet will not be influenced by sedimentation device, ensure that water inlet water body can fully be reacted with flocculant;
And setting charging component, flocculant for treating can be added into pond body under constant duration by the component, avoid institute
There is flocculant that situations such as causing flocculant excessive is added together;And mixing component then can stirring-up sewage, flocculant addition after make
Flocculant quickly dissolves, and accelerates reacting between flocculant and the pollutant in sewage, improves the treatment effeciency to sewage;
Feed compartment is set, which can hold flocculant, therefore in use, and a large amount of flocculation can be added on feed compartment
Agent avoids traditional artificial multiple addition flocculant, is conveniently operated, reduces cost of labor;And the blowing in lower end is set
Switch switchs the opening and closing of constant duration by the blowing, can constant duration and equivalent addition processing into pond body
Flocculant avoids excessive flocculant and is difficult to dissolve or the case where excessive addition, and transmission mechanism is arranged, and mixing component passes through
The transmission mechanism switchs to open the blowing, to which after mixing component rotation, blowing switch can be with mixing component
Rotation constantly discharges flocculant into bucket, and under stiring, flocculant one is fallen into sewage, so that it may quickly dissolve, mix simultaneously
Reaction, therefore can quickly neutralize the pollutant in water body;And which avoids additional even motor etc. devices and opens blowing
It puts capable unlatching into, reduces the use cost of device, while in entire opening process, using purely mechanic device, device is not easy
It is damaged, service life is long.
Further, the sedimentation device include supporting rack, be spaced apart on supporting rack multigroup sedimentation component and set
In in the pond body with the matched support portion of the supporting rack.
Further, support frame as described above includes two cross bars and multiple connecting rods being spaced apart between two cross bars,
Each connecting rod is correspondingly arranged one group of sedimentation component;Multigroup sedimentation component is set, and effect of settling is good, further promotes water outlet water
Matter.
Further, the sedimentation component includes multiple being spaced equally distributed sedimentation along the connecting rod length direction
Plate;The flocculate for being obliquely installed by settling plate, preferably being settled to flocculate, and be precipitated on sedimentation plate will be along
The gradient of sedimentation plate slides to bottom of pond.
Further, the sedimentation plate is to be obliquely installed, and the angle between the sedimentation plate axis and connecting rod axis is
60°。
Further, the support portion is the raised line extended outward to form by the pond body inner wall, blowing room side wall
It is upper to have and the matched bar shaped protrusion of the cross bar;Supporting rack excellent support is existed by the cooperation of support portion and bar shaped protrusion
On the upper position of water inlet, it is not easy digital display position offset.
Further, the transmission mechanism includes described with the matched transmission parts of the mixing component and for opening
The switch block of blowing switch, the switch block are matched with the transmission parts;Transmission parts can will be on mixing component
Kinetic energy is transmitted, and also the lower end of mixing component can be fixed, and has been ensured the stability of mixing component work, has been avoided
Mixing component shakes in pond body;And switch block is arranged then can open blowing switch under the promotion of transmission parts, into
And when realizing mixing component work, material is put into pond body by synchronization.
Further, the switch block includes motion bar for opening blowing switch and for pushing the work
The impeller that lever acts upwards;The second piston is matched with the impeller;Motion bar moves upwards, and then can push
The blowing switch is opened, and impeller is arranged, and is moved by the impeller, to jack up the motion bar, the device
It is simple in structure, it is hardly damaged, impeller fore-aft motion is pushed away by second piston, thrust is big, can effectively jack up the work
Lever.
In conclusion the present invention is provided with sedimentation device, and then in water outlet, sedimentation device can be to carrying in water body
Flocculate into water outlet flowing water body is settled again, and flocculate is carried when water body being avoided to be discharged, and ensures water outlet
Water quality is good;And water inlet is arranged in sedimentation device lower part, and then the flow intake will not be influenced by sedimentation device, be ensured
Water inlet water body can fully be reacted with flocculant;Blowing is arranged to switch, flocculant can be added by constant duration into pond body, avoided
Flocculant excessive addition.
Specific implementation mode
In order to make those skilled in the art be better understood from the present invention program, below in conjunction in the embodiment of the present invention
Attached drawing, technical solution in the embodiment of the present invention carry out clear, complete description.
As shown in Figs. 1-5, a kind of flocculation sedimentation tank of sewage, including pond body 1, mixing component 2 and charging component 3, it is described
Mixing component 2 includes revolving part 21 and agitating paddle 22, and the revolving part 21 is a metallic rod, which is driven by motor
Its rotation is moved, the agitating paddle 22 is connected with revolving part 21, and is stirred to the sewage in pond body 1;The charging component 3
Including feed compartment 31 and blowing switch 32, the feed compartment 31 is a metal drum being connected with pond body 1, the bottom of the feed compartment 31
Portion is that opening is arranged, and the flocculant in feed compartment 31 can come out in the opening, later fall into pond body 1, blowing switch
32 are located at opening, which is a metallic plate, and the blowing switch 32 is flexibly connected with the bottom of feed compartment 31;It is logical
The blowing switch 32 is crossed to block the opening;A transmission mechanism 4 is equipped in the pond body 1, the revolving part 21 is logical
Cross the transmission mechanism 4 can open-top blowing switch 32, released from the opening of 31 bottom of feed compartment to flocculant.
Further, it is equipped with sedimentation device 7 in the pond body 1, and corresponds to above sedimentation device on 1 side wall of the pond body
Equipped with water outlet 12, corresponds to and be equipped with water inlet 13 below sedimentation device;And the water inlet pipe 14 of the water inlet connection stainless steel,
The outlet pipe 15 of the water outlet connection stainless steel;Specifically, the sedimentation device 7 includes supporting rack 71, is spaced apart in branch
Multigroup sedimentation component 72 on support and in the pond body with the matched support portion of the supporting rack 73;Support frame as described above 71
The connecting rod 712 of multiple evenly spaced distributions including two cross bars 711 and between two cross bars, the both ends of connecting rod 712
It is welded respectively with two cross bars;The support portion 73 is the raised line 731 of the strip extended outward to form by the pond body inner wall, institute
It states and also is provided with bar shaped protrusion 33 on 3 side wall of blowing room, a cross bar in two cross bar is placed on the support portion 73, another
Item is placed on the bar shaped protrusion 33, and then realizes the support to supporting rack, and supporting rack is limited in water outlet top.
Each connecting rod 712 is correspondingly arranged one group of sedimentation component 72;Specifically, the sedimentation component 72 includes multiple stainless
The sedimentation plate 721 of steel, these sedimentation plates 721 are to be obliquely installed, and welding is connected in connecting rod, and is grown along the connecting rod 712
It is spaced and is uniformly distributed on degree direction;Preferably, the angle between sedimentation 721 axis of plate and 712 axis of connecting rod is 60 °.
Further, a positioning column 10 is equipped on the bottom of the pond body 1, which is a metal column, at this
A bearing 101, the interior becket of bearing 101 and being connected for positioning column 10 are arranged on positioning column 10, the outer becket of bearing can
Rotation;The pond body 1 is equipped with a placed cavity 11, and the parts thereof in the transmission mechanism 4 is located in the placed cavity 11;
Placed cavity, which is arranged, can be convenient for hiding installation activity part, and movable part is avoided to be corroded, and return unit is arranged, and can upwards live in movable part
Dynamic to quickly recover to original position later, avoiding movable part from being detained leads to open the blowing switch for a long time;And locating part and anti-
De- part cooperates, and the both ends of return unit can be fixed, and ensures during motion bar is movable upwards, makes return unit pressure
Contracting.
Specifically, the transmission mechanism 4 includes transmission parts 41 and blowing component 42, the transmission parts 41 include
Supporting 411 and hydraulic part 412, specifically, the supporting 411 includes rotating disc 401, is fixed on rotating disc 401
Shaft 402 and reduction gearing 403;The rotating disc 401 is a metal dish, and the side wall of the rotating disc 401 is equipped with biting teeth,
The lower face of the rotating disc 401 is fixedly connected with the outer becket of the bearing 101, thus can relative positioning column 10 rotate,
The middle section of the rotating disc 401 is equipped with a pillar 403, and the shaft 402 is set on the pillar 403, and can be opposite
Projection seat 403 rotates, and biting teeth is equipped on 402 outer wall of shaft;404 side of reduction gearing and rotating disc 401
Side wall biting teeth is mutually engaged, and the other side is mutually engaged with the side wall of shaft 402, to form a sun planetary gear set;Further
, 402 top of shaft is six water chestnut columns, and the revolving part 21 is equipped with the cylindrical cavity of one or six water chestnuts, therefore described
21 lower part of revolving part is set in shaft 402, can rotate with revolving part 21 to shaft 402, so rotating disc 401 with turn
It is dynamic;It is the face of arc to be equipped with one on 401 lower face of the rotating disc and push protrusion 413, the lower part of the promotion protrusion 413, is pushed away
Dynamic protrusion 413 is set for the eccentric in the lower part of rotating disc 401.
Further, the hydraulic part 412 is located in placed cavity 11, which includes first piston 416, the
Two pistons 418 and cylinder 414, the first piston 416 are located at one end of cylinder 414, and second piston 418 is located at cylinder 414
The other end, between first piston 416 and second piston 418 be filled with hydraulic oil, opened equipped with one in 1 bottom of pond body
Mouthful, first piston 416 stretches out in the opening, and to be tightly connected between first piston 416 and the side wall of opening, specifically
Sealed connection can be one thin shrapnel of setting, have among the shrapnel through-hole, the upper end of the first piston 416 logical across this
Hole, then shrapnel and first piston 416 weld;The outer rim and opening edge weld of shrapnel realize sealing;The promotion protrusion
413 in 401 rotation process of rotating disc, is in contact with 416 upper end of first piston, first piston 416 is pressed down on
To push second piston 418 to move out, while it being connected with a resetting spring 417 in 416 lower end of the first piston, it is multiple
The end of position spring 417 is in contact with the inner wall of cylinder 414, therefore resetting spring 417 can again jack up first piston 416,
Convenient for pushing protrusion 413 to push first piston 416 again;Cylinder is set, first is lived and second piston, first piston and the are passed through
Two pistons block the end of cylinder, and the liquid filling body in cylinder, under the compacting that protrusion is pushed by first piston, make first
Piston presses against the liquid in cylinder and is moved towards second piston direction towards cylinder intrinsic displacement, to which second piston is outside
It releases, in the transmission process, no mechanical wear, device is not damaged;Same setting resetting spring can push protrusion to push it
Afterwards, resetting spring may make first piston to reset, after first piston reset, under inner wall pressure becomes, therefore under external pressure,
Second piston can be restored to original position, and the movement of pressure official post second piston is adequately utilized in whole process, effectively will
Kinetic energy on revolving part is converted.
Agitating paddle is stirred sewage under the driving of revolving part so that the pollutant and flocculant in sewage are quick
Reaction;And revolving part is inserted on supporting, is rotated by revolving part, and supporting rotation is driven, realization will be on mixing component
Kinetic energy is tentatively transmitted, and supporting fixes the lower part of revolving part, is not interfered with revolving part rotation, can also be reduced revolving part
Vibrations in rotation process are arranged hydraulic part and push protrusion, in supporting rotary course, push protrusion to rotate therewith, pushing away
Under dynamic one circle of protrusion rotation, pushes the hydraulic part to work primary, and then hydraulic part keeps movable part movable, open blowing switch
Once, the time interval of one circle of protrusion rotation should be pushed constant in the process, therefore blowing of the blowing switch in opening process is frequently
Rate is constant, so only needing to adjust openings of sizes when blowing switch is opened, you can ensure during each blowing, into dirt
The flocculant of water can be completely dissolved and react away in the time interval, improve the utilization rate of flocculant, reduce flocculant
Waste;And by way of hydraulic pressure, it eliminate mechanical transfer, no abrasion, it is only necessary to ensure that the amount of its internal liquid is constant,
Which also accommodates a variety of different position installations, during the installation process, it is only necessary to which then pipe laying installs one at both ends
The piston in sealing contact with inner wall of the pipe, shape, the degree of bending of pipeline are all driven without influence the hydraulic part,
It avoids in conventional mounting, machine driving needs to consider the shape etc. of machinery.
Further, the blowing component 42 is arranged in placed cavity 11, and the blowing component 42 includes 421 He of motion bar
Impeller 422 is arranged with a return unit 425 on the motion bar 421, which is spring, in the placed cavity 11
Wall is equipped with extension, and the upper end of return unit 425 is withstood on extension;Lower end is stuck on motion bar 421, the motion bar
421 upper ends and one end of blowing switch 32 are in contact, and to push up 32 one end of blowing switch upwards, the other end are made to transport downwards
It is dynamic;It is equipped with a shrinkage pool in 421 lower end of motion bar, a ball 424 is equipped in the shrinkage pool;The impeller 422 is
With the metal derby for pushing inclined-plane 423, one end of the impeller 422 is connected with a spring, and second piston 418 pushes the impeller
422 other end;Therefore after second piston 418 pushes impeller 422 to be moved to a direction, spring makes impeller 422 reset,
During this period, the ball 424 of motion bar 421 is along the activity upwards of inclined-plane 423 is pushed, to rise motion bar 421;And then it is living
Lever 421 opens blowing switch 32;Multiple lug bosses 427 are equipped on the promotion inclined-plane 421, which is convex ribs,
The ball 424 can be rolled across from lug boss 427;Setting push inclined-plane can keep in pushing course, gradually by impeller to
On boost;Lug boss is set on return unit, when ball rolls across lug boss, makes motion bar that the shake on longitudinal direction occur,
To which blowing switch is also it also occur that shake, which can shake out the flocculant at blowing switch, avoid powdered wadding
Solidifying agent is extruded in the opening of blowing switch, has ensured that flocculant can smoothly enter into sewage.
An elastic component 319 is connected on the end of the blowing switch 32, which is spring, the elasticity
One end of part 319 is fixedly connected with the inner wall of placed cavity 11, therefore after motion bar 421 moves downward, and elastic component 319 can make
Blowing switch 32 resets, from the new opening for being closed 31 bottom of feed compartment.
Specifically, when device works, the revolving part 21 drives shaft 402 to rotate, and drives and slows down when shaft 402 rotates
The rotation of gear 403 is to drive the rotating disc 401 to rotate;During rotating disc 401 rotates, protrusion 413 and first is pushed
The upper end of piston 416 collides, and is all that arc is arranged because pushing the lower part of protrusion 413 and the top of first piston 416, therefore
Protrusion 413 is pushed to suppress the activity downwards of first piston 416, and then first piston 416 suppresses the hydraulic oil in cylinder 414, passes through
Hydraulic oil pushes second piston 418 to move out, and second piston 418 pushes impeller 422 to move right, to 424 edge of ball
The activity upwards of promotion inclined-plane 423, in ball 424 along during pushing the upward activity in inclined-plane 423, motion bar 421 moves upwards,
And then motion bar 421 pushes blowing switch 32 to open so that flocculant releases in feed compartment 31, in opening procedure, because
The setting of lug boss 427, therefore motion bar 421 can constantly carry out shake up and down so that blowing switch 32 is constantly shaken, in turn
Ensure that flocculant smoothly releases in feed compartment 31;Simultaneously, do not connect with 416 upper end of first piston pushing protrusion 413
When touching, resetting spring 417 makes first piston 416 move upwards, and to which second piston 418 moves downward, and impeller 422 is in bullet
It is resetted from new under the action of spring, in the reseting procedure, the activity downwards under the action of return unit 425 of motion bar 421, and it is elastic
Part 319 can then pull described 32 one end of blowing switch movable downwards, and blowing switch 32 closes the opening of 31 lower end of feed compartment, until
This, whole device completes the blowing process of a cycle.
Obviously, described embodiment is only a part of the embodiment of the present invention, instead of all the embodiments.It is based on
Embodiment in the present invention, it is obtained by those of ordinary skill in the art without making creative efforts every other
Embodiment should all belong to the scope of protection of the invention.