CN108636530A - Ore dressing ball adding device - Google Patents

Ore dressing ball adding device Download PDF

Info

Publication number
CN108636530A
CN108636530A CN201810804535.2A CN201810804535A CN108636530A CN 108636530 A CN108636530 A CN 108636530A CN 201810804535 A CN201810804535 A CN 201810804535A CN 108636530 A CN108636530 A CN 108636530A
Authority
CN
China
Prior art keywords
hook
turnover panel
ore dressing
ball
box
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201810804535.2A
Other languages
Chinese (zh)
Inventor
杨庆林
常校亮
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
MCC North Dalian Engineering Technology Co Ltd
Northern Engineering and Technology Corp MCC
Original Assignee
MCC North Dalian Engineering Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by MCC North Dalian Engineering Technology Co Ltd filed Critical MCC North Dalian Engineering Technology Co Ltd
Priority to CN201810804535.2A priority Critical patent/CN108636530A/en
Publication of CN108636530A publication Critical patent/CN108636530A/en
Pending legal-status Critical Current

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B02CRUSHING, PULVERISING, OR DISINTEGRATING; PREPARATORY TREATMENT OF GRAIN FOR MILLING
    • B02CCRUSHING, PULVERISING, OR DISINTEGRATING IN GENERAL; MILLING GRAIN
    • B02C17/00Disintegrating by tumbling mills, i.e. mills having a container charged with the material to be disintegrated with or without special disintegrating members such as pebbles or balls
    • B02C17/18Details
    • B02C17/20Disintegrating members
    • B02C17/205Adding disintegrating members to the tumbling mill

Landscapes

  • Engineering & Computer Science (AREA)
  • Food Science & Technology (AREA)
  • Hooks, Suction Cups, And Attachment By Adhesive Means (AREA)

Abstract

The present invention provides a kind of ore dressing ball adding devices, including:Babinet, the top of the box and bottom opening;Turnover panel, the turnover panel are set to the bottom of box, and turnover panel one end is connect with bottom of box side, and the other end may be reversed ground and be fixed with the bottom of box other side;Lifting member, the lifting member is set on the side of babinet, lifting member one end and the surface of babinet are connected and fixed, its other end is connected and fixed with turnover panel, wherein, the both sides of the bottom of box and turnover panel junction are respectively arranged with the first hook and the second hook, it is connected by shaft between first hook and the second hook, so that the first hook and the second hook are rotated synchronously with shaft, it is unclamped connect band by manual type, so that turnover panel is detached with hook, to which steel ball be drawn off from box house, instead of the mode in the prior art directly toppling over the steel ball in ball adding case, ball is conveniently and efficiently accurately unloaded after the lifting, effectively improve fixed ball adding case ball adding efficiency, and improve ball adding process construction safety.

Description

Ore dressing ball adding device
Technical field
The present invention relates to preparation equipment technical fields, specifically, being related to a kind of ore dressing ball adding device.
Background technology
Ore dressing is in the raw mineral materials acquired, according to various mineral physics properties, physicochemical properties and chemically The difference of matter selects the process of valuable mineral.The machinery for implementing this process is known as benficiation machinery, and benficiation machinery presses beneficiation flowsheet It is divided into broken, grinding, screening, sorting (sorting) and dewatering machine.
In ore-dressing technique, commonly use ball mill as general grinding attachment, ball mill be by medium to the impact of material and Abrasive action is completed to the fragmentation of material, and during this Crushing Mechanics of medium to material, medium is as energy Outside energy is changed into the crushing force of material and implements fragmentation to material by the mediator of amount.In the prior art, it selects Ball mill involved in miner's skill is ground material as medium using a large amount of steel balls.Since steel ball is a kind of erosion wear Material, thus in Proccessing technology, need to carry out steel ball supplement to grinding attachment in time.
In the prior art, by the way that a kind of fixation ball adding case filling steel ball is arranged, to realize in time to grinding attachment Carry out steel ball supplement.This fixed ball adding case in the prior art, in ball adding, need by lifting device (such as crane, fork Vehicle) the ball adding case is promoted to above grinding attachment, after the steel ball in ball adding case is poured onto in grinding attachment.However, It has been found that this ball adding side that will be toppled over after fixed ball adding case promotion by lifting device in long-term practice and production Formula, steel ball mutually collide in toppling process, easily rout up outside grinding attachment, and topple over mode itself there is also certain safety Risk.
In view of this, fixed ball adding case in the prior art should be improved, it is existing in the prior art to solve Above-mentioned technical problem.
Invention content
In order to solve the above-mentioned technical problem the present invention makes, the purpose is to provide one kind can after the lifting facilitate Ball is quickly accurately unloaded, fixed ball adding case ball adding efficiency is effectively improved, and improves the ore dressing ball adding dress of ball adding process construction safety It sets.
To achieve the goals above, the present invention provides a kind of ore dressing ball adding device, the ore dressing ball adding device includes:Case Body, the top of the box and bottom opening;Turnover panel, the turnover panel are set to the bottom of box, described turnover panel one end and the babinet Bottom side connects, and the other end may be reversed ground and be fixed with the bottom of box other side;Lifting member, the lifting member are set to institute It states on the side of babinet, described lifting member one end and the surface of the babinet are connected and fixed, and the other end is connect with the turnover panel It is fixed, wherein the both sides of the bottom of box and the turnover panel junction are respectively arranged with the first hook and the second hook, described It is connected by shaft between first hook and the second hook, so that first hook and the second hook are synchronous with the shaft Rotation, when the ore dressing ball adding device stores steel ball, the turnover panel is connected with first hook and the second hook, when described When ore dressing ball adding device unloads ball, the turnover panel is detached with first hook and the second hook, the reprint downwardly turns over, steel Ball is drawn off from the bottom of box.
Preferably, the bottom of box side may include two first baffles and two second baffles, the first baffle Length is more than the side edge length of the babinet, described when the first baffle can be made to be bonded with the bottom of box side The both ends of first baffle can extend to outside babinet, and can form the first extension, and each first extension surface can To be provided with rotary shaft through hole, the shaft can be set in the rotary shaft through hole.
It is further preferred that the turnover panel may include bottom plate and the starting stave for being set to backplate surface surrounding and The length of two risers, the starting stave can be consistent with the length of the first baffle, and the length of second riser can With consistent with the length of the second baffle, can make when the turnover panel is connect with the babinet, the starting stave It is bonded with first baffle, second riser is bonded with second baffle, wherein the length of the starting stave is more than the bottom plate Length, can extend to the plate outer side when starting stave is connect with the bottom plate, second can be formed and prolonged Two second extensions of extending portion, the side connected with first hook and the second hook on the turnover panel are respectively arranged with hook Connecting pole, when the turnover panel is connect with the babinet, the two hook connecting poles can hang on first hook and the Two hooks.
It is further preferred that the turnover panel can be connect by connecting plate with the first baffle, the connecting plate table Face could be formed with the shaft hole and bolt hole with rotary shaft through hole, can be set between the connecting plate and the starting stave It is equipped with backing plate, the pad surfaces can form circular hole corresponding with bolt hole.
Further preferably, the lifting member may include the first shackle, the second shackle and connection the first shackle and The surface of the promotion chain of second shackle, the body side and starting stave can be respectively formed promotion fixed ring, and described One shackle and the second shackle can be connected and fixed with the two promotion fixed rings respectively.
Further preferably, lifting lug can be provided at top of the box opening surrounding edge, outside the lifting member Side is provided with protective cover.
Further preferably, second hook may include hanging head, the pivoted arm being connect with the hanging head and setting It is also formed in that can be provided on the interconnecting piece of the pivoted arm face extremities, the babinet on the side for promoting fixed ring side Fixed ring is linked up with, the interconnecting piece can be connect by connect band with the hook fixed ring, wherein when the ore dressing ball adding fills When setting storage steel ball, interconnecting piece and the hook fixed ring described in the connection band connection, described second links up with the connection Band stretches, and the turnover panel is hung on first hook and the second hook, when the ore dressing ball adding device unloads ball, unclamps institute Connect band is stated, first hook and the second hook rotate so that the turnover panel is detached from first hook and the second hook Overturning, steel ball are drawn off from the bottom of box.
Further preferably, finite place piece can be arranged in the first baffle upper end with the second hook homonymy, work as institute When stating the rotation of the second hook, limited by the locating part.
It is set as described above in bottom of box fixation it is found that in ore dressing ball adding device of the present invention with practice Be equipped with turnover panel, turnover panel may be reversed ground and is connected and fixed with the bottom of box, when the present apparatus stores steel ball, turnover panel by the first hook with Second hang on babinet.Second hook is rotatablely arranged at by pivoted arm on body side, when the present apparatus stores steel When ball, the second hook is connect by connect band with babinet.When unloading ball, connect band, the second hook rotation are unclamped, and make turnover panel It is detached with the first hook and the second hook, turnover panel is overturn therewith.It is connect again with turnover panel by lifting member so that when turnover panel is overturn When, it is elevated part tension, then the steel ball stored in babinet at this time is drawn off from the bottom of box.In conclusion choosing of the present invention In mine ball adding device, turnover panel with by way of hook connection so that when fixed ball adding case is promoted to mill by lifting means When above mine equipment, connect band can be unclamped by manual type so that turnover panel is detached with hook, thus by steel ball from babinet Inside is drawn off, and is being promoted by simplified structure instead of the mode in the prior art directly toppling over the steel ball in ball adding case Ball is conveniently and efficiently accurately unloaded afterwards, effectively improves fixed ball adding case ball adding efficiency, and improve ball adding process construction safety.
Description of the drawings
Fig. 1 is schematic diagram, shows the structure of the ore dressing ball adding device described in one embodiment of the present of invention;
Fig. 2 is schematic diagram, shows the structure of ore dressing ball adding device middle case shown in FIG. 1;
Fig. 3 is schematic diagram, shows the structure of turnover panel in ore dressing ball adding device shown in FIG. 1;
Fig. 4 is schematic diagram, shows the structure of connecting plate in ore dressing ball adding device shown in FIG. 1;
Fig. 5 is schematic diagram, shows the structure of backing plate in ore dressing ball adding device shown in FIG. 1.
Specific implementation mode
The embodiment of ore dressing ball adding device of the present invention described below with reference to the accompanying drawings.The ordinary skill of this field Personnel will recognize, without departing from the spirit and scope of the present invention, can be with a variety of different modes to being retouched The embodiment stated is modified.Therefore, attached drawing and description are regarded as illustrative in nature, rather than for limiting claim Protection domain.In addition, in the present specification, attached drawing is drawn not in scale, and identical reference numeral indicates identical part.
Fig. 1 is schematic diagram, shows the structure of the ore dressing ball adding device described in one embodiment of the present of invention.Such as Fig. 1 Shown, the ore dressing ball adding device described in the embodiment of the invention includes babinet 1, is set to 1 bottom of babinet and can with babinet 1 The turnover panel 2 that turningly connects, the lifting member 3 for connecting babinet 1 and turnover panel 2.1 front end of babinet is provided with 11 He of the first hook Second hook 12, turnover panel 2 12 is connected and fixed by the first hook 11 and the second hook with babinet 1, when needing to unload ball, then first 12 rotation of hook 11 and the second hook so that the hook of turnover panel 2 and first 11 and the second hook 12 are detached from, and leading in lifting member 3 It is fixed after overturning to predeterminated position under gravitation, and the steel ball in rear box 1 is drawn off from turnover panel 2.
Fig. 2 is schematic diagram, shows the structure of ore dressing ball adding device middle case shown in FIG. 1.As shown in Fig. 2, babinet 1 pushes up Portion and bottom are formed with opening, and bottom sides include two first baffles 13 and two second baffles 14, and two first baffles 13 are opposite Setting, two second baffles 14 are oppositely arranged, and in this embodiment of the invention, the length of first baffle 13 is more than 1 side of babinet Length, in this way, can make when first baffle 13 is bonded with bottom of box side, first baffle 13 is to 1 outer both sides of babinet Extend, and two first extensions 15 are respectively formed in the both sides of extension, 15 surface of every 1 first extension is provided with rotary shaft through hole 151, shaft 16 is provided between two opposite rotary shaft through holes 151 of through-hole.Referring again to Fig. 1, the both ends of 1 bottom side side of babinet It is provided with the first hook 11 and second hook 12, the surface that the first hook 11 and second links up with 12 is all formed with and 16 phase one of shaft The rotary shaft through hole (not shown) of cause, so that shaft 16 can be each passed through the first hook 11 and second hook 12, the first hook 11 and second hook 12 can with shaft 16 rotate and rotate.
Second hook 12 and 3 homonymy of lifting member, the pivoted arm 122 that the second hook 12 includes hanging head 121, connect with hanging head 121, And it is set to the interconnecting piece 123 of 122 face extremities of pivoted arm.It is carried on babinet 1 with being respectively arranged on the surface of 3 homonymy of lifting member Rise fixed ring 17 and hook fixed ring 18.Wherein, lifting member 3, which is hung on, is promoted in fixed ring 17, is connected and is connected by connect band 19 Socket part 123 and hook fixed ring 18 fix the second hook 12.It fixes and sets with 13 upper end of first baffle of the second 12 homonymies of hook It is equipped with locating part 131, when the second 12 rotation of hook, is limited the limit of part 131.When storing steel ball, the connection of connect band 19 connects Socket part 123 and hook fixed ring 18, second hook 12 downwards and by connect band 19 stretch fixed to hook fixed ring on, and make Turnover panel 2 is connected and fixed with the first hook 11 and the second hook 12;When unloading ball, connect band 19 is unclamped, then 12 rotation of the second hook, When the rotation of hanging head 121 is downward to mouth hanging, then turnover panel 2 is detached with the first hook 11 and the second hook 12, and end blocking 2 rotates, Steel ball is drawn off from 1 bottom of babinet.
Referring again to Fig. 1, lifting member 3 includes that the first shackle 31, the second shackle 32 and connection the first shackle 31 and second are unloaded The promotion chain 33 of button 32.In this embodiment of the invention, protective cover 34 can be provided with by promoting 33 outside of chain, to keep being promoted 33 position of chain is fixed, and is reduced and promoted the lateral displacement that chain 33 is generated in lifting process and stress.In addition, 1 top of babinet is opened Mouth surrounding is provided with lifting lug 100 along edge, and in this embodiment of the invention, lifting lug 100 is set to same with second baffle 14 The top of the box of side.
Fig. 3 is schematic diagram, shows the structure of turnover panel in ore dressing ball adding device shown in FIG. 1.As shown in figure 3, in this hair In the bright embodiment, 2 one end of turnover panel is connect with 1 bottom side of babinet, and ground and the 1 bottom other side of babinet may be reversed in the other side It is fixed.Specifically, turnover panel 2 includes bottom plate 21, and be set to backplate surface surrounding two starting staves 22 and two second it is perpendicular Plate 23.In this embodiment of the invention, the length of starting stave 22 is consistent with the length of first baffle 13, the second riser 23 Length it is consistent with the length of second baffle 14, in this way, when turnover panel 2 is connect with 1 bottom of babinet, starting stave 22 and first Baffle 13 is bonded, and the second riser 23 is bonded with second baffle 14.Then, the length of starting stave 22 is more than the length of bottom plate 21, When starting stave 22 is connect with bottom plate 21, starting stave 22 extends on the outside of 21 both sides of bottom plate, and forms the in extended position Two extensions 24 are all worn at two second extensions 24 of the side of 12 connection of the first hook 11 and the second hook on turnover panel 2 There is hook connecting pole 25, in this way, when turnover panel 2 is connect with babinet 1, hook connecting pole 25 hang on the first hook 11 and second extension At hook 12, another two 24 surfaces of the second extension being oppositely arranged form through-hole 241, when turnover panel 2 is connect with 1 bottom of babinet, lead to Hole 241 is corresponding with rotary shaft through hole 151, and 241 side of through-hole is provided with bolt hole 241.Promotion is also equipped on starting stave 22 Fixed ring 17, the promotion fixed ring 17 is identical as the promotion fixed ring 17 on 1 side of babinet, is used to connect with the second shackle 32 It connects.
Fig. 4 is schematic diagram, shows the structure of connecting plate in ore dressing ball adding device shown in FIG. 1.Fig. 5 is schematic diagram, is shown The structure of backing plate in ore dressing ball adding device shown in FIG. 1 is gone out.As shown in Figure 1, Figure 4 and Figure 5, turnover panel 2 passes through connecting plate 4 and One baffle 13 connects, and 4 surface of connecting plate is formed with shaft hole 41 corresponding with rotary shaft through hole 151 and bolt hole 42, backing plate 5 It is set between connecting plate 4 and starting stave 22, surface forms circular hole corresponding with bolt hole 42 51.
When ore dressing ball adding device of the present invention works, shaft 16 sequentially passes through the second hook 12, first baffle 13 11 are linked up with first, and makes the rotation of shaft 16 that can drive 12 rotation of the first hook 11 and second hook.In 1 bottom of babinet The other side, shaft 16 sequentially pass through connecting plate 4, first baffle 13 so that connecting plate 4 is connect with 1 bottom of babinet, then passes through bolt Connecting plate 4, backing plate 5 and turnover panel 2 are sequentially passed through, so that connecting plate 4 is connect with backing plate 5 and turnover panel 2.Again so that promoting chain 33 The first shackle 31 and the second shackle 32 respectively with two promotion fixed rings 17 be connected and fixed, and will hook connecting pole 25 and first extension 12 connection of the hook of hook 11 and second, meanwhile, using second hook 12 of the connection of connect band 19 and hook fixed ring 18.
The ore dressing ball adding device that will be filled with steel ball is sling by lifting means to above grinding attachment, is then unclamped Connect band 19,11 rotation of the second hook 12 and the first hook, and it is limited the limit of part 131, the first hook 11 and second is hung at this time 12 mouth hanging of hook is downward, so that turnover panel 2 is detached from 1 bottom of babinet, and falls to fixed bit under the draw for promoting chain 33 It sets.Steel ball is drawn off from 1 bottom of babinet at this time.
It is set as described above in bottom of box fixation it is found that in ore dressing ball adding device of the present invention with practice Be equipped with turnover panel, turnover panel may be reversed ground and is connected and fixed with the bottom of box, when the present apparatus stores steel ball, turnover panel by the first hook with Second hang on babinet.Second hook is rotatablely arranged at by pivoted arm on body side, when the present apparatus stores steel When ball, the second hook is connect by connect band with babinet.When unloading ball, connect band, the second hook rotation are unclamped, and make turnover panel It is detached with the first hook and the second hook, turnover panel is overturn therewith.It is connect again with turnover panel by lifting member so that when turnover panel is overturn When, it is elevated part tension, then the steel ball stored in babinet at this time is drawn off from the bottom of box.In conclusion choosing of the present invention In mine ball adding device, turnover panel with by way of hook connection so that when fixed ball adding case is promoted to mill by lifting means When above mine equipment, connect band can be unclamped by manual type so that turnover panel is detached with hook, thus by steel ball from babinet Inside is drawn off, and is being promoted by simplified structure instead of the mode in the prior art directly toppling over the steel ball in ball adding case Ball is conveniently and efficiently accurately unloaded afterwards, effectively improves fixed ball adding case ball adding efficiency, and improve ball adding process construction safety.
Describe ore dressing ball adding device according to the present invention in an illustrative manner above with reference to attached drawing.But ability Field technique personnel should be appreciated that the ore dressing ball adding device proposed for aforementioned present invention, can also not depart from the present invention Various improvement are made on the basis of appearance.Therefore, protection scope of the present invention should be determined by the content of appended claims.

Claims (8)

1. a kind of ore dressing ball adding device, which is characterized in that the ore dressing ball adding device includes:
Babinet, the top of the box and bottom opening;
Turnover panel, the turnover panel are set to the bottom of box, and described turnover panel one end is connect with the bottom of box side, the other end Ground may be reversed to fix with the bottom of box other side;
Lifting member, the lifting member are set on the side of the babinet, and described lifting member one end is connect with the surface of the babinet Fixed, the other end is connected and fixed with the turnover panel, wherein
The both sides of the bottom of box and the turnover panel junction are respectively arranged with the first hook and the second hook, and described first hangs It is connected by shaft between hook and the second hook, so that first hook and the second hook are rotated synchronously with the shaft, When the ore dressing ball adding device stores steel ball, the turnover panel is connected with first hook and the second hook, when the ore dressing When ball adding device unloads ball, by the turnover panel with it is described first hook and second link up with detach, the reprint downwardly turns over, steel ball from The bottom of box is drawn off.
2. ore dressing ball adding device as described in claim 1, which is characterized in that the bottom of box side includes two first baffles With two second baffles, the length of the first baffle is more than the side edge length of the babinet, so that the first baffle and institute When stating the fitting of bottom of box side, the both ends of the first baffle extend to outside babinet, and form the first extension, each described First extension surface is provided with rotary shaft through hole, and the shaft is set in the rotary shaft through hole.
3. ore dressing ball adding device as claimed in claim 2, which is characterized in that the turnover panel includes bottom plate and is set to bottom plate The starting stave of surface surrounding and the second riser, the length of the starting stave is consistent with the length of the first baffle, institute The length for stating the second riser is consistent with the length of the second baffle, so that when the turnover panel is connect with the babinet, The starting stave is bonded with first baffle, and second riser is bonded with second baffle, wherein
The length of the starting stave is more than the length of the bottom plate, when the starting stave is connect with the bottom plate to described Plate outer side extends, and forms the second extension, links up with the two of the side of connection on the turnover panel with first hook and second Second extension is respectively arranged with hook connecting pole, and when the turnover panel is connect with the babinet, the two hook connecting poles are hung Set on first hook and the second hook.
4. ore dressing ball adding device as claimed in claim 3, which is characterized in that the turnover panel passes through connecting plate and the first gear Plate connects, and the connection plate surface is formed with shaft hole corresponding with rotary shaft through hole and bolt hole, the connecting plate with it is described Backing plate is provided between starting stave, the pad surfaces form circular hole corresponding with bolt hole.
5. ore dressing ball adding device as claimed in claim 3, which is characterized in that the lifting member is unloaded including the first shackle, second The surface of button and the promotion chain of connection the first shackle and the second shackle, the body side and starting stave, which is respectively formed, to be carried Fixed ring is risen, first shackle and the second shackle are connected and fixed with the two promotion fixed rings respectively.
6. ore dressing ball adding device as claimed in claim 3, which is characterized in that be arranged at the top of the box opening surrounding edge There is lifting lug, protective cover is provided on the outside of the lifting member.
7. ore dressing ball adding device as claimed in claim 3, which is characterized in that second hook includes hanging head, with the extension The pivoted arm of head connection and it is set to the interconnecting pieces of the pivoted arm face extremities, is provided on the babinet and promotes fixed ring side Side on be also formed with hook fixed ring, the interconnecting piece is connect by connect band with the hook fixed ring, wherein
When the ore dressing ball adding device stores steel ball, interconnecting piece and the hook fixed ring described in the connection band connection, institute It states the second hook to stretch the connect band, the turnover panel is hung on first hook and the second hook, when the ore dressing When ball adding device unloads ball, the connect band is unclamped, first hook and the second hook rotate so that the turnover panel and described the One hook and the second hook are detached from overturning, and steel ball is drawn off from the bottom of box.
8. ore dressing ball adding device as claimed in claim 7, which is characterized in that on the first baffle for linking up with homonymy with described second Setting finite place piece in end is limited when the second hook rotation by the locating part.
CN201810804535.2A 2018-07-20 2018-07-20 Ore dressing ball adding device Pending CN108636530A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810804535.2A CN108636530A (en) 2018-07-20 2018-07-20 Ore dressing ball adding device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810804535.2A CN108636530A (en) 2018-07-20 2018-07-20 Ore dressing ball adding device

Publications (1)

Publication Number Publication Date
CN108636530A true CN108636530A (en) 2018-10-12

Family

ID=63759882

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810804535.2A Pending CN108636530A (en) 2018-07-20 2018-07-20 Ore dressing ball adding device

Country Status (1)

Country Link
CN (1) CN108636530A (en)

Citations (17)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB190422181A (en) * 1904-10-14 1905-08-17 Thomas Drake Hollick Improvements in Automatic Grabs for Filling, Hoisting, Removing, and Discharging Earth, Coal or other Materials.
FR2741330A1 (en) * 1995-11-22 1997-05-23 Dao Alain Bin with tipping mechanism for discharging rubble or gravel
CN201626659U (en) * 2009-12-17 2010-11-10 浙江豪情汽车制造有限公司 Bottom opening type waste tank
CN201753170U (en) * 2010-08-11 2011-03-02 云顶汽车部件股份有限公司 Self-discharging waste material box
CN203108621U (en) * 2013-01-22 2013-08-07 鞍钢集团矿业公司 Crane type milling medium feeder of ball mill
CN103482257A (en) * 2013-09-11 2014-01-01 安庆市华鑫重工有限公司 Metal scrap loading box with automatic discharging function
CN103738605A (en) * 2013-12-13 2014-04-23 山东新矿赵官能源有限责任公司 Full-automatic hydraulic discharging device for mine container and discharging method thereof
CN103909857A (en) * 2012-12-31 2014-07-09 江苏中美华铁塔工业有限公司 Multipurpose self-dumping type material case
CN204184772U (en) * 2014-09-16 2015-03-04 河南博奥建设有限公司 The quick dump box of self-locking type
CN204297397U (en) * 2014-11-06 2015-04-29 重庆至信实业有限公司 A kind of bottom discharge formula ash can
CN204503238U (en) * 2015-04-07 2015-07-29 梅县梅雁旋窑水泥有限公司 Cement ball mill steel ball supplementing structure
CN204606685U (en) * 2015-03-03 2015-09-02 李福全 A kind of from toppling over calcium carbide freight container
CN106395185A (en) * 2016-11-28 2017-02-15 大唐环境产业集团股份有限公司 Discharge box suitable for long-distance cableway transport
CN206064538U (en) * 2016-08-31 2017-04-05 玉溪大红山矿业有限公司 A kind of simple steel ball ball adding suspension bucket of ball mill
CN206886529U (en) * 2017-06-28 2018-01-16 绍兴市上虞区虞南绿色食品有限公司 One kind transport hanging box
CN207536525U (en) * 2017-10-17 2018-06-26 中建八局第一建设有限公司 It is a kind of to struggle against from the waste material outward transport of switch vertical transport formula soil stone
CN208742705U (en) * 2018-07-20 2019-04-16 中冶北方(大连)工程技术有限公司 Ore dressing ball adding device

Patent Citations (17)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB190422181A (en) * 1904-10-14 1905-08-17 Thomas Drake Hollick Improvements in Automatic Grabs for Filling, Hoisting, Removing, and Discharging Earth, Coal or other Materials.
FR2741330A1 (en) * 1995-11-22 1997-05-23 Dao Alain Bin with tipping mechanism for discharging rubble or gravel
CN201626659U (en) * 2009-12-17 2010-11-10 浙江豪情汽车制造有限公司 Bottom opening type waste tank
CN201753170U (en) * 2010-08-11 2011-03-02 云顶汽车部件股份有限公司 Self-discharging waste material box
CN103909857A (en) * 2012-12-31 2014-07-09 江苏中美华铁塔工业有限公司 Multipurpose self-dumping type material case
CN203108621U (en) * 2013-01-22 2013-08-07 鞍钢集团矿业公司 Crane type milling medium feeder of ball mill
CN103482257A (en) * 2013-09-11 2014-01-01 安庆市华鑫重工有限公司 Metal scrap loading box with automatic discharging function
CN103738605A (en) * 2013-12-13 2014-04-23 山东新矿赵官能源有限责任公司 Full-automatic hydraulic discharging device for mine container and discharging method thereof
CN204184772U (en) * 2014-09-16 2015-03-04 河南博奥建设有限公司 The quick dump box of self-locking type
CN204297397U (en) * 2014-11-06 2015-04-29 重庆至信实业有限公司 A kind of bottom discharge formula ash can
CN204606685U (en) * 2015-03-03 2015-09-02 李福全 A kind of from toppling over calcium carbide freight container
CN204503238U (en) * 2015-04-07 2015-07-29 梅县梅雁旋窑水泥有限公司 Cement ball mill steel ball supplementing structure
CN206064538U (en) * 2016-08-31 2017-04-05 玉溪大红山矿业有限公司 A kind of simple steel ball ball adding suspension bucket of ball mill
CN106395185A (en) * 2016-11-28 2017-02-15 大唐环境产业集团股份有限公司 Discharge box suitable for long-distance cableway transport
CN206886529U (en) * 2017-06-28 2018-01-16 绍兴市上虞区虞南绿色食品有限公司 One kind transport hanging box
CN207536525U (en) * 2017-10-17 2018-06-26 中建八局第一建设有限公司 It is a kind of to struggle against from the waste material outward transport of switch vertical transport formula soil stone
CN208742705U (en) * 2018-07-20 2019-04-16 中冶北方(大连)工程技术有限公司 Ore dressing ball adding device

Similar Documents

Publication Publication Date Title
CN208742705U (en) Ore dressing ball adding device
CN108636530A (en) Ore dressing ball adding device
CN206082731U (en) Grinder is used in preparation of industry cement
CN104443906B (en) Container unlocking device, lock structure with same and container
CN105152006B (en) Gravity-controlled opening and closing lifting appliance
CN107052234A (en) The multi-functional feeding device of cast used sand processing
CN207276021U (en) A kind of new steel plate protects component
CN202465026U (en) Hoisting tool for mould basket carburization
CN106334384B (en) A kind of bag-type dust removal system and cloth bag erecting by overhang
CN205973467U (en) A thick barium hopper hoist mechanism that slags tap
CN206580218U (en) A kind of belt collet roll change tools
CN205932944U (en) Copper mould tube stone tongs
CN206735618U (en) A kind of middle plate hanging apparatus
CN202967876U (en) Special lifting tool for profile steel and sectional material
CN207175211U (en) A kind of oil cooler anticreep hoisting fixture
CN208747462U (en) A kind of coal gas storage high-pressure seamless steel cylinder suspender
CN106829223A (en) The collection charging basket of self-dumping
CN206597570U (en) A kind of high reliable ore in sand form pulverising apparatus
CN207243250U (en) A kind of easy-to-dismount crane hook
CN207333293U (en) A kind of device for being suitable for lifting spiral case housing
CN106695526B (en) Production system and its production technology after a kind of demoulding of steel ball
CN215666576U (en) Visual quick adjustment hoist
CN205740135U (en) A kind of chain block
CN205257775U (en) Loader backplate special lifting device device
CN207615613U (en) The riveting rack of bus duct production

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination